About this file
This is a Planning Event Readiness List (PERL) for FY26 maintenance and repair work on the YON-285 barge scheduled at Commander, Fleet Activities Sasebo (CFAS) Naval Base in Sasebo, Japan. The work period spans from September 30, 2026 through February 12, 2027, with key operational milestones including docking on October 15, 2026, tank closeout on December 20, 2026, and undocking on January 20, 2027.
The scope of work encompasses nine primary task groups: underwater hull and freeboard repair and preservation; cargo oil tank and fuel tank cleaning for Level I/II inspection; cathodic protection accomplishment; multiple ship alterations including bitt upgrades, safe working load label plates, rail and stanchion work, brow installation, and main deck floodlight installation; modifications to manhole, access, and flood alarm systems; electrical modifications; knuckle crane installation with three integrated phases covering hull, machinery, electrical, and piping work; and docking/undocking services. Additional support services include temporary fire reporting systems, temporary head facilities, and temporary pier shack provisions. Work completion is scheduled for February 2, 2027. The PERL document references multiple specification documents (89MVA numbers) and indicates testing requirements, with some items requiring open and inspection reports and post-undock load testing where applicable.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6B1 PERL YON 285
| PKG # | No. | ICN | |||||||||||
| (Industrial Control No) | KOP | YON-285 6B1 FY26 DSRA | |||||||||||
| Planning Event Readiness List (PERL) | JSN | Job Summary | PS00 MM/DD/YYYY | PF00 | FM15 AM15 MM/DD/YYYY | SA00 | |||||||
| (Start AVAIL) 09/30/2026 | DD42 (Comp WK suppurt DD00) MM/DD/YYYY | DD00 (Commence Docking)10/15/2026 | AT00 | ||||||||||
| (Open and inspection reports complete) 11/09/2026 | TK42 | ||||||||||||
| (Comp WK support TK00) 12/13/2026 | TK00 | ||||||||||||
| (Tank Closeout) 12/20/2026 | UD42 | ||||||||||||
| (Comp WK support UD00) 01/13/2027 | UD00 (Commence Undocking) 01/20/2027 | WC00 | |||||||||||
| (All Work Complete) 02/02/2027 | CA00 (End Avail) 02/12/2027 | EG42 (Comp WK support EG00) MM/DD/YYYY | EG00 (End Guarantee Period) MM/DD/YYYY | EG00 (End Guarantee Period) MM/DD/YYYY | COMMENTS | ||||||||
| Job Title | Job Summary | Suggest KE/MS | Suggest PCD | "I" = Open & Inspect (CFR) | |||||||||
| 89MVA11001 | A01 | (FO) Underwater Hull and Freeboard; repair and preserve | N/A | UW HULL Preservation | UD42 | 1/6/27 | I | PTC | |||||
| 89MVA12301 | A01 | (8) Cargo Oil Tank and 8-120-1-F Fuel Tank; Clean | N/A | 8 CARGO Oil Tanks and Fuel Tank Cleaning for | |||||||||
| L1/L2 Inspection | TK42 | 1/5/27 | I | PTC | |||||||||
| 89MVA12301 | H01 | (AS) Fuel/Cargo Oil Tank Level I and II Inspection; accomplish | N/A | Tank Inspection | TK42 | 1/5/27 | I | PTC | |||||
| 89MVA15002 | A01 | S/A 0SSRD Cathodic Protection; accomplish | N/A | SHIPALT YON-OSSRD | UD42 | 1/6/27 | PTC | ||||||
| 89MVA15003 | A01 | SHIPALT YON-122D; accomplish | N/A | BITT Upgrade and Safe Working Load Label Plates |
Rails& Stanchion, Brow, WEA DK Floodlight Installaton, Main Deck/Deck House Preservation WC00 1/28/27 PTC
PTC
P
PTC
PTC
TC No test required for BITT work Brow load test requires floating pier
| 89MVA15004 | A01 | SHIPALT YON-0123D; accomplish | N/A | Throughout Barge MOD | WC00 | 1/28/27 | P | TC | |
| 89MVA15005 | A01 | S/A 124D, Modifications of Manhole, Access and Flood Alarm System; accomplish | N/A | Mod Flooding Alarm Sys, Manhole Cover Label Plate, Access Ladder Install, | UD00 | 1/13/27 | PTC | ||
| 89MVA15006 | A01 | SHIPALT 125D Electrical Modification; accomplish | N/A | UD00 | 1/13/27 | PTC | Does KTR have 450VAC shore power?? | ||
| 89MVA15007 | A01 | Knuckle Crane; Install | N/A | Knuckle Crane; Install (Part-I, HULL Work) |
Knuckle Crane; install (Part-II, MACH and ELEC Work) Knuckle Crane; install (Part-Ill, Piping Work) WC00 1/28/27 PTC P
PTC
TC Part-1: Test per part-2 Part-2: KBC Load Test, Post Undock Part-3: Test per part-2
| 89MVA86301 | A01 | Docking or Hauling Out YON-285; accomplish | N/A | DOCK/UNDOCK YON-285 | CA00 | 2/12/27 | PTC | No Testing | |
| 89MVA86302 | H01 | (IH) Temporary Fire Reporting System; provide | N/A | CA00 | 2/12/27 | PTC | No Testing | ||
| 89MVA86303 | A01 | Temporary Head; provide | N/A | CA00 | 2/12/27 | PTC | No Testing | ||
| 89MVA86401 | A01 | Temporary Pier Shack; provide | N/A | CA00 | 2/12/27 | PTC | No Testing | ||
| ERROR:#N/A | |||||||||
| ERROR:#N/A |
https://spsas1.srf.local/sites/s300/SPEC/MISC/SCANNED%20SPEC/89MVA12301_00_A01.pdfhttps://spsas1.srf.local/sites/s300/SPEC/MISC/SCANNED%20SPEC/89MVA86303_00_A01.pdfhttps://spsas1.srf.local/sites/s300/SPEC/MISC/SCANNED%20SPEC/89MVA86401_00_A01.pdfhttps://spsas1.srf.local/sites/s300/SPEC/MISC/SCANNED%20SPEC/89MVA11001_00_A01.pdfhttps://spsas1.srf.local/sites/s300/SPEC/MISC/SCANNED%20SPEC/89MVA15002_00_A01.pdfhttps://spsas1.srf.local/sites/s300/SPEC/MISC/SCANNED%20SPEC/89MVA15003_00_A01.pdfhttps://spsas1.srf.local/sites/s300/SPEC/MISC/SCANNED%20SPEC/89MVA15004_00_A01.pdfhttps://spsas1.srf.local/sites/s300/SPEC/MISC/SCANNED%20SPEC/89MVA15005_00_A01.pdfhttps://spsas1.srf.local/sites/s300/SPEC/MISC/SCANNED%20SPEC/89MVA15006_00_A01.pdfhttps://spsas1.srf.local/sites/s300/SPEC/MISC/SCANNED%20SPEC/89MVA15007_00_A01.pdfhttps://spsas1.srf.local/sites/s300/SPEC/MISC/SCANNED%20SPEC/89MVA86301_00_A01.pdf image1.png