XS CO FTNP ROMO 407(1).pdf
PDF 1003 KB Posted
- Attached to
- CO NP ROMO 407(1) Holzwarth Culvert
- Solicitation number
- 6982AF27B000004
About this file
This is a technical drawing document containing cross-sectional views of the Holzwarth Culvert Access Road project located in Colorado (CO FTNP ROMO 407(1)). The document is prepared by the Federal Highway Administration (FHWA), Office of Federal Lands Highway, with NPS Project Management Information System (PMIS) Number 230863 and Drawing Number 121-197211.
The document comprises 15 sheets indexed as follows: Sheet X1 is the title sheet, and Sheets X2-X15 contain mainline cross sections. The cross sections are presented at various station locations ranging from 11+20.00 to 13+00.00, displaying designed grade elevations, original ground elevations, and roadway slope information. Each cross section shows a typical roadway profile with centerline (CL) markings, elevation measurements, slope percentages (ranging from -1.0% to +1.0%), and slope ratios (such as 1:2.0 and 1:3.0) representing embankment or cut slopes. The design grade elevations generally range from 8,893.21 to 8,895.77 feet, while original ground elevations remain relatively consistent between approximately 8,893.16 and 8,893.90 feet. The document provides the technical design specifications necessary for construction of the culvert access road improvement project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CROSS SECTIONS
HOLZWARTH CULVERT
CO FTNP ROMO 407(1)
MAINLINE CROSS SECTIONSX2-X15
TITLE SHEET CROSS SECTIONSX1
DESCRIPTIONSHEET
INDEX TO SHEETS
:3
A
M u g u s t
D e s ig n I n tl
F t c p w w o r k c f l\ d m s \X
S S
T
T L
.d g n
PROJECT
NUMBER
SHEET
HOLZWARTH CULVERT
CO FTNP ROMO 407(1)
X1
NPS Drwg No. 121-197211 NPS PMIS No. 230863
LC
11+20.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
-0.0% +1.0% -1.0%
-1.0%
8,893.23 Des Grade =
8,893.23 Original Grnd =
LC
11+24.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
-0.0% +1.0% -1.0%
-1.0%
8,893.22 Des Grade =
8,893.22 Original Grnd =
HOLZWARTH CULVERT ACCESS ROAD
FHWA, Office of Federal Lands Highway
:1 u g u s t
H o lz a r th
C
L
.0
S h e e t] p w w o r k c f l\ d m s
\X S
S
R O
M O
.d g n
X2
NPS Drwg No. 121-197211 NPS PMIS No. 230863
NUMBER
SHEET
PROJECT
CO FTNP ROMO 407(1)
11+30.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
-0.0% +1.0% -1.0%
-1.0%
8,893.21 Des Grade =
8,893.21 Original Grnd =
LC
11+40.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
+1.0% -1.0% -1.0%
8,893.36 Des Grade =
8,893.18 Original Grnd =
FHWA, Office of Federal Lands Highway
:1 u g u s t
H o lz a r th
C
L
.0
S h e p w w o r k c f l\ d m s
\X S
S
R O
M O
.d g n
X3
NPS Drwg No. 121-197211 NPS PMIS No. 230863
NUMBER
SHEET
PROJECT
11+43.47
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
+1.0% -1.0% -1.0%
8,893.47 Des Grade =
8,893.17 Original Grnd =
LC
11+50.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
+1.0% -1.0%
8,893.77 Des Grade =
8,893.16 Original Grnd =
FHWA, Office of Federal Lands Highway
:1 u g u s t
H o lz a r th
C
L
.4
S h e p w w o r k c f l\ d m s
\X S
S
R O
M O
.d g n
X4
NPS Drwg No. 121-197211 NPS PMIS No. 230863
NUMBER
SHEET
PROJECT
11+60.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
1:3 .0
+1.0% -1.0%
8,894.27 Des Grade =
8,893.20 Original Grnd =
LC
11+70.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
1:3 .0
+1.0% -1.0% 1:3.0
8,894.77 Des Grade =
8,893.30 Original Grnd =
FHWA, Office of Federal Lands Highway
:1 u g u s t
H o lz a r th
C
L
.0
S h e p w w o r k c f l\ d m s
\X S
S
R O
M O
.d g n
X5
NPS Drwg No. 121-197211 NPS PMIS No. 230863
NUMBER
SHEET
PROJECT
11+71.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
1:3 .0
+1.0% -1.0% 1:3.0
8,894.82 Des Grade =
8,893.31 Original Grnd =
LC
11+80.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
1:3 .0
+1.0% -1.0%
1:3.0
8,895.27 Des Grade =
8,893.40 Original Grnd =
FHWA, Office of Federal Lands Highway
:1 u g u s t
H o lz a r th
C
L
.0
S h e p w w o r k c f l\ d m s
\X S
S
R O
M O
.d g n
X6
NPS Drwg No. 121-197211 NPS PMIS No. 230863
NUMBER
SHEET
PROJECT
11+90.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
1:3 .0
+1.0% -1.0%
1:3.0
8,895.62 Des Grade =
8,893.54 Original Grnd =
LC
11+95.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
1:3 .0
+1.0% -1.0%
1:3.0
8,895.68 Des Grade =
8,893.61 Original Grnd =
FHWA, Office of Federal Lands Highway
:1 u g u s t
H o lz a r th
C
L
.0
S h e p w w o r k c f l\ d m s
\X S
S
R O
M O
.d g n
X7
NPS Drwg No. 121-197211 NPS PMIS No. 230863
NUMBER
SHEET
PROJECT
12+00.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
-0.0% +0.0%
8,895.67 Des Grade =
8,893.70 Original Grnd =
LC
12+50.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
-0.0% +0.0%
8,895.17 Des Grade =
8,893.87 Original Grnd =
FHWA, Office of Federal Lands Highway
:1 u g u s t
H o lz a r th
C
L
.0
S h e p w w o r k c f l\ d m s
\X S
S
R O
M O
.d g n
X8
NPS Drwg No. 121-197211 NPS PMIS No. 230863
NUMBER
SHEET
PROJECT
12+54.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
+0.0% -0.0% 1:2.0
8,895.11 Des Grade =
8,893.77 Original Grnd =
LC
12+56.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
-1.0% +1.0% 1:2.0
8,895.07 Des Grade =
8,893.71 Original Grnd =
FHWA, Office of Federal Lands Highway
:1 u g u s t
H o lz a r th
C
L
.0
S h e p w w o r k c f l\ d m s
\X S
S
R O
M O
.d g n
X9
NPS Drwg No. 121-197211 NPS PMIS No. 230863
NUMBER
SHEET
PROJECT
12+58.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
1:
2.
-1.0% +1.0% 1:2.0
8,895.02 Des Grade =
8,893.69 Original Grnd =
LC
12+60.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
1:
2.
-1.0% +1.0% 1:2.0
8,894.97 Des Grade =
8,893.71 Original Grnd =
FHWA, Office of Federal Lands Highway
:1 u g u s t
H o lz a r th
C
L
.0
S h e p w w o r k c f l\ d m s
\X S
S
R O
M O
.d g n
X10
NPS Drwg No. 121-197211 NPS PMIS No. 230863
NUMBER
SHEET
PROJECT
12+67.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
-1.0% +1.0%
1:3.0
8,894.71 Des Grade =
8,893.63 Original Grnd =
LC
12+70.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
1:
2.
-1.0% +1.0%
1:3.0
8,894.57 Des Grade =
8,893.65 Original Grnd =
FHWA, Office of Federal Lands Highway
:1 u g u s t
H o lz a r th
C
L
.0
S h e p w w o r k c f l\ d m s
\X S
S
R O
M O
.d g n
X11
NPS Drwg No. 121-197211 NPS PMIS No. 230863
NUMBER
SHEET
PROJECT
12+70.79
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
1:
2.
-1.0% +1.0%
1:3.0
8,894.53 Des Grade =
8,893.66 Original Grnd =
LC
12+74.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
-1.0% +1.0%
1:3.0
8,894.37 Des Grade =
8,893.68 Original Grnd =
FHWA, Office of Federal Lands Highway
:1 u g u s t
H o lz a r th
C
L
.7
S h e p w w o r k c f l\ d m s
\X S
S
R O
M O
.d g n
X12
NPS Drwg No. 121-197211 NPS PMIS No. 230863
NUMBER
SHEET
PROJECT
12+80.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
1:3 .0
-1.0% +1.0% 1:3.0
8,894.12 Des Grade =
8,893.76 Original Grnd =
LC
12+81.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
1:3 .0
-1.0% +1.0%
8,894.09 Des Grade =
8,893.78 Original Grnd =
FHWA, Office of Federal Lands Highway
:1 u g u s t
H o lz a r th
C
L
.0
S h e p w w o r k c f l\ d m s
\X S
S
R O
M O
.d g n
X13
NPS Drwg No. 121-197211 NPS PMIS No. 230863
NUMBER
SHEET
PROJECT
12+83.03
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
1:3 .0
-1.0% +1.0%
8,894.03 Des Grade =
8,893.82 Original Grnd =
LC
12+90.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
1:3 .0
-1.0% +1.0%
8,893.91 Des Grade =
8,893.89 Original Grnd =
FHWA, Office of Federal Lands Highway
:1 u g u s t
H o lz a r th
C
L
.0
S h e p w w o r k c f l\ d m s
\X S
S
R O
M O
.d g n
X14
NPS Drwg No. 121-197211 NPS PMIS No. 230863
NUMBER
SHEET
PROJECT
12+96.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
-1.0% +1.0%
8,893.90 Des Grade =
8,893.90 Original Grnd =
LC
13+00.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
8,880 8,880
8,890 8,890
8,900 8,900
-1.0% +1.0%
8,893.91 Des Grade =
8,893.91 Original Grnd =
FHWA, Office of Federal Lands Highway
:1 u g u s t
H o lz a r th
C
L
.0
S h e p w w o r k c f l\ d m s
\X S
S
R O
M O
.d g n
X15
NPS Drwg No. 121-197211 NPS PMIS No. 230863
NUMBER
SHEET
PROJECT
| XSS-TTL |
| XSS_100_ROMO_407(1) |
| XSS_100_ROMO_407(1) |
| XSS_100_ROMO_407(1) |
| XSS_100_ROMO_407(1) |
| XSS_100_ROMO_407(1) |
| XSS_100_ROMO_407(1) |
| XSS_100_ROMO_407(1) |
| XSS_100_ROMO_407(1) |
| XSS_100_ROMO_407(1) |
| XSS_100_ROMO_407(1) |
| XSS_100_ROMO_407(1) |
| XSS_100_ROMO_407(1) |
| XSS_100_ROMO_407(1) |
| XSS_100_ROMO_407(1) |
File details come from the government source that posted it. Updated .