DRAFT Attachment L-3 BESRC Pricing Matrix
View the file
Other files for this federal contract opportunity
Show all 48
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Commoditized Pricing Model: General Notes and Instructions |
| BRAC Environmental Construction & Services Requirements Contract (BECSRC) |
| Single Award Task Order Contract (SATOC) |
| 1 | . | Prices should include all activities associated with completing the over arching tasks unless otherwise specified or called out as a separate activity. | |
| 2 | . | This activities list uses CERCLA terminology; however, the activities apply to comparable RCRA or state restoration terminology. | |
| 3 | . | Complexity level is the sum of all component scores (component = affected media, analytical methods and stakeholders). Each component is counted equally. Each occurrence within a component is equal to 1. Complexity levels Low=(<=3) Medium= (4-13) High= (>13). For example, a site that has 1 affected media (groundwater), 3 analytical methods (VOC, SVOC and metals) and 1 stakeholder (State Regulator) would have a total complexity score of 5 equal to medium complexity. | |
| 4 | Deliverables FFP Tab - for each version of the deliverable, include cost for each complexity level. If complexity is N/A, input cost in "Low" column. | ||
| 5 | . | Preparation of documentation should include the efforts required for reproduction, distribution, response to AF and Regulatory comments for a each iteration as required. | |
| 6 | . | All work plan documentation shall include appropriate sections as applicable and as specified in the SOW including but not limited to* Waste Management Plan, Air Modeling and Monitoring Plan, Surface Water Management Plan, Emissions Control Plan, Transportation Plan, Remediation Management Plan, Siting Analysis Plan, Site Preparation Plan, Spill and Discharge Management Plan, Erosion Control Plan, Groundwater Management Plan, Demolition Plan, Construction Quality Plan, etc. | |
| 7 | . | Drummed and bulk waste disposal prices shall include handling, and transportation costs as well as any characterization fees. Other waste disposal cost shall include handling, and transportation costs as well as any characterization fees. | |
| 8 | . | Site Restoration activities shall include watering and fertilizing where the re-establishment of natural vegetative cover is required. | |
| 9 | . | Metes and bounds survey shall also apply to excavated soils and any survey required to determine volume excavated. | |
| 10 | . | Water quality evaluations shall include but not be limited to the standard suite of analysis for BOD, DO, REDOX, pH, turbidity, conductivity, salinity and other parameters as required. | |
| 11 | . | Soil Characteristics evaluations shall include but not be limited to the standard suite of analysis for TKN, TOC, permeability, and other characteristics as applicable to the evaluation being conducted. | |
| 12 | . | Any gains from recycling or disposal of equipment/supplies/etc. may be used to off-set the cost of any ongoing efforts included with this project (TBD at the TO level). | |
| 13 | . | System component readings conducted during O&M activities shall include but not be limited to system temperature, flow, vacuum, motor status, pressure readings, OVA screening, H2O quality measurements, etc. | |
| 14 | . | All proposed activity prices shall include dust control and decontamination* where required. | |
| 15 | . | Analytical data packages may be submitted to the regulators at the AF or regulator's request; but, not without Air Force concurrence. | |
| 16 | . | As part of site restoration all backfilled areas will be compacted to 90% proctor (MODIFIED) unless otherwise specified. | |
| 17 | . | All backfill shall be certified clean in accordance with state and federal regulations and direction from AF/Regulators. | |
| 18 | . | Assume 10% Duplicate samples, 5% MS/MSD, 1 equipment blank between sites each day and 1 trip blank for each cooler containing samples to analyzed for VOCs. | |
| 19 | . | Efforts including use of environmental equipment shall include any calibration, monitoring and testing requirements as required to ensure proper maintenance and operation of the equipment. | |
| 20 | . | All sampling and other efforts shall include record keeping activities as specified in section 4.17 of the SOW. | |
| 21 | . | All travel required shall be cost reimbursable in accordance with actuals. | |
| 22 | . | Note that the Quality control program plan requirement addressed in Section 4.13 shall be incorporated into the development of QAPP and work planning documentation. | |
| 23 | . | The Air Force will accept invoicing of up to 80% upon AF acceptance of the draft document that incorporates AF comments and is ready to submit to the regulator, as applicable. | |
| 24 | . | Electrical repairs may include, but not limited to, 10-12 GA THHN conductor color covering for 480V 3-phase; termination/landing of conductors; phase check and system shake-out; and communication cabling. | |
| 25 | . | As part of the repair activities assume one-inch power/communication conduits and two-inch contaminated ground water lateral piping damaged during utility installation. | |
| 26 | . | Assume each fencing repair event requires replacing eight-foot high, nine-gauge chain link fencing with three- strands of barb-wire, one full weight terminal post and two full weight line posts, and seven-gauge top and bottom tension wire. | |
| 27 | . | Assume 1 acre sites for site restoration (i.e. re-landscaping, watering, hard surface restoration, repairs and minor construction) and maintenance (i.e. clearing, mowing, grubbing, etc.) activities. | |
| 28 | . | Assume average sampling depth for well sampling and redevelopment of 30 feet. | |
| 29 | . | Assume any activity requiring excavation and dewatering will require removal of approximately 500 gallons of contaminated water and associated handling, bulk transport, and disposal activities. | |
| 30 | . | For activities involving UST removal/management assume 500-gallon tank removal with closure sampling (assume samples analyzed for BTEX), waste fuel and soil wastes (for offsite disposal). Assume soil samples will be collected at suspected impacted soils for analysis in accordance with the sampling requirements. | |
| 31 | . | For activities involving AST removal/management assume 500-gallon AST removal with closure sampling (analyzed for BTEX), waste fuel and 50 cubic yards of wastes (for offsite disposal) per tank excavation. Assume six soil samples will be collected at suspected impacted soils for analysis in accordance with the sampling requirements. Assume conducting any required confirmatory (6 samples) and closure sampling (6 samples) as well as documentation and reporting. | |
| 32 | . | For five year reviews assume all milestones and activities associated with the completion, submittal and government acceptance for Five Year Reviews are captured under that specific deliverable. | |
| 33 | . | Prices should include all activities associated with completing each field task including efforts to prepare field notes, boring logs, etc. | |
| 34 | . | Project Management activities shall include but are not limited to controls, contracts, program oversight, implementation of other general management requirements as specified in the SOW, training, site access, etc. | |
| 35 | . | Technical review/evaluation of data, programs, studies, technology shall be captured under labor as required. | |
| 36 | . | Any required daily activity reports shall be included in the effort for that specific activity. | |
| 37 | . | Miscellaneous system/electrical repair shall involve an initial inspection followed by summary/estimate of type and price of activities necessary to complete repairs. These activities shall include but not be limited to pump rebuild/replacement, motor rebuild/replacement, miscellaneous system/electrical repair, etc. | |
| 38 | . | Health and Safety monitoring (air, soils, work sites, etc.) efforts shall be included with each individual activity set as required. | |
| 39 | . | All analyses shall be conducted in an off-site/fixed laboratory. No on-site laboratories shall be utilized. Include all shipping costs in unit pricing | |
| 40 | . | Analytical pricing will be based on competitive pricing taken from lists provided by a selected laboratory. | |
| 41 | . | Data validation/management efforts shall be included with each individual activity. | |
| 42 | . | Well abandonment activities shall be in accordance with local regulations and includes characterization, transportation and disposal of waste material. | |
| 43 | . | Method e537 modified - compound list | Perfluorobutanesulfonic acid, Perfluorodecanoic acid, Perfluorododecanoic acid, Perfluoroheptanoic acid, Perfluorohexanesulfonic acid, Perfluorohexanoic acid, Perfluorononanoic acid, Perfluorooctanesulfonic acid, Perfluorooctanoic acid, Perfluorotetradecanoic acid, Perfluorotridecanoic acid, Perfluoroundecanoic acid, 6:2 Fluorotelomer sulfonate, 8:2 Fluorotelomer sulfonate, Perfluorooctane sulfonamide, Perfluorodecane sulfonate, N-Methyl-heptadecafluorooctane sulfonamide, N-Ethyl-heptadecafluorooctane sulfonamide, N-Methyl-heptadecafluorooctane sulfonamidoethanol, N-Ethyl-heptadecafluorooctane sulfonamidoethanol, Perfluoropentanoic acid, Perfluorobutanoic acid. (Indicate in the pricing matrix standard and rush turn-around times with associated costs) |
| 43 | Monitoring well installation - assume 30 feet in depth, 10 feet of screen, flush mount 4' X 4' X 6", no bollards, brass well I.D. plate. |
BESRC Instructions DRAFT PWS Eclosure 1 3/10/2014
BESRC Instructions DRAFT PWS Eclosure 1 3/20/2014
BESRC Instructions DRAFT PWS Eclosure 1 3/20/2014
BESRC Instructions DRAFT PWS Enclosure 1 3/10/2014
BESRC Instructions DRAFT PWS Enclosure 1 3/10/2014
BECSRC Instructions Pricing Matrix 01/21/2015
Page &P of &N
Page &P of &N
Page &P of &N
Page &P of &N
Page &P of &N
Page &P of &N
Deliverables (FFP) Installation:
| Documentation | |||||||||||
| Plans (CDRL B001) | Complexity (see instructions tab, #3) | Price - Draft Version | Price - Draft Final Version | Price - Final Version | |||||||
| Low | Medium | High | Low | Medium | High | Low | Medium | High | |||
| Investigative Work Plan (e.g. SI, RI, etc.) | Low/Med/High | ||||||||||
| Radiological Work Plan | Low/Med/High | ||||||||||
| Remedial Action Work Plan (e.g. RA, Excavation, etc.) | Low/Med/High | ||||||||||
| Design Plan | Low/Med/High | ||||||||||
| Site Closure Plan | Low/Med/High | ||||||||||
| Health and Safety Plan | Low/Med/High | ||||||||||
| UFP Quality Assurance Project Plan (QAPP) incl. | |||||||||||
| SAP/FSP | Low/Med/High | ||||||||||
| Abatement Plan (Asbestos/Lead) - Min. Requirement | Low/Med/High | ||||||||||
| Site Restoration Plan (Wetlands, etc.) | Low/Med/High | ||||||||||
| Optimization Plan | Low/Med/High | ||||||||||
| Reports (CDRL A001) | Complexity (see instructions tab, #3) | Price - Draft Version | Price - Draft Final Version | Price - Final Version | |||||||
| Low/Med/High | Low | Medium | High | Low | Medium | High | Low | Medium | High | ||
| Completion Report (e.g. Remedial Action, etc.) | Low/Med/High | ||||||||||
| Remedial Investigative Report (RI) | Low/Med/High | ||||||||||
| Preliminary Assessment/Site Investigation Report (e.g. preliminary, environmental, SI etc.) | Low/Med/High | ||||||||||
| Feasibility Evaluation to include Alternatives Analysis | Low/Med/High | ||||||||||
| Cost Benefit Analysis | Low/Med/High | ||||||||||
| Remedial Design Report | Low/Med/High | ||||||||||
| Remedial Optimization Progress Report | Low/Med/High | ||||||||||
| Operating Properly and Successfully (OPS) Determination | Low/Med/High | ||||||||||
| Analytical Data Package (draft or validated ) | Low/Med/High | ||||||||||
| Technical Memorandum (Interim TI Report) | Low/Med/High | ||||||||||
| Demolition Report- Min. Requirement | N/A | ||||||||||
| Closure Report | Low/Med/High | ||||||||||
| CSE Phase I Report | Low/Med/High | ||||||||||
| CSE Phase II Report | Low/Med/High | ||||||||||
| Shop Drawings and/or As-built drawings- Min. Requirement | N/A | ||||||||||
| Geographical Information System Reporting | Low/Med/High | ||||||||||
| Visual Site Inspection Report | Low/Med/High | ||||||||||
| Monitoring Report | Low/Med/High | ||||||||||
| Survey Report | Low/Med/High | ||||||||||
| Five-Year Review Report (1 site) | Low/Med/High | ||||||||||
| LUC/IC Inspection Report (1 Site) | Low/Med/High | ||||||||||
| O&M Report | Low/Med/High | ||||||||||
| Field Summary Report | Low/Med/High | ||||||||||
| Well Decomissioning Report (10 wells) | N/A | ||||||||||
| Soil Vapor Intrusion (SVI) Evaluation Report | Low/Med/High | ||||||||||
| Radiological Survey Characterization | Low/Med/High | ||||||||||
| Radiological Free Release | Low/Med/High | ||||||||||
| Radiological Final Status Survey | Low/Med/High | ||||||||||
| Operations and Maintenance (O&M) Manual | Low/Med/High | ||||||||||
| Decision Document Support (CDRL A002) | Complexity (see instructions tab, #3) | Price - Draft Version | Price - Draft Final Version | Price - Final Version | |||||||
| Low/Med/High | Low | Medium | High | Low | Medium | High | Low | Medium | High | ||
| Record of Decision | Low/Med/High | ||||||||||
| Record of Decision Ammendment | Low/Med/High | ||||||||||
| Explanation of Significant Difference (ESD) | Low/Med/High | ||||||||||
| Statement of Basis | Low/Med/High | ||||||||||
| Updated/Revised Remedial (including Iterim) Action Plan | Low/Med/High | ||||||||||
| Proposed Plan | Low/Med/High | ||||||||||
| Other Reports (CDRL A003) | Complexity (see instructions tab, #3) | Price - Draft Version | Price - Draft Final Version | Price - Final Version | |||||||
| Low/Med/High | Low | Medium | High | Low | Medium | High | Low | Medium | High | ||
| Site Visit/Survey Report (1 Site up to 100 pages) | Low | ||||||||||
| Surveying Documentation (i.e. Metes/Bounds, Geophysical, etc.) (1 Site) | Low | ||||||||||
| ERPIMS Data Submission (1000 records) | N/A | ||||||||||
| Revised/Updated Conceptual Site Model (1 Site) | |||||||||||
| Environmental Baseline Survey (10 Sites) | N/A | ||||||||||
| Wetland Delineation (1 acre) | N/A | ||||||||||
| Asbestos/Lead Based Paint Sampling Report- Min. Requirement | N/A | ||||||||||
| Asbestos/Lead Based Paint Abatement Reports- Min. Requirement | N/A | ||||||||||
| UXO/MMRP Clearance/Removal Report | Low/Med/High | ||||||||||
| Radiological, Hazardous Material and/or Hazardous Waste Disposal Report - Min. Requirement | N/A | ||||||||||
| Deed modifications/LUC implementation (1 site) | N/A | ||||||||||
| Permits (CDRL A004) | Complexity (see instructions tab, #3) | Price - Draft Version | Price - Draft Final Version | Price - Final Version | |||||||
| Low/Medium/High | Low | Medium | High | Low | Medium | High | Low | Medium | High | ||
| UXO/MMRP Permitting - Min. Requirement | N/A | ||||||||||
| Dig/Utility Clearance permit | N/A | ||||||||||
| Storm Water Pollution Prevention Plan (SWPPP) Permit - Min. Requirement | N/A | ||||||||||
| National Pollution Discharge Elimination System (NPDES) Permit - Min. Requirement | N/A | ||||||||||
| RCRA Permits/Mods - Min. Requirement | N/A | ||||||||||
| Joint Application for Permit Notification (Wetlands) - Min. Requirement | N/A | ||||||||||
| Encroachment Permits - Min. Requirement | N/A | ||||||||||
| Miscellaneous Permits (including construction of utilities, etc.) - Min. Requirement | N/A | ||||||||||
| Surface Water Discharge (remediation system discharge) - Min. Requirement | N/A | ||||||||||
| Air Emission Permit (remediation system emissions) - Min. Requirement | N/A | ||||||||||
| Radiological Permit - Min. Requirement | N/A |
BESRC Deliverables DRAFT PWS Enclsoure 1
BESRC Deliverables (FFP) DRAFT PWS Enclsoure 1 3/20/2014
BESRC Deliverables (FFP) DRAFT PWS Enclsoure 1 3/20/2014
BESRC Deliverables DRAFT PWS Enclsoure 1
BESRC Deliverables DRAFT PWS Enclsoure 1
BECSRC Deliverables Pricing Matrix 1/21/2015
Page &P of &N
*costs should include all activities associated with completing the activity or called out as a separate activity in the list
Page &P of &N
*costs should include all activities associated with completing the activity or called out as a separate activity in the list
Page &P of &N
*costs should include all activities associated with completing the activity or called out as a separate activity in the list
Page &P of &N
*costs should include all activities associated with completing the activity or called out as a separate activity in the list
Page &P of &N
*costs should include all activities associated with completing the activity or called out as a separate activity in the list
Page &P of &N *costs should include all activities associated with completing the activity or called out as a separate activity in the list
Unit Pricing Installation:
| Field Work | |||||
| Environmental Construction | Unit | Quantity | Type | Price | |
| Digging/excavation | CY | 100 | Deep (>12 feet) | ||
| Digging/excavation | CY | 100 | Shallow (<=12 feet) | ||
| UXO removal | acre | 1 | Shallow (<=5 feet) | ||
| Backfill | CY | 25 | topsoil | ||
| Backfill | CY | 25 | course | ||
| Grading | SY | 250 | N/A | ||
| Compaction | SY | 100 | smooth roller | ||
| Dewatering and on-site storage/treatment | Gal | ||||
| Shoring Activities (5'H x 10'L x 4'W Sections) | LF | 40 | Trench | ||
| Erosion Control Measures - Installation | LF | 100 | Silt Fencing | ||
| Erosion Control Measures - Maintenance | LF | 100 | Silt Fencing | ||
| Soils Management to include operations/maintenance of stockpiled soils, staging piles, biopiles, landfarms, etc. Assume 100 CY stockpile. | Day | 1 | N/A | ||
| MW Installation and Abandonment (30 feet deep) | Unit | Quantity | Type | Diameter | Price |
| Install ground water monitoring well (includes development, using hallow stem auger) | Each | 5 | PVC | 2" | |
| Install ground water monitoring well (includes development, using hallow stem auger) | Each | 5 | SS | 2" | |
| Plug/Abandon in place monitoring wells | Each | 5 | grout in place | 2" | |
| Plug/Abandon in place monitoring wells | Each | 5 | overdrill | 2" | |
| Repair/Replace caps, locks, etc. | Each | 5 | 2" | ||
| Repair/Replace monitoring well risers | Each | 5 | PVC | 2" | |
| Repair/Replace monitoring well risers | Each | 5 | SS | 2" | |
| Redevelopment of Monitoring Wells | Each | 5 | 2" | ||
| Repair/Replacement of well pads/vaults (including elevation) | Each | 1 | concrete | 3'x3' |
| Tank Management | Unit | Quantity | Price | |
| AST Removal (500 gallon) | Each | 1 | ||
| UST Removal (500 gallon, asphalt surface, deadman anchor system) | Each | 1 | ||
| Flushing Pipes - containing fuels | LF | 100 ft 12" diameter | ||
| Cap & Seal Piping | LF | 100 ft | ||
| Grouting | CF | 100 ft 12" diameter | ||
| Removal of Piping - above ground, 6" steel | LF | 100 ft | ||
| Removal of Piping - below ground 6" steel up to 5 feet bgs | LF | 100 ft | ||
| Excavation of contaminated Soil (<12 feet deep) | CY | 50 CY | ||
| Sampling (closure, confirmatory, waste characterization) (BTEX, SVOC and metals) | Each | 1 | ||
| Remedial Process Optimization (RPO) | Unit | Quantity | Price | |
| RPO Site Visits and Evaluations | Each | 5 sites | ||
| System evaluation | Each | 1 systems | ||
| System reconfiguration (assume $2500 in parts for each system) | Each | 1 systems | ||
| Landfill Monitoring | Unit | Quantity | Price | |
| Landfill Cap monitoring/inspection | Each | <=15 acre | ||
| Landfill Cap (Monolithic) Maintenance and Repair (includes material, equipment and labor) | Each | <=.10 acre | ||
| Landfill Cap (RCRA) Maintenance and Repair (includes material, equipment and labor) | Each | <=.10 acre | ||
| Landfill Gas Monitoring | Each | 8 wells | ||
| Leachate Monitoring (analyzed for VOC, SVOC, Metals, PCBs, Pesticides) | Each | 5 wells | ||
| Abatement | Unit | Quantity | Type | Price |
| Lead Abatement | Day | 1000 SF | N/A | |
| Asbestos Abatement | Day | 1000 SF | friable |
| System Installation | Unit | Type | Quantity | Price | ||
| Soil Vapor Extraction Systems (10,000 sq/ft affected soil, 20 ft depth to base of contamination, 5 wells, 500 linear feet) | Full System | GAC | 1 | |||
| Soil Vapor Intrusion Mitigation Systems (5,000sf/ft affected area) | Full System | Subslab Depressurization | 1 | |||
| Biosparge Systems (10,000 sq/ft, 20 ft depth to aquifer, 15 ft aquifer thickness, 5 wells, 500 linear feet) | Full System | N/A | 1 | |||
| Biovent Systems (10,000 sq/ft, 20 ft depth to contamination, 5 wells, 500 linear feet) | Full System | N/A | 1 | |||
| Pump & Treat (10,000 sq/ft affected area, 15-30 gpm system influent rate, 5 wells, 500 linear feet) | Full System | GAC | 1 | |||
| Sample Collection/Monitoring | Unit | Type | Media | Sample Quantity | # of sample locations | Price |
| Membrane Interface Probe (MIP) data collection | Each | DPT | Soil | 10 | 10 | |
| Groundwater level gauge (30' bgs) | Each | 2" well | Groundwater | N/A | 10 | |
| Groundwater (30' bgs) | Each | 2" well | Groundwater | 5 | 5 | |
| Groundwater (30' bgs) | Each | DPT/grap | Groundwater | 5 | 5 | |
| Surface water | Each | grab | water | 10 | 10 | |
| Stockpile Sampling (1 per 500cy) | Each | grab | Soil | 1 | 1 | |
| IDW Characterization | Each | grab | Soil | 1 | 1 | |
| IDW Characterization | Each | grab | Groundwater | 1 | 1 | |
| Surface soil | Each | grab | Soil | 10 | 10 | |
| Subsurface soil | Each | DPT | Soil | 2 | 5 | |
| Subsurface soil | Each | Sonic | Soil | 2 | 5 | |
| Subsurface soil | Each | Rotary | Soil | 2 | 5 | |
| Subsurface soil | Each | Hand Auger | Soil | 2 | 5 | |
| Backfill Material | Each | composite | Soil | 1 | 10 | |
| Sediment | Each | grab | Soil | 1 | 10 | |
| Asbestos | Each | grab | N/A | 1 | 10 | |
| Lead | Each | grab | N/A | 1 | 10 | |
| Miscellaneous debris (municipal, C&D, Spent GAC etc.) | per Ton/CY /Roll-off | grab | Solids | 1 | 10 |
| Vapor Intrusion Monitoring | Unit | Quantity | Price | ||
| Soil gas - Passive gas survey | Each | 5 samples | |||
| Sub-slab vapor - Passive gas survey | Each | 5 samples | |||
| Indoor Air - Passive gas survey | Each | 5 samples | |||
| Outdoor Air - Passive gas survey | Each | 5 samples | |||
| SUMMA Canister Sample | Each | 5 samples | |||
| Biological Tissue Monitoring | Unit | Quantity | Price | ||
| Fish Tissue | Each | 10 samples | |||
| Analytical (14 Day and 2 Day TAT) | Unit | Type | Quantity | Price (14 day TAT) | Price (2 Day TAT) |
| Asbestos | sample | applicable methods | each | Laboratory Pricing | Laboratory Pricing |
| Lead | sample | applicable methods | each | Laboratory Pricing | Laboratory Pricing |
| TCLP (metals, etc.) | sample | applicable methods | each | Laboratory Pricing | Laboratory Pricing |
| toxicity | sample | applicable methods | each | Laboratory Pricing | Laboratory Pricing |
| biological | sample | applicable methods | each | Laboratory Pricing | Laboratory Pricing |
| soil | sample | applicable methods (include PFCs modified list see instructions tab item 42, 22 compounds, include standard and rush turn around times. Include 1,4 dioxane) | each | Laboratory Pricing | Laboratory Pricing |
| water | sample | applicable methods (include PFCs modified list see instructions tab item 42, 22 compounds, include standard and rush turn around times. Include 1,4 dioxane) | each | Laboratory Pricing | Laboratory Pricing |
| air | sample | applicable methods | each | Laboratory Pricing | Laboratory Pricing |
| vapor | sample | applicable methods | each | Laboratory Pricing | Laboratory Pricing |
| municipal waste, etc. | sample | applicable methods | each | Laboratory Pricing | Laboratory Pricing |
| water quality | sample | applicable methods | each | Laboratory Pricing | Laboratory Pricing |
| soil characteristics | sample | applicable methods | each | Laboratory Pricing | Laboratory Pricing |
| Radiological | sample | IAW MARSSIM | each | Laboratory Pricing | Laboratory Pricing |
| Infrastructure Maintenance | Unit | Quantity | Price | ||
| Fencing Repair (8' Chain Link) | LF | 10 ft | |||
| Fencing Install (8' Chain Link) | LF | 100 ft | |||
| Security Fencing Install (10' Chain Link w/ wire) | LF | 100 ft | |||
| Security Fencing Repair (10' Chain Link w/ wire) | LF | 10 ft | |||
| Engineering Controls Maintenance | Unit | Quantity | Price | ||
| Inspect/monitor Institutional/Engineering controls | Day | 10 acres | |||
| Miscellaneous Restoration Activities | Unit | Type | Quantity | Price | |
| Site Restoration to original conditions - asphalt | sq ft | 2" layer | 1000 sq ft | ||
| Site Restoration to original conditions - grass cover | sq ft | Region specific | 1 acre | ||
| Site Restoration to original conditions - Concrete | sq ft | 6" layer | 1000 sq ft | ||
| Site Restoration to original conditions - top soil | sq ft | 4" layer | 1000 sq ft | ||
| System Operations | Unit | Type | Quantity | Price | |
| Filter Exchange | ton | GAC | 1 | ||
| Filter Cleaning | ton | Sand | 1 | ||
| Remediation System Operation | Month | Groundwater Pump and Treat | 1 | ||
| Rapid Response | Unit | Type | Quantity | Price | |
| Spill response | CY | Standard Priority | |||
| (non-haz) | 5 | ||||
| Spill response | CY | Rapid Response | |||
| (hazardous) | 5 | ||||
| Removal of previously unknown environmental or physical hazard | CY | Rapid Response | |||
| (hazardous) | 1 | ||||
| Removal of previously unknown environmental or physical hazard | CY | Standard Priority | |||
| (non-haz) | 1 | ||||
| Data Management | Unit | Type | Quantity | Price | |
| GIS/CADD Data Management/Reproduction | each | site map | 1 |
| Disposal | Unit | Quantity | Distance | Price |
| Lab packs - Non Hazardous | drum | 1 | far (50-100 miles) | |
| Lab packs - Hazardous | drum | 1 | far (50-100 miles) | |
| Water – Non Hazardous | drum | 5 | near (15-50 miles) | |
| Water – Non Hazardous | drum | 5 | far (50-100 miles) | |
| Water – Non Hazardous | drum | 5 | remote (>100 miles) | |
| Water – Hazardous | drum | 5 | far (50-100 miles) | |
| Water – Non-Hazardous - Vacuum Truck | gal | 500 | far (50-100 miles) | |
| Water – Hazardous - Vacuum Truck | gal | 500 | far (50-100 miles) | |
| Soil – Non-Hazardous | drum | 5 | far (50-100 miles) | |
| Soil – Hazardous | drum | 5 | far (50-100 miles) | |
| Soil – Non-Hazardous - Bulk | ton | 25 | far (50-100 miles) | |
| Soil – Hazardous - Bulk | ton | 25 | far (50-100 miles) | |
| Investigative Derived Waste Management | drum | 5 | far (50-100 miles) | |
| Asbestos Containing Material | drum | 5 | far (50-100 miles) | |
| Lead contaminated material | drum | 5 | far (50-100 miles) | |
| Monitoring well P/A / repair/ replace waste material | drum | 5 | far (50-100 miles) | |
| Miscellaneous debris (municipal, C&D, spent GAC etc.) | ton | 5 | far (50-100 miles) | |
| Low-level Radiological Waste | 5 | far (50-100 miles) | ||
| Recycling of surplus materials and/or unserviceable equipment | ton | 0.25 | far (50-100 miles) | |
| Residual Fuel - Vacuum Truck | gal | 100 | far (50-100 miles) |
| Mobilization | Unit | Type | Quantity | Price |
| Sampling | Crew | Small (1-2 people) | 1 | |
| Sampling | Crew | Medium (3-5 people) | 1 | |
| Survey | Crew | 1-2 people | 1 | |
| Drilling | Rig | H.S.A | 1 | |
| Drilling | Rig | D.P.T | 1 | |
| Drilling | Rig | Sonic/Hydro/etc | 1 | |
| Drilling | Rig | Rotary | 1 | |
| Construction | Crew | Small (1-2 people) | 1 | |
| Construction | Crew | Medium (3-5 people) | 1 | |
| Construction | Crew | Large (5-10 people) | 1 | |
| Miscellaneous | Crew | Small (1-2 people) | 1 | |
| General heavy equipment (i.e. excavators, backhoes, scrapers, etc.) | Rig | N/A | 1 | |
| Site Security | Unit | Type | Quantity | Price |
| Manned | week | 1 | 1 | |
| Remote Sensing | System | 2 motion activated cameras, control station, & monitoring | each | |
| Patrol | week | 1 | 1 |
| Other | Unit | Type | Quantity | Price |
| Equipment and Personnel Decontamination - Radiological | Day | N/A | 5 | |
| Equipment and Personnel Decontamination - PPE and Equipment | Day | N/A | 5 | |
| Equipment and Personnel Decontamination - MARSSIM | Day | N/A | 5 | |
| UXO Avoidance Services | Day | N/A | 1 | |
| Utility Clearance | Day | N/A | 5 | |
| Oversight of Private Utility Clearance | Day | N/A | 5 | |
| General Site Clean-up | Day | N/A | 5 | |
| Clearing/Grubbing | Day | N/A | 5 | |
| Mowing | Acre | N/A | 5 | |
| Equipment/Bldg Inventory (chemicals, etc.) | Bldg | Occupied | 1 | |
| Equipment/Bldg Inventory (chemicals, etc.) | Bldg | Unoccupied | 1 | |
| Topographical Survey | Acre | Dense Brush | 1 | |
| Topographical Survey | Acre | Wetland Area | 1 | |
| Topographical Survey | Acre | Clearing | 1 | |
| Location Survey (well location/elevation, etc.) | Each | N/A | 1 acre | |
| Geophysical Survey (ground penetrating radar) | Each | N/A | 1 acre | |
| Metes and Bounds Survey (up to 10 points) | Acre | N/A | 1 |
BESRC Unit Pricing DRAFT PWS Enclosure 1 03/10/2014
BESRC Unit Pricing DRAFT PWS Enclosure 1 03/20/2014
BESRC Unit Pricing DRAFT PWS Enclosure 1 03/20/2014
BESRC Unit Pricing DRAFT PWS Enclosure 1 03/10/2014
BESRC Unit Pricing DRAFT PWS Enclosure 1 03/10/2014
BECSRC Unit Pricing Pricing Matrix 1/21/2015
Page &P of &N
*costs should include all activities associated with completing the activity or called out as a separate activity in the list
Page &P of &N
*costs should include all activities associated with completing the activity or called out as a separate activity in the list
Page &P of &N
*costs should include all activities associated with completing the activity or called out as a separate activity in the list
Page &P of &N
*costs should include all activities associated with completing the activity or called out as a separate activity in the list
Page &P of &N
*costs should include all activities associated with completing the activity or called out as a separate activity in the list
Page &P of &N
*costs should include all activities associated with completing the activity or called out as a separate activity in the list