AFICA AFCEC BECSRC Western Solicitation
Awarded Award Notice Posted
- Solicitation number
- FA8903-15-R-0023
- Agency
- Air Force Installation Contracting Agency Air Force Installation and Mission Support Center, Department of Defense
- Awarded
- to Noreas-Aptim JV
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- FA890316D0059 Federal IDV award
- NAICS code
- 562910 Remediation Services
- PSC
- Not on record
- Place of performance
- Multiple Brac Bases (EPA regions 9 & 10 Western), United States
Notice details come from SAM.gov. Updated .
Notice text
14 versions
Update #14 · Latest ·
Added: Nov 05, 2015 4:49 pm
Section L has been revised to include a Rough Order of Magnitude for the Sample Task Order in Section 5.1.2, and to include changes in Table 2.2, corresponding paragraph 2.2.2, and Sections 3.8 and 5.1.
Update #13 ·
Added: Oct 28, 2015 8:23 pm
Proposal due date for BECSRC Western has been extended to 4:00 PM Central Standard Time on Thursday, 19 November 2015.
Revised Sections L and M are attached.
Eastern and Central BECSRCs are anticipated to post in November/December 2015.
Update #12 ·
Added: Sep 23, 2015 2:30 pm Revised Section L is attached.
Update #11 ·
Added: Sep 21, 2015 4:32 pm
Based on industry input, the BECSRC Western, Eastern, and Central solicitations have been revised to delete the Pricing Matrices from the solicitations. The Air Force has therefore determined the need for a pre-solicitation conference is no longer valid.
THIS IS A FINAL SOLICITATION AS OF 21 SEPTEMBER 2015
The due date for QUESTIONS on BECSRC Western is 4:00 pm central, Monday, 28 Sep 2015.
PROPOSAL due date for BECSRC Western is 4:00 pm central Thursday, Nov 5, 2015.
Eastern and Central BECSRCs will be posted Monday, 12 Oct 2015 and Monday, 2 Nov 2015, respectively.
Revised documents are attached.
Update #10 ·
Added: Jun 30, 2015 3:20 pm
Solicitation is hereby suspended until further notice. The Air Force is making changes to documents based on industry input. Also, the Air Force plans on hosting a pre-solicitation conference with potential offerors. Details will be posted on FBO late July 2015.
***********************************
Update #9 ·
Added: Jan 26, 2015 4:54 pm Modified: Jun 10, 2015 5:24 pmTrack Changes
Solicitation Numbers: Notice Type: Solicitation
FA8903-15-R-0023
FA8903-15-R-0024
FA8903-15-R-0034
Synopsis:
KEYWORD: AFCEC_BECSRC
THIS IS A FINAL SOLICITATION.
1. This Final Solicitation notice is being posted for the purpose of obtaining proposals. There is no entitlement to payment by the Government of direct or indirect costs or charges that arise as a result of the submission of a proposal in response to this notice. The Government shall not be liable for or suffer any consequential damages for any improperly identified proprietary information. Proprietary information will be safeguarded in accordance with applicable Government regulations.
2. This requirement is to provide a full range of responsive environmental remediation actions necessary to protect human health & the environment. It includes rapid response and removal of environmental media contaminations and site restoration activities located on Base Realignment and Closure Bases (BRAC) in EPA regions 1-4 (Eastern), 5-8 (Central), and 9&10 (Western). The BRAC Environmental Construction and Services Requirements Contract (BECSRC) will include a 5 year ordering period with 24 additional months for performance completion of services.
3. The purpose of soliciting and awarding this Requirements Contract is to have a tool in place for "pop-up" interim Environmental Remediation requirements. "Pop-ups" are unplanned, out-of-cycle requirements that occur periodically, but erratically on installations included in the BRAC Program Management Division portfolio. The BRAC Program Management Division, responsible for remediation and transfer of Air Force property affected by BRAC legislation, manages the disposal of Air Force property in accordance with BRAC law and the BRAC Master Plan to achieve early environmental resolution and early property disposal to return value to the Air Force and local communities. Requirements contracts are set up with one contractor to provide service (FAR 16.503). Generally speaking, an IDIQ obligates the Government to a minimum quantity/dollar amount at the time of award, while a Requirements Contract guarantees the contractor no such minimum.
4. The contracting officer will conduct this source selection in accordance with the procedures indicated in Section M of the Solicitation. While the Government source selection evaluation team and the SSA will strive for maximum objectivity, the source selection process by its nature is subjective; and therefore, professional judgment is implicit throughout the entire process. The contracting officer shall notify Offerors promptly in writing when their proposals are excluded from the competitive range or otherwise eliminated from the competition. Evaluation Notices (ENs) will be sent to Offerors within the competitive range as needed.
5. All questions/comments pertaining to the Solicitation shall be provided to the Government within two weeks of Final Solicitation release. Questions concerning the Solicitation and attachments are due by 12:00 PM CT on June 12, 2015 to: rita.leal@us.af.mil and richard.compton.4@us.af.mil.
Any communications with the Government from the date of this solicitation through contract award shall be directed in writing to the Procuring Contracting Officer (PCO), Ms. Dianna Saenz (dianna.saenz@us.af.mil) and to Contract Specialists, Ms. Rita Leal at rita.leal@us.af.mil, and Mr. Richard Compton III at richard.compton.4@us.af.mil.
MISCELLANEOUS:
The Key Milestone Dates for all three BECSRC Solicitations are as follows:
Est. Milestone Dates
Solicitation Release (all three): 28 May 2015
Questions Due (for all three): 12 Jun 2015
BECSRC West Proposals Due: 13 Jul 2015
BECSRC Eastern Proposals Due: 03 Aug 2015
BECSRC Central Proposals Due: 24 Aug 2015
ATTACHMENTS:
1. SOLICITATION, dated 28 May 2015
2. Attachments L&M
3. Statement of Work (SOW)
4. CDRLs (Exhibits A, B and C)
5. BECSRC Pricing Matrix including FFP Labor Categories/Rates
6. Sample Task Order (TO) SOW
7. Sample TO CDRL Exhibit A
8. Sample TO CDRL Exhibit B
Added: Jun 09, 2015 5:39 pm
Modified: Jun 10, 2015 5:24 pmTrack Changes
***********************************
Please note the date for submission of questions and comments in Paragraph 2.1.1. of Section L of the BECSRC Western Solicitation is incorrect. All questions and comments are due in this office as indicated above, by 2:00 pm central on 11 Jun 2015.
***********************************
Please note the date for submission of questions is extended to 12:00 pm central on Friday, 12 Jun 2015.
***********************************
Update #8 ·
Added: Jun 09, 2015 5:39 pm
***********************************
Please note the date for submission of questions and comments in Paragraph 2.1.1. of Section L of the BECSRC Western Solicitation is incorrect. All questions and comments are due in this office as indicated above, by 2:00 pm central on 11 Jun 2015.
***********************************
Update #7 ·
Added: Jan 26, 2015 4:54 pm Modified: Jun 09, 2015 1:17 pmTrack Changes
Solicitation Numbers: Notice Type: Solicitation
FA8903-15-R-0023
FA8903-15-R-0024
FA8903-15-R-0034
Synopsis:
KEYWORD: AFCEC_BECSRC
THIS IS A FINAL SOLICITATION.
1. This Final Solicitation notice is being posted for the purpose of obtaining proposals. There is no entitlement to payment by the Government of direct or indirect costs or charges that arise as a result of the submission of a proposal in response to this notice. The Government shall not be liable for or suffer any consequential damages for any improperly identified proprietary information. Proprietary information will be safeguarded in accordance with applicable Government regulations.
2. This requirement is to provide a full range of responsive environmental remediation actions necessary to protect human health & the environment. It includes rapid response and removal of environmental media contaminations and site restoration activities located on Base Realignment and Closure Bases (BRAC) in EPA regions 1-4 (Eastern), 5-8 (Central), and 9&10 (Western). The BRAC Environmental Construction and Services Requirements Contract (BECSRC) will include a 5 year ordering period with 24 additional months for performance completion of services.
3. The purpose of soliciting and awarding this Requirements Contract is to have a tool in place for "pop-up" interim Environmental Remediation requirements. "Pop-ups" are unplanned, out-of-cycle requirements that occur periodically, but erratically on installations included in the BRAC Program Management Division portfolio. The BRAC Program Management Division, responsible for remediation and transfer of Air Force property affected by BRAC legislation, manages the disposal of Air Force property in accordance with BRAC law and the BRAC Master Plan to achieve early environmental resolution and early property disposal to return value to the Air Force and local communities. Requirements contracts are set up with one contractor to provide service (FAR 16.503). Generally speaking, an IDIQ obligates the Government to a minimum quantity/dollar amount at the time of award, while a Requirements Contract guarantees the contractor no such minimum.
4. The contracting officer will conduct this source selection in accordance with the procedures indicated in Section M of the Solicitation. While the Government source selection evaluation team and the SSA will strive for maximum objectivity, the source selection process by its nature is subjective; and therefore, professional judgment is implicit throughout the entire process. The contracting officer shall notify Offerors promptly in writing when their proposals are excluded from the competitive range or otherwise eliminated from the competition. Evaluation Notices (ENs) will be sent to Offerors within the competitive range as needed.
5. All questions/comments pertaining to the Solicitation shall be provided to the Government within two weeks of Final Solicitation release. Questions concerning the Solicitation and attachments are due by 2:00 PM CT on June 11, 2015 to: rita.leal@us.af.mil and richard.compton.4@us.af.mil.
Any communications with the Government from the date of this solicitation through contract award shall be directed in writing to the Procuring Contracting Officer (PCO), Ms. Dianna Saenz (dianna.saenz@us.af.mil) and to Contract Specialists, Ms. Rita Leal at rita.leal@us.af.mil, and Mr. Richard Compton III at richard.compton.4@us.af.mil.
MISCELLANEOUS:
The Key Milestone Dates for all three BECSRC Solicitations are as follows:
Est. Milestone Dates
Solicitation Release (all three): 28 May 2015
Questions Due (for all three): 11 Jun 2015
BECSRC West Proposals Due: 13 Jul 2015
BECSRC Eastern Proposals Due: 03 Aug 2015
BECSRC Central Proposals Due: 24 Aug 2015
ATTACHMENTS:
1. SOLICITATION, dated 28 May 2015
2. Attachments L&M
3. Statement of Work (SOW)
4. CDRLs (Exhibits A, B and C)
5. BECSRC Pricing Matrix including FFP Labor Categories/Rates
6. Sample Task Order (TO) SOW
7. Sample TO CDRL Exhibit A
8. Sample TO CDRL Exhibit B
Added: Jun 02, 2015 5:33 pm
Modified: Jun 09, 2015 1:17 pmTrack Changes
***********************************
Please note the proposal due date in Block 9 of the BECSRC Western SF33 is incorrect. The correct BECSRC Western proposal due date is 13 Jul 2015 as indicated in the synopsis and in Section L of this solicitation.
***********************************
Please note the Procuring Contracting Officer for the BECSRC Western Solicitation has been changed to Dianna Saenz, dianna.saenz@us.af.mil, effective immediately.
***********************************
Update #6 ·
Added: Jun 02, 2015 5:33 pm
***********************************
Please note the proposal due date in Block 9 of the BECSRC Western SF33 is incorrect. The correct BECSRC Western proposal due date is 13 Jul 2015 as indicated in the synopsis and in Section L of this solicitation.
***********************************
Update #5 ·
Added: Jan 26, 2015 4:54 pm Modified: May 28, 2015 5:19 pmTrack Changes
Solicitation Numbers: Notice Type: Solicitation
FA8903-15-R-0023
FA8903-15-R-0024
FA8903-15-R-0034
Synopsis:
KEYWORD: AFCEC_BECSRC
THIS IS A FINAL SOLICITATION.
1. This Final Solicitation notice is being posted for the purpose of obtaining proposals. There is no entitlement to payment by the Government of direct or indirect costs or charges that arise as a result of the submission of a proposal in response to this notice. The Government shall not be liable for or suffer any consequential damages for any improperly identified proprietary information. Proprietary information will be safeguarded in accordance with applicable Government regulations.
2. This requirement is to provide a full range of responsive environmental remediation actions necessary to protect human health & the environment. It includes rapid response and removal of environmental media contaminations and site restoration activities located on Base Realignment and Closure Bases (BRAC) in EPA regions 1-4 (Eastern), 5-8 (Central), and 9&10 (Western). The BRAC Environmental Construction and Services Requirements Contract (BECSRC) will include a 5 year ordering period with 24 additional months for performance completion of services.
3. The purpose of soliciting and awarding this Requirements Contract is to have a tool in place for "pop-up" interim Environmental Remediation requirements. "Pop-ups" are unplanned, out-of-cycle requirements that occur periodically, but erratically on installations included in the BRAC Program Management Division portfolio. The BRAC Program Management Division, responsible for remediation and transfer of Air Force property affected by BRAC legislation, manages the disposal of Air Force property in accordance with BRAC law and the BRAC Master Plan to achieve early environmental resolution and early property disposal to return value to the Air Force and local communities. Requirements contracts are set up with one contractor to provide service (FAR 16.503). Generally speaking, an IDIQ obligates the Government to a minimum quantity/dollar amount at the time of award, while a Requirements Contract guarantees the contractor no such minimum.
4. The contracting officer will conduct this source selection in accordance with the procedures indicated in Section M of the Solicitation. While the Government source selection evaluation team and the SSA will strive for maximum objectivity, the source selection process by its nature is subjective; and therefore, professional judgment is implicit throughout the entire process. The contracting officer shall notify Offerors promptly in writing when their proposals are excluded from the competitive range or otherwise eliminated from the competition. Evaluation Notices (ENs) will be sent to Offerors within the competitive range as needed.
5. All questions/comments pertaining to the Solicitation shall be provided to the Government within two weeks of Final Solicitation release. Questions concerning the Solicitation and attachments are due by 2:00 PM CT on June 11, 2015 to: rita.leal@us.af.mil and richard.compton.4@us.af.mil.
Any communications with the Government from the date of this solicitation through contract award shall be directed in writing to the Procuring Contracting Officer (PCO), Mr. Jonathan Swall (Jonathan.Swall.1@us.af.mil) and to Contract Specialists, Ms. Rita Leal at rita.leal@us.af.mil, and Mr. Richard Compton III at richard.compton.4@us.af.mil.
MISCELLANEOUS:
The Key Milestone Dates for all three BECSRC Solicitations are as follows:
Est. Milestone Dates
Solicitation Release (all three): 28 May 2015
Questions Due (for all three): 11 Jun 2015
BECSRC West Proposals Due: 13 Jul 2015
BECSRC Eastern Proposals Due: 03 Aug 2015
BECSRC Central Proposals Due: 24 Aug 2015
ATTACHMENTS:
1. SOLICITATION, dated 28 May 2015
2. Attachments L&M
3. Statement of Work (SOW)
4. CDRLs (Exhibits A, B and C)
5. BECSRC Pricing Matrix including FFP Labor Categories/Rates
6. Sample Task Order (TO) SOW
7. Sample TO CDRL Exhibit A
8. Sample TO CDRL Exhibit B
Update #4 ·
Added: Jan 26, 2015 4:54 pm Modified: Apr 06, 2015 4:26 pmTrack Changes
This synopsis amendment to FA8903-15-R-0023 removes the 2 step, phased approach to proposal submission. This program will now require ALL PROPOSAL DOCUMENTATION to include pricing be submitted by the proposal cutoff date. The revised RFP is expected to be released within the next 30 days.
FOR PLANNING PURPOSES ONLY
1. As identified in the initial synopsis this requirement is to provide a full range of responsive environmental remediation actions necessary to protect human health & the environment. It includes rapid response and removal of environmental media contaminations and site restoration activities located on Base Realignment and Closure Bases (BRAC) in EPA regions 9 & 10 (Western). The BRAC Environmental Construction and Services Requirements Contract (BECSRC) is being contemplated to include a 5 year ordering period with 24 additional months for performance completion of services.
2. The purpose of soliciting and awarding this Requirements Contract is to have a tool in place for "pop-up" interim Environmental Remediation requirements. "Pop-ups" are unplanned, out-of-cycle requirements that occur periodically, but erratically on installations included in the BRAC Program Management Division portfolio. The BRAC Program Management Division, responsible for remediation and transfer of Air Force property affected by BRAC legislation, manages the disposal of Air Force property in accordance with BRAC law and the BRAC Master Plan to achieve early environmental resolution and early property disposal to return value to the Air Force and local communities. Requirements contracts are set up with one contractor to provide service (FAR 16.503). Generally speaking, an IDIQ obligates the Government to a minimum quantity/dollar amount at the time award, while a Requirements Contract guarantees the contractor no such minimum.
3. IAW DoD SS procedures and FAR part 15 offerors will be promptly notified in writing if their proposals are excluded from the competitive range or otherwise eliminated from the competition.
CLIN STRUCTURE:
0001 Environmental Services (FFP)
0003 Environmental Remediation (FFP)
0002 Environmental Services (CPFF)
0004 Environmental Remediation (CPFF)
0005 Data NSP (FFP)
0006 Data NSP (CPFF)
0007 Travel (CPFF)
4. Request for Questions: The Government anticipates a final solicitation to be released within 30 days; however, this is subject to change. This notification is provided to allow early review of DRAFT solicitation documentation for this requirement. Please submit any questions/comments to: Mr. Richard Compton at richard.compton.4@us.af.mil.
Any communications with the Government from the date of this synopsis through contract award shall be directed in writing to the Procuring Contracting Officer (PCO), Mr. Jonathan Swall (jonathan.swall.1@us.af.mil) and Contract Specialist, Mr. Richard Compton at richard.compton.4@us.af.mil
Update #3 ·
Added: Jan 26, 2015 4:54 pm
Modified: Feb 18, 2015 11:27 amTrack Changes
This amendment to FA8903-15-R-0023 is a pre-solicitation notice (synopsis in accordance with FAR 5.201). The contracting officer anticipates releasing the final solicitation in approximately 15 to 30 days.
FOR PLANNING PURPOSES ONLY, THIS IS A REQUEST FOR SUBMISSION OF QUESTIONS CONCERNING DRAFT SOLICITATION. THIS REQUEST IS NOT A FINAL SOLICITATION. PLEASE DO NOT SUBMIT A PROPOSAL.
1. This pre-solicitation notice is being posted for the purpose of obtaining industry feedback concerning the attached DRAFT Solicitation. Response to the request for questions is strictly voluntary and will not affect any firm's ability to submit an offer if, or when, a Final Solicitation is released. However, we highly encourage you to reply. The request is for final planning purposes only and does not constitute a commitment, implied or otherwise, that a procurement action will be issued. There is no entitlement to payment by the Government of direct or indirect costs or charges that arise as a result of the submission of information in response to this notice. The Government shall not be liable for or suffer any consequential damages for any improperly identified proprietary information. Proprietary information will be safeguarded in accordance with the applicable Government regulations.
2. This requirement is to provide a full range of responsive environmental remediation actions necessary to protect human health & the environment. It includes rapid response and removal of environmental media contaminations and site restoration activities located on Base Realignment and Closure Bases (BRAC) in EPA regions 9 & 10 (Western). The BRAC Environmental Construction and Services Requirements Contract (BECSRC) is being contemplated to include a 5 year ordering period with 24 additional months for performance completion of services.
3. The purpose of soliciting and awarding this Requirements Contract is to have a tool in place for "pop-up" interim Environmental Remediation requirements. "Pop-ups" are unplanned, out-of-cycle requirements that occur periodically, but erratically on installations included in the BRAC Program Management Division portfolio. The BRAC Program Management Division, responsible for remediation and transfer of Air Force property affected by BRAC legislation, manages the disposal of Air Force property in accordance with BRAC law and the BRAC Master Plan to achieve early environmental resolution and early property disposal to return value to the Air Force and local communities. Requirements contracts are set up with one contractor to provide service (FAR 16.503). Generally speaking, an IDIQ obligates the Government to a minimum quantity/dollar amount at the time award, while a Requirements Contract guarantees the contractor no such minimum.
4. The contracting officer will conduct this source selection using a phased evaluation process which is sometimes referred to as a "down-select." To make the process more efficient, the contracting officer is limiting the amount of information that offerors must submit initially. The contracting officer shall notify offerors promptly in writing when their proposals are excluded from the competitive range or otherwise eliminated from the competition after which Evaluation Notices (ENs) will be sent to offerors within the competitive range as needed. Those offerors considered by the Contracting Officer to be within the competitive range will be asked to submit the Volume III (Pricing) and Volume IV (Sample Task Order) in Phase II of this source selection.
5. All questions/comments pertaining to the DRAFT RFP shall be provided to the Government for consideration in the provided matrix Excel spreadsheet. The spreadsheet has a field for Section/Attachment Number, Applicable Region, Page # / Paragraph Reference and Question/Comment. Please ensure that both sheets and fields are completed in their entirety.
The Government is specifically requesting industry input on the adequacy and feasibility of the BECSRC Western Pricing Matrix which includes tabs for Deliverables, Unit Pricing, and Labor Rates.
6. Request for Questions: The Government anticipates a final solicitation to be released 12 Feb 2015; however, this is subject to change depending on the amount of questions we receive. This notification is provided to allow early review of DRAFT solicitation documentation for this requirement. Questions concerning the DRAFT Request for Proposal (RFP) and attachments are due by 4:00 PM CT on 6 Feb 2015 to: Mr. Richard Compton at richard.compton.4@us.af.mil.
Any communications with the Government from the date of this solicitation through contract award shall be directed in writing to the Procuring Contracting Officer (PCO), Mr. Jonathan Swall (jonathan.swall.1@us.af.mil) and Contract Specialist, Mr. Richard Compton at richard.compton.4@us.af.mil.
MISCELLANEOUS:
The Key Estimated Milestones Dates for BECSRC Western have been established (Schedule information is subject to change without notice). Please see schedule below:
Milestones Dates
Draft RFP: 26 Jan 2015
Questions Comments due: 6 Feb 2015
RFP Release: 12 Feb 2015
Financial Statements and Attachment L-3: 27 Feb 2015
Phase I Proposals Due: 30 Mar 2015
Phase II Proposals Due: 7 May 2015
ATTACHMENTS:
1. DRAFT SOLICITATION, dated 23 Jan 2015
2. Questions/Comments Matrix Excel Spreadsheet
3. DRAFT Attachment L
4. DRAFT Attachment M
4. DRAFT Attachment L-1 Statement of Work
5. DRAFT Attachment L-2 BECSRC Pricing Matrix
6. DRAFT Attachment L-2c FFP Labor Categories and Labor Rate Table
7. DRAFT Attachment L-2c CPFF Labor Categories and Labor Rate Table
8. Frequently Asked Questions
Update #2 ·
Added: Jan 26, 2015 4:54 pm
Modified: Jan 29, 2015 4:22 pmTrack Changes
FOR PLANNING PURPOSES ONLY, THIS IS A REQUEST FOR SUBMISSION OF QUESTIONS CONCERNING DRAFT SOLICITATION. THIS REQUEST IS NOT A FINAL SOLICITATION. PLEASE DO NOT SUBMIT A PROPOSAL.
1. This pre-solicitation notice is being posted for the purpose of obtaining industry feedback concerning the attached DRAFT Solicitation. Response to the request for questions is strictly voluntary and will not affect any firm's ability to submit an offer if, or when, a Final Solicitation is released. However, we highly encourage you to reply. The request is for final planning purposes only and does not constitute a commitment, implied or otherwise, that a procurement action will be issued. There is no entitlement to payment by the Government of direct or indirect costs or charges that arise as a result of the submission of information in response to this notice. The Government shall not be liable for or suffer any consequential damages for any improperly identified proprietary information. Proprietary information will be safeguarded in accordance with the applicable Government regulations.
2. This requirement is to provide a full range of responsive environmental remediation actions necessary to protect human health & the environment. It includes rapid response and removal of environmental media contaminations and site restoration activities located on Base Realignment and Closure Bases (BRAC) in EPA regions 9 & 10 (Western). The BRAC Environmental Construction and Services Requirements Contract (BECSRC) is being contemplated to include a 5 year ordering period with 24 additional months for performance completion of services.
3. The purpose of soliciting and awarding this Requirements Contract is to have a tool in place for "pop-up" interim Environmental Remediation requirements. "Pop-ups" are unplanned, out-of-cycle requirements that occur periodically, but erratically on installations included in the BRAC Program Management Division portfolio. The BRAC Program Management Division, responsible for remediation and transfer of Air Force property affected by BRAC legislation, manages the disposal of Air Force property in accordance with BRAC law and the BRAC Master Plan to achieve early environmental resolution and early property disposal to return value to the Air Force and local communities. Requirements contracts are set up with one contractor to provide service (FAR 16.503). Generally speaking, an IDIQ obligates the Government to a minimum quantity/dollar amount at the time award, while a Requirements Contract guarantees the contractor no such minimum.
4. The contracting officer will conduct this source selection using a phased evaluation process which is sometimes referred to as a "down-select." To make the process more efficient, the contracting officer is limiting the amount of information that offerors must submit initially. The contracting officer shall notify offerors promptly in writing when their proposals are excluded from the competitive range or otherwise eliminated from the competition after which Evaluation Notices (ENs) will be sent to offerors within the competitive range as needed. Those offerors considered by the Contracting Officer to be within the competitive range will be asked to submit the Volume III (Pricing) and Volume IV (Sample Task Order) in Phase II of this source selection.
5. All questions/comments pertaining to the DRAFT RFP shall be provided to the Government for consideration in the provided matrix Excel spreadsheet. The spreadsheet has a field for Section/Attachment Number, Applicable Region, Page # / Paragraph Reference and Question/Comment. Please ensure that both sheets and fields are completed in their entirety.
The Government is specifically requesting industry input on the adequacy and feasibility of the BECSRC Western Pricing Matrix which includes tabs for Deliverables, Unit Pricing, and Labor Rates.
6. Request for Questions: The Government anticipates a final solicitation to be released 12 Feb 2015; however, this is subject to change depending on the amount of questions we receive. This notification is provided to allow early review of DRAFT solicitation documentation for this requirement. Questions concerning the DRAFT Request for Proposal (RFP) and attachments are due by 4:00 PM CT on 6 Feb 2015 to: Mr. Richard Compton at richard.compton.4@us.af.mil.
Any communications with the Government from the date of this solicitation through contract award shall be directed in writing to the Procuring Contracting Officer (PCO), Mr. Jonathan Swall (jonathan.swall.1@us.af.mil) and Contract Specialist, Mr. Richard Compton at richard.compton.4@us.af.mil.
MISCELLANEOUS:
The Key Estimated Milestones Dates for BECSRC Western have been established (Schedule information is subject to change without notice). Please see schedule below:
Milestones Dates
Draft RFP: 26 Jan 2015
Questions Comments due: 6 Feb 2015
RFP Release: 12 Feb 2015
Financial Statements and Attachment L-3: 27 Feb 2015
Phase I Proposals Due: 30 Mar 2015
Phase II Proposals Due: 7 May 2015
ATTACHMENTS:
1. DRAFT SOLICITATION, dated 23 Jan 2015
2. Questions/Comments Matrix Excel Spreadsheet
3. DRAFT Attachment L
4. DRAFT Attachment M
4. DRAFT Attachment L-1 Statement of Work
5. DRAFT Attachment L-2 BECSRC Pricing Matrix
6. DRAFT Attachment L-2c FFP Labor Categories and Labor Rate Table
7. DRAFT Attachment L-2c CPFF Labor Categories and Labor Rate Table
8. Frequently Asked Questions
Update #1 ·
Added: Jan 26, 2015 4:54 pm
FOR PLANNING PURPOSES ONLY, THIS IS A REQUEST FOR SUBMISSION OF QUESTIONS CONCERNING DRAFT SOLICITATION. THIS REQUEST IS NOT A FINAL SOLICITATION. PLEASE DO NOT SUBMIT A PROPOSAL.
1. This pre-solicitation notice is being posted for the purpose of obtaining industry feedback concerning the attached DRAFT Solicitation. Response to the request for questions is strictly voluntary and will not affect any firm's ability to submit an offer if, or when, a Final Solicitation is released. However, we highly encourage you to reply. The request is for final planning purposes only and does not constitute a commitment, implied or otherwise, that a procurement action will be issued. There is no entitlement to payment by the Government of direct or indirect costs or charges that arise as a result of the submission of information in response to this notice. The Government shall not be liable for or suffer any consequential damages for any improperly identified proprietary information. Proprietary information will be safeguarded in accordance with the applicable Government regulations.
2. This requirement is to provide a full range of responsive environmental remediation actions necessary to protect human health & the environment. It includes rapid response and removal of environmental media contaminations and site restoration activities located on Base Realignment and Closure Bases (BRAC) in EPA regions 9 & 10 (Western). The BRAC Environmental Construction and Services Requirements Contract (BECSRC) is being contemplated to include a 5 year ordering period with 24 additional months for performance completion of services.
3. The purpose of soliciting and awarding this Requirements Contract is to have a tool in place for "pop-up" interim Environmental Remediation requirements. "Pop-ups" are unplanned, out-of-cycle requirements that occur periodically, but erratically on installations included in the BRAC Program Management Division portfolio. The BRAC Program Management Division, responsible for remediation and transfer of Air Force property affected by BRAC legislation, manages the disposal of Air Force property in accordance with BRAC law and the BRAC Master Plan to achieve early environmental resolution and early property disposal to return value to the Air Force and local communities. Requirements contracts are set up with one contractor to provide service (FAR 16.503). Generally speaking, an IDIQ obligates the Government to a minimum quantity/dollar amount at the time award, while a Requirements Contract guarantees the contractor no such minimum.
4. The contracting officer will conduct this source selection using a phased evaluation process which is sometimes referred to as a "down-select." To make the process more efficient, the contracting officer is limiting the amount of information that offerors must submit initially. The contracting officer shall notify offerors promptly in writing when their proposals are excluded from the competitive range or otherwise eliminated from the competition after which Evaluation Notices (ENs) will be sent to offerors within the competitive range as needed. Those offerors considered by the Contracting Officer to be within the competitive range will be asked to submit the Volume III (Pricing) and Volume IV (Sample Task Order) in Phase II of this source selection.
5. All questions/comments pertaining to the DRAFT RFP shall be provided to the Government for consideration in the provided matrix Excel spreadsheet. The spreadsheet has a field for Section/Attachment Number, Applicable Region, Page # / Paragraph Reference and Question/Comment. Please ensure that both sheets and fields are completed in their entirety.
The Government is specifically requesting industry input on the adequacy and feasibility of the BECSRC Western Pricing Matrix which includes tabs for Deliverables, Unit Pricing, and Labor Rates.
6. Request for Questions: The Government anticipates a final solicitation to be released 12 Feb 2015; however, this is subject to change depending on the amount of questions we receive. This notification is provided to allow early review of DRAFT solicitation documentation for this requirement. Questions concerning the DRAFT Request for Proposal (RFP) and attachments are due by 4:00 PM CT on 6 Feb 2015 to: Mr. Richard Compton at ricky.compton@us.af.mil.
Any communications with the Government from the date of this solicitation through contract award shall be directed in writing to the Procuring Contracting Officer (PCO), Mr. Jonathan Swall (Jonathan.Swall.1@us.af.mil) and Contract Specialist, Mr. Richard Compton at ricky.compton@us.af.mil.
MISCELLANEOUS:
The Key Estimated Milestones Dates for BECSRC Western have been established (Schedule information is subject to change without notice). Please see schedule below:
Milestones Dates
Draft RFP: 26 Jan 2015
Questions Comments due: 6 Feb 2015
RFP Release: 12 Feb 2015
Financial Statements and Attachment L-3: 27 Feb 2015
Phase I Proposals Due: 30 Mar 2015
Phase II Proposals Due: 7 May 2015
ATTACHMENTS:
1. DRAFT SOLICITATION, dated 23 Jan 2015
2. Questions/Comments Matrix Excel Spreadsheet
3. DRAFT Attachments L&M
4. DRAFT Attachment L-1 Statement of Work
5. DRAFT Attachment L-3 BECSRC Pricing Matrix
6. Frequently Asked Questions
Attachments
Show all 49
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity