C04f New SOI 1240LT26Q0109 102026.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- 1240LT26Q0109
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items (SOI) pricing template for the Buckboard Marina Water System Improvements project under USDA Forest Service solicitation 1240LT26Q0109 in Ashley National Forest, Wyoming. The SOI is organized into a base bid and five optional line items, with all pricing currently listed at zero dollars pending contractor submission.
The base bid (Section 1.00) encompasses the primary raw water intake and irrigation system improvements, including mobilization, erosion control, site preparation, three booster pumps (40 GPM, 50 GPM, and 75 GPM), a submersible water pump, pump house structure with electrical systems, approximately 6,400 linear feet of HDPE water piping (2-inch and 3-inch), associated valves and fittings, electrical infrastructure (power poles, transformer, overhead service line), communication line extension, cofferdam construction, concrete structures including a bulk head and two 60-inch manholes, a 6,000-gallon storage tank, and approximately 3,883 linear feet of waterline service road. Optional items include: Option 1 featuring five 6,000-gallon underground storage tanks with culinary booster pump and potable water piping; Option 2 providing a looped water distribution system with 8,115 linear feet of 2-inch potable water pipe, fire hydrant, and multiple valve and service connections; Option 3 for five 2-inch water meters; Option 4 for design-build replacement treatment system; and Option 5 for waterline extension to a future dock location. Contractors must provide pricing for each item, with the contract quote due date extended to November 17, 2026, per Amendment 0003.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOI
| USDA Forest Service |
| SCHEDULE OF ITEMS |
| BUCKBOARD MARINA WATER SYSTEM IMPROVEMENTS |
| Final (Revised) - 10/19/2026 |
| ITEM NUMBER | DESCRIPTION | METHOD OF MEAS | UNIT | QUANTITY | PRICE | TOTAL |
| 1.00 | Base Bid - New Raw Water Intake & Irrigation | |||||
| 1.01 | Mobilization | LSQ | LS | 1 | $ - 0 | |
| 1.02 | SWPPP (Erosion Control) | LSQ | LS | 1 | $ - 0 | |
| 1.03 | Clear and Grub | DQ | AC | 2.4 | $ - 0 | |
| 1.04 | Construction Staking | LSQ | LS | 1 | $ - 0 | |
| 1.05 | Material Import/Export | DQ | CY | 1,944 | $ - 0 | |
| 1.06 | 40 GPM In-Line Treatment Booster Pump (Near treatment facility) | AQ | EA | 1 | $ - 0 | |
| 1.07 | 50 GPM In-Line Irrigation Booster Pump | AQ | EA | 1 | $ - 0 | |
| 1.08 | 75 GPM Pump House Booster Pump | AQ | EA | 1 | $ - 0 | |
| 1.09 | 75 GPM Submersible Water Pump | AQ | EA | 1 | $ - 0 | |
| 1.10 | Pump House Structure and Electrical | LSQ | LS | 1 | $ - 0 | |
| 1.11 | Pump House Piping | LSQ | LS | 1 | $ - 0 | |
| 1.12 | Electrical Transformer | AQ | EA | 1 | $ - 0 | |
| 1.13 | Electrical Power Pole | DQ | EA | 11 | $ - 0 | |
| 1.14 | Overhead Elecrical Service Line to Pumphouse | DQ | LF | 2,856 | $ - 0 | |
| 1.15 | Communication Line Extension | DQ | LF | 900 | $ - 0 | |
| 1.16 | Design-Build Electrical Operating System | LSQ | LS | 1 | $ - 0 | |
| 1.17 | Cofferdam | DQ | LF | 610 | $ - 0 | |
| 1.18 | 2" HDPE Non-Potable Water Pipe | DQ | LF | 460 | $ - 0 | |
| 1.19 | 3" HDPE Non-Potable Water Pipe | DQ | LF | 5,565 | $ - 0 | |
| 1.20 | 1" Air/Vac Valves | AQ | EA | 1 | $ - 0 | |
| 1.21 | 2" Gate Valve | AQ | EA | 3 | $ - 0 | |
| 1.22 | 3" Gate Valve | LSQ | EA | 6 | $ - 0 | |
| 1.23 | 8" HDPE DR-21 Casing Pipe | DQ | LF | 653 | $ - 0 | |
| 1.24 | Concrete Bulk Head | LSQ | LS | 1 | $ - 0 | |
| 1.25 | 60" Concrete Manhole (for in line pumps) | AQ | EA | 2 | $ - 0 | |
| 1.26 | 6,000 Gallon Dura-Crete Water Tank | AQ | EA | 1 | $ - 0 | |
| 1.27 | Drain Drop Manhole | AQ | EA | 1 | $ - 0 | |
| 1.28 | 4" HDPE Drain Pipe | DQ | LF | 214 | $ - 0 | |
| 1.29 | 2" Galvanized Steel Drain Pipe to Daylight | DQ | LF | 10 | $ - 0 | |
| 1.30 | 4" Galvanized Steel Drain Pipe to Daylight | DQ | LF | 10 | $ - 0 | |
| 1.32 | Asphalt Surface Repair | DQ | SF | 270 | $ - 0 | |
| 1.33 | Waterline Service Road | DQ | LF | 3,883 | $ - 0 | |
| Subtotal | $ - 0 | |||||
| 2.00 | Option 1 - Underground Storage Tanks | |||||
| 2.01 | 40 GPM In-Line Culinary Booster Pump | AQ | EA | 1 | $ - 0 | |
| 2.02 | 2" HDPE Potable Water Pipe | DQ | LF | 605 | $ - 0 | |
| 2.03 | 2" Gate Valve | AQ | EA | 15 | $ - 0 | |
| 2.04 | 60" Concrete Manhole (for in line pumps) | AQ | EA | 1 | $ - 0 | |
| 2.05 | 6,000 Gallon Dura-Crete Water Tank | AQ | EA | 5 | $ - 0 | |
| Subtotal | $ - 0 | |||||
| 3.00 | Option 2 - Looped Water Distribution System | |||||
| 3.01 | Clear and Grub | DQ | AC | 1.3 | $ - 0 | |
| 3.02 | Construction Staking | LSQ | LS | 1 | $ - 0 | |
| 3.03 | 2" HDPE Potable Water Pipe | DQ | LF | 8,115 | $ - 0 | |
| 3.04 | 1" Air Vac Valve | AQ | EA | 2 | $ - 0 | |
| 3.05 | 2" Gate Valve | AQ | EA | 23 | $ - 0 | |
| 3.06 | Water Services | AQ | EA | 7 | $ - 0 | |
| 3.07 | Fire Hydrant - Mueller A-411 | AQ | EA | 1 | $ - 0 | |
| 3.08 | 2" Galvanized Steel Drain Pipe to Daylight | DQ | LF | 20 | $ - 0 | |
| 3.09 | Tie-In A Through L | AQ | EA | 12 | $ - 0 | |
| 3.10 | Asphalt Surface Repair | DQ | SF | 2,745 | $ - 0 | |
| Subtotal | $ - 0 | |||||
| 4.00 | Option 3 - Water Meters | |||||
| 4.01 | 2" Water Meters | AQ | EA | 5 | $ - 0 | |
| Subtotal | $ - 0 | |||||
| 5.00 | Option 4 - Upgrade Treatment Plant | |||||
| 5.01 | Design Build Replacement Treatment System | LSQ | LS | 1 | $ - 0 | |
| Subtotal | $ - 0 | |||||
| 6.00 | Option 5 - Waterline Extension to Future Dock Location | |||||
| 6.01 | 2" HDPE Potable Water Pipe | DQ | LF | 2,270 | $ - 0 | |
| 6.02 | 2" Gate Valve | AQ | EA | 2 | $ - 0 | |
| 6.03 | 2" Galvanized Steel Drain Pipe to Daylight | DQ | LF | 10 | $ - 0 | |
| Subtotal | $ - 0 |
GRAND TOTAL $ - 0
File details come from the government source that posted it. Updated .