Amend0001.pdf

PDF 1 MB Posted

Attached to
CA FTNP GOGA PRES 1(15) Golden Gate N. R. A. Tunnel Preservation
Solicitation number
DTFH6816B00024
Issued by

About this file

Amendment 1 to the IFB changes percentage of work performance required by Prime Contractor from 50 to 25

View the file

Other files

File Type Posted
Option_Y_Tabs.pdf PDF
Schedule_A_Tabs.pdf PDF
Option_X_Tabs.pdf PDF
Bid_Opening_Summary_rev.pdf PDF
Bid_Opening_Summary.pdf PDF
Amend0005.pdf PDF
Amend0004.pdf PDF
Amend0003.pdf PDF
Amend0002.pdf PDF
QA3.pdf PDF
QA.pdf PDF
Prebid_8_16_16.pdf PDF
CA_FTNP_GOGA_PRES_1(15)_-_Construction_Plans_-_Advertisement.pdf PDF
DTFH6816B00024.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text A-3

Jeremiah.Rogers Typewritten Text

Jeremiah.Rogers Typewritten Text

C-14 Amendment 0001 August 18, 2016

52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)

52.236-1 Performance of Work by the Contractor. (APR 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least fifty (50%) twenty five (25%) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

52.236-2 Differing Site Conditions. (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)

52.236-4 Physical Data. (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by See SF 1442 .

(b) Weather conditions Contact National Weather Service .

(c) Transportation facilities N/A .

(d) See SF 1442 .

52.236-5 Material and Workmanship. (APR 1984)

52.236-6 Superintendence by the Contractor. (APR 1984)

52.236-7 Permits and Responsibilities. (NOV 1991)

52.236-8 Other Contracts. (APR 1984)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.

(APR 1984)

52.236-10 Operations and Storage Areas. (APR 1984)

52.236-11 Use and Possession Prior to Completion. (APR 1984)

52.236-12 Cleaning Up. (APR 1984)

52.236-13 Accident Prevention. (NOV 1991)

Full Appendix B.pdf
APPENDIX B.pdf
subcontractingplan
Text1:
Text2:
0: 1
1: 2
Text3:
0: A001
1: 08/18/2016
2:
0:
1: CA FTNP GOGA PRES 1(15)
Text4:
0:
0: FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 WEST DAKOTA AVENUE, SUITE 360

LAKEWOOD, COLORADO 80228

ATTENTION: JEREMIAH ROGERS

1:

1:
0:
Text6:
0: DTFH6816B00024
1: 08/03/2016
2:
3:
Check Box7:
0: Yes
2: Yes
1:
0:
0: Off
1: Off
2: Yes
Check Box9:
1: Off
2: Off
0:
0: Off
1: Off
Text10: 0*
Text11:
0:
1:
Text12: * See Item 14 Below
Text13: INVITATION FOR BID

Remove and replace Page C-14 of the Invitation for Bid, FAR Clause 52.236-1 Performance of Work by the Contractor changed to twenty five (25%) percent.

*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)

Text14:
0:
1:
Text15:
1:
0:
1:
0:
0:
1:
Text16:
0:
1:
Text17:
Text5:
0: 6905001
1:
Check Box1:
0: Yes
1: Off

File details come from the government source that posted it. Updated .