Bid Opening Summary bids opened at 1 00 p.m. September 7 2016

View the file

Other files

File Type Posted
Option_Y_Tabs.pdf PDF
Schedule_A_Tabs.pdf PDF
Option_X_Tabs.pdf PDF
Bid_Opening_Summary_rev.pdf PDF
Amend0005.pdf PDF
Amend0004.pdf PDF
Amend0003.pdf PDF
Amend0002.pdf PDF
QA3.pdf PDF
QA.pdf PDF
Amend0001.pdf PDF
Prebid_8_16_16.pdf PDF
CA_FTNP_GOGA_PRES_1(15)_-_Construction_Plans_-_Advertisement.pdf PDF
DTFH6816B00024.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N:\Bridge Preservation\PWR\FY14\CA FTNP GOGA PRES 1(14)\acqteam\BidOpen\Bid Opening Summary.doc

Bid Opening Summary (Single Schedule w/ 2 Options)

Project Name: Golden Gate NRA Tunnel Preservation Project Number: CA FTNP GOGA PRES 1(15)

Bid Opening Date: September 7, 2016 Time: 1:00 p.m. (local Denver time)

Bid Opening Location: Lakewood, CO Bid Opening Officer: Lori Kliethermes

Amendments: (1) 08/18/2016 (2) 08/29/2016 (3) 08/29/2016 (4) 09/01/2016 (5) 09/02/2016

Bidder’s Name Schedule A Total [Calendar Days]/

Cost (X $6,000) Schedule A A+B Total

Option X [Calendar Days]/ Cost (X $6,000)

Option X A+B Total

Option Y Overall Project Total

1. Engineering & Construction Innovations, Inc.

Oakdale, CA

A$

$6,120,310.00

150 /$

$900,000.00

$7,020,310.00

X$

$1,212,621.00

50 /$

$300,000.00

$1,512,621.00

Y$

$204,520.00

A$+Options$+Time$

$7,537,451.00

2. Maloney Construction, Inc.

Novato, CA

$5,279,835.00

85 /$

$510,000.00

$5,789,835.00

$1,183,917.00

25 /$

$150,000.00

$1,333,917.00

$195,110.00

$7,318,862.00

3. Shimmick Construction Oakdale, CA

$5,559,810.00

100 /$

$600,000.00

$6,159,810.00

$1,105,400.00

25 /$

$150,000.00

$1,255,400.00

$346,000.00

$7,761,210.00

4. Freyssinet, Inc.

Sterling, VA

$4,006,216.00

150 /$

$900,000.00

$4,900,216.00

$1,022,540.00

50 /$

$300,000.00

$1,322,540.00

$162,230.00

$6,390,986.00

Engineers Estimate

$3,761,539.00

MIN 85 / MAX 150

$1,022,540.00

MIN 25 / MAX 50

$323,425.00

Total A$+X$+Y$

$5,107,504.00

All bids subject to verification

File details come from the government source that posted it. Updated .