This is an electrical load estimation document for a VA infrastructure upgrade project. The submittal provides detailed power consumption calculations for the EHRM Infrastructure Upgrades - Tier 3 facility located in Mountain Home, Tennessee (VA Project Number 621-24-701).

The server room electrical load analysis indicates a total estimated UPS load of 72,249 watts (72.249 kW), with a recommended UPS size of 90 kW at 85% design capacity. Primary equipment loads include 19 server cabinets (41,895 W demand load at 63% demand factor), 6 MDA network cabinets (13,230 W), 4 HDA network cabinets (7,056 W), and miscellaneous telecom equipment (3,500 W), with a 10% future growth allowance of 6,568.1 watts incorporated into the total. The NEC demand load calculation for the server room MCR totals 158 kW, comprising receptacle/plug loads (3,060 VA across 17 outlets), lighting (893 VA across 21 fixtures), miscellaneous loads (5,000 VA), and HVAC (76,800 VA). The total estimated MCR load is 439 amperes, calculated for a 208V, 3-phase distribution system. Demand factors used in calculations were deduced from Spur Design historical and metering data, with most IT equipment calculated at a 63% demand factor and HVAC, miscellaneous, and telecom equipment estimated at 100% demand.

View the file

Other files

File Type Posted
36C77626B0006 0008.pdf PDF
Bid opening 4.16.2026 - 2pm.pdf PDF
Tech Questions Tracker - MT Home Combined - 4-9-26.pdf PDF
260408_Addendum 04.pdf PDF
36C77626B0006 0007.pdf PDF
36C77626B0006 0006.pdf PDF
Tech Questions Tracker - MT Home Combined - 3-25-26.pdf PDF
Addendum 03.pdf PDF
0005 - Architectural Narrative - 621-24-701.pdf PDF
0005 - Telecommunications Narrative - 621-24-701.pdf PDF
0005 - Electrical Narrative - 621-24-701.pdf PDF
0005 - HVAC Narrative - 621-24-701.pdf PDF
36C77626B0006 0005.pdf PDF
0005 - Fire Protection Narrative - 621-24-701.pdf PDF
0005 - Structural Narrative - 621-24-701.pdf PDF
Tech Questions Tracker - MT Home Combined - 3-24-26.pdf PDF
0005 - Environmental Narrative - 621-24-701.pdf PDF
Tech Questions Tracker - MT Home Combined - 3-16-26.pdf PDF
36C77626B0006 0004.pdf PDF
Addendum 02.pdf PDF
36C77626B0006 0003.pdf PDF
36C77626B0006 0002.pdf PDF
Site Visit Sign-In Sheet - 2-12-2026.pdf PDF
36C77626B0006 0001.pdf PDF
36C77626B0006_1 - 1-29-2026 - FINAL.pdf PDF
Attachment 1 - V1_621-24-701_Specifications.pdf PDF
Attachment 8 - Site Visit Instructions - 2-12-2026.pdf PDF
Attachment 9 - Limitations on Subcontracting - Construction.pdf PDF
Attachment 6 - Pre- Construction Risk Assessment.pdf PDF
Attachment 7 - Washington Co Bldg Construction Wage Determinations 1.2.2026.pdf PDF
Attachment 2 - V2_621-24-701_Specifications.pdf PDF
Attachment 4 - Addendum 01 to Specs - 621-24-701 - 12-22-25.pdf PDF
Attachment 5 - Statement of Work - 621-24-701 EHRM - Tier 3 DC - Mtn Home.docx DOCX document
Attachment 3 - CONSTRUCTION DRAWINGS-COMBINED EHRM 621-24-701.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA PROJECT NUMBER

PROJECT NAME

621-24-701 (2409) EHRM Infrastructure Upgrades - Tier 3 Mountain Home, TN

SUBMITTAL Final Bid Documents SUBJECT Server & TR – Electrical load estimation

Electrical 1

Server Room

Devices/Equipment Quantity Average Estimated Load (W) **Demand Factors Estimated

Demand Load (W)

Modem/Demarc 0 500 100% 0 Server Cabinets 19 3500* 63% 41895 HDA Network Cabinets 4 2800* 63% 7056 MDA Network Cabinets 6 3500* 63% 13230 Misc. Telecom Equip -- 3500 100% 3500 *kW heat load for Generic Small Data MCR as electrical Loads.

**Demand Factors deduced from Spur Design Historical and Metering Data.

Sub total (W) 65681

10% future Growth (W) 6568.1

Total Estimated UPS Load (W) 72249

Total Estimated UPS Size (@85% Design Capacity) 90 kW

Server Room NEC Demand Load (VA)

Load Type Quantity VA Table 220.44 Table 220.42

Receptacle/Plug 17 180 3060 -- Lighting 21 34 -- 893 Miscellaneous1 -- 5,000 5000 --

HVAC1 1 76,800 76800 --

1 Indicate loads estimated at 100% Demand

Total Estimated MCR Load (kVA) 158 kW Total Estimated MCR Load* (A) 439 A

*Estimated for a 208V, 3-phase distribution system

END DIVISION 26

END division 26