C1DZ--621-24-701 EHRM Infrastructure Upgrades Tier 3 Data Center Construction - Mountain Home VAMC
Closed Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest special notice from .
- Solicitation number
- 36C77626B0006
- Agency
-
VA Technology Acquisition Center
Headquarters, Department of Veterans Affairs
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Mountain Home, Tennessee 37684, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Veterans Affairs Technology Acquisition Center is seeking a general contractor to coordinate the relocation and upgrade of the main computer room on Floor 3 of Building 77 at James H. Quillen VA Medical Center in Mountain Home, Tennessee, to comply with VA standards for a Tier 3 data center. The scope of work encompasses providing redundant power distribution, computer room cooling and distribution systems, replacement of aged equipment, grounding and bonding installations, cable management, new fiber and copper cabling, a new clean-agent fire suppression system, and fire-rated wall assemblies with sealed penetrations. Key contract requirements include the contractor furnishing all supervision, labor, materials, and equipment; establishing a comprehensive quality control system with a dedicated Contractor Quality Control System Manager; obtaining VA Personal Identity Verification cards for all personnel; and maintaining compliance with prevailing wage rates, OSHA safety standards, and extensive VA design specifications. The evaluation will be made on a firm-fixed-price basis to the lowest responsive and responsible bidder, with bids due April 16, 2026, at 2:00 PM EDT. Technical questions submitted by prospective bidders have been addressed through multiple amendments and technical question tracking documents, with final answers provided in Amendment 0006 and subsequent amendments issued through April 9, 2026.
This is a 100 percent set-aside for Service-Disabled Veteran-Owned Small Businesses, with only entities certified by the Small Business Administration and listed in the SBA certification database at the time of bid submission and award being eligible for consideration. The estimated contract value ranges between $5,000,000 and $10,000,000, with a Construction Cost Limitation of $6,248,000. The contractor must complete all work within 365 calendar days of receiving the Notice to Proceed, with award anticipated 30-45 days after bid receipt and Notice to Proceed issuance within 90 calendar days thereafter. Work will occur within rooms 3A109, 3A112, 3A112A, 3A112D, 3A113, 3A113A, and 3A212 on Floor 3 of Building 77 at the James H. Quillen VA Medical Center located in Mountain Home, Tennessee 37684. Performance and payment bonds are required, along with a bid guarantee of no less than 20 percent of the bid price but not exceeding $3,000,000, submitted electronically with the bid package.
Notice text
2 versions
Update #2 · Latest ·
**Amendment 0008 - Please see attachments.***
The Mountain Home VAMC is seeking a general contractor to coordinate all design efforts to relocate the main computer room (MCR) on Floor 3 of Building 77 located at James H. Quillen VA Medical Center (JHQVAMC) and make it compliant with VA standards for a Tier 3 data center. The area of work for this project will occur within rooms 3A109 (existing MCR), 3A112, 3A112A, 3A112D, 3A113, 3A113A, and 3A212. Work will include providing redundant power distribution, computer room cooling and distribution, replacement of aged equipment, grounding and bonding, cable management, and new fiber and copper to the new MCR. A new clean-agent system will be provided, as well as a new fire rated assembly within the new MCR, ensuring that all penetrations are sealed appropriately. A new space will be provided in room 3A112A to host cylinder storage for the clean agent system.
Update #1 ·
The Mountain Home VAMC is seeking a general contractor to coordinate all design efforts to relocate the main computer room (MCR) on Floor 3 of Building 77 located at James H. Quillen VA Medical Center (JHQVAMC) and make it compliant with VA standards for a Tier 3 data center. The area of work for this project will occur within rooms 3A109 (existing MCR), 3A112, 3A112A, 3A112D, 3A113, 3A113A, and 3A212. Work will include providing redundant power distribution, computer room cooling and distribution, replacement of aged equipment, grounding and bonding, cable management, and new fiber and copper to the new MCR. A new clean-agent system will be provided, as well as a new fire rated assembly within the new MCR, ensuring that all penetrations are sealed appropriately. A new space will be provided in room 3A112A to host cylinder storage for the clean agent system.
Files
Show all 35
Notice history
| Notice | Type | Posted |
|---|---|---|
| C1DZ--621-24-701 EHRM Infrastructure Upgrades Tier 3 Data Center Construction - Mountain Home VAMC | Award Notice | |
| C1DZ--621-24-701 EHRM Infrastructure Upgrades Tier 3 Data Center Construction - Mountain Home VAMC | Special Notice | |
| This notice | Solicitation | |
| C1DZ--621-24-701 EHRM Infrastructure Upgrades Tier 3 Data Center Construction - Mountain Home VAMC | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Z2DA--FY26 NRM - 626-25-101 - Upgrade Critical Environments I | Veterans Integrated Service Network 9 | Service-Disabled Veteran-Owned Small Business | |
| Z2DA--FY27 EHRM | 657-21-702JC EHRM Training And Administrative Space Construction - St Louis John Cochran | VA Technology Acquisition Center | Service-Disabled Veteran-Owned Small Business | |
| Z1DA--Design Building (DB) 626-27-504 MHEOCC Compliance TVHS VAMC (Nashville Campus) | Veterans Integrated Service Network 9 | Service-Disabled Veteran-Owned Small Business | |
| Y1DA--Construction | 619-21-106 | EHRM Infrastructure Upgrades - Montgomery (VA-27-00002289) | VA Technology Acquisition Center | Service-Disabled Veteran-Owned Small Business | |
| 763-25-700 EHRM Infrastructure Upgrades Construction Dallas CMOP, TX | VA Technology Acquisition Center | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity