C04g Options Supplement 1240LT26Q0109 102026.pdf
PDF 961 KB Posted
- Solicitation number
- 1240LT26Q0109
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a work options supplement drawing for the Buckboard Marina Water System Improvements project located in McKinnon, Wyoming, within the Flaming Gorge Recreation Area on the Ashley National Forest under the Forest Service. The document is prepared by the United States Department of Agriculture Forest Service and outlines base bid work and five optional bid items for water infrastructure development.
The base bid includes raw water line installation from the treatment plant connection to the intake, parallel access road, communication line, power lines, intake infrastructure, raw water tank infrastructure, and pumps to the treatment plant and irrigation system, with electrical plans for full build-out (except Option 4). Option 1 encompasses five finished water tanks with associated drains, valves, and booster pump to the distribution system. Option 2 includes a distribution system in a "figure 8" pattern with all associated valves and service tie-ins. Option 3 adds water meters at five service and mainline locations. Option 4 involves design-build of a water treatment plant upgrade to 40 GPM capacity with associated electrical and communications design. Option 5 extends the distribution system for future boat docks from Option 2 work, including associated valves and drains. The drawing specifies that optional work will be awarded in numerical order, with minor field adjustments required at no additional cost if subsequent options are not awarded. Water services must remain active during construction, and the contractor is responsible for verifying all existing utility locations prior to commencing work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C04f New SOI 1240LT26Q0109 102026.xlsx | XLSX spreadsheet | |
| C04c New Specs 1240LT26Q0109 102026.docx | DOCX document | |
| C04a RFI QA 1240LT26Q0109 102026.docx | DOCX document | |
| C04 SF30 1240LT26Q0109-0003.pdf | ||
| C04d Measurement PYMT Sup 1240LT26Q0109 102026.docx | DOCX document | |
| C04e Measurement PYMT Spec 1240LT26Q0109 102026.pdf | ||
| C04b New SOW 1240LT26Q0109 102026.docx | DOCX document | |
| C05a Site Visit 1240LT26Q0109.pdf | ||
| C05 SF30 1240LT26Q0109-0002.pdf | ||
| C05 SF30 1240LT26Q0109-0001.pdf | ||
| C04d Attachment 4 General Decision WY20260044 07302026.pdf | ||
| C04f Attachment 6 Site Visit 1240LT26Q0109.docx | DOCX document | |
| C04b Attachment 2 Specifications 1240LT26Q0109.pdf | ||
| C04c Attachment 3 Plans 1240LT26Q0109.pdf | ||
| C04e Attachment 5 RFI Form 1240LT26Q0109.docx | DOCX document | |
| C04a Attachment 1 SOI 1240LT26Q0109.xlsx | XLSX spreadsheet | |
| C04 SF1442 1240LT26Q0109.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W
W
W
W
W
W
W W W
W
W
W
W
WFO
FO
FO
FO FO
FO
FO FO
FO
FO
FO
FO
E
OHP
OHP OHP
OHP OHP
OHP
SD
W
IR
W
W
W
WM
WM
WM
WM
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
PP
W
WM
P
P
P
P
P
P
P
P
P
M
M
M
M
M
M
M
M
M co co co co co co co co co co co w s co co co s e e e e e e e e jb jb jb jb
SS
SS
SS
SS
SS
P
P
P
P
P
P P co co co co co co co co co co co co co co co co co co co co co co co co co co
P
P
P
P
P
P
P
P
P
EL
EL
jb
SS
co
KEYNOTES
BEGINNING OF BASE BID WORK AT RAW WATER CONNECTION TO
TREATMENT PLANT.
END OF BASE BID WORK AT INTAKE INLET.
BID OPTION 1 WORK TO INCLUDE FINISHED WATER TANKS AND
ASSOCIATED PIPING FROM TREATMENT PLANT TO EXISTING
DISTRIBUTION SYSTEM CONNECTIONS
BID OPTION 2 WORK INCLUDES NEW DISTRIBUTION LOOPS WITH
CONNECTIONS TO EXISTING SERVICES.
BID OPTION 3 WORK INCLUDES WATER METERS AT 5 LOCATIONS.
BID OPTION 4 WORK INCLUDES PACKAGE TREATMENT PLANT
REPLACEMENT WITHIN AN EXISTING BUILDING.
BEGINNING OF BID OPTION 5 AT CONNECTION TO BID OPTION 2
DISTRIBUTION SYSTEM.
END OF BID OPTION 5 AT FUTURE STUBOUT AND DRAIN.
A
B
C
D
E
F
G
H
SHEET NOTES
1. THE ENGINEER HAS MADE AN EXTENSIVE EFFORT TO LOCATE ALL EXISTING
UTILITY LINES FROM RECORDS PROVIDED BY OTHERS AND EVIDENCE IN THE
FIELD. CONTRACTOR TO VERIFY ALL EXISTING UTILITY LOCATIONS PRIOR TO
COMMENCING WORK.
2. BASE BID AND OPTIONAL WORK AS DESCRIBED ON THIS SHEET ARE FOR
GENERAL INFORMATION ONLY. SEE THE SCHEDULE OF ITEMS FOR SPECIFIC
INFORMATION ON WHAT IS INCLUDED IN THE BASE OR BID OPTIONS. SEE
THE PLANS AND SPECIFICATIONS FOR MORE INFORMATION ON WHAT IS
INCLUDED IN EACH BID ITEM UNIT OF WORK.
3. OPTIONAL WORK WILL BE AWARDED IN NUMERICAL ORDER. PLANS ARE
DRAWN ASSUMING ALL OPTIONS ARE TO BE CONSTRUCTED. MINOR FIELD
ADJUSTMENTS MAY BE REQUIRED IF SOME OPTIONAL WORK IS NOT
AWARDED. IN ALL CASES IT IS THE RESPONSIBILITY OF THE CONTRACTOR
TO MAKE SUCH MINOR ADJUSTMENTS AT NO ADDITIONAL COST TO ENSURE
THE COMPLETED WORK IS FULLY FUNCTIONAL INDEPENDENT OF
SUBSEQUENT BID OPTIONS NOT AWARDED.
4. WATER SERVICES TO REMAIN ACTIVE DURING CONSTRUCTION.
H o r r o c k s
N 0 500'250'
SCALE: 1" = 500'
C E
E
D
FR 009
FR 009FR 010FR 010A
FR
FR
FR 055
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO. REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
/1/
:2 1 K
CA
RN
ES
X:
\A
SH
LE
Y\
BU
CK
BO
AR
D.
W
AT
ER
SY
ST
EM
.20
\D
RA
W
IN
GS
\C .2.
2 O
PT
IO
NS
P
LA
N.
DW
G
BUCKBOARD MARINA
WATER SYSTEM
IMPROVEMENTS
BUCKBOARD MARINA FR 009,
MCKINNON, WY 82938
FLAMING GORGE RECREATION AREA
ASHLEY NATIONAL FOREST
FLAMING GORGE RANGER DISTRICT
R4
10/01/2026
K.CARNES
K.CARNES
UT-10875-25
1 1
C.2.2
WORK OPTIONS
SUPPLEMENT
D
GENERAL WORK OPTIONS OVERVIEW
BASE BID: INCLUDES RAW WATER LINE FROM TREATMENT PLANT CONNECTION "A" TO INTAKE "B" AND ASSOCIATED PARALLEL ACCESS ROAD, COMMUNICATION LINE, AND POWER LINES. ALSO INCLUDES INTAKE INFRASTRUCTURE, RAW WATER TANK INFRASTRUCTURE, AND PUMPS TO TREATMENT PLANT AND IRRIGATION SYSTEM. ELECTRICAL PLANS FOR FULL BUILD-OUT (EXCEPT OPTION 4 TREATMENT
PLANT) SHALL BE PREPARED.
OPTION 1: INCLUDES FIVE FINISH WATER TANKS "C" AND ASSOCIATED DRAINS, VALVES, AND BOOSTER
PUMP TO DISTRIBUTION SYSTEM.
OPTION 2: INCLUDES DISTRIBUTION SYSTEM "D" IN A "FIGURE 8" PATTERN TO AND INCLUDING THE AIR-VAC
VALVE AT "G". ALSO INCLUDES ALL ASSOCIATED VALVES AND SERVICE TIE-INS.
OPTION 3: INCLUDES WATER METERS INSTALLED AT SERVICES AND MAINLINE POINTS "E" AS SHOWN ON
THE PLANS.
OPTION 4: INCLUDES DESIGN-BUILD OF THE WATER TREATMENT PLANT TO UPGRADE CAPACITY TO 40 GPM.
WORK WILL INCLUDE ASSOCIATED ELECTRICAL AND COMMUNICATIONS DESIGN ABOVE THE BASE BID
DESIGN WORK ITEM.
OPTION 5: INCLUDES DISTRIBUTION SYSTEM EXTENSION FOR FUTURE BOAT DOCKS FROM THE OPTION 2 WORK AT "G" TO THE STUB AND DRAIN AT "H", INCLUDING ASSOCIATED VALVES AND DRAINS.
E E
E
A
F
G
H
B
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
| Sheets and Views |
| C.2.1 UTILITY PLAN |
File details come from the government source that posted it. Updated .