Amend0001.pdf
PDF 1 MB Posted
- Solicitation number
- DTFH6816B00024
About this file
Amendment 1 to the IFB changes percentage of work performance required by Prime Contractor from 50 to 25
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Option_Y_Tabs.pdf | ||
| Schedule_A_Tabs.pdf | ||
| Option_X_Tabs.pdf | ||
| Bid_Opening_Summary_rev.pdf | ||
| Bid_Opening_Summary.pdf | ||
| Amend0005.pdf | ||
| Amend0004.pdf | ||
| Amend0003.pdf | ||
| Amend0002.pdf | ||
| QA3.pdf | ||
| QA.pdf | ||
| Prebid_8_16_16.pdf | ||
| CA_FTNP_GOGA_PRES_1(15)_-_Construction_Plans_-_Advertisement.pdf | ||
| DTFH6816B00024.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text A-3
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
C-14 Amendment 0001 August 18, 2016
52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)
52.236-1 Performance of Work by the Contractor. (APR 1984)
The Contractor shall perform on the site, and with its own organization, work equivalent to at least fifty (50%) twenty five (25%) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.
52.236-2 Differing Site Conditions. (APR 1984)
52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)
52.236-4 Physical Data. (APR 1984)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by See SF 1442 .
(b) Weather conditions Contact National Weather Service .
(c) Transportation facilities N/A .
(d) See SF 1442 .
52.236-5 Material and Workmanship. (APR 1984)
52.236-6 Superintendence by the Contractor. (APR 1984)
52.236-7 Permits and Responsibilities. (NOV 1991)
52.236-8 Other Contracts. (APR 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.
(APR 1984)
52.236-10 Operations and Storage Areas. (APR 1984)
52.236-11 Use and Possession Prior to Completion. (APR 1984)
52.236-12 Cleaning Up. (APR 1984)
52.236-13 Accident Prevention. (NOV 1991)
| Full Appendix B.pdf |
| APPENDIX B.pdf |
| subcontractingplan |
| Text1: |
| Text2: |
| 0: 1 |
| 1: 2 |
| Text3: |
| 0: A001 |
| 1: 08/18/2016 |
| 2: |
| 0: |
| 1: CA FTNP GOGA PRES 1(15) |
| Text4: |
| 0: |
| 0: FEDERAL HIGHWAY ADMINISTRATION |
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: JEREMIAH ROGERS
1:
| 1: |
| 0: |
| Text6: |
| 0: DTFH6816B00024 |
| 1: 08/03/2016 |
| 2: |
| 3: |
| Check Box7: |
| 0: Yes |
| 2: Yes |
| 1: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Yes |
| Check Box9: |
| 1: Off |
| 2: Off |
| 0: |
| 0: Off |
| 1: Off |
| Text10: 0* |
| Text11: |
| 0: |
| 1: |
| Text12: * See Item 14 Below |
| Text13: INVITATION FOR BID |
Remove and replace Page C-14 of the Invitation for Bid, FAR Clause 52.236-1 Performance of Work by the Contractor changed to twenty five (25%) percent.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
| Text14: |
| 0: |
| 1: |
| Text15: |
| 1: |
| 0: |
| 1: |
| 0: |
| 0: |
| 1: |
| Text16: |
| 0: |
| 1: |
| Text17: |
| Text5: |
| 0: 6905001 |
| 1: |
| Check Box1: |
| 0: Yes |
| 1: Off |
File details come from the government source that posted it. Updated .