This is a Questions and Answers document for the CO FTNP ROMO 407(1) Holzwarth Culvert federal contract opportunity, issued during the advertisement period from October 9-20, 2026. The document addresses 31 inquiries from potential contractors regarding project requirements, site conditions, and specification clarifications across four Q&A release dates.
Key project requirements include clearing and grubbing disposal per FP-24 section 201.06, roadway widening removal per SCR section 650.07, and diversion structure removal and reset per plan sheets S12 and S13. The project involves erection of a 10' wide × 48' long prefabricated modular steel vehicular bridge, potentially delivered fully assembled in multiple longitudinal modules for field connection. Contractors must obtain necessary permits per SCR and FP-24 section 107, and certified steel erectors are required per section 555.18. The site is located within Rocky Mountain National Park; contractors receive passes waiving entrance fees and timed-entry reservations but cannot access park water sources, use campers at the site, or access park bathrooms during construction. Ground-disturbing activities are restricted until August 2, 2027. Anchor bolts may be cast-in-place or drilled and epoxied with required submittals for the latter method. Dewatering is subsidiary and not directly paid. The Geotechnical Report is available on sam.gov. Amendment A001 extended the bid date one week and clarified solicitation number 6982AF27B000004, which must appear on bid bonds and all submission documents.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for
CO FTNP ROMO 407(1) HOLZWARTH CULVERT
October 9, 2026
Questions Answers 1 Can the material grubbed from the project remain on site or will it need to be hauled off?
Refer to FP-24 section 201.06 for clearing and grubbing disposal.
2 Can the material used for the road widening be left, or will it need to be reclaimed?
Refer to SCR section 650.07 for roadway widening removal requirements.
3 Is there a power supply near by for the office trailer? Refer to the plans and SCR section 107-2 for utility information near the project.
4 Will a lab trailer be required? Refer to SCR section 154.04B for laboratory requirements.
5 Can you provide more detail or description of what is needed for the remove and reset of the diversion structure? Is this reset as more of a monument structure?
Refer to plan sheets S12 and S13 in the plans and section 203 of the FP-24 and SCRs for diversion structure information.
6 What permits, if any, is the contractor responsible for obtaining? Refer to SCR and FP-24 section 107 for permit requirements.
7 Is a certified steel erector going to be required for this project? Refer to SCR and FP-24 section 555.18 for steel structure erection requirements.
October 12, 2026
Questions Answers 8 Can the contractor use water from the river for dust control, and road conditioning?
No
9 If water from the river is not available, is there a water source nearby?
There are no water sources within Rocky Mountain National Park that are available for use.
10 Will the contractors be permitted to stay in campers at the site? No 11 Will the bathrooms remain open during construction? No 12 How will the reservation into the park effect construction? Will the contractor be required to purchase permits to enter the park?
Contractors working on the project will receive a pass from Rocky Mountain National Park, waiving standard entrance fees and timed-entry reservation requirements.
October 13, 2026
13 Page 20 States government to provide electrical and telephone conduit. Does this include hangers bolted to structural steel?
This does not include hangers.
14 Is there a source for power for the Field Office on site? Refer to the plans and SCR section 107-2 for utility information near the project.
15 Salvage items in removed diversion box what address items to be delivered to?
Refer to plan sheets S12 and S13 in the plans and section 203 of the FP-24 and SCRs for diversion structure information.
16 Extend the bid date one (1) week per sub-contractors and suppliers request?
See Amendment A001.
17 Diverting the Colorado River around the existing channel, or must the diverting have to stay within the existing channel?
Refer to SCR and FP-24 section 628 for temporary stream diversion requirements.
18 New anchor bolts (ps 20) in abutment have to be placed or embedded in concrete or can they be drilled and epoxy grouted after concrete placement.
Anchor bolts may be either cast in place or drilled and epoxied. For epoxied installations a submittal with calculations verifying embedment and material certs will be required for approval.
19 What is the load rating for the Superstructure? Refer to SCR section 555.03 for required superstructure load rating.
20 Is the Owner open to any Value Engineering for the
Superstructure for an alternate design?
No. Bid as specified within the plans and specifications.
21 What is the desired seed mix? Refer to SCR section 105.02(a).
22 Is dewatering included with the Temporary Stream Diversion item and how will dewatering be paid for?
Dewatering will not be paid for directly and is subsidiary.
23 What is the anticipated start date for the project and if the start time frame is this year when will a winter shut down be considered (what timeframe will the winter shut down be considered).
Refer to SCR section 105.02(a) for restrictions on work and completion date.
24 The bid schedule includes one verification test and two proof load tests. Please confirm whether these tests are to be performed on the six production micropiles or whether additional sacrificial/test micropiles are required.
Refer to FP-24 sections 567.06 for testing requirements.
25 The foundation plans and Specs Sheet E-1, reference the Final Geotechnical Report, Holzwarth Bridge, dated April 2026, prepared by CFLHD Geotechnical Services. Can you provide this Geotech report. If it isn’t available, are there any assumptions we should be making in our estimate?
The Geotech Report is available on project solicitation on sam.gov
26 The bid schedule identifies a 10' wide × 48' long prefabricated modular steel vehicular bridge. Please confirm whether the contractor may have the bridge delivered to the site fully assembled, or whether field assembly at the project site is anticipated/required
Typically these prefabricated bridges are delivered to the site fully assembled (minus railings) and may come in 2 or more longitudinal modules which are field connected. This is usually determined by hauling limits and site access limitations.
27 May the designated temporary truck turnaround area (Plan Sheet D-1) also be used for crane setup, bridge assembly, material staging, temporary stockpiling, office trailers and bridge erection?
Refer to SCR and FP-24 section 104 for control of work, 105 for control of material, section 555 for steel structure, and section 637 for office trailer requirements.
28 The bid schedule carries 20 hours of survey services. Is there a survey tabulation that shows contractor required survey elements?
Refer to FP-24 section 152 for construction survey and staking requirements.
29 Are there any items of the existing removed features that must be provided to the owner or are all removals the contractors responsibility?
Refer to the SCRs removal salvage or storage requirements.
30 Please confirm what items would be considered ground-disturbing activities that may only begin after August 2, 2027 per the specs.
For instance, can material delivery, bridge fabrication, surveying, mobilization, traffic-control setup, or prefabrication occur before that date?
Refer to Amendment A001.
October 20, 2026
31 Amendment A001 references solicitation number 6982AF27B000012 in box 9A. What number should be listed on the bid bond?
The incorrect solicitation number was referenced on Amendment A001.
Amendment A001 should have referenced solicitation number 6982AF27B000004. The bid bond should also reference solicitation number 6982AF27B000004 under the Bid Identification section.