This is a Schedule of Items (SOI) pricing template for the Buckboard Marina Water System Improvements project located in Ashley National Forest, Wyoming, under USDA Forest Service solicitation 1240LT26Q0109. The document outlines eight schedules of work with detailed line items and quantities for which offerors must provide unit and total costs.

The project encompasses comprehensive water system infrastructure improvements organized into eight major schedules: General Items including mobilization, erosion control, clearing, and material import/export (3.7 acres); New Raw Water Intake and Irrigation systems featuring multiple pumps, piping, electrical infrastructure, and appurtenances totaling over 15,000 linear feet of pipe; Underground Storage Tanks requiring six 6,000-gallon concrete tanks; Looped Water Distribution System with over 7,100 linear feet of 2-inch HDPE pipe, booster pumps, and 12 connection tie-ins; Water Meters installation of five 2-inch meters; Upgrade Treatment Plant requiring a design-build replacement system; Dock Waterline improvements at a future dock location with approximately 3,268 linear feet of piping; and Roadway Items including asphalt repairs and a waterline service road. Offerors are required to complete all unit pricing, with the total project cost calculated by extending quantities by unit costs. The template includes fields for offeror identification, UEI, date, and point of contact information. In case of bid extension errors, unit prices will govern unless otherwise determined by the Contracting Officer.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOI

Buckboard Marina Water System Improvements
Schedule of Items
Horrocks Project #: UT-10875-25
ItemUnitTotal
No.Item DescriptionQuantityUnitCostCost
1.00Schedule A - General Items
1.01Mobilization1LS$ - 0
1.02SWPPP (Erosion Control)1LS$ - 0
1.03Clear and Grub3.7AC$ - 0
1.04Construction Staking1LS$ - 0
1.05Material Import/Export1944CY$ - 0
Subtotal$ - 0
2.00Schedule B - New Raw Water Intake & Irrigation
2.0140 GPM In-Line Treatment Booster Pump (Near treatment facility)2EA$ - 0
2.0275 GPM Pump House Booster Pump2EA$ - 0
2.0375 GPM Submersible Water Pump2EA$ - 0
2.04Pump House Structure and Electrical1LS$ - 0
2.05Pump House Piping1LS$ - 0
2.06Electrical Transformer with Phase Converter1EA$ - 0
2.07Electrical Power Pole11EA$ - 0
2.08Overhead Elecrical Service Line to Pumphouse2,856LF$ - 0
2.09Overhead Communication Line4,738LF$ - 0
2.10Design-Build Electrical Operating System1LS$ - 0
2.11Cofferdam610LF$ - 0
2.123" HDPE Non-Potable Water Pipe5,565LF$ - 0
2.132" HDPE Non-Potable Water Pipe1,055LF$ - 0
2.141" Air/Vac Valves1EA$ - 0
2.153" Gate Valve6EA$ - 0
2.168" HDPE DR-21 Casing Pipe653LF$ - 0
2.17Concrete Bulk Head1LS$ - 0
2.1848" Concrete Manhole (for in line pumps)3EA$ - 0
2.192" Galvanized Steel Drain Pipe to Daylight50LF$ - 0
2.203" Flow Meter1EA$ - 0
Subtotal$ - 0
3.00Schedule C - Underground Storage Tanks
3.016,000 Gallon Dura-Crete Water Tank6EA$ - 0
Subtotal$ - 0
4.00Schedule D - Looped Water Distribution System
4.0140 GPM In-Line Culinary Booster Pump2EA$ - 0
4.022" HDPE Pipe7,127LF$ - 0
4.031" Air Vac Valve1EA$ - 0
4.042" Gate Valve (Culinary Water)37EA$ - 0
4.05Water Services7EA$ - 0
4.06Fire Hydrant - Mueller A-4111EA$ - 0
4.07Drain Drop Manhole1EA$ - 0
4.084" HDPE Drain Pipe214LF$ - 0
4.094" Galvanized Steel Drain Pipe to Daylight10LF$ - 0
4.10Tie-In A Through L12EA$ - 0
Subtotal$ - 0
5.00Schedule E - Water Meters
5.012" Water Meters5EA$ - 0
Subtotal$ - 0
6.00Schedule F - Upgrade Treatment Plant
6.01Design Build Replacement Treatment System1LS$ - 0
Subtotal$ - 0
7.00Schedule G - Dock Waterline at Future Dock Location
7.012" HDPE Pipe3,268LF$ - 0
7.021" Air/Vac Valve1EA$ - 0
7.032" Gate Valve (To Future Dock Location)6EA$ - 0
Subtotal$ - 0
8.00Schedule H - Roadway Items
8.01Asphalt Surface Repair3,015SF$ - 0
8.02Waterline Service Road3,883LF$ - 0
Subtotal$ - 0
Total$ - 0
TOTAL PROJECT COST$ - 0
Offeror:
UEI:
DATE:
POC NAME:
POC EMAIL:
In the event of an error in extending the bid prices, unit prices will govern, unless otherwise determined by the Contracting Officer, in accordance with applicable regulations.

&6Printed: &D&10 &6File Location:&Z&F