6982AF27B000004.pdf
PDF 2 MB Posted
- Attached to
- CO NP ROMO 407(1) Holzwarth Culvert
- Solicitation number
- 6982AF27B000004
About this file
This is a Solicitation for a bridge replacement and infrastructure project located in Rocky Mountain National Park, Colorado. The Federal Highway Administration is seeking a contractor to remove the existing six-barrel corrugated metal arch pipe culvert (Structure No. 1520-029S) on the Holzwarth Access Road and construct a new steel girder bridge with a cast-in-place concrete deck. The project is situated approximately nine miles north of Grand Lake along US Highway 34 at an elevation of 8,900 feet and serves to convey Colorado River flow while providing access to the Holzwarth Historic Site, employee housing, and National Park Service and Forest Service recreation opportunities.
The scope of work includes removal of the existing culvert, construction of new bridge abutments with micropiles, temporary stream diversion and riprap installation, new aggregate roadway surfacing, relocation of an existing electrical line, and relocation of historic head gates onto a new concrete slab. Principal work items include removal of the bridge (1 each), roadway aggregate of 120 tons, a prefabricated steel bridge measuring 10 feet wide by 48 feet long (1 lump sum), micropile installation of 8.68-inch diameter for 180 linear feet, and temporary stream diversion (1 lump sum). The Holzwarth Culvert Access Road is approximately 13 feet wide with tight turns requiring temporary widening to prevent truck tracking onto sensitive environmental resources, and construction access is limited to 100 feet west of the bridge. The anticipated advertisement date is September 2026 with award anticipated in December 2026. Solicitation Number: 6982AF27B000004, Project Number: CO FTNP ROMO 407(1).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR BID
SOLICITATION NUMBER:
SOLICITATION TYPE:
PROJECT NUMBER:
PROJECT NAME:
6982AF2 B0000
FULL & OPEN COMPETITION (with HUBZone Price Preference)
CO NP ROMO 407(1)
HOLZWARTH CULVERT
BID OPENING DATE:
This solicitation cites Standard Specifications for Construction of Roads and Bridges on
Federal Highway Projects, FP-24 US Customary Units
ISSUING OFFICE:
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 W. DAKOTA AVENUE, SUITE 360
LAKEWOOD, CO 80228
Web site: https://highways.dot.gov/federal-lands E-mail: CFLContracts@dot.gov
TABLE OF CONTENTS
Notice to Bidders .................................................................................................................. A-i
Solicitation, Offer, and Award ............................................................................................ A-1
Basis for Award and Bid Schedule .................................................................................... A-7
Solicitation Provisions ......................................................................................................... B-7
Contract Clauses .................................................................................................................. C-1
Construction Wage Rate Requirement ............................................................................... D-1
Division 100 ..........................................................................................................................E-1 Division 150 ....................................................................................................................... E-17 Division 200 ....................................................................................................................... E-26 Division 300 ....................................................................................................................... E-27 Division 400 ............................................................................................................. SEE FP-24 Division 500 ....................................................................................................................... E-28 Division 600 ....................................................................................................................... E-33 Division 700 ....................................................................................................................... E-41
APPENDICES
Appendix A .............................................................................................. Fire Prevention Plan
Appendix B ...............................................................................Aquatic Disinfection Protocol
Appendix C ......................................................................................... Nest Survey Data Sheet
Appendix D .............................................................................................. 401 and 404 Permits
Appendix E................................................................................................ Subcontracting Plan
SPECIAL CONTRACT REQUIREMENTS (SCRs)
The following Special Contract Requirements amend and supplement the Standard Specification for Construction of Roads and Bridges on Federal Highway Projects
PROJECT OVERVIEW
Potential bidders may access the site by walking past the locked gate for a quarter mile to the project site.
d
I. PRE-BID INFORMATION
ELECTRONIC BIDS WILL NOT BE ACCEPTED. Submit a printed copy of your bid to the address listed on the SF-1442 (Page A-1, Item 8).
Bids and shall be submitted in sealed envelopes or packages:
(1) addressed to the office specified in the solicitation, and
(2) showing the time and date specified for receipt, the solicitation number, and the name and address of the bidder.
Bidders using commercial carrier services shall ensure that the bid is addressed and marked on the outermost envelope or wrapper as prescribed above when delivered to the office specified in the solicitation.
Submit the following documents with your Bid Package– o
Notice of SAM Registration
Representations and Certifications – NAICS 237310
Vets-4212 Reporting: -
This Solicitation Contains a Price Evaluation Factor
52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns
52.219-14, Limitations on Subcontracting
Bid Guarantee 52.228-1 Bid Guarantee
Accuracy and Completeness of Bid-
Request for Technical Information –
TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE
ACCEPTED AFTER 4 P.M. ON BER , 2026
Consolidate all questions on a single word document and submit NLT the deadline to submit technical questions.
Modifications to Bids prior to the time specified for receipt of bids
STRONGLY ENCOURAGE you to resubmit the entire bid schedule with a unit price and amount for every bid item, and a Schedule Total.
Email Address to submit modifications to bids for this project is cflcontracts@dot.gov
II. POST AWARD INFORMATION
CFLHD will no longer be providing paper copies of the conformed contract to the Awarded Prime Contractor.
Subcontracting 52.219-8, Utilization of Small Business Concerns
52.219-9, Small Business Subcontracting Plan, Alternate I
5.303, Announcement of contract awards, NOTE:
FHWA Small Business Subcontracting Goals (As of FY 2026) Business Size Goal (%)
Insurance requirements
Masterworks - Inspector’s Daily Record of Construction Operations” Contractors Daily Reports)
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration or Repair)
(IFB)
(RFP)
IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.
(Include area code)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
48 CFR, CHAPTER 1, FEDERAL ACQUISTION REGULATION (FAR), REVOLUTIONARY FAR OVERHAUL (RFO)
AND THE DEPARTMENT OF TRANSPORATION REGULATION (TAR)
DEPARTMENT OF LABOR, CONSTRUCTION WAGE RATE REQUIREMENT RATES.
SPECIAL CONTRACT REQUIREMENTS.
PLANS.
BID SCHEDULE.
STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY
PROJECTS, FP-24, U.S. CUSTOMARY UNITS.
*See Page A-3
(If "YES," indicate within how many calendar days after award in Item 12B.)
OFFEROR (Must be fully completed by offeror) (Include ZIP Code) (Include area code)
(Include only if different than Item 14)
(Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
(Type or print)
AWARD (To be completed by Government)
(4 copies unless otherwise specified)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return copies to issuing office.)
(Contractor is not required to sign this document.)
(Type or print) (Type or print)
Item 8: LOCATION OF PUBLIC BID OPENING:
Item 9: FOR GENERAL INFORMATION:
FOR TECHNICAL INFORMATION (plans and specifications):
Item 11: COMPLETION DATE:
See SCR Section 108.01
Item 12A: PERFORMANCE AND PAYMENT BONDS: Clause 52.228-15 Performance and Payment Bonds-Construction
Item 13B: BID BOND AMOUNT: 52.228-1 Bid Guarantee Subsection 102.03 Bid Guarantee
Item 19: ACKNOWLEDGMENT OF AMENDMENTS:
IN ITEM 19 OF THE SF-1442,
Item 24: SUBMITTING INVOICES: Subsection 109.08 Progress Payments
ESTIMATED
PRICE:
Bid Schedule Instructions
NOTE:
Basis for Award
Partnering
Subsection 103.05 Partnering
Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Unit bid prices should be quoted no more precisely than the nearest cent (2 decimal places). Unit bid prices quoted more precisely will be rounded up to the nearest cent by the Government. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern. When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.
BID SCHEDULE
Bid Schedule Project: CO FTNP ROMO 407(1), HOLZWARTH CULVERT
A-7
BID SCHEDULE
Project No : CO FTNP ROMO 407(1) Schedule : A Project Name : HOLZWARTH CULVERT Schedule Type : Base
Contract Quantity Pay Items
20801-0000 STRUCTURE EXCAVATION
20803-0000 STRUCTURAL BACKFILL
55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
55235-0000 EXPANSION JOINTS
55401-1000 REINFORCING STEEL
55401-2000 REINFORCING STEEL, EPOXY-COATED
55601-0900 BRIDGE RAILING, STEEL (pedestrian)
60101-0000 CONCRETE (Diversion Box Reconstruction)
63610-0000 CONDUIT (government provided)
AMD# Line Item Number
Pay Item Number
Description Supplemental Description
Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION ALL LPSM
A0040 15210-3000
CENTERLINE,
VERIFICATION AND
STAKING
0.014 MILE
A0060 15214-1000 SURVEY AND
STAKING, BRIDGE ALL LPSM
A0080 15225-0000
SLOPE, REFERENCE,
AND CLEARING AND
GRUBBING CONTROL
0.034 MILE
A0100 15236-2000 SURVEY CONTROL,
GRADE FINISHING 0.068 MILE
A0120 15301-0000 CONTRACTOR
QUALITY CONTROL ALL LPSM
A0140 15401-0000 CONTRACTOR
TESTING ALL LPSM
A0160 15501-0000 CONSTRUCTION
SCHEDULE ALL LPSM
A0180 15701-0000 SOIL EROSION
CONTROL ALL LPSM
A0200 15802-0000 WATERING FOR DUST
CONTROL ALL LPSM
A0220 20103-0000 CLEARING AND
GRUBBING 1,685.000 SQYD
A0240 20301-2700 REMOVAL OF
STRUCTURE
(Diversion Box) 1.000 EACH
A0260 20304-2000 REMOVAL OF BRIDGE ALL LPSM
A0280 20420-0000 EMBANKMENT
CONSTRUCTION 60.000 CUYD
A0300 20801-0000 STRUCTURE
EXCAVATION 50.000 CUYD
A0320 20803-0000 STRUCTURAL
BACKFILL 20.000 CUYD
A0340 25101-0100 PLACED RIPRAP,
CLASS 1 6.000 CUYD
A0360 25101-0300 PLACED RIPRAP,
CLASS 3 70.000 CUYD
A0380 30202-2000
ROADWAY
AGGREGATE,
METHOD 2
70.000 TON
A0400 30302-6000 ROADWAY
RECONDITIONING 75.000 LNFT
Bid Schedule
A-8
A0420 55201-0200
STRUCTURAL
CONCRETE, CLASS A
(AE)
24.000 CUYD
A0440 55235-0000 EXPANSION JOINTS 22.000 LNFT
A0460 55401-1000 REINFORCING STEEL 2,300.000 LB
A0480 55401-2000 REINFORCING STEEL,
EPOXY-COATED 700.000 LB
A0500 55504-0000
PREFABRICATED
STEEL BRIDGE
(10' wide x 48' long modular steel vehicular bridge)
ALL LPSM
A0520 55601-0900 BRIDGE RAILING,
STEEL (pedestrian)
(pedestrian) 32.000 LNFT
A0540 56701-0000 MICROPILE (8.68" dia.) 180.000 LNFT
A0560 56705-0000 MICROPILE LOAD
VERIFICATION TEST 1.000 EACH
A0580 56706-0000 MICROPILE PROOF
LOAD TEST 2.000 EACH
A0600 60101-0000 CONCRETE (Diversion Box Reconstruction)
(Diversion Box Reconstruction) 4.000 CUYD
A0620 62201-0050
DUMP TRUCK, 5
CUBIC YARD MINIMUM
CAPACITY
20.000 HOUR
A0640 62201-0450
BACKHOE LOADER, 4
CUBIC FOOT MINIMUM
RATED CAPACITY
BUCKET, 18-INCH
WIDTH
20.000 HOUR
A0660 62201-0950
WHEEL LOADER, 3
CUBIC YARD MINIMUM
RATED CAPACITY
20.000 HOUR
A0680 62201-2750 MOTOR GRADER 20.000 HOUR
A0700 62201-3000 HYDRAULIC
EXCAVATOR 20.000 HOUR
A0720 62301-0000 GENERAL LABOR 20.000 HOUR
A0740 62302-1100
SPECIAL LABOR,
HIRED SURVEY
SERVICES
20.000 HOUR
A0760 62303-1010
SPECIAL LABOR,
HIRED TECHNICAL
SERVICES,
BIOLOGICAL
SERVICES
ALL LPSM
A0780 62401-0400
PROVIDING AND
PLACING TOPSOIL, 6-
INCH DEPTH
1,360.000 SQYD
A0800 62405-0400
PLACING
CONSERVED
TOPSOIL, 6-INCH
DEPTH
164.000 SQYD
A0820 62511-1000 SEEDING, DRY
METHOD
(HAND SEEDING) 1,520.000 SQYD
A0840 62516-2000 MULCHING,
HYDRAULIC METHOD
(WOOD FIBER) 1,520.000 SQYD
A0860 62801-0000 TEMPORARY STREAM
DIVERSION ALL LPSM
A0880 63502-0600
TEMPORARY TRAFFIC
CONTROL,
BARRICADE TYPE 3
8.000 EACH
A0900 63502-1600
TEMPORARY TRAFFIC
CONTROL, WARNING
LIGHT TYPE B
2.000 EACH
A0920 63502-2000
TEMPORARY TRAFFIC
CONTROL, PORTABLE
CHANGEABLE
MESSAGE SIGN
2.000 EACH
Bid Schedule
A-9
A0940 63502-3900
TEMPORARY TRAFFIC
CONTROL,
CONSTRUCTION SIGN
6.000 EACH
A0960 63506-0500 TEMPORARY TRAFFIC
CONTROL, FLAGGER 40.000 HOUR
A0980 63610-0000 CONDUIT (government provided)
(government provided) 100.000 LNFT
A1000 63701-0000 FIELD OFFICE 1.000 EACH
A1020 64620-0000 REMOVE AND RESET (INFORMATION SIGN) 1.000 EACH
A1040 64620-0300 REMOVE AND RESET
BENCH 1.000 EACH
A1060 65001-1000 TEMPORARY TRAFFIC
DIVERSION ALL LPSM
Submitted By: Schedule Total:
Bid Schedule
A-10
Total-Schedule(s) and Option(s) Bid Total
Schedule A
BID SCHEDULE SUMMARY
Schedule Bid Total
Schedule A - Base
Bid Schedule
A-11
Corporate Certificate
Limited Liability Certificate
Authority to Bind Partnership
Authority to Bind Joint Venture
Sole Proprietorship Requirement
BUY AMERICAN ACT- CONSTRUCTION MATERIALS
NOTE TO CONTRACTOR:
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] [Please include name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.
Include all applicable supporting information.]
HAZARDOUS MATERIALS
BIOBASED PRODUCTS AND SUSTAINABLE PRODUCTS AND SERVICES
USE OF RECOVERED MATERIALS ON FEDERAL LANDS HIGHWAY PROJECTS
Comprehensive Guidelines for Procurement of Products Containing Recovered Materials
Bid Bond (See Instructions on Page 3)
Date Bond Executed (Must Not Be Later Than Bid Opening Date)
OMB Control Number: 9000-0001 Expiration Date: 1/31/2027
Principal (Legal Name And Business Address) Type Of Organization ("X" One) Individual Partnership Joint Venture Corporation Other (Specify)
State Of Incorporation
Surety(ies) (Name And Business Address)
Penal Sum Of Bond Bid Identification Percent Of Bid Price
Amount Not To Exceed Bid Date Invitation Number 6982AF27B000004 Million(s)
Thousand(s)
Hundred(s)
Cents
For (Construction , Supplies Or Services) Construction
Obligation:
We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.
Conditions:
The Principal has submitted the bid identified above.
Therefore:
The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the Principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.
Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government. Notice to the Surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.
Authorized For Local Reproduction STANDARD FORM 24 (REV. 10/2023) Previous Edition Is Not Usable Prescribed by GSA FAR (48 CFR) 53.228(a)
Witness:
The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.
Principal
Signature(s) 1.
(Seal)
2.
(Seal)
3.
(Seal) Corporate Seal Name(s)
And Title(s) (Typed)
1. 2. 3.
Individual Surety(ies)
Signature(s) 1. (Seal) 2. (Seal) Name(s) (Typed)
1. 2.
Corporate Surety(ies)
Su re ty A
Name And Address
State Of Incorporation Liability Limit ($)
Corporate Seal
Signature(s) 1. 2.
Name(s) And Title(s) (Typed)
1. 2.
Su re
B
State Of Incorporation Liability Limit ($)
Corporate Seal
Signature(s) 1. 2.
Name(s) And Title(s) (Typed)
1. 2.
Su re
C
State Of Incorporation Liability Limit ($)
Corporate Seal
Signature(s) 1. 2.
Name(s) And Title(s) (Typed)
1. 2.
Su re
D
State Of Incorporation Liability Limit ($)
Corporate Seal
Signature(s) 1. 2.
Name(s) And Title(s) (Typed)
1. 2.
STANDARD FORM 24 (REV. 10/2023) PAGE 2
Su re
E
State Of Incorporation Liability Limit ($)
Corporate Seal
Signature(s) 1. 2.
Name(s) And Title(s) (Typed)
1. 2.
Su re
F
State Of Incorporation Liability Limit ($)
Corporate Seal
Signature(s) 1. 2.
Name(s) And Title(s) (Typed)
1. 2.
Su re
G
State Of Incorporation Liability Limit ($)
Corporate Seal
Signature(s) 1. 2.
Name(s) And Title(s) (Typed)
1. 2.
1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.
2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.
3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).
4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the Liability
Limit block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.
STANDARD FORM 24 (REV. 10/2023) PAGE 3
(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "Corporate Surety(ies)." In the space designated
"Surety(ies)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.
(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form
28) for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability.
5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New
Hampshire, or any other jurisdiction requiring adhesive seals.
6. Type the name and title of each person signing this bond in the space provided.
7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include
"proposal" and "offeror."
Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC §
3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number.
The OMB control number for this collection is 9000-0001. We estimate that it will take 1 hour to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General Services Administration, Regulatory Secretariat Division (MVCB), 1800 F
Street, NW, Washington, DC 20405.
STANDARD FORM 24 (REV. 10/2023) PAGE 4
BIDDER’S INFORMATION
52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. (SEP 2024)
52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements-Representation. (JAN 2017)
52.204-5 Women-Owned Business (Other Than Small Business). (OCT 2014)(DEVIATION
NOV 2025)
52.204-7 System for Award Management. (NOV 2024)(DEVIATION NOV 2025)
52.204-90 Offeror Identification (DEVIATION NOV 2025)
52.209-5 Certification Regarding Responsibility Matters. (AUG 2020)(DEVIATION SEP
2025)(DEVIAION JAN 2026)
52.209-7 Information Regarding Responsibility Matters (OCT 2018)(DEVIATION SEP
2025)(DEVIATION JAN 2026)
52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law (FEB 2016)(DEVIATION SEP 2025)(DEVIATION
JAN 2026)
52.209-13 Violation of Arms Control Treaties or Agreements – Certification (NOV
2021)(DEVIATION SEP 2025)(DEVIATION JAN 2026)
52.214-3 Amendments to Invitations for Bids. (DEC 2016)(DEVIATION OCT 2025)
52.214-4 False Statements in Bids. (APR 1984)(DEVIATION OCT 2025)
52.214-5 Submission of Bids. (DEC 2016)(DEVIATION OCT 2025)
52.214-6 Explanation to Prospective Bidders. (APR 1984)
52.214-7 Late Submissions, Modifications, and Withdrawals of Bids. (NOV
1999)(DEVIATION OCT 2025)
52.214-18 Preparation of Bids - Construction. (APR 1984)
52.214-19 Contract Award - Sealed Bidding - Construction. (AUG 1996)
52.214-34 Submission of Offers in the English Language. (APR 1991)
52.214-35 Submission of Offers in U.S. Currency. (APR 1991)
52.216-1 Type of Contract. (APR 1984)(DEVIATION OCT 2025)
FIRM FIXED PRICE
52.219-1 Small Business Program Representations (FEB 2024)(DEVIATION NOV 2025)
52.222-5 Construction Wage Rate Requirements Secondary Site of the Work. (MAY
2014)(DEVIATION OCT 2025)
52.223-1 Bio based Product Certification (MAY 2024)(DEVIATION FEB 2025)
(DEVIATION DEC 2025)
52.225-10 Notice of Buy American Requirement—Construction Materials (MAY 2014)
52.228-1 Bid Guarantee. (SEP 1996) e.g twenty (20%) percent $3,000,000.00
52.233-2 Service of Protest. (SEP 2006)(DEVIATION SEP 2025)
Mrs. Leslie Karsten Acting Acquisitions Branch Chief Federal Highway Administration 12300 West Dakota Avenue, Suite 360 Lakewood, Colorado 80228
52.240-90 Security Prohibitions and Exclusions Representations and Certifications.
(DEVIATION SEP 2025)
52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998) http://www.acquisition.gov/far https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52
52.252-3 Alterations in Solicitation. (APR 1984)
NONE
52.252-5 Authorized Deviations in Provisions. (NOV 2020)
1252.239–92 Information and Communication Technology Accessibility Notice (NOV 2022)
Contract Clauses
52.202-1 Definitions (JUN 2020)
52.203-3 Gratuities. (APR 1984)
52.203-5 Covenant Against Contingent Fees. (MAY 2014)
52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020)
52.203-7 Anti-Kickback Procedures. (JUN 2020)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (MAY 2014)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (MAY 2014)
52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (JUN 2020)
52.203-13 Contractor Code of Business Ethics and Conduct (NOV 2021)
52.203-14 Display of Hotline Poster(s) (NOV 2021)
Definition.
United States
Display of fraud hotline poster(s).
General Fraud https://www.oig.dot.gov/sites/default/files/files/OIG-generic-2.pdf
Subcontracts.
52.203-17 Contractor Employee Whistleblower Rights and Requirements to Inform Employees of Whistleblower Rights (NOV 2023)
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)
52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011)
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (JUN
2020)(DEVIATION NOV 2025)
52.204-13 System for Award Management Maintenance. (OCT 2018)(DEVIATION NOV
52.204-14 Service Contract Reporting Requirements (OCT 2016)(DEVIATION NOV 2025)
52.204-19 Incorporation by Reference of Representations and Certifications. (DEC
2014)(DEVIATION NOV 2025)
52.204-91 Contractor Identification (DEVIATION NOV 2025)
52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (JAN 2025)(DEVIATION
SEP 2025)(DEVIATION JAN 2026)
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations (NOV
2015)(DEVIATION SEP 2025)(DEVIATION JAN 2026)
52.211-12 Liquidated Damages - Construction. (SEP 2000)
4,000.00
52.211-13 Time Extensions. (SEP 2000)
52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns. (OCT 2022)(DEVIATION NOV 2025)
Waiver of evaluation preference
Joint venture.
52.219-8 Utilization of Small Business Concerns (JAN 2025)(DEVIATION NOV 2025)
52.219-14 Limitations on Subcontracting (OCT 2022)(DEVIATION NOV 2025)
52.219-27 Notice of Set-Aside for, or Sole -Source Award to, Service-Disabled Veteran- Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (FEB
2024)(DEVIATION NOV 2025)
52.219-28 Post-Award Small Business Program Rerepresentation (JAN 2025)(DEVAITION
NOV 2025)
52.222-1 Notice to the Government of Labor Disputes. (FEB 1997)(DEVIATION OCT 2025)
52.222-3 Convict Labor. (JUN 2003)(DEVIATION OCT 2025)
52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation. (MAY 2018)(DEVIATION OCT 2025)
52.222-6 Construction Wage Rate Requirements. (AUG 2018)(DEVIATION FEB
2025)(DEVIATION OCT 2025)
52.222-7 Withholding of Funds. (MAY 2014)(DEVIATION OCT 2025)
52.222-8 Payrolls and Basic Records. (JUL 2021)(DEVIATION OCT 2025)
52.222-10 Compliance with Copeland Act Requirements. (FEB 1988)(DEVIATION OCT 2025)
52.222-11 Subcontracts (Labor Standards). (MAY 2014)(DEVIATION FEB
2025)(DEVIATION OCT 2025)
52.222-12 Contract Termination - Debarment. (MAY 2014)(DEVIATION FEB 2025)
52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. (MAY 2014)
52.222-14 Disputes Concerning Labor Standards. (FEB 1988)(DEVIATION OCT 2025)
52.222-15 Certification of Eligibility. (MAY 2014)
52.222-35 Equal Opportunity for Veterans. (JUN 2020)(DEVIATION OCT 2025)
52.222-36 Affirmative Action for Workers with Disabilities. (JUN 2020)(DEVIATION OCT 2025)
52.222-37 Employment Reports on Veterans (JUN 2020)(DEVIATION OCT 2025)
52.222-40 Notification of Employee Rights Under the National Labor Relations Act (DEC
2010)(DEVIATION OCT 2025)
52.222-50 Combating Trafficking in Persons (OCT 2025)(DEVIATION OCT 2025)
52.222-54 Employment Eligibility Verification (JAN 2025)(DEVIATION OCT 2025)
52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2022)(DEVIATION OCT 2025)
52.222-90 Addressing DEI Discrimination by Federal Contractors (DEVIATION APR 2026)
Definitions Program participation
Racially discriminatory diversity, equity, and inclusion (DEI) activities e.g.
52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2024)
52.223-23 Sustainable Products and Services (May 2024)(DEVIATION FEB
2025)(DEVIATION DEC 2025)
52.223-2 Reporting of Biobased Products Under Service and Construction Contract. (MAY
2024)(DEVIATION FEB 2025)(DEVIATION DEC 2025)
(a) Definitions.
Biobased product
USDA-designated product category
(b) Requirement
52.223-3 Hazardous Material Identification and Material Safety Data. (FEB
2021)(DEVIATION DEC 2025)
Definitions.
(b) Requirements
52.224-1 Privacy Act Notification. (APR 1984)
52.224-2 Privacy Act. (APR 1984)
52.225-9 Buy American-Construction Materials (OCT 2022)(DEVIATION NOV 2025)
(a) Definitions
Commercially available off-the-shelf (COTS) item
"Construction material"
Cost of components means
Critical component
Critical item
Domestic construction material
Fastener
Foreign construction material
Foreign iron and steel
Predominantly of iron or steel or a combination of both
Steel
For domestic construction material that is not a critical item or does not contain critical components
(1)
(3 (2)
For domestic construction material that is a critical item or contains critical components
(1)
(2
(3 (2)
Data
Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued) List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.
Include other applicable supporting information.
52.226-7 Drug Free Workplace (May 2024)
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. (MAY 2024)
52.227-1 Authorization and Consent. (JUN 2020)
52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement. (JUN 2020)
52.227-4 Patent Indemnity--Construction Contracts. (DEC 2007)
52.228-2 Additional Bond Security. (OCT 1997)
52.228-5 Insurance - Work on a Government Installation. (JAN 1997)
52.228-11 Individual Surety - Pledges of Assets. (FEB 2021)
52.228-12 Prospective Subcontractor Requests for Bonds. (DEC 2022)
52.228-14 Irrevocable Letter of Credit (Nov 2014) 52.228-15 Performance and Payment Bonds - Construction. (JUN 2020)
52.229-3 Federal, State, and Local Taxes. (FEB 2013)(DEVIATION AUG 2025)
52.232-5 Payments under Fixed-Price Construction Contracts. (MAY 2014)
52.232-17 Interest. (MAY 2014)
52.232-23 Assignment of Claims. (MAY 2014)
52.232-27 Prompt Payment For Construction Contracts. (JAN 2017)
52.232-33 Payment by Electronic Funds Transfer – System for Award Management
(OCT 2018)
52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013)
52.232-40 Providing Accelerated Payments to Small Business Subcontractors (MAR 2023)
52.233-1 Disputes. (MAY 2014)(DEVIATION SEP 2025) - Alternate I (DEC
1991)(DEVIATION SEP 2025)
52.233-3 Protest after Award. (AUG 1996)(DEVIATION SEP 2025)
52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)(DEVIATION SEP 2025)
52.236-2 Differing Site Conditions. (APR 1984)(DEVIATION AUG 2025)
52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)(DEVIATION
AUG 2025)
52.236-5 Material and Workmanship. (APR 1984)(DEVIATION AUG 2025)
52.236-6 Superintendence by the Contractor. (APR 1984)(DEVIATION AUG 2025)
52.236-7 Permits and Responsibilities. (NOV 1991)(DEVIATION AUG 2025)
52.236-8 Other Contracts. (APR 1984)(DEVIATION AUG 2025)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984)(DEVIATION AUG 2025)
52.236-10 Operations and Storage Areas. (APR 1984)(DEVIATION AUG 2025)
52.236-11 Use and Possession Prior to Completion. (APR 1984)(DEVIATION AUG 2025) 52.236-12 Cleaning Up. (APR 1984)(DEVIATION AUG 2025)
52.236-13 Accident Prevention. (NOV 1991)(DEVIATION AUG 2025) Alternate I (NOV 1991)
52.236-15 Schedules for Construction Contracts. (APR 1984)(DEVIATION AUG 2025)
52.236-17 Layout of Work. (APR 1984)(DEVIATION AUG 2025)
52.236-21 Specifications and Drawings for Construction. (FEB 1997)(DEVIATION AUG 2025)
52.240-91 Security Prohibitions and Exclusions (DEVIATION SEP 2025)
52.242-13 Bankruptcy. (JUL 1995)
52.242-14 Suspension of Work. (APR 1984)
52.243-4 Changes. (JUN 2007)(DEVIATION JUL 2025)
52.243-6 Change Order Accounting. (APR 1984)(DEVIATION JUL 2025)
52.244-6 Subcontracts for Commercial Products and Commercial Services (OCT
2025)(DEVIATION APR 2026)
52.245-1 Government Property (SEP 2021) - Alternate I (APR 2012)
52.245-9 Use and Charges. (APR 2012)
52.246-12 Inspection of Construction. (AUG 1996)
52.247-64 Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV
2021)(DEVIATION OCT 2025)
52.248-3 Value Engineering - Construction. (OCT 2025)
52.249-2 Termination for Convenience of the Government (Fixed-Price). (APR 2012) - Alternate I (SEP 1996)
52.249-10 Default (Fixed-Price Construction). (APR 1984)
52.252-2 Clauses Incorporated by Reference. (FEB 1998) http://www.acquisition.gov/far and https://www.acquisition.gov/far-overhaul
52.252-4 Alterations in Contract. (APR 1984)
NONE
52.252-6 Authorized Deviations in Clauses. (NOV 2020)
52.253-1 Computer Generated Forms. (JAN 1991)(DEVIATION OCT 2025)
1252.201-70 Contracting Officer’s Representative (NOV 2022)
1252.223-70 Removal or Disposal of Hazardous Substances – Applicable Licenses and Permits (NOV 2022)
1252.223-71 Accident and Fire Reporting (NOV 2022)
1252.223-73 Seat Belt Use Policies and Programs (NOV 2022)
1252.228-74 Notification of Payment Bond Protection (NOV 2022)
1252.232–70 Electronic Submission of Payment Requests (NOV 2022)(DEVIATION AUG 2025)
Definitions.
Contract financing payment
Payment request
Electronic form
Invoice payment
Electronic payment requests.
Processing system.
iSupplier.
login.gov.
iSupplier www.login.gov.
Invoice requirements.
iSupplier
Payment system registration. iSupplier login.gov.
Electronic authentication. See www.login.gov www.login.gov www.login.gov iSupplier http://einvoice.esc.gov iSupplier
Training on DELPHI.
http://einvoice.esc.gov.
Account Management.
Waivers.
Exceptions and alternate payment procedures.
1252.239–93 Information and Communication Technology Accessibility (NOV 2022)
POST-AWARD EVALUATION OF CONTRACTOR PERFORMANCE
Contractor Performance Evaluations
D-1
D-2
D-3
D-4
D-5
D-6
D-7
SPECIAL CONTRACT REQUIREMENTS
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-24), Section 101. — TERMS, FORMAT, AND DEFINITIONS
101.02 Specifications Format.
101.03(a) Acronyms.
CDR
101.04 Definitions.
101.04 Definitions.
Masterworks
Section 102. — BID, AWARD, AND EXECUTION OF CONTRACT
102.02A Physical Data. (
(a)
(2)
(3)
(b)
(c)
(1)
(2)
(3)
(4)
(5)
(6)
Section 104. — CONTROL OF WORK
104.04 Electronic Documentation.
Masterworks User Account Form
104.08 Load Restrictions.
Section 105. — CONTROL OF MATERIAL
105.01 Source of Supply and Quality Requirements.
105.02(a) Government-furnished sources.
105.04 Handling and Storing Material.
Section 106. — ACCEPTANCE OF WORK
106.01 Conformity with Contract Requirements.
Field Materials Manual
106.03 Certification.
Table 106-3 Schedule For Full or Partial Acceptance by Materials Certification
Section Description Material Material Property Or Specification
Certification Frequency
Sample Frequency
Section Description Material Material Property Or Specification
Certification Frequency
Sample Frequency
Section Description Material Material Property Or Specification
Certification Frequency
Sample Frequency
106.03(b) Production certification. (3)
(3)
(a)
(b)
(c)
Section 107. — LEGAL RELATIONS
AND RESPONSIBILITY TO THE PUBLIC
107.01 Laws to be Observed.
(a) Section 401 and Section 404 of the Clean Water Act.
107.02 d) Utilities.
Utility Data Quality Certification
Table 107-2 Status of Utilities
Utility Type Company Contact Name Phone Number / Email Status(1)
107.03 Bulletin Board.
107.05 Responsibility for Damage Claims.
certificates of insurance
107.08 Sanitation, Health, and Safety.
107.10(a) Federal Water Pollution Control Act (Clean Water Act) 33 USC § 1251 et seq.
(4)
(5)
107.10(b) Oil and hazardous substances.
107.10(c) Dirt, plant, and foreign material.
107.10(d) Clearances for Contractor-selected, noncommercial areas.
(5) Any required certifications.
107.10(e) Project-specific commitments.
(a)
(1)
(2)
(3)
(b)
(2)
(a)
(b)
(c)
(b)
(4)
(5)
(6)
(a)
(b)
(c)
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(7)
107.11 Protection of Forests, Parks, and Public Lands.
Section 108. — PROSECUTION AND PROGRESS
108.01 Commencement, Prosecution, and Completion of Work.
(a)
Table 108-2 Holidays and Surrounding Days
Holiday Time Remarks
108.03 Subcontracting.
108.04 Determination and Extension of Contract Time.
108.04(c) Time extensions.
108.05 Failure to Complete Work on Time.
Section 109. — MEASUREMENT AND PAYMENT
109.01 Measurement of Work.
109.01 Measurement of Work.
109.02(d)(1)(a) Average end area method.
(a) Average end area method.
109.06(c)(3) Profit.
(3) Profit.
109.06(d) Cost or pricing data.
(d) Cost or pricing data
109.06 Pricing of Adjustments.
(e) Variation in estimated quantity.
109.08(a) General.
109.08(b) Invoice requirements.
109.08(c) Government’s receiving report.
109.08(d) Closing date and invoice submittal date.
109.08(e)(1) Proper invoices.
(1) Invoices received by the 7th day following the closing date.
(a) Proper invoices.
(b) Defective invoices.
109.08(e)(2) Defective invoices.
(2) Invoices received between the 8th and 16th day following the closing date.
(a) Proper invoices.
(b) Defective invoices.
109.08(f) Partial payments.
(f) Partial payments.
(1)
(2)
Section 152. — CONSTRUCTION SURVEY AND STAKING
Construction Requirements
152.04 General.
152.05(b) Centerline establishment.
152.05(d)(2) Conventional survey methods.
152.05(f)(1) AMG method.
152.05 Survey and Staking Requirements.
(m) Centerline verification and staking.
(1)
Measurement
152.07
Section 153. — CONTRACTOR QUALITY CONTROL
Description
153.01
153.03(b) QC procedures.
153.03 Quality Control Plan.
(d) Subcontractors and suppliers.
153.03 Quality Control Plan.
153.05 Certifications and Submittals.
153.06 Prosecution of Work.
(a) Preparatory phase.
(1)
(2)
(3)
(4)
(5)
(6)
(b) Start-up phase.
(1)
(2)
(c) Production phase.
(1)
(4)
153.07 Sampling and Testing.
(a) Sample splitting.
(b) Testing.
153.08 Records and Control Charts.
(a) QC and construction operations reports.
(a) QC and construction operations reports.
(1) Subcontractor data.
(2) Labor/Equipment
(a)
(b)
(c)
“I certify that the information contained in this record is accurate and that work documented herein complies with the contract. Exceptions to this certification are documented as a part of this record.”
153.09 Acceptance.
Payment
153.11
(a)
(b)
(c)
Section 154. — CONTRACTOR SAMPLING AND TESTING
Construction Requirements
154.03 Sampling.
154.04B Laboratory (Contractor-Provided).
Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS
155.05 Baseline Construction Schedule.
155.06(d)(1) f f
Section 156. — PUBLIC TRAFFIC
156.04 Maintaining Roadways During Work.
156.06 Limitations on Construction Operations.
156.06 Limitations on Construction Operations.
(j)
(k)
156.07 Nighttime Operations.
156.08 Traffic Control Supervisor.
Section 157. — SOIL EROSION AND SEDIMENT CONTROL
157.04 General.
Section 203. — REMOVAL OF STRUCTURES AND OBSTRUCTIONS
203.03 Submittals.
(a) Bridge Removal Plan.
(4)
(c) Salvage Plan.
203.04 Salvaging Material.
203.05 Removing Material.
Payment 203.11
Section 204. — EXCAVATION AND EMBANKMENT
204.05 Conserved Topsoil.
204.16 (c)(1)(a).
(a)
Section 302. — CRUSHED AGGREGATE
302.06 Acceptance.
Table 302-1 Sampling, Testing, and Acceptance Requirements
Material or Product
Type of Acceptance (Subsection)
C ha ra ct er is tic
Test Methods Specifications
Sampling Frequency
Point of Sampling
Sp lit
S am pl e
Reporting Time
Production
Material or Product
Type of Acceptance (Subsection)
C ha ra ct er
Sampling Frequency
Point of Sampling
Sp lit
S am pl e
Reporting Time
Finished Product
Section 552. — STRUCTURAL CONCRETE
552.03(a)(12)(c) Hydration stabilizing admixtures.
(c) Hydration stabilizing admixtures.
552.03(a) Structural Concrete.
(17)
552.03(a) Structural Concrete.
(23) f'cr f'cr
Section 554. — REINFORCING STEEL
554.08 Placing and Fastening.
Section 555. — STEEL STRUCTURES
Description
555.01
555.03 Submittals.
555.03A General.
(b)
(c)
(d)
(e)
AASHTO LRFD Bridge Design Specifications.
(b)
(c)
(d)
(e)
(f)
(g) AASHTO LRFD Bridge Design Specifications
(h)
(i) AASHTO Manual for Bridge Evaluation
(j)
555.05 Inspection.
555.07 Fabrication.
Quality Certification Program
555.16(f)(7)(b) Threaded fasteners.
555.18 Erection.
Quality Certification Program
555.20 Acceptance.
555.21.
Section 564. — BEARING DEVICES
564.04 Elastomeric Bearings.
Rubber Handbook
Section 567. — MICROPILES
Construction Requirements
567.04 (c)
(c)
Section 601. — MINOR CONCRETE
Description
601.01
Material
601.02
601.04 General.
Table 601-2 Sampling, Testing, and Acceptance Requirements
Material or Product
(Subsection)
Type of Acceptance (Subsection)
C ha ra ct er
Sampling Frequency
Point of Sampling
Split Sample
R ep or tin g T im e
R em ar ks
Source
Mix Design
Production
601.07 Acceptance.
Section 623. — GENERAL LABOR
Construction Requirements
623.02 General.
623.03(b) Technical services.
(1) Biological services.
(a)
Section 624. — TOPSOIL
624.03 General
Section 625. — TURF ESTABLISHMENT
Construction Requirements
625.03 General.
625.07(a) Dry Method, (Hand Seeding).
625.08(b) Hydraulic method.
Measurement
625.11
Section 628. — TEMPORARY STREAM DIVERSIONS
628.04 General.
628.05(d) Bypass pumping diversion.
Section 635. — TEMPORARY TRAFFIC CONTROL
Construction Requirements
635.07 Construction Signs.
Section 637. — FACILITIES AND SERVICES
637.04(k)(1)
(1)
(a)
(1)
(2)
(b)
(1)
(2)
(3)
637.04(l) Telephone.
637.04
(n) Hygiene supplies.
(o) All-in-One (AIO) device.
(3)
(4)
(5)
(6)
(7)
(8)
Table 637-3 Services Provided for Facilities
Service Field Office
Section 646. — REMOVE AND RESET
(ADDED SECTION)
Description
646.01
646.02 General.
646.03 Removing and Resetting Information Signs and Benches.
646.04 Acceptance.
646.05
Payment
646.10
Section 650. — TEMPORARY TRAFFIC DIVERSIONS
(ADDED SECTION)
Description
650.01
Material
650.02
Design Requirements
650.03 Design.
650.04 Submittals.
(a)
(b)
650.05 General.
650.06 Maintenance.
650.07 Removal.
650.08 Acceptance.
650.09
Payment
650.10
(a)
(b)
Section 701. — CEMENTITIOUS MATERIAL
701.03 Pozzolans.
(a) Fly ash.
701.05(b) Packaged repair mortar.
Section 703. — AGGREGATE
703.01 Fine Aggregate for Concrete.
(c)
703.06 Crushed Aggregate.
Table 703-2a Surface Course Gradation and Plasticity Index
Sieve Size Percent by Mass Passing
Designated Sieve
(AASHTO T 27 & T 11)
Section 712. — JOINT MATERIAL
712.01 Sealants, Fillers, and Seals.
(h) Pre-compressed foam-supported silicone joint seal.
(3)
Table 712-3 Impregnated Foam Requirements
Property Test Method Minimum Requirement
Table 712-4 Epoxy Adhesive Requirements
Property Test Method Minimum Requirement
Table 712-5 Silicone Sealant Bands Requirements
Property Test Method Requirement
(i) Reserved.
Section 713. — ROADSIDE IMPROVEMENT MATERIAL
713.04 Seed.
713.05 Mulch.
(a) Wood fiber.
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(b) Bonded fiber matrix hydromulch.
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(c) Wood chips.
713.11 Tackifiers.
(a) Plant based tackifier.
(1) Psyllium.
713.12 Fiber Rolls.
(a) Excelsior fiber roles.
(b) Coir fiber rolls.
(c) Wattles/Sediment Logs.
(1)
(2)
(3)
(4)
(5)
(6)
713.17 Rolled Erosion Control Products.
(a) Erosion Control Blankets.
(7)
(8)
(9)
(10)
(11)
Section 714. — GEOSYNTHETIC MATERIAL
714.01(c) Geotextile filter.
(1)
(a) b)
(c)
(2)
(a)
APPENDIX A
ROCKY MOUNTAIN NATIONAL PARK
FIRE PREVENTION PLAN
Hot Work Permits
Smoking and Lunch Fires. on non-non-
Power Saws. -
(e)
APPENDIX
Have you visited an area where whirling disease, chytrid fungus, or New Zealand mudsnails are known or suspected to exist?
Are you moving within a drainage to sites that are more than 2.5 miles (4km) apart?
Are you visiting a new drainage?
Is this your first time in Rocky Mountain National Park?
Are you using equipment that has been previously used?
The Required Steps
Remove mud, snails, algae, and additional debris from nets, boots, waders, and other equipment.
1.
2. or
NOTE: When sensitive equipment cannot be soaked, liberally spray equipment with a 1:1 water to bleach solution.
Freeze gear overnight (most effective step 3 option).
Soak and agitate equipment for more than
10 minutes in a 1:1 solution of Formula 409 Antibacterial Formula (household cleaner).
Soak equipment for more than 1 minute in 120°F or warmer water
(dishwasher provides adequate heat).
3.
oror
Recommended: Allow equipment to air dry, preferably in direct sunlight at 84°F or warmer for more than 4 hours.
Wash all equipment (and tools used to clean equipment) with a 10% household bleach solution.
Soak equipment for 10 minutes.
Soak and agitate gear and equipment in a solution of 6 oz
Sparquat per gallon of water for more than 10 minutes.
Rocky Mountain National Park Aquatic Disinfection Guidelines
Rocky Mountain National Park 1000 U.S. Highway 36 Estes Park, CO 80517
For more information, call (970) 586-1285
National Park Service U.S. Department of the Interior
If you answered YES to any of these questions, you are REQUIRED to disinfect any equipment that has had contact with water and/or soil.
Do not use felt wading soles (highly recommended). If felt wading soles are used, freeze the waders as outlined in step 3 (required).
Start at the top of a drainage and work downstream (highly recommended). Aquatic threats are typically located in lower elevation areas and this will minimize spread.
Updated 2020-06-01 by AK
WILDLIFE CLEARANCE FORM – NESTS
***Please fill out this form for each clearance survey, even if no nests are detected. See back of datasheet for details*** Project/Area surveyed: Observer/s (FULL NAME):
Work Group:
Date:
Was a Nest Observed?
Yes No
***IF NO NEST WAS OBSERVED, NO NEED TO FILL OUT REMAINDER OF FORM. PLEASE KEEP FORM
AND FORWARD MONTHLY TO ALLIE KONKOWSKI (RS BUILDING)***
If a nest was detected, can cutting of affected tree/limb be avoided?
Yes No
***IF CUTTING OF TREE/LIMB CAN BE AVOIDED, NO NEED TO FILL OUT REMAINDER OF FORM.
PLEASE KEEP FORM AND FORWARD MONTHLY TO ALLIE KONKOWSKI (RS BUILDING)***
If nest cannot be avoided, please mark tree containing nest & describe mark (flagging, color, etc.)
Nest location (circle):
Tree (on branch) Tree (in trunk)
Shrub Ground Cliff
Stream Other_______________
Nest type (circle):
Ground Stick Scrape Cavity Other
Nest details (nest/cavity height, tree species, tree live/dead, etc.):
UTMs: Easting:
Northing:
Photographs:
Yes No
Bird Species # of Birds Life Stage (juvenile, adult, etc.)
Behavior
Status (circle):
Live/normal sick/injured disturbed dead
Comments:
Action taken (NPS USE ONLY):
***IF NEST WAS OBSERVED AND CANNOT BE AVOIDED, PLEASE RETURN FORM TO ALLIE
KONKOWSKI (RS BUILDING) RIGHT AWAY UPON COMPLETION OF SURVEY ***
Updated 2020-06-01 by AK
IF YOU OBSERVE A TREE CONTAINING A NEST:
IF YOU FELL A TREE CONTAINING A NEST:
December 16, 2025
SENT VIA EMAIL
Christina Schroeder U.S. Army Corps of Engineers Albuquerque District Christina.L.Schroeder@usace.army.mil
RE: Clean Water Act Section 401 Water Quality Certification of the U.S. Army Corps of Engineers 2026 Nationwide Permits in Colorado
Dear Ms. Schroeder:
Please find enclosed the water quality certification decisions consistent with Section 401 of the Clean Water Act (CWA) for the reissuance of the Nationwide Permits (NWP). On June 18, 2025, the U.S.
Environmental Protection Agency, Region 8 received the U.S. Army Corps of Engineers’ requests for water quality certification under CWA Section 401 for the proposed 2026 NWPs. The EPA reviewed the June 18, 2025, Federal Register1 notice announcing the reissuance of the NWPs, along with the regional conditions proposed by the Albuquerque District for Colorado. The enclosed CWA section 401 water quality certification decision applies where the EPA is the certifying authority and includes Indian country2 lands within the state of Colorado3 and lands of exclusive federal jurisdiction in relevant respects within the state of Colorado.4
Please provide this certification to any project proponent (or their designated agent) contacting the Corps regarding applicable projects that may be authorized under the 2026 NWPs. If a project proposal
1 See 90 FR 26100 (June 18, 2025).
2 Indian country is defined at 18 U.S.C. § 1151.
3 Indian country in Colorado generally includes: (1) lands within the exterior boundaries of the following Indian reservations located within Colorado: the Southern Ute Indian Reservation and the Ute Mountain Ute Reservation; (2) any land held in trust by the United States for an Indian tribe; and (3) any other areas that are “Indian country” within the meaning of 18 U.S.C. Section 1151. The enclosed CWA Section 401 certification document specifies where these decisions apply.
4 An inventory report compiled by the U.S. General Services Administration for federal properties as of 1962 identifies properties that may contain exclusive federal jurisdiction. This document is accessible at https://www.congress.gov/116/meeting/house/110088/documents/HHRG-116-II13-20191017-SD044.pdf. The EPA notes that this inventory report is not all-inclusive and that the information contained within it has not been recently confirmed and/or updated. Please contact EPA Region 8 at R8CWA401@epa.gov with questions regarding the jurisdictions where this certification decision applies.
The enclosed CWA section 401 water quality certification decision applies where the EPA is the certifying authority and includes of exclusive federal jurisdiction in relevant respects within the state of Colorado.4
Please provide this certification to any project proponent (or their designated agent) contacting the Corps regarding applicable projects that may be authorized under the 2026 NWPs.
does not meet either the general or NWP-specific certification conditions contained herein, the project proponent must request an individual certification from EPA Region 8 at R8CWA401@epa.gov. Project proponents are encouraged to contact EPA Region 8 during the project planning phase if there are any questions about relevant best management practices (e.g., bioengineering techniques, biodegradable erosion control measures, revegetation using native plant species, suitable fill materials, and disposal of debris/construction materials preventing runoff) and resources that can assist with compliance.
Prior to work commencing, EPA recommends that project proponents notify the appropriate Tribal Environmental Office, if applicable.
Thank you for your ongoing partnership and coordination in implementing CWA regulatory programs.
Please contact Tanya Code with any questions at (303) 312-6110 or Code.Tanya@epa.gov. If your staff have questions, please have them contact Estella Moore at (303) 312-6357 or R8CWA401@epa.gov.
Sincerely, Stephanie DeJong, Manager Clean Water Branch
Enclosure
CC: Mark Hutson, Environmental Programs Department Director, Southern Ute Indian Tribe
Mitch Dorsk, Water Quality and Remediation Division Head, Southern Ute Indian Tribe Geoff Hensgen, Water Quality Program Manager, Southern Ute Indian Tribe
STEPHANIE
DEJONG
Digitally signed by
STEPHANIE DEJONG
Date: 2025.12.16 16:25:23 -07'00'
U.S. Environmental Protection Agency Region 8’s Clean Water Act Section 401 Certification of the 2026 Nationwide
Permits in the State of Colorado
DDecemberr 16,, 20266
Clean Water Act (CWA) Section 401 requires applicants for Federal licenses or permits to conduct any activity which may result in any discharge into waters…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .