Exhibit_B_BECSRC_Basic_West__CDRL_05132015.pdf
PDF 14 KB Posted
- Attached to
- AFICA AFCEC BECSRC Western Solicitation Federal contract opportunity
- Solicitation number
- FA8903-15-R-0023
About this file
Exhibit B - BECSRC Basic West CDRL
View the file
Other files for this federal contract opportunity
Show all 48
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8903-15-R-023
Exhibit B
1/21/ 2015
1. DATA 2. TITLE 4. AUTHORITY
ITEM NO. 5. CONTRACT REFERENCE
3. SUBTITLE 16. REMARKS HC CD HC CD HC CD HC CD
B001 Plans Reference SOW/As
Required
AFCEC/CIB 0 0 2 2 0 0 2 2
772d ESS/PKC 0 0 LT 0 0 0 LT 1
Investigative Work Plan SOW paragraphs 3.6, 3.6.1, 3.6.2, 3.7.1, 4.10, 4.12, 4.13, 4.18, 5.1.3, 6.6, 6.6.1, 6.6.4, 6.6.6,
6.10 and 6.11 Base POC 0 0 1 1 + email 0 0 1 1 + email
Radiological Work Plan AFCEC Library
POC
0 0 0 0 0 0 1 1
Remedial Action Work
Plan
AFCEC/CDUT
0 0 0 1 0 0 0 1
Design Plan Submit per instruction from the COR. The government will require 20 business days for review. The Contractor shall incorporate government comments and submit next/final version within 10 business days of receipt of government comments.
Site Closure Plan
Health and Safety Plan
UFP-QAPP (SAP, FSP) AFCEC Library POC: Send electronic copy of Final deliverable to Monico Luna
(monico.luna@us.af.mil).
Abatement Plan
(lead/asbestos)
Site Restoration Plan AFCEC: Submit deliverable submittal letter to Paul Berheisel (paul.berheisel@us.af.mil).
Optimization Plan
All Working Copy (WC), Draft (D), Draft Final (DF), and Final (F) deliverables shall also be submitted by compact disc (CD) and hard copy (HC) as specified in the distribution section.
The F versions shall include hard copies and web-ready (WR) files. The WR files shall be submitted in a single portable document file (pdf) format.
Letters of transmittal (LT) shall be submitted by e-mail and HC.
All deliverables shall be prepared in a format compatible with current AFCEC Administrative
Record requirements.
BRAC ENVIRONMENTAL CONSTRUCTION and SERVICES REQUIREMENTS CONTRACT AT AFCEC WESTERN REGION BRAC INSTALLATIONS
PROJECT NO: TBD
10. FREQUENCY
14. DISTRIBUTION (Per Plan)
ADDRESSEE
WORKING COPY DRAFT DRAFT FINAL
SOLICITATION NO.: FA8903-15-R-0023
FINAL
File details come from the government source that posted it. Updated .