Yale_Kilgore_ID_EPA_CompiledSWPPP.pdf

PDF 27 MB Posted

Attached to
ID CLARK 6805(1) ID FREMONT 6805(1), Yale-Kilgore Road, MP 9 to 16. 9 and Yale-Kilgore Road, MP 16. 9 to 30. 8
Solicitation number
69056721B000015
Issued by

About this file

The document provided appears to be a Stormwater Pollution Prevention Plan (SWPPP) for the ID CLARK 6805(1), Yale-Kilgore Road, MP 9 to 16.9 and ID FREMONT 6805(1), Yale-Kilgore Road, MP 16.9 to 30.8 construction project. The SWPPP outlines the measures to be taken to prevent and control stormwater pollution during the construction activities for this federal highway project. It includes details on erosion and sediment control, stormwater management, inspection and monitoring requirements, and other best management practices to ensure compliance with environmental regulations. The SWPPP is a required component of the solicitation for this construction project, which is being managed by the Department of Transportation Federal Highway Administration.

View the file

Other files

File Type Posted
BidTab_ID CLARK 6805(1) and ID FREMONT 6805(1)_Updated.pdf PDF
BidTab_ID CLARK 6805(1) and ID FREMONT 6805(1).pdf PDF
BidSum ID CLARK 6805(1) and ID FREMONT 6805(1).pdf PDF
QA_04-29-2024-02.pdf PDF
QA_04-29-2024.pdf PDF
QA_04-25-2024.pdf PDF
Amendment A003.pdf PDF
Amendment A002.pdf PDF
QA_04-24-2024.pdf PDF
QA_04-23-2024.pdf PDF
QA_04-19-2024.pdf PDF
QA_04-17-2024.pdf PDF
Amendment A001.pdf PDF
QA_04-08-2024.pdf PDF
C4185017.Clarification Memo 09142023_signed.pdf PDF
ida-clark6805-1_Superelevation_Road.xlsx XLSX spreadsheet
ATV-Snowmobile Bridge Design Calcs_100.pdf PDF
ida-clark6805-1_control-points.xlsx XLSX spreadsheet
C4185017.Yale Kilgore Final Geotechnical Engineering Report_stamped.pdf PDF
Culvert Design Report 10-31-2019.pdf PDF
ida-clark6805-1_Plans G-N.pdf PDF
Taylor Creek AOP Report.pdf PDF
ida-clark6805-1_XS_Trail.pdf PDF
ida-clark6805-1_XS_Road.pdf PDF
ida-clark6805-1_Plans A-F.pdf PDF
WF Mill Creek AOP Report.pdf PDF
ida-clark6805-1_proposed_alignments.pdf PDF
ida-clark6805-1_Earthwork_Data.pdf PDF
Physical Data.zip ZIP file
IFB 69056721B000015.pdf PDF
Sheridan Creek Bridge Load Rating.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Stormwater Pollution Prevention Plan

SWPPP

For:

Federal Highway Administration Western Federal Lands Highway Division

Table of Contents

SWPPP TABS

TAB 1: SWPPP Narrative

TAB 2: IPDES Permit (Construction General Permit)

TAB 3: NOI, ID DEQ Authorization Letter, Other Applicable Correspondence

TAB 4: Delegation of Authority

TAB 5: Site Maps (Indicate Wetlands, Waters, other Waterbodies)

TAB 6: Erosion/Sediment Control Plan Sheets (Plan Set and BMP Typical Details)

TAB 7: Revegetation Plan (if applicable)

TAB 8: SWPPP Amendment Log

TAB 9: Inspection Reports

TAB 10: Corrective Action Log

TAB 11: Water Quality Monitoring, Reporting Requirements, and Reports

TAB 12: Training Certificates and SWPPP Training Log

TAB 13: Government-Selected Waste, Borrow, Staging Sites (Indicate BMPs at Each Site)

TAB 14: Grading and Stabilization Log

TAB 15: Hazardous Spill Plan or Spill Prevention, Control, and Countermeasures (SPCC)

TAB 16: Endangered Species Act (ESA)

TAB 17: Quality Assurance Checklist

TAB 18: NPDES Notice of Termination (NOT)

Tab 1 - SWPPP Narrative

Revise and update as needed per SCR 107 and SCR 157

IPDES - Stormwater Pollution Prevention Plan (SWPPP) Yale-Kilgore Road, MP 9 to 16.9: ID CLARK 6805(1)

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1) i

Construction Stormwater Pollution Prevention Plan Template

To be used for IPDES permit requirements: This Template has been adapted from the EPA’s SWPPP Template. References and guidance language has been revised/updated, but if there is any conflict you must follow the IPDES permit and requirements as well as the SCRs.

IPDES permit - https://www2.deq.idaho.gov/admin/LEIA/index.html?view=folder&id=2998

Instructions for Using the SWPPP Template

Each section of the SWPPP Template includes instructions and space for your project and site information. Read the instructions for each section before you complete that section. Specific instructions on what information to include is indicated in each text field in blue text.

Click on the blue text and the instructions will disappear once you start typing.

The SWPPP Template is an editable document file so that you can easily add tables and additional text and delete unneeded or non-applicable fields. Note that some sections may require only a brief description while others may require several pages of explanation.

The following tips for using this template will help ensure that you meet the minimum permit requirements:

• Read the IPDES 2022 CGP thoroughly before you begin preparation of your SWPPP to ensure that you have a working understanding of the permit’s underlying requirements.

• Complete the SWPPP prior to submitting your NOI for permit coverage. This is required in Parts 1.4 and 7.1.

• If there is more than one construction operator for your project, consider coordinating development of your SWPPP with the other operators.

• Once DEQ has provided your site with coverage under the CGP, include your NOI, your authorization email, and a copy of the CGP as attachments to the SWPPP.

In the event of a conflict between the SWPPP Template and any corresponding provision of the 2022 CGP, you must abide by the requirements in the permit.

https://www2.deq.idaho.gov/admin/LEIA/index.html?view=folder&id=2998 https://www2.deq.idaho.gov/admin/LEIA/index.html?view=folder&id=2998

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1) ii

Stormwater Pollution Prevention Plan (SWPPP)

For Construction Activities At:

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

Insert Project Site Location/Address Insert City, State, Zip Code

360-619-7700 (FHWA Western Federal Lands)

SWPPP Prepared For:

Insert Operator Company or Organization Name Insert Name

Insert Address Insert City, State, Zip Code Insert Telephone Number

Insert Fax/Email

SWPPP Prepared By:

FHWA Western Federal Lands Highway Division Jennifer Chariarse 610 East 5th Street

Vancouver, WA 98661 360-619-1621 jennifer.chariarse@dot.gov

SWPPP Preparation Date:

06/28/2023

Estimated Project Dates:

March 2024 to October 2025

Project Start Date: 03/13/2024

Project Completion Date: 10/31/2025

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1) iii

Contents

SECTION 1: CONTACT INFORMATION/RESPONSIBLE PARTIES

1.1 Operator(s) / Subcontractor(s)

1.2 Stormwater Team

SECTION 2: SITE EVALUATION, ASSESSMENT, AND PLANNING

2.1 Project/Site Information

2.2 Discharge Information

2.3 Nature of the Construction Activities

2.4 Sequence and Estimated Dates of Construction Activities

2.5 Authorized Non-Stormwater Discharges

2.6 Site Maps

SECTION 3: DOCUMENTATION OF COMPLIANCE WITH OTHER FEDERAL

REQUIREMENTS

3.1 Endangered Species Protection

3.2 Safe Drinking Water Act Underground Injection Control Requirements ...16

SECTION 4: EROSION AND SEDIMENT CONTROLS AND DEWATERING PRACTICES ...17

4.1 Natural Buffers or Equivalent Sediment Controls

4.2 Perimeter Controls

4.3 Sediment Track-Out

4.4 Stockpiles or Land Clearing Debris Piles Comprised of Sediment or Soil ...22

4.5 Minimize Dust

4.6 Minimize Steep Slope Disturbances

4.7 Topsoil

4.8 Soil Compaction

4.9 Storm Drain Inlets

4.10 Constructed Site Drainage Feature

4.11 Sediment Basins or Similar Impoundments

4.12 Chemical Treatment

4.13 Dewatering Practices

4.14 Other Stormwater Controls

4.15 Site Stabilization

SECTION 5: POLLUTION PREVENTION CONTROLS

5.1 Potential Sources of Pollution

5.2 Spill Prevention and Response

5.3 Fueling and Maintenance of Equipment or Vehicles

5.4 Washing of Equipment and Vehicles

5.5 Storage, Handling, and Disposal of Building Products, Materials, and Wastes 35

5.6 Washing of Applicators and Containers used for Stucco, Paint, Concrete, Form Release Oils, Cutting Compounds, or Other Materials

5.7 Application of Fertilizers

5.8 Other Pollution Prevention Practices

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1) iv

SECTION 6: INSPECTION, MAINTENANCE, AND CORRECTIVE ACTION

6.1 Inspection Personnel and Procedures

6.2 Corrective Action

6.3 Delegation of Authority

SECTION 7: TURBIDITY MONITORING

SECTION 8: CERTIFICATION AND NOTIFICATION

SWPPP APPENDICES

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

SECTION 1: CONTACT INFORMATION/RESPONSIBLE PARTIES

1.1 Operator(s) / Subcontractor(s)

Operator(s):

Insert Company or Organization Name Insert Name Insert Address Insert City, State, Zip Code Insert Telephone Number Insert Fax/Email Insert area of control (if more than one operator at site)

[Repeat as necessary.]

Subcontractor(s):

Insert Name Insert Address Insert City, State, Zip Code Insert Telephone Number Insert Fax/Email Insert area of control (if more than one operator at site)

Emergency 24-Hour Contact:

Insert Name Insert Telephone Number

Instructions (see definition of “operator” at CGP Part 1.1.1):

― Identify all site operators who will be engaged in construction activities at the site and the areas of the site over which each operator has control (Part 7.2.1). Indicate respective responsibilities, where appropriate. Also include the 24-hour emergency contact.

― List subcontractors expected to work on-site. Notify subcontractors of stormwater requirements applicable to their work.

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

1.2 Stormwater Team

Instructions (see CGP Parts 6 and 7.2.2):

― Identify the individuals (by name and position) that you have made part of the project’s stormwater team pursuant to CGP Part 6.1, their individual responsibilities, and which members are responsible for inspections. At a minimum the stormwater team is comprised of individuals who are responsible for the design, installation, maintenance, and/or repair of stormwater controls; the application and storage of treatment chemicals (if applicable); conducting inspections as required in CGP Part 4; and taking corrective actions as required in Part 5.

― Each member of the stormwater team must have ready access to either an electronic or paper copy of applicable portions of the CGP and the SWPPP.

― Each member of the stormwater team must understand the requirements of the CGP and their specific responsibilities with respect to those requirements, including the information in Part 6.2.

― To conduct inspections under Part 4, you must, at a minimum, either:

Have completed the EPA construction inspection course developed for this permit and have passed the exam; or Hold a current valid construction inspection certification or license from a program that, at a minimum, covers the following:

o Principles and practices of erosion and sediment control and pollution prevention practices at construction sites;

o Proper installation, and maintenance of erosion and sediment controls and pollution prevention practices used at construction sites; and o Performance of inspections, including the proper completion of required reports and documentation, consistent with the requirements of Part 4.

Note that if one of the following topics (e.g., installation and maintenance of pollution prevention practices) is not covered by the non-EPA training program, you may consider supplementing the training with the analogous module of the EPA course (e.g., Module 4) that covers the missing topic.

― Provide copies of training certificates in Tab 12. Training/Certification Log is found in Tab 12 of the SWPPP https://www.epa.gov/npdes/construction-general-permit-inspector-training

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

Stormwater Team

Name and/or Position, and Contact

Responsibilities I Have Completed Training Required by CGP Part 6

I Have Read the CGP and Understand the

Applicable Requirements Insert Name of Responsible Person Insert Position Insert Telephone Number Insert Email

Insert Responsibility ☐ Yes ☐ No

☐ Yes Date: Click here to enter a date.

Insert Name of Responsible Person Insert Position Insert Telephone Number Insert Email

Insert Responsibility ☐ Yes ☐ No

☐ Yes Date: Click here to enter a date.

[Insert or delete rows as necessary.]

Stormwater Team Members Who Conduct Inspections Pursuant to CGP Part 4

Name and/or Position and Contact

Training(s) Received

Date Training(s)

Completed

If Training is a Non-EPA Training, Confirm that it Satisfies the Minimum

Elements of CGP Part 6.3.2 Insert Name of Responsible Person Insert Position Insert Telephone Number Insert Email

Insert Title of Training Received

Date: Click here to enter a date.

☐ Principles and practices of erosion and sediment control and pollution prevention practices at construction sites

☐ Proper installation and maintenance of erosion and sediment controls and pollution prevention practices used at construction sites

☐ Performance of inspections, including the proper completion of required reports and documentation, consistent with the requirements of Part 4

[Insert or delete rows as necessary.]

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

SECTION 2: SITE EVALUATION, ASSESSMENT, AND PLANNING

2.1 Project/Site Information

Project Name and Address

Project/Site Name: Yale-Kilgore Road, MP 9 to 16.9: ID CLARK 6805(1) Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

Street/Location: Yale-Kilgore Road City: N/A State: Idaho ZIP Code: N/A County or Similar Government Division: Clark County and Fremont County

Project Latitude/Longitude

Latitude/Longitude:

Clark Co Begin: 44.3894444°, -111.8505556° Clark Co End: 44.4880556°, -111.6172222° Fremont Co Begin: 44.4888°, -111.6173° Fremont Co End: 44.4534°, -111.3612° Latitude/longitude data source: ☒ Other (please specify): Google Earth Pro

Additional Site Information

Is your site located on Indian country lands, or on a property of religious or cultural significance to an Indian Tribe? ☒ Yes ☐ No

If yes, provide the name of the Indian Tribe associated with the area of Indian country (including the name of Indian reservation if applicable), or if not in Indian country, provide the name of the Indian Tribe associated with the property: Nez Perce Tribe (area of interest and a landscape of cultural importance)

Instructions (see “Project/Site Information,” Section IV of Appendix F – NOI Form and Instructions):

― In this section, compile basic site information that will be helpful when you file your NOI.

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

2.2 Discharge Information

Does your project/site discharge stormwater into a Municipal Separate Storm Sewer System (MS4)?

Are there any waters of the U.S. within 50 feet of your project’s earth disturbances?

☐ Yes ☒ No

☒ Yes ☐ No

Instructions (see “Discharge Information,” Section V of Appendix F – NOI Form and Instructions):

― In this section, include information relating to your site’s discharge. This information corresponds to the “Discharge Information” section of the NOI form.

― List all of the stormwater points of discharge from your site. Identify each point of discharge with a unique 3-digit ID (e.g., 001, 002).

― For each unique point of discharge you list, specify the name of the first receiving water that receives stormwater directly from the point of discharge and/or from the MS4 that the point of discharge discharges to. You may have multiple points of discharge that discharge to the same receiving water.

― Next, specify whether any waters of the U.S. that you discharge to are listed as “impaired” as defined in Appendix A, and the pollutants causing the impairment.

Identify any Total Maximum Daily Loads (TMDL) that have been completed for any of the waters of the U.S. that you discharge to and the pollutants for which there is a TMDL.

For more information on impaired waters and TMDLs, including a list of TMDL contacts and links by State, visit https://www.epa.gov/tmdl and from Idaho at https://www.deq.idaho.gov/water-quality/surface-water/total-maximum-daily-loads/

― Finally, indicate whether any receiving water that you discharge to is designated as a Tier 2 or Tier 3 water and if so, what the designation is (2 or 3). A list of Tier 2 and 3 waters located in the areas eligible for coverage under this permit can be found at https://www.deq.idaho.gov/water-quality/surface-water/monitoring-and-assessment/?msclkid=4dddd628a94411eca1ea7c6fdf5abdb2.

https://www.epa.gov/tmdl https://www.deq.idaho.gov/water-quality/surface-water/total-maximum-daily-loads/ https://www.deq.idaho.gov/water-quality/surface-water/monitoring-and-assessment/?msclkid=4dddd628a94411eca1ea7c6fdf5abdb2 https://www.deq.idaho.gov/water-quality/surface-water/monitoring-and-assessment/?msclkid=4dddd628a94411eca1ea7c6fdf5abdb2

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

For each point of discharge, provide a point of discharge ID (a unique 3-digit ID, e.g., 001, 002), the name of the first receiving water that receives stormwater directly from the point of discharge and/or from the MS4 that the point of discharge discharges to, and the following receiving water information, if applicable:

Point of Discharge

ID

Name of receiving water that receives stormwater discharge:

Is the receiving water impaired (on the CWA 303(d) list)?

If yes, list the pollutants that are causing the impairment:

Has a TMDL been completed for this receiving waterbody?

If yes, list

TMDL

Name and ID:

Pollutant(s) for which there is a

TMDL:

Is this receiving water designated as a Tier 2 or Tier 3 water?

If yes, specify which Tier (2 or 3)?

001 Henry’s Fork, 44.46353°, - 111.40291°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

002 Mill Creek 44.46756°, -111.42975°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

003 Unnamed Perennial Stream NHD Permanent ID 52163231, 44.46723°, -111.43394°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

004 Unnamed Intermittent Stream NHD Permanent ID 52163233, 44.46810°, -111.43807°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

005 Unnamed Intermittent Stream NHD Permanent ID 52163285, 44.46901°, -111.44329°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

006 Yale Creek, 44.46883°, - 111.44456°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

007 Hotel Creek, 44.46767°, - 111.45438°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

008 Blue Creek, 44.46848°, - 111.48645°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

Point of Discharge

ID

Name of receiving water that receives stormwater discharge:

Is the receiving water impaired (on the CWA 303(d) list)?

If yes, list the pollutants that are causing the impairment:

Has a TMDL been completed for this receiving waterbody?

If yes, list

TMDL

there is a

TMDL:

Is this receiving water designated as a Tier 2 or Tier 3 water?

If yes, specify which Tier (2 or 3)?

009 Unnamed Intermittent Stream NHD Permanent ID 52163087, 44.46522°, -111.50211°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

010 Dry Creek (Fremont Co.), 44.46837°, - 111.51502°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

011 Unnamed Intermittent Stream NHD Permanent ID 52162899, 44.46951°, -111.51985°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

012 Unnamed Intermittent Stream NHD Permanent ID 52162901, 44.47600°, -111.53204°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

013 Tom Creek, 44.48420°, - 111.54905°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

014 Bunkhouse Creek, 44.48597°, - 111.55272°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

015 Unnamed Canal/Ditch NHD Permanent ID 52162371, 44.48898°, -111.56470°

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

Point of Discharge

ID

Name of receiving water that receives stormwater discharge:

Is the receiving water impaired (on the CWA 303(d) list)?

If yes, list the pollutants that are causing the impairment:

Has a TMDL been completed for this receiving waterbody?

If yes, list

TMDL

there is a

TMDL:

Is this receiving water designated as a Tier 2 or Tier 3 water?

If yes, specify which Tier (2 or 3)?

016 Unnamed Perennial Stream NHD Permanent ID 52162425, 44.48897°, -111.56685°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

017 Icehouse Creek, 44.48897°, - 111.56898°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

018 Willow Creek, 44.48882°, - 111.59008°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

019 Myers Creek, 44.48882°, - 111.59518°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

020 Blind Creek, 44.348877°, - 111.60976°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

021 Unnamed Intermittent Stream NHD Permanent ID 52162181, 44.48875°, -111.61366°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

022 Keg Spring Creek, 44.48873°, - 111.61667°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

023 Unnamed Intermittent Stream NHD Permanent ID 52162307, 44.48870°, -111.62055°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

024 Schneider Creek, 44.4886°, -111.62812°

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

Point of Discharge

ID

Name of receiving water that receives stormwater discharge:

Is the receiving water impaired (on the CWA 303(d) list)?

If yes, list the pollutants that are causing the impairment:

Has a TMDL been completed for this receiving waterbody?

If yes, list

TMDL

there is a

TMDL:

Is this receiving water designated as a Tier 2 or Tier 3 water?

If yes, specify which Tier (2 or 3)?

025 Unnamed Intermittent Stream NHD Permanent ID 52161835, 44.48842°, -111.63843°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

026 Taylor Creek, 44.47034°, - 111.65582°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

027 Unnamed Intermittent Stream NHD Permanent ID 52162467, 44.46940°, -111.65655°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

028 Unnamed Intermittent Stream NHD Permanent ID 52162611, 44.46735°, -111.66130°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

029 Unnamed Canal/Ditch NHD Permanent ID 52162613, 44.46749°, -111.66709°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

030 Unnamed Intermittent Stream NHD Permanent ID 52162749, 44.46753°, -111.66759°

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

Point of Discharge

ID

Name of receiving water that receives stormwater discharge:

Is the receiving water impaired (on the CWA 303(d) list)?

If yes, list the pollutants that are causing the impairment:

Has a TMDL been completed for this receiving waterbody?

If yes, list

TMDL

there is a

TMDL:

Is this receiving water designated as a Tier 2 or Tier 3 water?

If yes, specify which Tier (2 or 3)?

031 Unnamed Perennial Stream NHD Permanent ID 52162481, 44.46775°, -111.67040°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

032 Unnamed Perennial Stream NHD Permanent ID 52162503, 44.46790°, -111.67217°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

033 Sheridan Creek, 44.46800°, - 111.67327°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

034 Unnamed Perennial Stream NHD Permanent ID 52162443, 44.46807°, -111.67404°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

035 Unnamed Intermittent Stream NHD Permanent ID 52162403, 44.46838°, -111.69070°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

036 Kick Creek, 44.46745°, - 111.70597°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

037 Unnamed Intermittent Stream NHD Permanent ID 52162493, 44.46447°, -111.72190°

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

Point of Discharge

ID

Name of receiving water that receives stormwater discharge:

Is the receiving water impaired (on the CWA 303(d) list)?

If yes, list the pollutants that are causing the impairment:

Has a TMDL been completed for this receiving waterbody?

If yes, list

TMDL

there is a

TMDL:

Is this receiving water designated as a Tier 2 or Tier 3 water?

If yes, specify which Tier (2 or 3)?

038 Mud Creek, 44.46389°, - 111.72484°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

039 Unnamed Canal/Ditch NHD Permanent ID 52162493, 44.46348°, -111.72692° and 44.46496°, - 111.71943°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

040 Unnamed Intermittent Stream NHD Permanent ID 52162401, 44.46285°, -111.73015°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

041 Unnamed Intermittent Stream NHD Permanent ID 52162409, 44.46268°, -111.73103°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

042 Unnamed Intermittent Stream NHD Permanent ID 52162427, 44.46190°, -111.73647°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

043 East Fork Dry Creek, 44.46062°, - 111.74676°

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

Point of Discharge

ID

Name of receiving water that receives stormwater discharge:

Is the receiving water impaired (on the CWA 303(d) list)?

If yes, list the pollutants that are causing the impairment:

Has a TMDL been completed for this receiving waterbody?

If yes, list

TMDL

there is a

TMDL:

Is this receiving water designated as a Tier 2 or Tier 3 water?

If yes, specify which Tier (2 or 3)?

044 Unnamed Canal/Ditch NHD Permanent ID 52376495, 44.45970°, -111.75214°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

045 Dry Creek (Clark Co.), 44.45793°, - 111.75419°

☐ Yes ☒ No ☐ Yes ☒ No ☐ Yes ☒ No N/A

046 Unnamed Canal/Ditch NHD Permanent ID 52376315, 44.45666°, -111.75563°

[Include additional rows or delete as necessary.]

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

2.3 Nature of the Construction Activities

General Description of Project Provide a general description of the nature of your construction activities, including the age or dates of past renovations for structures that are undergoing demolition:

The proposed Clark County project consists of grading, drainage improvements, bridge structures, soft spot repair, aggregate base addition, culvert replacement, and asphalt surface course for the Forest Highway ID‐65 and STC 6805 (Yale‐Kilgore Road) from MP 9.0 to MP 16.9 (7.9 miles).

The proposed Fremont County project consists of drainage improvements, shoulder repair, pavement patching, existing pavement pulverizing or reclamation, and asphalt surface course of the Yale-Kilgore Road from MP 16.9 to MP 30.8 (13.9 miles).

The total length of the combined projects is approximately 21.8 miles. Both projects will widen the existing traveled way from 22’‐26’ to a consistent, 28'-wide asphalt overlay on a pulverized base.

From MP 26.25 to MP 30.55 (3.7 miles of the Fremont length), a gravel-surfaced, separated ATV and snowmobile trail would be constructed along the south side of the road, separate from the roadway. The trail design will include a 10‐foot-wide travel way, with added clearing width totaling 16 feet, to accommodate a snow grooming machine for winter trail maintenance.

Business days and hours for the project: Contractor to Update

Instructions (see CGP Parts 1.2.1.c and 7.2.3):

― Provide a general description of the nature of the construction activities at your site.

― Describe the size of the property (in acres), the total area expected to be disturbed by the construction activities (to the nearest quarter acre), and the maximum area expected to be disturbed at any one time.

― A description of any on-site and off-site construction support activity areas covered by this permit;

― Indicate the type of construction site, whether there will be certain demolition activities, and whether the predevelopment land use was for agriculture.

― Provide a list and description of all pollutant-generating activities (e.g., paving operations; concrete, paint, and stucco washout and waste disposal; solid waste storage and disposal; and dewatering operations) and indicate for each activity the associated pollutants or pollutant constituents (e.g., sediment, fertilizers, pesticides, paints, caulks, sealants, fluorescent light ballasts, contaminated substrates, solvents, fuels) which could be discharged in stormwater from your construction site.

― Describe the construction support activities covered by this permit (see Part 1.2.1.c of the permit).

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

Size of Construction Site

Size of Property Approximately 98 acres

Total Area Expected to be Disturbed by Construction Activities

Approximately 22 acres

Maximum Area Expected to be Disturbed at Any One Time, Including On-site and Off-site Construction Support Areas

No more than 5 acres

[Repeat as necessary for individual project phases.]

Type of Construction Site (check all that apply):

☐ Single-Family Residential ☐ Multi-Family Residential ☐ Commercial ☐ Industrial

☐ Institutional ☒ Highway or Road ☐ Utility ☐ Other ____________________________ Will you be discharging dewatering water from your site? ☒ Yes ☐ No If yes, will you be discharging dewatering water from a current or former Federal or State remediation site? ☐ Yes ☒ No

Pollutant-Generating Activities

List and describe all pollutant-generating activities and indicate for each activity the associated pollutants or pollutant constituents that could be discharged in stormwater from your construction site. Take into account where potential spills and leaks could occur that contribute pollutants to stormwater discharges, and any known hazardous or toxic substances, such as PCBs and asbestos, that will be disturbed during construction.

Pollutant-Generating Activity (e.g., paving operations; concrete, paint, and stucco washout and waste disposal; solid waste storage and disposal; and dewatering operations)

Pollutants or Pollutant Constituents (e.g., sediment, fertilizers, pesticides, paints, caulks, sealants, fluorescent light ballasts, contaminated substrates, solvents, fuels)

Clearing, excavating, and grading Sediment

Solid waste (trash and debris) Trash and debris

Vehicle/Equipment use/fueling/storage/maintenance

Oil, grease, and fuel

Paving operations Oil, grease, trash, and debris

Landscaping operations Sediment and nutrients

[Include additional rows or delete as necessary.]

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

Construction Support Activities (only provide if applicable)

Describe any construction support activities for the project (e.g., concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal areas, borrow areas):

Insert Description of Construction Support Activity

Contact information for construction support activity:

Insert Name Insert Telephone No.

Insert Email Insert Address And/Or Latitude/Longitude

2.4 Sequence and Estimated Dates of Construction Activities

Phase I (Clark County)

Clearing/Grubbing, Roadway Excavation/Prep and Drainage (Clark County Portion) Estimated Start Date of Construction Activities for this Phase

Insert Estimated Date

Estimated End Date of Construction Activities for this Phase

Insert Estimated Date

Instructions (see CGP Part 7.2.3):

― Describe the intended construction sequence and duration of major activities.

― For each portion or phase of the construction site, include the following:

Commencement and duration of construction activities, including clearing and grubbing, mass grading, demolition activities, site preparation (i.e., excavating, cutting and filling), final grading, and creation of soil and vegetation stockpiles requiring stabilization;

Temporary or permanent cessation of construction activities in each portion of the site;

Temporary or final stabilization of exposed areas for each portion of the site. The dates for stabilization must reflect the applicable deadlines to which you are subject to in Part 2.2.14; and

Removal of temporary stormwater controls and construction equipment or vehicles, and cessation of any construction-related pollutant-generating activities.

― The construction sequence must reflect the following requirements:

Part 2.1.3 (installation of stormwater controls); and Parts 2.2.14 (stabilization deadlines).

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

Estimated Date(s) of Application of Stabilization Measures for Areas of the Site Required to be Stabilized

Insert Estimated Date [Add additional dates as necessary]

Estimated Date(s) when Stormwater Controls will be Removed

Insert Estimated Date [Add additional dates as necessary]

Phase II (Clark County) Aggregate Base, Paving, Pavement Markings/Signs (Clark County) Estimated Start Date of Construction Activities for this Phase

Insert Estimated Date

Estimated End Date of Construction Activities for this Phase

Insert Estimated Date

Estimated Date(s) of Application of Stabilization Measures for Areas of the Site Required to be Stabilized

Insert Estimated Date [Add additional dates as necessary]

Estimated Date(s) when Stormwater Controls will be Removed

Insert Estimated Date [Add additional dates as necessary]

Phase III (Clark County) Revegetation (Clark County) Estimated Start Date of Construction Activities for this Phase

Insert Estimated Date

Estimated End Date of Construction Activities for this Phase

Insert Estimated Date

Estimated Date(s) of Application of Stabilization Measures for Areas of the Site Required to be Stabilized

Insert Estimated Date [Add additional dates as necessary]

Estimated Date(s) when Stormwater Controls will be Removed

Insert Estimated Date 025 [Add additional dates as necessary]

Phase I (Fremont County) Clearing/Grubbing, Roadway Excavation/Prep and Drainage (Fremont County Portion) Estimated Start Date of Construction Activities for this Phase

Insert Estimated Date

Estimated End Date of Construction Activities for this Phase

Insert Estimated Date

Estimated Date(s) of Application of Stabilization Measures for Areas of the Site Required to be Stabilized

Insert Estimated Date

Estimated Date(s) when Stormwater Controls will be Removed

Insert Estimated Date

Phase II (Fremont County) Aggregate Base, Paving, Pavement Markings/Signs (Fremont County) Estimated Start Date of Construction Activities for this Phase

Insert Estimated Date

Estimated End Date of Construction Activities for this Phase

Insert Estimated Date

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

Estimated Date(s) of Application of Stabilization Measures for Areas of the Site Required to be Stabilized

Insert Estimated Date

Estimated Date(s) when Stormwater Controls will be Removed

Phase III (Fremont County) Trail Construction (Fremont County) Estimated Start Date of Construction Activities for this Phase

Insert Estimated Date

Estimated End Date of Construction Activities for this Phase

Insert Estimated Date

Estimated Date(s) of Application of Stabilization Measures for Areas of the Site Required to be Stabilized

Insert Estimated Date

Estimated Date(s) when Stormwater Controls will be

Phase III (Fremont County) Revegetation (Fremont County) Estimated Start Date of Construction Activities for this Phase

Insert Estimated Date

Estimated End Date of Construction Activities for this Phase

Insert Estimated Date

Estimated Date(s) of Application of Stabilization Measures for Areas of the Site Required to be Stabilized

Insert Estimated Date

Estimated Date(s) when Stormwater Controls will be

[Repeat as needed.]

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

2.5 Authorized Non-Stormwater Discharges

List of Authorized Non-Stormwater Discharges Present at the Site

Authorized Non-Stormwater Discharge Will or May Occur at Your Site?

Discharges from emergency fire-fighting activities ☒ Yes ☐ No Fire hydrant flushings ☐ Yes ☒ No Landscape irrigation ☐ Yes ☒ No Water used to wash vehicles and equipment ☐ Yes ☒ No Water used to control dust ☒ Yes ☐ No Potable water including uncontaminated water line flushings ☐ Yes ☒ No External building washdown (soaps/solvents are not used and external surfaces do not contain hazardous substances)

☐ Yes ☒ No

Pavement wash waters ☐ Yes ☒ No Uncontaminated air conditioning or compressor condensate ☐ Yes ☒ No

Instructions (see CGP Parts 1.2.2 and 7.2.5):

― Identify all authorized non-stormwater discharges. The authorized non-stormwater discharges identified in Part 1.2.2 of the 2022 CGP include:

Discharges from emergency fire-fighting activities;

Fire hydrant flushings;

Landscape irrigation;

Waters used to wash vehicles and equipment, provided that there is no discharge of soaps, solvents, or detergents used for such purposes;

Water used to control dust;

Potable water including uncontaminated water line flushings;

External building washdown, provided soaps, solvents and detergents are not used, and external surfaces do not contain hazardous substances as defined in CGP Appendix A (e.g., paint or caulk containing polychlorinated biphenyls (PCBs));

Pavement wash waters provided spills or leaks of toxic or hazardous materials have not occurred (unless all spilled material has been removed) and detergents are not used. You are prohibited from directing pavement wash waters directly into any receiving water, storm drain inlet, or constructed or natural site drainage features, unless the conveyance is connected to a sediment basin, sediment trap, or similarly effective control;

Uncontaminated air conditioning or compressor condensate;

Uncontaminated, non-turbid discharges of ground water or spring water;

Foundation or footing drains where flows are not contaminated with process materials such as solvents or contaminated ground water; and Uncontaminated construction dewatering water discharged in accordance with

Part 2.4.

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

Authorized Non-Stormwater Discharge Will or May Occur at Your Site?

Uncontaminated, non-turbid discharges of ground water or spring water ☐ Yes ☒ No Foundation or footing drains ☐ Yes ☒ No Uncontaminated construction dewatering water ☒ Yes ☐ No

(Note: You are required to identify the likely locations of these authorized non-stormwater discharges on your site map. See Section 2.6, below, of this SWPPP Template.)

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

2.6 Site Maps

Instructions (see CGP Part 7.2.4):

― Attach site maps in Tabs 5 and 6 of the SWPPP. For most projects, a series of site maps is necessary and recommended. The first should show the undeveloped site and its current features. An additional map or maps should be created to show the developed site or, for more complicated sites, show the major phases of development.

These maps must include the following features:

― Boundaries of the property and of the locations where construction will occur, including:

Locations where earth-disturbing activities will occur, noting any phasing of construction activities and any demolition activities;

Approximate slopes before and after major grading activities. Note any areas of steep slopes, as defined in CGP Appendix A;

Locations where sediment, soil, or other construction materials will be stockpiled;

Locations of any crossings of receiving waters;

Designated points where vehicles will exit onto paved roads;

Locations of structures and other impervious surfaces upon completion of construction; and Locations of on-site and off-site construction support activity areas covered by the permit (see CGP Part 1.2.1.c).

― Locations of any receiving waters, including wetlands, within your site and all receiving waters within one mile downstream of the site’s discharge point(s). Indicate which receiving waters are listed as impaired, and which are identified by your State, Tribe, or EPA as Tier 2 or Tier 3 waters.

― Any areas of Federally-listed critical habitat for endangered or threatened species within the site and upstream and downstream from the storm water discharge point into a stream segment that may be affected by these discharges.

― Type and extent of pre-construction cover on the site (e.g., vegetative cover, forest, pasture, pavement, structures).

― Drainage pattern(s) of stormwater and authorized non-stormwater before and after major grading activities.

― Stormwater and authorized non-stormwater discharge locations, including:

Locations where stormwater and/or authorized non-stormwater will be discharged to storm drain inlets; and Locations where stormwater or allowable non-stormwater will be discharged directly to receiving waters, including wetlands (i.e., not via a storm drain inlet).

― Locations of all potential pollutant-generating activities identified in Part 7.2.3g (note:

you should have those identified in Section 2.3 in this SWPPP Template).

― Designated areas where construction wastes that are covered by the exception in Part

2.3.3e.ii (i.e., they are not pollutant-generating) will be stored.

― Locations of stormwater controls, including natural buffer areas and any shared controls utilized to comply with the permit.

― Locations where polymers, flocculants, or other treatment chemicals will be used and stored.

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

SECTION 3: DOCUMENTATION OF COMPLIANCE WITH OTHER FEDERAL REQUIREMENTS

3.1 Endangered Species Protection

Eligibility Criterion Following the process outlined in Appendix C, under which criterion are you eligible for coverage under this permit?

☐ Criterion A: No ESA-listed species and/or designated critical habitat present in action area. Using the process outlined in Appendix C of the CGP, you certify that ESA-listed species and designated critical habitat(s) under the jurisdiction of the USFWS or NMFS are not likely to occur in your site’s “action area” as defined in Appendix A of the CGP.

Please Note: NMFS’ jurisdiction includes ESA-listed marine and estuarine species that spawn in inland rivers.

☐ Check to confirm you have provided documentation in your SWPPP (Note: reliance on State resources is not acceptable; see CGP Appendix C).

Documentation: Insert Text Here

Using the instructions in Appendix C of the permit, determine which criterion listed below (A-F) applies with respect to the protection of endangered species.

To make this determination, you must use information from BOTH the National Marine Fisheries Service (NMFS) and U.S. Fish and Wildlife Service (USFWS).

Both the NMFS and USFWS maintain lists of Endangered Species Act-listed (ESA-listed) species and designated critical habitat. Operators must consult both when determining their eligibility.

― Check only 1 box, include the required information, and provide a sound basis for supporting the criterion selected. Select the most conservative criterion that applies.

― Copies of the ESA compliance documentation should be placed in Tab 16 of the

SWPPP.

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

Eligibility Criterion Following the process outlined in Appendix C, under which criterion are you eligible for coverage under this permit?

☐ Criterion B: Eligibility requirements met by another operator under the 2022 CGP. The construction site’s discharges and discharge-related activities were already addressed in another operator’s valid certification of eligibility for your “action area” under eligibility Criterion A, C, D, E, or F of the 2022 CGP and you have confirmed that no additional ESA-listed species and/or designated critical habitat under the jurisdiction of USFWS and/or NMFS not considered in the that certification may be present or located in the “action area.” To certify your eligibility under this criterion, there must be no lapse of NPDES permit coverage in the other CGP operator’s certification. By certifying eligibility under this criterion, you agree to comply with any conditions upon which the other CGP operator's certification was based. You must include in your NOI the IPDES ID from the other 2022 CGP operator’s notification of authorization under this permit and list any measures that you must comply with. If your certification is based on another 2022 CGP operator’s certification under criterion C, you must provide the relevant supporting information required of existing dischargers in Criterion C in your NOI form.

☐ Check to confirm you have provided documentation in your SWPPP.

Documentation: Insert Text Here

☐ Criterion C: Discharges not likely to adversely affect ESA-listed species and/or designated critical habitat. ESA-listed species and/or designated critical habitat(s) under the jurisdiction of the USFWS and/or NMFS are likely to occur in or near your site’s “action area,” and you certify to DEQ that your site’s discharges and discharge-related activities are not likely to adversely affect ESA-listed threatened or endangered species and/or designated critical habitat. This certification may include consideration of any stormwater controls and/or management practices you will adopt to ensure that your discharges and discharge-related activities are not likely to adversely affect ESA-listed species and/or designated critical habitat. To certify your eligibility under this criterion, indicate 1) the ESA-listed species and/or designated habitat located in your “action area” using the process outlined in Appendix C of this permit; 2) the distance between the site and the listed species and/or designated critical habitat in the action area (in miles); and 3) a rationale describing specifically how adverse effects to ESA-listed species will be avoided from the discharges and discharge-related activities. You must include a copy of your site map from your SWPPP showing the upland and in-water extent of your “action area” with your NOI.

Attaching: 1) the species list with the action area used to obtain the list; 2) aerial images of the site; and 3) a copy of the SWPPP to the NOI is helpful to EPA, USFWS, and NMFS in confirming eligibility under this criterion

☐ Check to confirm you have provided documentation in your SWPPP.

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

Eligibility Criterion Following the process outlined in Appendix C, under which criterion are you eligible for coverage under this permit?

☐ Criterion D: Coordination with USFWS and/or NMFS has successfully concluded.

Coordination between you and the USFWS and/or NMFS has concluded. The coordination must have addressed the effects of your site’s discharges and discharge-related activities on ESA-listed species and/or designated critical habitat under the jurisdiction of USFWS and/or NMFS, and resulted in a written confirmation from USFWS and/or NMFS that your site’s discharges and discharge-related activities are consistent with a not likely to adversely affect determination for ESA-listed species and/or critical habitat in your action area. You must include copies of the correspondence with the participating agencies in your SWPPP and this NOI.

☐ Check to confirm you have provided documentation in your SWPPP.

Documentation: Insert Text Here

☒ Criterion E: ESA Section 7 consultation has successfully concluded. Consultation between a Federal agency and the USFWS and/or NMFS under section 7 of the ESA has concluded. The consultation must have addressed the effects of the construction site’s discharges and discharge-related activities on ESA-listed species and/or designated critical habitat under the jurisdiction of USFWS and/or NMFS. To certify eligibility under this criterion, indicate the results of the consultation:

i. A biological opinion and/or conference opinion and incidental take statement currently in effect from USFWS and/or NMFS that concludes that the action in question (taking into account the effects of your site’s discharges and discharge-related activities) is not likely to jeopardize the continued existence of ESA-listed species, nor the destruction or adverse modification of critical habitat;

or

ii. Written concurrence from USFW and/or NMFS with a finding that the site’s discharges and discharge-related activities are not likely to adversely affect ESA-listed species and/or designated critical habitat.

If eligible under Criterion E, you must also provide supporting documentation for your selection of Criterion E in your NOI and SWPPP, including the Biological Opinion (or ECO tracking number) or concurrence letter. You must include copies of the correspondence between yourself and USFWS and/or NMFS in your NOI and your

SWPPP.

☒ Check to confirm you have provided documentation in your SWPPP.

Documentation: USFWS Letter of Concurrence (9/24/2020)

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

Eligibility Criterion Following the process outlined in Appendix C, under which criterion are you eligible for coverage under this permit?

☐ Criterion F: Issuance of section 10 permit. Potential take is authorized through the issuance of a permit under section 10 of the ESA by the USFWS and/or NMFS, and this authorization addresses the effects of the site’s discharges and discharge-related activities on ESA-listed species and designated critical habitat. You must include copies of the correspondence between yourself and the participating agencies in your SWPPP and your NOI.

☐ Check to confirm you have provided documentation in your SWPPP.

3.2 Safe Drinking Water Act Underground Injection Control Requirements

Do you plan to install any of the following controls? Check all that apply below.

☐ Infiltration trenches (if stormwater is directed to any bored, drilled, driven shaft or dug hole that is deeper than its widest surface dimension, or has a subsurface fluid distribution system)

☐ Commercially manufactured pre-cast or pre-built proprietary subsurface detention vaults, chambers, or other devices designed to capture and infiltrate stormwater flow

☐ Drywells, seepage pits, or improved sinkholes (if stormwater is directed to any bored, drilled, driven shaft or dug hole that is deeper than its widest surface dimension, or has a subsurface fluid distribution system)

If yes, insert copies of letters, emails, or other communication between you and the State agency or EPA regional office.

Instructions (see CGP Part 7.2.8.B):

― If you will use any of the identified controls in this section, document any contact you have had with the applicable State agency or EPA Regional Office responsible for implementing the requirements for underground injection wells in the Safe Drinking Water Act and EPA’s implementing regulations at 40 CFR Parts 144-147.

― For State UIC program contacts, refer to the following EPA website:

https://www.epa.gov/uic.

https://www.epa.gov/uic

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

SECTION 4: EROSION AND SEDIMENT CONTROLS AND DEWATERING PRACTICES

4.1 Natural Buffers or Equivalent Sediment Controls

Buffer Compliance Alternatives Are there any receiving waters within 50 feet of your project’s earth disturbances? ☐ YES ☐ NO

(Note: If no, no further documentation is required for Section 4.1 in the SWPPP Template.

Continue to Section 4.2.)

Check the compliance alternative that you have chosen:

☐ (i) I will provide and maintain a 50-foot undisturbed natural buffer.

(Note 1: You must show the 50-foot boundary line of the natural buffer on your site map.)

(Note 2: You must show on your site map how all discharges from your construction disturbances through the natural buffer area will first be treated by the site’s erosion and sediment controls. Also, show on the site map any velocity dissipation devices used to prevent erosion within the natural buffer area.)

General Instructions (See CGP Parts 2.2 and 7.2.6):

― Describe the erosion and sediment controls that will be implemented at your site to meet the requirements of CGP Part 2.2.

― Describe any applicable stormwater control design specifications (including references to any manufacturer specifications and/or erosion and sediment control manuals/ordinances relied upon).

― Describe any routine stormwater control maintenance specifications.

― Describe the projected schedule for stormwater control installation/implementation.

Instructions (see CGP Parts 2.2.1 and 7.2.6.b.i, and Appendix D):

This section only applies to you if discharge to a receiving water is located within 50 feet of your site’s earth disturbances. If this is the case, consult CGP Part 2.2.1 and Appendix D for information on how to comply with the buffer requirements.

― Describe the compliance alternative (CGP Part 2.2.1.a.i, ii, or iii) that you will implement to meet the buffer requirements, and include any required documentation supporting the alternative selected. For alternative 3, also include why it is infeasible for you to provide and maintain an undisturbed natural buffer of any size. For “linear construction sites” where it is infeasible to implement alternative 1, 2, or 3, also include a description of any buffer width retained and/or supplemental erosion and sediment controls installed. The compliance alternative selected must be maintained throughout the duration of permit coverage. However, if you select a different compliance alternative during your period of permit coverage, you must modify your SWPPP to reflect this change.

― If you qualify for one of the exceptions in CGP Part 2.2.1.b, include documentation related to your qualification for such exceptions.

Yale-Kilgore Road, MP 16.9 to 30.3: ID FREMONT 6805(1)

☐ (ii) I will provide and maintain an undisturbed natural buffer that is less than 50 feet and is supplemented by additional erosion and sediment controls that achieve, in combination, the sediment load reduction equivalent to a 50-foot undisturbed natural buffer.

(Note 1: You must show the boundary line of the natural buffer on your site map.)

(Note 2: You must show on your site map how all discharges from your construction disturbances through the natural buffer area will first be treated by the site’s erosion and sediment controls.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .