A001 10.19.26.pdf

PDF 522 KB Posted

Attached to
CO NP ROMO 407(1) Holzwarth Culvert
Solicitation number
6982AF27B000004
Issued by

About this file

This is an Amendment A001 to Solicitation 6982AF26B000012, a Sealed Bid (IFB) for roadway construction issued by the Federal Highway Administration, Central Federal Lands Highway Division on September 16, 2026. The amendment was effective October 19, 2026, and extends the offer receipt deadline from October 20, 2027 to October 19, 2026. The requisition number is HFLCEO260321PR, and the project is CO FTNP ROMO 407(1) for the Holzwarth Culvert located in Colorado (NPS PMIS #230863). Contract Specialist Denise Martinez administers the solicitation from the Federal Highway Administration's office in Lakewood, Colorado.

The amendment modifies the Invitation for Bids (IFB) section A-1 and replaces pages E-12 and E-25 of the Special Contract Requirements. Key changes include removal and salvage of headgates per Section 203.04; fire prevention plan compliance requirements; a mandatory preconstruction conference seven days before work begins; restrictions on streambed work when water flows exceed 50 cubic feet per second (monitored via the Colorado River below Baker Gulch gauge); prohibitions on night and weekend work; and a critical constraint that no equipment mobilization or ground-disturbing activities may commence before August 2, 2027. Additional modifications address construction operation limitations, traffic control requirements (minimum 10-foot lane width for one-way alternate traffic and 10-foot roadway width for two-way traffic), closure of the Holzwarth Historic Site Parking Lot and Access Road beginning August 2, 2027, soil erosion and sediment control plan requirements, and clarifications on nighttime operations (defined as after sunrise and before sunset). Performance bonds are required within 10 calendar days of award. Contractors must provide a site-specific soil erosion and sediment control plan within 30 days of the preconstruction conference and may submit offers with a minimum 60-calendar-day Government acceptance period.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

2. AMENDMENT/MODIFICATION NUMBER

*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 WEST DAKOTA AVENUE, SUITE 360

LAKEWOOD, COLORADO 80228

ATTENTION:

9A. AMENDMENT OF SOLICITATION NUMBER

5. PROJECT NUMBER (If applicable)

9B. DATED (SEE ITEM 11)

0*

*See Item 14

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration or Repair)

(IFB)

(RFP)

IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.

(Include area code)

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

48 CFR, CHAPTER 1, FEDERAL ACQUISTION REGULATION (FAR), REVOLUTIONARY FAR OVERHAUL (RFO)

AND THE DEPARTMENT OF TRANSPORATION REGULATION (TAR)

DEPARTMENT OF LABOR, CONSTRUCTION WAGE RATE REQUIREMENT RATES.

SPECIAL CONTRACT REQUIREMENTS.

PLANS.

BID SCHEDULE.

STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY

PROJECTS, FP-24, U.S. CUSTOMARY UNITS.

*See Page A-3

(If "YES," indicate within how many calendar days after award in Item 12B.)

Amendment A001 10.19.2026 denise.martinez Cross-Out

(7)

107.11 Protection of Forests, Parks, and Public Lands.

Section 108. — PROSECUTION AND PROGRESS

108.01 Commencement, Prosecution, and Completion of Work.

(a)

(b)

(c) Do not mobilize construction equipment or material onsite, or perform onsite ground disturbing activities before August 2, 2027.

Amendment A001 10.19.2026

156.06 Limitations on Construction Operations.

156.06 Limitations on Construction Operations.

(j) The Holzwarth Historic Site Parking Lot and Access Road may be closed starting August 2, 2027 for the duration of construction.

(k)

156.07 Nighttime Operations.

156.08 Traffic Control Supervisor.

Section 157. — SOIL EROSION AND SEDIMENT CONTROL

Construction Requirements

157.04 General.

Amendment A001 10.19.2026

1 CONTRACT ID CODE:
2 AMENDMENTMODIFICATION NUMBER: A001
4 REQUISITIONPURCHASE REQUISITION NUMBER: HFLCEO260321PR
3 EFFECTIVE DATE6 ISSUED BY CODE:
5 PROJECT NUMBER If applicableRow1:
9A AMENDMENT OF SOLICITATION NUMBER: 6982AF26B000012
undefined:
undefined_2:
10A MODIFICATION OF CONTRACTORDER NUMBER:
CODE:
FACILITY CODE:
10B DATED SEE ITEM 13:
The above numbered solicitation is amended as set forth in Item 14 The hour and date specified for receipt of Offers: Off
is extended: On
is not extended: Off
13 THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTSORDERS:
undefined_3:
A THIS CHANGE ORDER IS ISSUED PURSUANT TO Specify authority THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A:
undefined_4:
undefined_5:
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
undefined_6:
D OTHER Specify type of modification and authority:
is not: Off
is required to sign this document and return: Off
Date1_af_date: 9/16/26
Date2_af_date: 10/19/26
Text3: IFB: Remove and replace A-1.

SCRs: Remove and replace pages E-12 and E-25.

Text4: 4
Contract Specialist: Denise Martinez
Project Number: CO NP ROMO 407(1)

File details come from the government source that posted it. Updated .