Bid_Opening_Summary_rev.pdf
PDF 13 KB Posted
- Solicitation number
- DTFH6816B00024
About this file
Bid Open Summary revised to correct Engineer's Estimate on Option X
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Option_Y_Tabs.pdf | ||
| Schedule_A_Tabs.pdf | ||
| Option_X_Tabs.pdf | ||
| Bid_Opening_Summary.pdf | ||
| Amend0005.pdf | ||
| Amend0004.pdf | ||
| Amend0003.pdf | ||
| Amend0002.pdf | ||
| QA3.pdf | ||
| QA.pdf | ||
| Amend0001.pdf | ||
| Prebid_8_16_16.pdf | ||
| CA_FTNP_GOGA_PRES_1(15)_-_Construction_Plans_-_Advertisement.pdf | ||
| DTFH6816B00024.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N:\Bridge Preservation\PWR\FY14\CA FTNP GOGA PRES 1(14)\acqteam\BidOpen\Bid Opening Summary.doc
Bid Opening Summary (Single Schedule w/ 2 Options)
Project Name: Golden Gate NRA Tunnel Preservation Project Number: CA FTNP GOGA PRES 1(15)
Bid Opening Date: September 7, 2016 Time: 1:00 p.m. (local Denver time)
Bid Opening Location: Lakewood, CO Bid Opening Officer: Lori Kliethermes
Amendments: (1) 08/18/2016 (2) 08/29/2016 (3) 08/29/2016 (4) 09/01/2016 (5) 09/02/2016
Bidder’s Name Schedule A Total [Calendar Days]/
Cost (X $6,000) Schedule A A+B Total
Option X [Calendar Days]/ Cost (X $6,000)
Option X A+B Total
Option Y Overall Project Total
1. Engineering & Construction Innovations, Inc.
Oakdale, CA
A$
$6,120,310.00
150 /$
$900,000.00
$7,020,310.00
X$
$1,212,621.00
50 /$
$300,000.00
$1,512,621.00
Y$
$204,520.00
A$+Options$+Time$
$7,537,451.00
2. Maloney Construction, Inc.
Novato, CA
$5,279,835.00
85 /$
$510,000.00
$5,789,835.00
$1,183,917.00
25 /$
$150,000.00
$1,333,917.00
$195,110.00
$7,318,862.00
3. Shimmick Construction Oakdale, CA
$5,559,810.00
100 /$
$600,000.00
$6,159,810.00
$1,105,400.00
25 /$
$150,000.00
$1,255,400.00
$346,000.00
$7,761,210.00
4. Freyssinet, Inc.
Sterling, VA
$4,006,216.00
150 /$
$900,000.00
$4,900,216.00
$1,022,540.00
50 /$
$300,000.00
$1,322,540.00
$162,230.00
$6,390,986.00
Engineers Estimate
$3,761,539.00
MIN 85 / MAX 150
$1,008,290.00
MIN 25 / MAX 50
$323,425.00
Total A$+X$+Y$
$5,107,504.00
All bids subject to verification