Exhibit_A_BECSRC_Basic_West__CDRL_05132015.pdf

PDF 49 KB Posted

Attached to
AFICA AFCEC BECSRC Western Solicitation Federal contract opportunity
Solicitation number
FA8903-15-R-0023
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

Exhibit A - BECSRC Basic West CDRL

View the file

Other files for this federal contract opportunity

Other files attached to AFICA AFCEC BECSRC Western Solicitation, newest first.
File Type Posted
BECSRC_West_Consolidated_QAs_Contracting_110915.pdf PDF
BECSRC_West_Consolidated_QAs_Contracting_110515.pdf PDF
FA8903-15-R-0023_Section_L_20151105.pdf PDF
BECSRC_West_Consolidated_QAs_Contracting_102915.pdf PDF
FA8903-15-R-0023_Section_L_20151027.pdf PDF
BECSRC_West_Consolidated_QAs_Contracting_102715.pdf PDF
FA8903-15-R-0023_Section_M_20151027.pdf PDF
FA8903-15-R-0023_Section_L_20151027.pdf PDF
15-R-0023_BECSRC_West_Sample_TO_Castle_AFB_SOW_102215.pdf PDF
15-R-0023_BECSRC_Sample_Installation_of_MWs_OWS_Soil_Excavation_Castle_Western_Region_STO_Exhibit_B_CDRL_10072015_Updated.pdf PDF
BECSRC_West_Consolidated_QAs_Technical_102215.pdf PDF
15-R-0023_BECSRC_Sample_Installation_of_MWs_OWS_Soil_Excavation_Castle_Western_Region_STO_Exhibit_C_CDRL_10072015_Updated.pdf PDF
15-R-0023_BECSRC_Sample_Installation_of_MWs_OWS_Soil_Excavation_Castle_Western_Region_Exhibit_A_CDRL_10072015_Updated.pdf PDF
FA8903-15-R-0023_Section_L_20150922.pdf PDF
FA8903-15-R-0023_Section_M_20150918.pdf PDF
15-R-0023_BECSRC_West_FY16-FY23_FFP_Labor_Rates_09032015.xlsx XLSX spreadsheet
15-R-0023_BECSRC_West__Basic_SOW_08182015.pdf PDF
15-R-0023_BECSRC_West_Sample_TO_Castle_AFB_SOW_08182015.pdf PDF
0023_West_Basic_CDRLs.pdf PDF
FA8903-15-R-0023_Solicitation.pdf PDF
0023_West_STO_CDRLs.pdf PDF
FA8903-15-R-0023_Section_L_20150921.pdf PDF
Attachment_7_Sample_TO_Exhibit_A_West_Castle_CDRL_05112015.pdf PDF
Attachment_4_BECSRC_West_Pricing_Matrix_03232015.xlsx XLSX spreadsheet
Attachment_2_FA8903-15-R-0023_BECSRC_Section_L_New_20150527.pdf PDF
Exhibit_B_BECSRC_Basic_West__CDRL_05132015.pdf PDF
Attachment_8_Sample_TO_Exhibit_B_West_Castle_CDRL_05112015.pdf PDF
FA8903-15-R-0023_SF_33_05282015_Final.pdf PDF
Attachment_1_FA8903-15-R-0023_BECSRC_West__Basic_SOW_05132015.pdf PDF
Attachment_3_FA8903-15-R-0023_BECSRC_Section_M_New_20150527.pdf PDF
Exhibit_C_BECSRC_Basic_West__CDRL_05132015.pdf PDF
Attachment_6_Sample_TO_West_Castle_AFB_SOW_05122015.pdf PDF
Attachment_5_BECSRC_West_FY15-FY22_FFP_Labor_Rates_05282015.xlsx XLSX spreadsheet
L-2_BECSRC_Western_Draft_Pricing_Matrix_01292015.xlsx XLSX spreadsheet
FA8903-15-R0023_Draft_Solicitation_01232015.pdf PDF
FA8903-15-R-0023_Draft_Section_M_01232015.docx DOCX document
L-1_FA8903-15-R-0023_DRAFT_BECSRC_Western_SOW.docx DOCX document
BECSRC_Western_Contractor_Question_Comments_Matrix_01222015.xlsx XLSX spreadsheet
BECSRC_West_FY15-FY20_FFP_Labor_Rates_01212015.xlsx XLSX spreadsheet
BECSRC_West_FY15-FY20_CPFF_Labor_Rates_01212015.xlsx XLSX spreadsheet
FA8903-15-R-0023_Draft_Section_L_01292015.docx DOCX document
BECSRC_Western_Contractor_Question_Comments_Matrix_01222015.xlsx XLSX spreadsheet
L-1_FA8903-15-R-0023_DRAFT_BECSRC_Western_SOW.docx DOCX document
FA8903-15-R-0023_Draft_Section_L_01232015.docx DOCX document
L-3_BECSRC_Western_Draft_Pricing_Matrix.xlsx XLSX spreadsheet
FA8903-15-R0023_Draft_Solicitation_01232015.pdf PDF
FA8903-15-R-0023_Draft_Section_M_01232015.docx DOCX document
FA8903-15_R-0023_Frequently_Asked_Questions_(FAQs)_01262015.docx DOCX document
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8903-15-R-0023

Exhibit A

1/21/2015

1. DATA 2. TITLE 4. AUTHORITY

5. CONTRACT REFERENCE

3. SUBTITLE 16. REMARKS HC CD HC CD HC CD HC CD

A001 Scientific and Technical

Reports

As Required AFCEC/CIB 0 0 2 (e-mail) 2 0 0 2 (e-mail) 2

772 ESS/PKC 0 0 LT 0 0 0 LT 0

Completion Report SOW paragraphs 3.7.4, 4.11, 5.1.3, 6.0, 6.1, 6.3, 6.6, 6.6.1, 6.6.4, 6.8, 6.15, 6.16.1, 6.16.2, 6.16.3, 6.16.5, 6.16.6, 6.16.7 and 6.16.8 Base POC 0 0 1 (e-mail) 0 0 0 1 (e-mail) 0

Remedial Investigative

Report AFCEC Library POC 0 0 0 0 0 0 0 0

Preliminary

Assessment/Site

Investigation Report

Shall include original disposal manifests for debris/wastes.

Shall include final results and laboratory quality data from sampling/analysis. AFCEC/CDUT

0 0 0 0 0 0 0 1

Feasibility Evaluation Submit per instruction from the COR. The government will require 20 business days for review. The Contractor shall incorporate government comments and submit next/final version within 10 business days of receipt of

Cost Benefit Analysis

Remedial Design Report

Remedial Optimization

Progress Report

AFCEC Library POC: Send electronic copy of Final deliverable to Monico

Luna (monico.luna@us.af.mil).

Operating Properly &

Successfully

Determination Analytical Data Packages

(Draft or validated)

AFCEC: Submit deliverable submittal letter to Paul Berheisel

(paul.berheisel@us.af.mil).

Technical Memorandum

Demolition Report All Working Copy (WC), Draft (D), Draft Final (DF), and Final (F) deliverables shall also be submitted by compact disc (CD) and hard copy (HC) as specified in the distribution section. The F versions shall include hard copies and web-ready (WR) files. The WR files shall be submitted in a single portable document file (pdf) format.

Closure Report

CSE Phase I and Phase II

Report

Letters of transmittal (LT) shall be submitted by e-mail and HC.

Shop drawings &/or As-built drawings

Geographical Information

System Reporting

All deliverables shall be prepared in a format compatible with current AFCEC

Administrative Record requirements.

Visual Site Inspection

Report

Monitoring Report

Survey Report

DRAFT FINAL

SOLICITATION NO.: FA8903-15-R-0023

FINAL

BRAC ENVIRONMENTAL CONSTRUCTION and SERVICES REQUIREMENTS CONTRACT AT AFCEC BRAC WESTERN REGION INSTALLATIONS

PROJECT NO: TBD

10. FREQUENCY

14. DISTRIBUTION (Per Deliverable)

ADDRESSEE

WORKING COPY DRAFT

ITEM NO.

1/21/2015

1. DATA 2. TITLE 4. AUTHORITY

5. CONTRACT REFERENCE

3. SUBTITLE 16. REMARKS HC CD HC CD HC CD HC CD

DRAFT FINAL

SOLICITATION NO.: FA8903-15-R-0023

FINAL

BRAC ENVIRONMENTAL CONSTRUCTION and SERVICES REQUIREMENTS CONTRACT AT AFCEC BRAC WESTERN REGION INSTALLATIONS

PROJECT NO: TBD

10. FREQUENCY

14. DISTRIBUTION (Per Deliverable)

ADDRESSEE

WORKING COPY DRAFT

ITEM NO.

Five-Year Review Report

LUC/IC Inspection

Report

O&M Report

Field Summary Report

Well Decomissioning

Report

Soil Vapor Intrusion

Evaluation Report

Radiological Survey

Characterization

Radiological Free Release

Radiological Final Status

Survey

O&M Manual

A002 Decision Document

Support

As Required AFCEC/CIB 0 0 0 0 0 0 2 (e-mail) 2

772 ESS/PKC 0 0 0 0 0 0 LT 0

Record of Decision SOW paragraph 6.16.4

Base POC 0 0 0 0 0 0 1 (e-mail) 1

Record of Decision

Ammendment AFCEC Library POC 0 0 0 0 0 0 0 0

Explanation of Significant

Difference

AFCEC/CDUT

0 0 0 0 0 0 0 1

Statement of Basis Submit per instruction from the COR. The government will require 20 business days for review. The Contractor shall incorporate government comments and submit next/final version within 10 business days of receipt of

Updated/Revised

Remedial Action Plan

Proposed Plan

AFCEC Library POC: Send electronic copy of Final deliverable to Monico

Luna (monico.luna@us.af.mil).

AFCEC: Submit deliverable submittal letter to Paul Berheisel

(paul.berheisel@us.af.mil).

All WC, D, DF, and F deliverables shall also be submitted by compact disc

CD and HC as specified in the distribution section. The F versions shall include HCs and WR files. The WR files shall be submitted in a single pdf format.

1/21/2015

1. DATA 2. TITLE 4. AUTHORITY

5. CONTRACT REFERENCE

3. SUBTITLE 16. REMARKS HC CD HC CD HC CD HC CD

DRAFT FINAL

SOLICITATION NO.: FA8903-15-R-0023

FINAL

BRAC ENVIRONMENTAL CONSTRUCTION and SERVICES REQUIREMENTS CONTRACT AT AFCEC BRAC WESTERN REGION INSTALLATIONS

PROJECT NO: TBD

10. FREQUENCY

14. DISTRIBUTION (Per Deliverable)

ADDRESSEE

WORKING COPY DRAFT

ITEM NO.

LT shall be submitted by e-mail and HC.

All deliverables shall be prepared in a format compatible with current AFCEC

Administrative Record requirements.

A003 Other Scientific and

Technical Reports

Monthly

AFCEC/CIB 0 0 2 2 2 2 2 2

772 ESS/PKC 0 0 LT 0 0 0 LT 0

Site Visit/Survey Report SOW paragraphs 4.11, 4.12, 4.16, 4.17, 6.2, 6.3, 6.7, 6.10, 6.11, 6.13, and

6.16.1 Base POC 0 0 1 1 1 1 1 1

Surveying Documentation Shall include original disposal manifests for hazardous wastes.

Shall include final results and laboratory quality data from sampling/analysis.

AFCEC Library POC 0 0 0 0 0 0 0 1

ERPIMS Data /

Submission

AFCEC/CDUT

0 0 0 1 0 1 0 1

Revised/Updated

Conceptual Site Model

Submit per instruction from the COR. The government will require 20 business days for review. The Contractor shall incorporate government comments and submit next/final version within 10 business days of receipt of

Environmental Baseline

Survey

Wetland Delineation

Asbestos/Lead Based

Paint Sampling Report

AFCEC Library POC: Send electronic copy of Final deliverable to Monico

Luna (monico.luna@us.af.mil).

Asbestos/Lead Based

Paint Abatement Report

UXO/MMRP

Clearance/Removal

Report

AFCEC: Submit deliverable submittal letter to Paul Berheisel

(paul.berheisel@us.af.mil).

Radiological, Hazardous

Material and/or

Hazardous Waste

Disposal Report

Deed Modification/LUC

Implementation

All WC, D, DF, and F deliverables shall also be submitted by compact disc

CD and HC as specified in the distribution section. The F versions shall includeHCs and WR files. The WR files shall be submitted in a single pdf format.

LT shall be submitted by e-mail and HC.

All deliverables shall be prepared in a format compatible with current AFCEC

Administrative Record requirements.

1/21/2015

1. DATA 2. TITLE 4. AUTHORITY

5. CONTRACT REFERENCE

3. SUBTITLE 16. REMARKS HC CD HC CD HC CD HC CD

DRAFT FINAL

SOLICITATION NO.: FA8903-15-R-0023

FINAL

BRAC ENVIRONMENTAL CONSTRUCTION and SERVICES REQUIREMENTS CONTRACT AT AFCEC BRAC WESTERN REGION INSTALLATIONS

PROJECT NO: TBD

10. FREQUENCY

14. DISTRIBUTION (Per Deliverable)

ADDRESSEE

WORKING COPY DRAFT

ITEM NO.

A004 Environmental Permits As required AFCEC/CIB 0 0 2 2 2 2 2 2

772 ESS/PKC 0 0 LT 0 0 0 LT 0

UXO/MMRP Permitting SOW paragraphs 3.7.4, 3.7.8, 5.1.3, 6.12, 6.13, and 6.16.2 Base POC 0 0 1 1 1 1 1 1

Dig/Utility Clearance AFCEC Library POC 0 0 0 0 0 0 0 1

Storm water Pollution

Prevention Plan

AFCEC/CDUT

0 0 0 1 0 1 0 1

National Pollution

Discharge Elimination

System (NPDES)

Submit per instruction from the COR. The government will require 20 business days for review. The Contractor shall incorporate government comments and submit next/final version within 10 business days of receipt of

RCRA Permits/Mods

Joint Application for

Permit Notification

(Wetlands)

Encroachment Permits AFCEC Library POC: Send electronic copy of Final deliverable to Monico

Luna (monico.luna@us.af.mil).

Miscellaneous Permits

Surface Water Discharge

(Remediation system discharge)

AFCEC: Submit deliverable submittal letter to Paul Berheisel

(paul.berheisel@us.af.mil).

Air Emission

(Remediation system emissions)

Radiological All WC, D, DF, and F deliverables shall also be submitted by compact disc

CD and HC as specified in the distribution section. The F versions shall include HCs and WR files. The WR files shall be submitted in a single pdf format.

LT shall be submitted by e-mail and HC.

All deliverables shall be prepared in a format compatible with current AFCEC

Administrative Record requirements.

File details come from the government source that posted it. Updated .