YON 285 6B1 Specs 9-11.pdf
PDF 1 MB Posted
- Attached to
- YON-285 Outfit
- Solicitation number
- N6264926R0013
About this file
This document contains three Job Specifications for the U.S. Navy vessel YON-285 (Barge), each describing distinct maintenance and support services required during a specified period of availability.
ICN 89MVA86301 – Docking or Hauling Out YON-285; Accomplish (Production Completion Date: 02/02/2027). This specification requires hoisting and setting the barge on blocks at either a contractor's yard or marine railway to accomplish underwater hull repair, preservation, and SHIPALT work. The contractor must transfer the barge from or to SASEBO BAY and Contractor's Ship Yard, provide access ways, connect the craft's hull to established grounding points for lightning protection using a minimum 500,000 circular mil cable, bounce the barge as necessary to repair and preserve the underwater hull, and lower the barge onto water upon completion and supervisor approval. The specification also requires cleaning and preservation of new and disturbed surfaces per standard items. The contractor is responsible for waste disposal in accordance with Japanese Environmental Governing Standards (JEGS). No government-furnished material is provided.
ICN 89MVA86303 – Temporary Head; Provide (Production Completion Date: 02/02/2027). This specification requires provision and maintenance of two temporary portable male heads and one temporary portable female head, each with water closets, sewage tanks, and locking doors, plus one portable washbasin with mirror and foundation. Services include installation of English and Japanese bilingual label plates, provision of hoses, toilet paper, soap, and disinfectant (approximately 200 cubic centimeters per head), cleaning twice daily, and securing units against weather. The contractor must collect, transport, and dispose of approximately 4,188 gallons of accumulated sewage in compliance with JEGS and submit a legible report in English documenting the amount disposed in gallons. Equipment must be removed upon SHIPSUPT notification. The availability period is 7B1 days. No government-furnished material is provided.
ICN 89MVA86401 – Temporary Pier Shack; Provide (Production Completion Date: 02/02/2027). This specification requires provision, installation, and maintenance of a temporary two-story pier shack on a rental basis with specified dimensions (2,400 millimeter width by 5,400 millimeter length by 5,300 millimeter height) including three unit houses, eaves, entrance door step, air conditioner, refrigerator, microwave, eight office desks, sixteen rolling chairs, large and small tables, book shelves, book cases, steel counters, window blinds, trash boxes, water dispenser, and miscellaneous furnishings and electrical equipment. The structure must be stationary and level, with properly sealed joints and rubber floor covering. All electrical work must comply with specified enclosures and include switches, receptacles, fluorescent lights, power distribution panels, circuit breakers, and cables. The contractor must provide potable water weekly, maintain all keys and equipment, conduct operational testing of electrical and air conditioning systems, perform janitorial services three times weekly, and remove the structure upon notification. Materials must meet or exceed Japanese Industrial Standards (JIS). No government-furnished material is provided.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9/28/2026
1301348511
6B1
Tasuku.Nagano.ja Text Box 02/02/2027
FY26
6B1
Tasuku.Nagano.ja
6B1
Tasuku.Nagano.ja
| 89MVA86301_00_A01 |
| 89MVA86301_00_A01.pdf |
| 89MVA86303_00_A01 |
| 89MVA86303_00_A01.pdf |
| 89MVA86401_00_A01 |
| 89MVA86401_00_A01.pdf |
File details come from the government source that posted it. Updated .