15-R-0023_BECSRC_Sample_Installation_of_MWs_OWS_Soil_Excavation_Castle_Western_Region_Exhibit_A_CDRL_10072015_Updated.pdf

PDF 34 KB Posted

Attached to
AFICA AFCEC BECSRC Western Solicitation
Solicitation number
FA8903-15-R-0023
Issued by

About this file

BECSRC West Revised STO CDRLs Exhibit A

View the file

Other files

File Type Posted
BECSRC_West_Consolidated_QAs_Contracting_110915.pdf PDF
BECSRC_West_Consolidated_QAs_Contracting_110515.pdf PDF
FA8903-15-R-0023_Section_L_20151105.pdf PDF
BECSRC_West_Consolidated_QAs_Contracting_102915.pdf PDF
FA8903-15-R-0023_Section_L_20151027.pdf PDF
BECSRC_West_Consolidated_QAs_Contracting_102715.pdf PDF
FA8903-15-R-0023_Section_M_20151027.pdf PDF
FA8903-15-R-0023_Section_L_20151027.pdf PDF
BECSRC_West_Consolidated_QAs_Technical_102215.pdf PDF
15-R-0023_BECSRC_West_Sample_TO_Castle_AFB_SOW_102215.pdf PDF
15-R-0023_BECSRC_Sample_Installation_of_MWs_OWS_Soil_Excavation_Castle_Western_Region_STO_Exhibit_B_CDRL_10072015_Updated.pdf PDF
15-R-0023_BECSRC_Sample_Installation_of_MWs_OWS_Soil_Excavation_Castle_Western_Region_STO_Exhibit_C_CDRL_10072015_Updated.pdf PDF
FA8903-15-R-0023_Section_L_20150922.pdf PDF
0023_West_Basic_CDRLs.pdf PDF
FA8903-15-R-0023_Solicitation.pdf PDF
0023_West_STO_CDRLs.pdf PDF
FA8903-15-R-0023_Section_M_20150918.pdf PDF
FA8903-15-R-0023_Section_L_20150921.pdf PDF
15-R-0023_BECSRC_West_FY16-FY23_FFP_Labor_Rates_09032015.xlsx XLSX spreadsheet
15-R-0023_BECSRC_West_Sample_TO_Castle_AFB_SOW_08182015.pdf PDF
15-R-0023_BECSRC_West__Basic_SOW_08182015.pdf PDF
Attachment_1_FA8903-15-R-0023_BECSRC_West__Basic_SOW_05132015.pdf PDF
Exhibit_A_BECSRC_Basic_West__CDRL_05132015.pdf PDF
Attachment_7_Sample_TO_Exhibit_A_West_Castle_CDRL_05112015.pdf PDF
Exhibit_B_BECSRC_Basic_West__CDRL_05132015.pdf PDF
Attachment_4_BECSRC_West_Pricing_Matrix_03232015.xlsx XLSX spreadsheet
Attachment_5_BECSRC_West_FY15-FY22_FFP_Labor_Rates_05282015.xlsx XLSX spreadsheet
Attachment_8_Sample_TO_Exhibit_B_West_Castle_CDRL_05112015.pdf PDF
FA8903-15-R-0023_SF_33_05282015_Final.pdf PDF
Attachment_2_FA8903-15-R-0023_BECSRC_Section_L_New_20150527.pdf PDF
Attachment_3_FA8903-15-R-0023_BECSRC_Section_M_New_20150527.pdf PDF
Attachment_6_Sample_TO_West_Castle_AFB_SOW_05122015.pdf PDF
Exhibit_C_BECSRC_Basic_West__CDRL_05132015.pdf PDF
L-1_FA8903-15-R-0023_DRAFT_BECSRC_Western_SOW.docx DOCX document
FA8903-15-R-0023_Draft_Section_M_01232015.docx DOCX document
L-2_BECSRC_Western_Draft_Pricing_Matrix_01292015.xlsx XLSX spreadsheet
FA8903-15-R-0023_Draft_Section_L_01292015.docx DOCX document
FA8903-15-R0023_Draft_Solicitation_01232015.pdf PDF
BECSRC_West_FY15-FY20_FFP_Labor_Rates_01212015.xlsx XLSX spreadsheet
BECSRC_West_FY15-FY20_CPFF_Labor_Rates_01212015.xlsx XLSX spreadsheet
BECSRC_Western_Contractor_Question_Comments_Matrix_01222015.xlsx XLSX spreadsheet
L-3_BECSRC_Western_Draft_Pricing_Matrix.xlsx XLSX spreadsheet
FA8903-15-R0023_Draft_Solicitation_01232015.pdf PDF
BECSRC_Western_Contractor_Question_Comments_Matrix_01222015.xlsx XLSX spreadsheet
L-1_FA8903-15-R-0023_DRAFT_BECSRC_Western_SOW.docx DOCX document
FA8903-15-R-0023_Draft_Section_M_01232015.docx DOCX document
FA8903-15_R-0023_Frequently_Asked_Questions_(FAQs)_01262015.docx DOCX document
FA8903-15-R-0023_Draft_Section_L_01232015.docx DOCX document
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8903-15-R-0023

STO Exhibit A

18 August 2015

1. DATA 2. TITLE 4. AUTHORITY

ITEM NO. 5. CONTRACT REFERENCE

3. SUBTITLE 16. REMARKS HC CD HC CD HC CD HC CD

A001 Scientific and Technical

Reports As Required AFCEC/CIB 0 0 2 (e-mail) 2 0 0 2 (e-mail) 2

772d ESS/PKC 0 0 LT 0 0 0 LT 0

Remedial Action Completion Report

SOW paragraphs: 3.7.4, 4.11, 6.0, 6.3, 6.6, 6.6.1, 6.6.4 and 6.16.2 Base POC 0 0 1 (e-mail) 0 0 0 1 (e-mail) 0

Remedial Investigative Report

AFCEC Library

POC

0 0 0 0 0 0 0 0

Preliminary Assessment/Site Investigation Report

Shall include original disposal manifests for debris/wastes.

Shall include final results and laboratory quality data from sampling/analysis. AFCEC/CDUT

0 0 0 0 0 0 0 1

Short-Term Monitoring Report

Submit per instruction from the COR. The government will require 20 business days for review. The Contractor shall incorporate government comments and submit next/final version within 10 business days of receipt of

Monitoring Report AFCEC Library POC: Send electronic copy of Final deliverable to Monico Luna (monico.luna@us.af.mil).

Analytical Data Packages (Draft or validated)

AFCEC: Submit deliverable submittal letter to Mark Davis (mark.davis.5@us.af.mil).

Monitoring Well Installation Report

All Working Copy (WC), Draft (D), Draft Final (DF), and Final (F) deliverables shall also be submitted by compact disc (CD) and hard copy (HC) as specified in the distribution section. The F versions shall include hard copies and web-ready (WR) files. The WR files shall be submitted in a single portable document file (pdf) format.

Field Summary Report Letters of transmittal (LT) shall be submitted by e-mail and HC.

Geographical Information System Reporting

All deliverables shall be prepared in a format compatible with current AFCEC Administrative Record requirements.

All deliverables shall be prepared in a format compatible with current AFCEC Administrative Record requirements.

DRAFT FINAL

SOLICITATION NO.: FA8903-15-R-0023

FINAL

BRAC ENVIRONMENTAL CONSTRUCTION AND SERVICES REQUIREMENTS CONTRACT TO SUPPORT INSTALLATION OF MONITORING WELLS, OIL WATER SEPARATOR REMEDIAL INVESTIGATION, AND SOIL

EXCAVATION

PROJECT NO: TBD

10. FREQUENCY

14. DISTRIBUTION (Per Deliverable)

ADDRESSEE

WORKING COPY DRAFT

AT FORMER CASTLE AIR FORCE BASE, CALIFORNIA

18 August 2015

1. DATA 2. TITLE 4. AUTHORITY

ITEM NO. 5. CONTRACT REFERENCE

3. SUBTITLE 16. REMARKS HC CD HC CD HC CD HC CD

DRAFT FINAL

SOLICITATION NO.: FA8903-15-R-0023

FINAL

BRAC ENVIRONMENTAL CONSTRUCTION AND SERVICES REQUIREMENTS CONTRACT TO SUPPORT INSTALLATION OF MONITORING WELLS, OIL WATER SEPARATOR REMEDIAL INVESTIGATION, AND SOIL

EXCAVATION

PROJECT NO: TBD

10. FREQUENCY

14. DISTRIBUTION (Per Deliverable)

ADDRESSEE

WORKING COPY DRAFT

AT FORMER CASTLE AIR FORCE BASE, CALIFORNIA

A003 Other Scientific and Technical Reports

Monthly SOW paragraphs: 4.11, 4.12, 4.16, 4.17, 6.2, 6.3, and 6.7 AFCEC/CIB 0 0 2 2 2 2 2 2

Waste Manifest 772d ESS/PKC 0 0 LT 0 0 0 LT 0

Site Visit/Survey Report Base POC 0 0 1 1 1 1 1 1

Hazardous/Non-hazardous material/Waste Report

Shall include original disposal manifests for hazardous wastes.

Shall include final results and laboratory quality data from sampling/analysis. AFCEC Library

POC 0 0 0 0 0 0 0 1

ERPIMS Data Submission

AFCEC/CDUT 0 0 0 1 0 1 0 1

Integrated Solid Waste Summary Report

The government will require 20 business days for review. The Contractor shall incorporate government comments and submit next/final version within 10 business days of receipt of government comments.

AFCEC Library POC: Send electronic copy of Final deliverable to Monico Luna (monico.luna@us.af.mil).

AFCEC: Submit deliverable submittal letter to Mark Davis (mark.davis.5@us.af.mil).

All WC, D, DF, and F deliverables shall also be submitted by compact disc CD and HC as specified in the distribution section. The F versions shall includeHCs and WR files. The WR files shall be submitted in a single pdf format.

LT shall be submitted by e-mail and HC.

All deliverables shall be prepared in a format compatible with current AFCEC Administrative Record requirements.

18 August 2015

1. DATA 2. TITLE 4. AUTHORITY

ITEM NO. 5. CONTRACT REFERENCE

3. SUBTITLE 16. REMARKS HC CD HC CD HC CD HC CD

DRAFT FINAL

SOLICITATION NO.: FA8903-15-R-0023

FINAL

BRAC ENVIRONMENTAL CONSTRUCTION AND SERVICES REQUIREMENTS CONTRACT TO SUPPORT INSTALLATION OF MONITORING WELLS, OIL WATER SEPARATOR REMEDIAL INVESTIGATION, AND SOIL

EXCAVATION

PROJECT NO: TBD

10. FREQUENCY

14. DISTRIBUTION (Per Deliverable)

ADDRESSEE

WORKING COPY DRAFT

AT FORMER CASTLE AIR FORCE BASE, CALIFORNIA

A004 Environmental Permits As required AFCEC/CIB 0 0 2 2 2 2 2 2 Dig/Utility Clearance 772d ESS/PKC 0 0 LT 0 0 0 LT 0

Miscellaneous Permits SOW paragraphs: 3.7.4, and 3.7.8 Base POC 0 0 1 1 1 1 1 1

AFCEC Library

POC

0 0 0 0 0 0 0 1

AFCEC/CDUT 0 0 0 1 0 1 0 1

Submit per instruction from the COR. The government will require 20 business days for review. The Contractor shall incorporate government comments and submit next/final version within 10 business days of receipt of

AFCEC Library POC: Send electronic copy of Final deliverable to Monico Luna (monico.luna@us.af.mil).

AFCEC: Submit deliverable submittal letter to Mark Davis (mark.davis.5@us.af.mil).

All WC, D, DF, and F deliverables shall also be submitted by compact disc CD and HC as specified in the distribution section. The F versions shall includeHCs and WR files. The WR files shall be submitted in a single pdf format.

LT shall be submitted by e-mail and HC.

All deliverables shall be prepared in a format compatible with current AFCEC Administrative Record requirements.

Exhibit A

File details come from the government source that posted it. Updated .