This document contains a series of questions and answers related to a federal contract opportunity for the ID CLARK 6805(1) and ID FREMONT 6805(1) projects on Yale-Kilgore Road. The contract opportunity is a solicitation (Solicitation Number: 69056721B000015) issued by the Department of Transportation Federal Highway Administration.

The questions and answers cover various technical and administrative aspects of the project, such as material specifications, equipment requirements, construction sequencing, and contract administration. Key details include the potential for contract amendments to address some of the questions, clarification on dust control requirements, and confirmation that the Government does not intend to revise certain design requirements prior to award. The summary also notes that the document does not contain a Performance Work Statement or Statement of Objectives, but rather a set of questions and answers related to the solicitation requirements.

View the file

Other files

File Type Posted
BidTab_ID CLARK 6805(1) and ID FREMONT 6805(1)_Updated.pdf PDF
BidTab_ID CLARK 6805(1) and ID FREMONT 6805(1).pdf PDF
BidSum ID CLARK 6805(1) and ID FREMONT 6805(1).pdf PDF
QA_04-29-2024.pdf PDF
QA_04-25-2024.pdf PDF
Amendment A003.pdf PDF
Amendment A002.pdf PDF
QA_04-24-2024.pdf PDF
QA_04-23-2024.pdf PDF
QA_04-19-2024.pdf PDF
QA_04-17-2024.pdf PDF
Amendment A001.pdf PDF
QA_04-08-2024.pdf PDF
C4185017.Clarification Memo 09142023_signed.pdf PDF
ida-clark6805-1_Superelevation_Road.xlsx XLSX spreadsheet
ATV-Snowmobile Bridge Design Calcs_100.pdf PDF
ida-clark6805-1_control-points.xlsx XLSX spreadsheet
C4185017.Yale Kilgore Final Geotechnical Engineering Report_stamped.pdf PDF
Culvert Design Report 10-31-2019.pdf PDF
ida-clark6805-1_Plans G-N.pdf PDF
Taylor Creek AOP Report.pdf PDF
Yale_Kilgore_ID_EPA_CompiledSWPPP.pdf PDF
ida-clark6805-1_XS_Trail.pdf PDF
ida-clark6805-1_XS_Road.pdf PDF
ida-clark6805-1_Plans A-F.pdf PDF
WF Mill Creek AOP Report.pdf PDF
ida-clark6805-1_proposed_alignments.pdf PDF
ida-clark6805-1_Earthwork_Data.pdf PDF
Physical Data.zip ZIP file
IFB 69056721B000015.pdf PDF
Sheridan Creek Bridge Load Rating.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ID CLARK 6805(1) & ID FREMONT 6805(1)

Yale‐Kilgore Road, MP 9 to 16.9 & Yale‐Kilgore Road, MP 16.9 to 30.8

# General Technical Question Answer Date

1 X

Does WFL want steel fabricated signs as specified under SCR 633.05(a)(1), or is aluminum sign panels acceptable?

This will be addressed under Amendment

A001.

4/8/2024

2 X

Section 306 requires an FDR mix with 100% of the material passing the 2‐inch sieve, but the specified pulverizing equipment does not possess a mechanism that produces this.

Standard construction equipment can produce a mix with a maximum 3‐inch material size, so we request that the Government change the material specifications for the FDR mix to allow for 100% of the material passing the 3‐inch sieve and 95% of the material passing the 2‐ inch sieve, since these are the requirements

Caltrans uses.

This will be addressed under Amendment

A002.

4/17/2024

3 X

Subsection 306.09 requires foamed asphalt to be applied when the surface and air temperatures in the shade are at least 50°F.

Given the location of this project and typical weather conditions in the area, this requirement can significantly reduce the potential working window for FDR‐FA on any given day. Would the Government consider removing the phrase “in the shade” from the specifications and/or reducing the minimum air temperature to 45°F, as specified in the ARRA

Recommended Construction Guidelines for FDR using Bituminous Stabilization?

This will be addressed under Amendment

A002.

4/17/2024

Check General or Technical

4 X

Could you please provide us with the contact information of the prime contractors or known plan holders of the project?

The Government does not provide this since bidders may obtain the registered vendors list (aka planholders list) from sam.gov after linking their entity to their registration. If you are signed into

SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract

Opportunities Administrator role for your entity in SAM.gov.

See GSAFSD_kb_articles ‐ GSA Federal

Service Desk Service Portal for more information.

If you need additional assistance, you can reach the Federal Service Desk at 866‐606‐

8220.

4/19/2024

5 X

Regarding Item No. A0500, would the FHWA consider allowing placement of the FDR‐FA using a compacting paver as an alternative to conventional grading?

The Government does not intend to revise the equipment requirements for this work.

In addition, proposed equipment for this work that does not meet the requirements of the solicitation documents, will not be evaluated by the Government before contract award. Please submit bids according to the solicitation requirements.

4/22/2024

6 X

Section 306.10 says to follow 301.06 on finishing, section 301.06 state in paragraph 2 that when grade finishing stakes are not required as per Section 152.05(f) then use a straight edge, however 152.05(f) does not discuss when grade stakes are NOT required. Can you clarify when grade stakes are not required?

Please submit bids according to the solicitation documents.

4/22/2024

7 X

Section 156.07(k)(4) states not to work from

Friday through Tuesday for Juneteenth which lands on a Wednesday. Could you please clarify if the

Wednesday it falls on will also have to be a non‐ work day?

This will be addressed under Amendment

A002.

4/22/2024

8 X

In section 555.18, Erection of the bridge, IT adds Perform all work related to the erection of the trail bridge within the timing window stipulated in Subsection 107.10(e)(8).

107.10(e)(8) is about reporting wild animals to the CO. Is there a timing window for the bridge?

This will be addressed under Amendment

A002.

4/22/2024

9 X Where do we stage all the timber that is stipulated to stay the governments property?

See Subsection 201.06. 4/22/2024

10 X

On the D sections the note "* Additional

Crushed Aggregate for full depth reclamation leveling meeting FP‐14 Standard Specification

703.06. Quantity shown is incidental to Full

Depth Reclamation Item 30603‐0600" Is the

Asterix quantity listed for the roadway aggregate at the bottom of the sheets by the ton or by the cubic yard in the full depth reclamation section?

The bottom graph quantities below the profile views are shown in cubic yard quantities.

4/22/2024

11A X

Is the existing asphalt in the station ranges under typical section 3 counted as roadway excavation in quantities?

The Typical Section 3 quantities shown in the Earthwork physical data includes the volumetric quantities for pavement to be removed.

4/24/2024

(Revised)

4/22/2024

11B X Can removed pavement be used as embankment?

This will be addressed under Amendment

A002.

4/22/2024

12 X

In the cross section provided for the trail @stn.

4+00‐4+50 shows the mainline shoulder slope over the top of the trail finish grade please provide clarification.

See 939+50 RT in the file ida‐clark6805‐

1_XS_Road.pdf, which shows a designed barnroof slope with a 1V:3H foreslope hinged above a 1V:2H fill slope that catches on the LT trail edge.

4/22/2024

13 X Is the topsoil removal in trail considered to be in excavation quantity?

The quantities shown in the Earthwork physical data do not include includes the volumetric quantities for topsoil to be conserved.

4/24/2024

(Revised)

4/22/2024

14 X

Plan sheet D.3 shows the clearing and slope stake limits with an arrow. There is only 1 slash line there. Are they the same location?

This will be addressed under Amendment

A002.

4/22/2024

15 X

Bid Item No. 63507‐0600 Temporary Traffic

Control, Pilot Car. This item is typically bid by the hour. This item however, is bid by the day.

Please clarify.

See Subsections 109.02(d), 156.07(l), and

635.25, and please submit bids according to the quantities shown in the Bid

Schedule.

4/25/2024

16 X

Grout spec is calling for a type II cement, this material is no longer available in this market.

Can the contractor substitute this material with

Type 1L cement? This is readily available in this market, and would be more cost effective for the project.

This will be addressed under Amendment

A003.

4/25/2024

17 X

Micropiles for the Mill Creek Trail Bridge call out 1‐1/2” grade 60 all thread bar. Can this material be substituted with a #14 grade 75 thread bar? I am having difficulty finding a supplier that has the 1‐1/2” grade 60 material.

This will be addressed under Amendment

A003.

4/25/2024

18 X

The micropile bid quantity of 420 LF appears to be incorrect. Based on the information in the plans this quantity should be 580 LF. This is based on the bottom of pile cap elevation, estimated bedrock depth, and minimum 7.5’ embedment depth.

This will be addressed under Amendment

A003.

4/25/2024

19 X

The contract specifications currently only allow for 30 minute delays for public traffic for this contract per FP‐14 156.07(i.). The technical requirements, detail, and weight requirements for installation of the arch culverts at Taylor

Creek and Mill Creek would require a full closure footprint to install elements of these culverts which could not be accomplished in the 30 minute window. Would the government consider allowing a full closure period for construction of these culverts?

This will be addressed under Amendment

A003.

4/25/2024

20 X

The Design shows intermediate and end diaphragms welding to the bearing and diaphragm stiffeners. With only 1" of clearance between the girder web and the edge of the diaphragm there will not be enough access to make the difficult vertical welds. We request the diaphragms have a bolted connection to stiffeners at all locations.

The Government does not intend to revise these design requirements, and the

Government will not evaluate proposed design revisions before contract award.

Please submit bids according to the solicitation documents.

4/25/2024

21 X

Section A‐A on design sheet M.18 does not specify how the horizontal W6x20 support connects to the girder web. We request an end plate be welded to the W6 x 20 horizontal member and a bolted connection made from the end plate to the girder web.

The Government does not intend to revise the solicitation documents for this. Follow the requirements of Subsection 555.03 and please submit bids according to the solicitation documents.

4/25/2024

22 X

The wage determination on D‐2 of the invitation to bid states there is a zone pay with the base points not in this area. Could you please clarify?

With the project being 45 miles from the closest base zone(s), please use zone 2 rates.

4/22/2024

23 X Will dust control be required for this project? Yes 4/29/2024

24 X Will you be adding an item for dust control? No 4/29/2024

25 X Will the dust control be considered incidental to the project?

Please refer to FP‐14, Section 158 .06 and section 109.05 and bid accordingly 4/29/2024