C04g Options Supplement 1240LT26Q0109 102026.pdf

PDF 961 KB Posted

Attached to
4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, Wyoming
Solicitation number
1240LT26Q0109
Issued by

About this file

This is a work options supplement drawing for the Buckboard Marina Water System Improvements project located in McKinnon, Wyoming, within the Flaming Gorge Recreation Area on the Ashley National Forest under the Forest Service. The document is prepared by the United States Department of Agriculture Forest Service and outlines base bid work and five optional bid items for water infrastructure development.

The base bid includes raw water line installation from the treatment plant connection to the intake, parallel access road, communication line, power lines, intake infrastructure, raw water tank infrastructure, and pumps to the treatment plant and irrigation system, with electrical plans for full build-out (except Option 4). Option 1 encompasses five finished water tanks with associated drains, valves, and booster pump to the distribution system. Option 2 includes a distribution system in a "figure 8" pattern with all associated valves and service tie-ins. Option 3 adds water meters at five service and mainline locations. Option 4 involves design-build of a water treatment plant upgrade to 40 GPM capacity with associated electrical and communications design. Option 5 extends the distribution system for future boat docks from Option 2 work, including associated valves and drains. The drawing specifies that optional work will be awarded in numerical order, with minor field adjustments required at no additional cost if subsequent options are not awarded. Water services must remain active during construction, and the contractor is responsible for verifying all existing utility locations prior to commencing work.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W

W

W

W

W

W

W W W

W

W

W

W

WFO

FO

FO

FO FO

FO

FO FO

FO

FO

FO

FO

E

OHP

OHP OHP

OHP OHP

OHP

SD

W

IR

W

W

W

WM

WM

WM

WM

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

W

WM

P

P

P

P

P

P

P

P

P

M

M

M

M

M

M

M

M

M co co co co co co co co co co co w s co co co s e e e e e e e e jb jb jb jb

SS

SS

SS

SS

SS

P

P

P

P

P

P P co co co co co co co co co co co co co co co co co co co co co co co co co co

P

P

P

P

P

P

P

P

P

EL

EL

jb

SS

co

KEYNOTES

BEGINNING OF BASE BID WORK AT RAW WATER CONNECTION TO

TREATMENT PLANT.

END OF BASE BID WORK AT INTAKE INLET.

BID OPTION 1 WORK TO INCLUDE FINISHED WATER TANKS AND

ASSOCIATED PIPING FROM TREATMENT PLANT TO EXISTING

DISTRIBUTION SYSTEM CONNECTIONS

BID OPTION 2 WORK INCLUDES NEW DISTRIBUTION LOOPS WITH

CONNECTIONS TO EXISTING SERVICES.

BID OPTION 3 WORK INCLUDES WATER METERS AT 5 LOCATIONS.

BID OPTION 4 WORK INCLUDES PACKAGE TREATMENT PLANT

REPLACEMENT WITHIN AN EXISTING BUILDING.

BEGINNING OF BID OPTION 5 AT CONNECTION TO BID OPTION 2

DISTRIBUTION SYSTEM.

END OF BID OPTION 5 AT FUTURE STUBOUT AND DRAIN.

A

B

C

D

E

F

G

H

SHEET NOTES

1. THE ENGINEER HAS MADE AN EXTENSIVE EFFORT TO LOCATE ALL EXISTING

UTILITY LINES FROM RECORDS PROVIDED BY OTHERS AND EVIDENCE IN THE

FIELD. CONTRACTOR TO VERIFY ALL EXISTING UTILITY LOCATIONS PRIOR TO

COMMENCING WORK.

2. BASE BID AND OPTIONAL WORK AS DESCRIBED ON THIS SHEET ARE FOR

GENERAL INFORMATION ONLY. SEE THE SCHEDULE OF ITEMS FOR SPECIFIC

INFORMATION ON WHAT IS INCLUDED IN THE BASE OR BID OPTIONS. SEE

THE PLANS AND SPECIFICATIONS FOR MORE INFORMATION ON WHAT IS

INCLUDED IN EACH BID ITEM UNIT OF WORK.

3. OPTIONAL WORK WILL BE AWARDED IN NUMERICAL ORDER. PLANS ARE

DRAWN ASSUMING ALL OPTIONS ARE TO BE CONSTRUCTED. MINOR FIELD

ADJUSTMENTS MAY BE REQUIRED IF SOME OPTIONAL WORK IS NOT

AWARDED. IN ALL CASES IT IS THE RESPONSIBILITY OF THE CONTRACTOR

TO MAKE SUCH MINOR ADJUSTMENTS AT NO ADDITIONAL COST TO ENSURE

THE COMPLETED WORK IS FULLY FUNCTIONAL INDEPENDENT OF

SUBSEQUENT BID OPTIONS NOT AWARDED.

4. WATER SERVICES TO REMAIN ACTIVE DURING CONSTRUCTION.

H o r r o c k s

N 0 500'250'

SCALE: 1" = 500'

C E

E

D

FR 009

FR 009FR 010FR 010A

FR

FR

FR 055

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO. REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

/1/

:2 1 K

CA

RN

ES

X:

\A

SH

LE

Y\

BU

CK

BO

AR

D.

W

AT

ER

SY

ST

EM

.20

\D

RA

W

IN

GS

\C .2.

2 O

PT

IO

NS

P

LA

N.

DW

G

BUCKBOARD MARINA

WATER SYSTEM

IMPROVEMENTS

BUCKBOARD MARINA FR 009,

MCKINNON, WY 82938

FLAMING GORGE RECREATION AREA

ASHLEY NATIONAL FOREST

FLAMING GORGE RANGER DISTRICT

R4

10/01/2026

K.CARNES

K.CARNES

UT-10875-25

1 1

C.2.2

WORK OPTIONS

SUPPLEMENT

D

GENERAL WORK OPTIONS OVERVIEW

BASE BID: INCLUDES RAW WATER LINE FROM TREATMENT PLANT CONNECTION "A" TO INTAKE "B" AND ASSOCIATED PARALLEL ACCESS ROAD, COMMUNICATION LINE, AND POWER LINES. ALSO INCLUDES INTAKE INFRASTRUCTURE, RAW WATER TANK INFRASTRUCTURE, AND PUMPS TO TREATMENT PLANT AND IRRIGATION SYSTEM. ELECTRICAL PLANS FOR FULL BUILD-OUT (EXCEPT OPTION 4 TREATMENT

PLANT) SHALL BE PREPARED.

OPTION 1: INCLUDES FIVE FINISH WATER TANKS "C" AND ASSOCIATED DRAINS, VALVES, AND BOOSTER

PUMP TO DISTRIBUTION SYSTEM.

OPTION 2: INCLUDES DISTRIBUTION SYSTEM "D" IN A "FIGURE 8" PATTERN TO AND INCLUDING THE AIR-VAC

VALVE AT "G". ALSO INCLUDES ALL ASSOCIATED VALVES AND SERVICE TIE-INS.

OPTION 3: INCLUDES WATER METERS INSTALLED AT SERVICES AND MAINLINE POINTS "E" AS SHOWN ON

THE PLANS.

OPTION 4: INCLUDES DESIGN-BUILD OF THE WATER TREATMENT PLANT TO UPGRADE CAPACITY TO 40 GPM.

WORK WILL INCLUDE ASSOCIATED ELECTRICAL AND COMMUNICATIONS DESIGN ABOVE THE BASE BID

DESIGN WORK ITEM.

OPTION 5: INCLUDES DISTRIBUTION SYSTEM EXTENSION FOR FUTURE BOAT DOCKS FROM THE OPTION 2 WORK AT "G" TO THE STUB AND DRAIN AT "H", INCLUDING ASSOCIATED VALVES AND DRAINS.

E E

E

A

F

G

H

B

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

Sheets and Views
C.2.1 UTILITY PLAN

File details come from the government source that posted it. Updated .