Amendment 0005 EXTENDS BID OPENING DATE TO SEPTEMBER 7 2016. BIDS DUE NO LATER THAN 1 00 P.M. MOUNTAIN TIME ON SEPTEMBER 7.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Option_Y_Tabs.pdf | ||
| Schedule_A_Tabs.pdf | ||
| Option_X_Tabs.pdf | ||
| Bid_Opening_Summary_rev.pdf | ||
| Bid_Opening_Summary.pdf | ||
| Amend0004.pdf | ||
| Amend0003.pdf | ||
| Amend0002.pdf | ||
| QA3.pdf | ||
| QA.pdf | ||
| Amend0001.pdf | ||
| Prebid_8_16_16.pdf | ||
| CA_FTNP_GOGA_PRES_1(15)_-_Construction_Plans_-_Advertisement.pdf | ||
| DTFH6816B00024.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
*Failure to acknowledge this amendment in Item 19 of the SF 1442 by designated date and hour specified in the solicitation may result in rejection of your bid (See Item 11).
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
A-1 Amendment 0005 September 2, 2016
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration or Repair)
1. SOLICITATION NO.
DTFH6816B00024
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
8/03/2016
IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
CFL16HFPM245
6. PROJECT NO.
CA FTNP GOGA PRES 1(15)
GOLDEN GATE N.R.A. TUNNEL PRES
7. ISSUED BY:
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS DIVISION
12300 WEST DAKOTA AVENUE
LAKEWOOD, COLORADO 80228
CODE: 69050001 8. ADDRESS OFFER TO:
LORI KIETHERMES, CONTRACT SPECIALIST
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS DIVISION
12300 WEST DAKOTA AVENUE
LAKEWOOD, COLORADO 80228
9. FOR INFORMATION CALL
SEE PAGE A-3
A. NAME:
SEE PAGE A-3
B. TELEPHONE NO. (Include area code)
SEE PAGE A-3
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:
CONSTRUCT CA FTNP GOGA PRES 1(15) PROJECT IN STRICT ACCORDANCE WITH:
1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR)
2. DEPARTMENT OF LABOR, DAVIS BACON MINIMUM WAGE RATES
3. SPECIAL CONTRACT REQUIREMENTS
4. PLANS
5. BID SCHEDULE
6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY
PROJECTS
7. SUBCONTRACTING PLAN (IF APPLICABLE)
See Subsection 104.04 of the FP-03 for governing order of precedence
11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving award notice to proceed. The performance period is mandatory negotiable. *Refer to Subsection 108.01 as amended in the Special Contract Requirements.
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.) YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8. by 2:00 p.m. (hour) local Denver time on 9/02/2016 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is is not required.
C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-102 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53-236-1(e)
9/07/2016
X
X
X
X
X
1:00 p.m.
B I D S C H E D U L E Schedule A Account: ALL
Project No: CA FTNP GOGA PRES 1(15)
Name: GOLDEN GATE N.R.A. TUNNEL PRESERVATION CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
15101-0000 Line A0020 ALL LPSM $
15210-0000 Line A0040 30.000 STA $ $
15301-0010 Line A0060 ALL LPSM $
15401-0000 Line A0080 ALL LPSM $
15501-0000 Line A0100 ALL LPSM $
20301-2400 Line A0120 2 EACH $ $
20302-0300 Line A0140 50 LNFT $ $
20303-1600 Line A0160 2,200 SQYD $ $
20303-2300 Line A0180 110 SQYD $ $
20304-1000 Line A0200 ALL LPSM $
20304-7000 Line A0220 ALL LPSM $
20402-0000 Line A0240 20 CUYD $ $
27001-0000 Line A0260 370 CUYD $ $
27102-0200 Line A0280 54 EACH $ $
27301-0000 Line A0300 8,550 LB $ $
30303-1000 Line A0320 2,200 SQYD $ $
40301-0000 Line A0340 900 TON $ $
41002-2000 Line A0360 1,700 SQYD $ $
41201-1000 Line A0380 3 TON $ $
Schedule Total: ________________________
Submitted by: _________________________
ROADBED RECONDITIONING
HOT ASPHALT CONCRETE PAVEMENT
MICRO-SURFACING, TYPE 2
MOBILIZATION
CENTERLINE, REESTABLISHMENT
CONTRACTOR QUALITY CONTROL AND ASSURANCE
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
REMOVAL OF SIGN
TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H
GROUT (POLYURETHANE VOID FILLING)
GEOTECHNICAL INSTRUMENTATION, CRACK MONITOR
POLYURETHANE RESIN INJECTION (CRACK SEALING)
REMOVAL OF CURB AND GUTTER, CONCRETE
REMOVAL OF PAVEMENT, ASPHALT
REMOVAL OF PAVEMENT, CONCRETE
REMOVAL OF STRUCTURES AND OBSTRUCTIONS (UNDERDRAIN SYSTEM)
REMOVAL OF UTILITY CONDUITS (LIGHTING SYSTEM)
SUBEXCAVATION
A-6 Amendment 0005 September 2, 2016
Lori.Kliethermes Rectangle
Lori.Kliethermes Polygonal Line
Project No: CA FTNP GOGA PRES 1(15)
Name: GOLDEN GATE N.R.A. TUNNEL PRESERVATION CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
41301-0000 Line A0400 5,000 SQYD $ $
50101-0700 Line A0420 110 SQYD $ $
55212-0000 Line A0440 31,500 SQFT $ $
56601-0100 Line A0460 3,500 SQYD $ $
60705-0000 Line A0480 60 EACH $ $
60705-0000 Line A0500 90 EACH $ $
60902-1100 Line A0520 50 LNFT $ $
62201-2360 Line A0540 40 HOUR $ $
62201-3600 Line A0560 40 HOUR $ $
62301-0000 Line A0580 40 HOUR $ $
63301-0000 Line A0600 2 EACH $ $
63313-0000 Line A0620 250 LNFT $ $
63401-0300 Line A0640 2,800 LNFT $ $
63401-0300 Line A0660 15,000 LNFT $ $
63405-0050 Line A0680 50 EACH $ $
63502-0600 Line A0700 10 EACH $ $
63502-0700 Line A0720 80 EACH $ $
63502-1400 Line A0740 100 EACH $ $
63502-2000 Line A0760 3 EACH $ $
TEMPORARY TRAFFIC CONTROL, VERTICAL PANEL
TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
PAVEMENT MARKINGS, SYMBOLS (TYPE B)
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
TEMPORARY TRAFFIC CONTROL, CONE
MANLIFT
GENERAL LABOR
SIGN SYSTEM
CLEAN CONCRETE SURFACE
SHOTCRETE, GRADING A
RECONDITIONING DRAINAGE STRUCTURE (EXISTING WEEP HOLES)
RUMBLE STRIP (TRANSVERSE RAISED, POLYMER)(WHITE)
PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW)
PAVEMENT MARKINGS, TYPE B, SOLID
ASPHALT PAVEMENT MILLING
REINFORCED RIGID PAVEMENT, 8-INCH DEPTH, TYPE A SMOOTHNESS
RECONDITIONING DRAINAGE STRUCTURE (ARCH WEEP HOLES)
CURB AND GUTTER, CONCRETE, 13-INCH DEPTH
VACUUM SWEEPER
A-7 Amendment 0005
Project No: CA FTNP GOGA PRES 1(15)
Name: GOLDEN GATE N.R.A. TUNNEL PRESERVATION CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
Schedule Total: ________________________
Submitted by: _________________________
63504-1000 Line A0780 650 SQFT $ $
63506-0500 Line A0800 400 HOUR $ $
63506-0500 Line A0820 500 HOUR $ $
63510-0100 Line A0840 16 WEEK $ $
63601-2000 Line A0860 ALL LPSM $
63601-3000 Line A0880 ALL LPSM $
63610-0000 Line A0900 12,500 LNFT $ $
63612-0000 Line A0920 197 EACH $ $
SYSTEM INSTALLATION, LIGHTING (CONTROLLER AND CCTV)
SYSTEM INSTALLATION, ELECTRICAL (PANELS, AMPS, TRANSFORMER, PADS)
CONDUIT (CONDUIT, WIRING, JUNCTION BOXES)
LUMINAIRE (ALL TYPES)
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, FLAGGER (WEEKENDS)
TEMPORARY TRAFFIC CONTROL, TRAFFIC AND SAFETY SUPERVISOR
A-8 Amendment 0005
A-9
Option X Project No. : CA FTNP GOGA PRES 1(15)
Project Name : GOLDEN GATE N.R.A. TUNNEL PRESERVATION
Item No. Quantity Unit Unit Price Amount
15101-0000 Line X0020 ALL LPSM $ $
15301-0010 Line X0040 ALL LPSM $ $
15401-0000 Line X0060 ALL LPSM $ $
15501-0000 Line X0080 ALL LPSM $ $
20301-3300 Line X0100 1 EACH $ $
20302-2200 Line X0120 2,600 LNFT $ $
20302-2300 Line X0140 2,700 LNFT $ $
56304-0100 Line X0160 5,130 LNFT $ $
61102-3450 Line X0180 2,500 LNFT $ $
61102-3500 Line X0200 200 LNFT $ $
61104-0200 Line X0220 2 EACH $ $
61107-0000 Line X0240 1 EACH $ $
61202-0700 Line X0260 2,500 LNFT $ $
61202-0800 Line X0280 150 LNFT $ $
61208-0000 Line X0300 1 EACH $ $
62201-2360 Line X0320 40 HOUR $ $
62201-3600 Line X0340 40 HOUR $ $
62301-0000 Line X0360 40 HOUR $ $
8-INCH SEWER LINE, PLASTIC
8-INCH SEWER LINE, DUCTILE IRON
VENT SCRUBBER
VACUUM SWEEPER
MANLIFT
GENERAL LABOR
REMOVAL OF WATERLINE
PAINTING, PIPE
10-INCH WATERLINE, POLYVINYL CHLORIDE (PVC)
10-INCH WATERLINE, DUCTILE IRON
VALVE, AIR RELEASE
WATER METER
MOBILIZATION
CONTRACTOR QUALITY CONTROL AND ASSURANCE
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
REMOVAL OF VAULT
REMOVAL OF SEWERLINE
8/2/2016 Page 1 of 1
Amendment 0005
A-10 Option Y Project No. : CA CA FTNP GOGA PRES 1(15)
Project Name : GOLDEN GATE N.R.A. TUNNEL PRESERVATION
Item No. Quantity Unit Unit Price Amount
15705-1400 Line Y0020 600 LNFT $ $
20103-0000 Line Y0040 220 SQYD $ $
60704-0000 Line Y0060 19 EACH $ $
62201-2360 Line Y0080 40 HOUR $ $
62201-3600 Line Y0100 40 HOUR $ $
62301-0000 Line Y0120 40 HOUR $ $
62511-1000 Line Y0140 550 SQYD $ $
62516-1000 Line Y0160 550 SQYD $ $
63501-0000 Line Y0180 ALL LPSM $ $
SEEDING, DRY METHOD
MULCHING, DRY METHOD
TEMPORARY TRAFFIC CONTROL
SOIL EROSION CONTROL, SEDIMENT LOG
CLEARING AND GRUBBING
CLEANING CULVERT IN PLACE
VACUUM SWEEPER
MANLIFT
GENERAL LABOR
8/2/2016 Page 1 of 1
A-11
CA FTNP GOGA PRES 1(15)
GOLDEN GATE N.R.A. TUNNEL PRESERVATION
# of Calendar Days* (Min: 85 Max: 150)
# of Calendar Days* (Min: 25 Max: 50)
*The number of calendar days used shall include all weekends, holidays, periods of inclement weather, winter shutdown periods, and all other days during which work may or may not be performed.
(total of Part A and Part B above)
Part B
Part B Total (Days * Road User Cost)
Schedule A (A+B Equation)
Part A
Part A Total (Construction Cost)
(A+B) Total for Schedule A=
Schedule A‐ Construction Cost (from bid schedule)=
$6,000
Road User/Administrative Cost $6,000 per day
Part B
Road User/Administrative Cost $6,000 per day Part B Total (Days * Road User Cost)
$6,000
Option X (A+B Equation)
Part A
Part A Total (Construction Cost)
Option X‐ Construction Cost (from bid schedule)=
TOTAL ‐ Schedule A, Option X and Option Y= $
(A+B) Total for Option X= $
(total of Part A and Part B above)
Option Y
Option Y‐ Construction Cost (from bid schedule, no A+B)= $
A-12 Amendment 0005
BUY AMERICAN ACT- CONSTRUCTION MATERIALS
UNDER TRADE AGREEMENTS
It is understood and agreed that the materials and components listed in Subparts 25.1 and 25.2 of the FAR are a part of this contract and are deemed to be Domestic Construction Material for the purposes of this contract.
NOTE TO CONTRACTOR:
The following information and any applicable supporting data is required for evaluation of requests under FAR Clause 52.225-9 Paragraph (c) & (d) and FAR Provision 52.225-10 Paragraph (b).
Material and/or Component
Construction Material Description Unit of Measure Quantity *Cost Delivered to Job Site
Foreign Construction Material
Comparable Domestic Material
Material and/or Component
Construction Material Description Unit of Measure Quantity *Cost Delivered to Job Site
Foreign Construction Material
Comparable Domestic Material
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] [Please include name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include all applicable supporting information.]
A-13 Amendment 0005
HAZARDOUS MATERIALS
As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data - Alternate I, the apparent low bidder must submit prior to award a Material Safety Data Sheet (MSDS) for all hazardous materials that the bidder identifies in paragraph (b) of the FAR clause and defined under the latest version of Federal Standard No. 313.
Hazardous Material Identification Number
USE OF RECOVERED MATERIALS ON FEDERAL LANDS HIGHWAY PROJECTS
Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act (RCRA) of 1976, as amended (42 U.S.C. 6901 et seq.), requires Federal, State, and local procuring agencies using appropriated Federal funds to purchase items composed of the highest percentage of recovered materials practical. Use of recovered materials is strongly encouraged on Federal Lands Highway Projects. Highway construction items covered by the Environmental Protection Agency’s Comprehensive Guidelines for Procurement of Products Containing Recovered Materials include fly ash, ground granulated blast furnace slag, traffic barricades, traffic cones, hydraulic mulch and compost for mulch.
Use of fly ash and ground granulated blast furnace slag and construction materials containing fly ash and ground granulated blast furnace slag on Federal Lands Highway Projects:
It is the policy of the United States Government that fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag shall have maximum practicable opportunity for incorporation into its construction projects.
The Contractor agrees to investigate the use of fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag to the fullest extent consistent with the efficient performance of this contract. Both the contractor and the subcontractors are urged to seek out suppliers of fly ash and ground granulated blast furnace slag, cement and concrete containing fly ash and ground granulated blast furnace slag and to solicit bids for these materials.
Names of firms that supply fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag are available from the American Coal Ash Association and the National Slag Association.
5 AMENDMENT 005 - CHANGED UNIT AND QUANTITY FOR ITEM 27001-000 GROUT (POLYURETHANE
VOID FILLING)
13- INCH DEPTH
COTT5598
Polygon
COTT5598
Polygonal Line
COTT5598
Polygonal Line
COTT5598
Polygon
COTT5598
Polygonal Line
| Full Appendix B.pdf |
| APPENDIX B.pdf |
| subcontractingplan |
| CA FTNP GOGA PRES 1(15) - B9.pdf |
| Untitled |
| Text1: |
| Text2: |
| 0: 1 |
| 1: 12 |
| Text3: |
| 0: A005 |
| 1: 09/02/2016 |
| 2: |
| 0: |
| 1: CA FTNP GOGA PRES 1(15) |
| Text4: |
| 0: |
| 0: FEDERAL HIGHWAY ADMINISTRATION |
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: JEREMIAH ROGERS
1:
| 1: |
| 0: |
| Text6: |
| 0: DTFH6816B00024 |
| 1: 08/03/2016 |
| 2: |
| 3: |
| Check Box7: |
| 0: Yes |
| 2: Off |
| 1: |
| 0: |
| 0: Yes |
| 1: Off |
| 2: Yes |
| Check Box9: |
| 1: Off |
| 2: Off |
| 0: |
| 0: Off |
| 1: Off |
| Text10: 0* |
| Text11: |
| 0: |
| 1: |
| Text12: * See Item 14 Below |
| Text13: INVITATION FOR BID |
Remove and replace Page A-1, SF-1442. Bid opening date changed from September 2 to September 7, 2016, as a result of Amendment 0004.
Remove Pages A-6 through A-12 and replace with Pages A-6 through A-13. Bid Schedule A ONLY; Bid Item 27001-0000 Grout (Polyurethane Void Filling) changed unit of measure and quantity. Subsequent Bid Schedule Pages were included to maintain formatting and pagination.
PLAN SHEETS
Remove and replace Sheets B-1 and B-6. Bid Item 27001-0000 Grout (Polyurethane Void Filling) changed unit of measure and quantity. Also, added conversion of unit of measure from pounds to cubic yards.
| Text14: |
| 0: |
| 1: |
| Text15: |
| 1: |
| 0: |
| 1: |
| 0: |
| 0: |
| 1: |
| Text16: |
| 0: |
| 1: |
| Text17: |
| Text5: |
| 0: 6905001 |
| 1: |
| Check Box1: |
| 0: Yes |
| 1: Off |
File details come from the government source that posted it. Updated .