This is a Solicitation for a bridge replacement and infrastructure project located in Rocky Mountain National Park, Colorado. The Federal Highway Administration is seeking a contractor to remove the existing six-barrel corrugated metal arch pipe culvert (Structure No. 1520-029S) on the Holzwarth Access Road and construct a new steel girder bridge with a cast-in-place concrete deck. The project is situated approximately nine miles north of Grand Lake along US Highway 34 at an elevation of 8,900 feet and serves to convey Colorado River flow while providing access to the Holzwarth Historic Site, employee housing, and National Park Service and Forest Service recreation opportunities.

The scope of work includes removal of the existing culvert, construction of new bridge abutments with micropiles, temporary stream diversion and riprap installation, new aggregate roadway surfacing, relocation of an existing electrical line, and relocation of historic head gates onto a new concrete slab. Principal work items include removal of the bridge (1 each), roadway aggregate of 120 tons, a prefabricated steel bridge measuring 10 feet wide by 48 feet long (1 lump sum), micropile installation of 8.68-inch diameter for 180 linear feet, and temporary stream diversion (1 lump sum). The Holzwarth Culvert Access Road is approximately 13 feet wide with tight turns requiring temporary widening to prevent truck tracking onto sensitive environmental resources, and construction access is limited to 100 feet west of the bridge. The anticipated advertisement date is September 2026 with award anticipated in December 2026. Solicitation Number: 6982AF27B000004, Project Number: CO FTNP ROMO 407(1).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION FOR BID

SOLICITATION NUMBER:

SOLICITATION TYPE:

PROJECT NUMBER:

PROJECT NAME:

6982AF2 B0000

FULL & OPEN COMPETITION (with HUBZone Price Preference)

CO NP ROMO 407(1)

HOLZWARTH CULVERT

BID OPENING DATE:

This solicitation cites Standard Specifications for Construction of Roads and Bridges on

Federal Highway Projects, FP-24 US Customary Units

ISSUING OFFICE:

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 W. DAKOTA AVENUE, SUITE 360

LAKEWOOD, CO 80228

Web site: https://highways.dot.gov/federal-lands E-mail: CFLContracts@dot.gov

TABLE OF CONTENTS

Notice to Bidders .................................................................................................................. A-i

Solicitation, Offer, and Award ............................................................................................ A-1

Basis for Award and Bid Schedule .................................................................................... A-7

Solicitation Provisions ......................................................................................................... B-7

Contract Clauses .................................................................................................................. C-1

Construction Wage Rate Requirement ............................................................................... D-1

Division 100 ..........................................................................................................................E-1 Division 150 ....................................................................................................................... E-17 Division 200 ....................................................................................................................... E-26 Division 300 ....................................................................................................................... E-27 Division 400 ............................................................................................................. SEE FP-24 Division 500 ....................................................................................................................... E-28 Division 600 ....................................................................................................................... E-33 Division 700 ....................................................................................................................... E-41

APPENDICES

Appendix A .............................................................................................. Fire Prevention Plan

Appendix B ...............................................................................Aquatic Disinfection Protocol

Appendix C ......................................................................................... Nest Survey Data Sheet

Appendix D .............................................................................................. 401 and 404 Permits

Appendix E................................................................................................ Subcontracting Plan

SPECIAL CONTRACT REQUIREMENTS (SCRs)

The following Special Contract Requirements amend and supplement the Standard Specification for Construction of Roads and Bridges on Federal Highway Projects

PROJECT OVERVIEW

Potential bidders may access the site by walking past the locked gate for a quarter mile to the project site.

d

I. PRE-BID INFORMATION

ELECTRONIC BIDS WILL NOT BE ACCEPTED. Submit a printed copy of your bid to the address listed on the SF-1442 (Page A-1, Item 8).

Bids and shall be submitted in sealed envelopes or packages:

(1) addressed to the office specified in the solicitation, and

(2) showing the time and date specified for receipt, the solicitation number, and the name and address of the bidder.

Bidders using commercial carrier services shall ensure that the bid is addressed and marked on the outermost envelope or wrapper as prescribed above when delivered to the office specified in the solicitation.

Submit the following documents with your Bid Package– o

Notice of SAM Registration

Representations and Certifications – NAICS 237310

Vets-4212 Reporting: -

This Solicitation Contains a Price Evaluation Factor

52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns

52.219-14, Limitations on Subcontracting

Bid Guarantee 52.228-1 Bid Guarantee

Accuracy and Completeness of Bid-

Request for Technical Information –

TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE

ACCEPTED AFTER 4 P.M. ON BER , 2026

Consolidate all questions on a single word document and submit NLT the deadline to submit technical questions.

Modifications to Bids prior to the time specified for receipt of bids

STRONGLY ENCOURAGE you to resubmit the entire bid schedule with a unit price and amount for every bid item, and a Schedule Total.

Email Address to submit modifications to bids for this project is cflcontracts@dot.gov

II. POST AWARD INFORMATION

CFLHD will no longer be providing paper copies of the conformed contract to the Awarded Prime Contractor.

Subcontracting 52.219-8, Utilization of Small Business Concerns

52.219-9, Small Business Subcontracting Plan, Alternate I

5.303, Announcement of contract awards, NOTE:

FHWA Small Business Subcontracting Goals (As of FY 2026) Business Size Goal (%)

Insurance requirements

Masterworks - Inspector’s Daily Record of Construction Operations” Contractors Daily Reports)

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration or Repair)

(IFB)

(RFP)

IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.

(Include area code)

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

48 CFR, CHAPTER 1, FEDERAL ACQUISTION REGULATION (FAR), REVOLUTIONARY FAR OVERHAUL (RFO)

AND THE DEPARTMENT OF TRANSPORATION REGULATION (TAR)

DEPARTMENT OF LABOR, CONSTRUCTION WAGE RATE REQUIREMENT RATES.

SPECIAL CONTRACT REQUIREMENTS.

PLANS.

BID SCHEDULE.

STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY

PROJECTS, FP-24, U.S. CUSTOMARY UNITS.

*See Page A-3

(If "YES," indicate within how many calendar days after award in Item 12B.)

OFFEROR (Must be fully completed by offeror) (Include ZIP Code) (Include area code)

(Include only if different than Item 14)

(Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

(Type or print)

AWARD (To be completed by Government)

(4 copies unless otherwise specified)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return copies to issuing office.)

(Contractor is not required to sign this document.)

(Type or print) (Type or print)

Item 8: LOCATION OF PUBLIC BID OPENING:

Item 9: FOR GENERAL INFORMATION:

FOR TECHNICAL INFORMATION (plans and specifications):

Item 11: COMPLETION DATE:

See SCR Section 108.01

Item 12A: PERFORMANCE AND PAYMENT BONDS: Clause 52.228-15 Performance and Payment Bonds-Construction

Item 13B: BID BOND AMOUNT: 52.228-1 Bid Guarantee Subsection 102.03 Bid Guarantee

Item 19: ACKNOWLEDGMENT OF AMENDMENTS:

IN ITEM 19 OF THE SF-1442,

Item 24: SUBMITTING INVOICES: Subsection 109.08 Progress Payments

ESTIMATED

PRICE:

Bid Schedule Instructions

NOTE:

Basis for Award

Partnering

Subsection 103.05 Partnering

Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Unit bid prices should be quoted no more precisely than the nearest cent (2 decimal places). Unit bid prices quoted more precisely will be rounded up to the nearest cent by the Government. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern. When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.

BID SCHEDULE

Bid Schedule Project: CO FTNP ROMO 407(1), HOLZWARTH CULVERT

A-7

BID SCHEDULE

Project No : CO FTNP ROMO 407(1) Schedule : A Project Name : HOLZWARTH CULVERT Schedule Type : Base

Contract Quantity Pay Items

20801-0000 STRUCTURE EXCAVATION

20803-0000 STRUCTURAL BACKFILL

55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)

55235-0000 EXPANSION JOINTS

55401-1000 REINFORCING STEEL

55401-2000 REINFORCING STEEL, EPOXY-COATED

55601-0900 BRIDGE RAILING, STEEL (pedestrian)

60101-0000 CONCRETE (Diversion Box Reconstruction)

63610-0000 CONDUIT (government provided)

AMD# Line Item Number

Pay Item Number

Description Supplemental Description

Quantity Unit Unit Price Amount

A0020 15101-0000 MOBILIZATION ALL LPSM

A0040 15210-3000

CENTERLINE,

VERIFICATION AND

STAKING

0.014 MILE

A0060 15214-1000 SURVEY AND

STAKING, BRIDGE ALL LPSM

A0080 15225-0000

SLOPE, REFERENCE,

AND CLEARING AND

GRUBBING CONTROL

0.034 MILE

A0100 15236-2000 SURVEY CONTROL,

GRADE FINISHING 0.068 MILE

A0120 15301-0000 CONTRACTOR

QUALITY CONTROL ALL LPSM

A0140 15401-0000 CONTRACTOR

TESTING ALL LPSM

A0160 15501-0000 CONSTRUCTION

SCHEDULE ALL LPSM

A0180 15701-0000 SOIL EROSION

CONTROL ALL LPSM

A0200 15802-0000 WATERING FOR DUST

CONTROL ALL LPSM

A0220 20103-0000 CLEARING AND

GRUBBING 1,685.000 SQYD

A0240 20301-2700 REMOVAL OF

STRUCTURE

(Diversion Box) 1.000 EACH

A0260 20304-2000 REMOVAL OF BRIDGE ALL LPSM

A0280 20420-0000 EMBANKMENT

CONSTRUCTION 60.000 CUYD

A0300 20801-0000 STRUCTURE

EXCAVATION 50.000 CUYD

A0320 20803-0000 STRUCTURAL

BACKFILL 20.000 CUYD

A0340 25101-0100 PLACED RIPRAP,

CLASS 1 6.000 CUYD

A0360 25101-0300 PLACED RIPRAP,

CLASS 3 70.000 CUYD

A0380 30202-2000

ROADWAY

AGGREGATE,

METHOD 2

70.000 TON

A0400 30302-6000 ROADWAY

RECONDITIONING 75.000 LNFT

Bid Schedule

A-8

A0420 55201-0200

STRUCTURAL

CONCRETE, CLASS A

(AE)

24.000 CUYD

A0440 55235-0000 EXPANSION JOINTS 22.000 LNFT

A0460 55401-1000 REINFORCING STEEL 2,300.000 LB

A0480 55401-2000 REINFORCING STEEL,

EPOXY-COATED 700.000 LB

A0500 55504-0000

PREFABRICATED

STEEL BRIDGE

(10' wide x 48' long modular steel vehicular bridge)

ALL LPSM

A0520 55601-0900 BRIDGE RAILING,

STEEL (pedestrian)

(pedestrian) 32.000 LNFT

A0540 56701-0000 MICROPILE (8.68" dia.) 180.000 LNFT

A0560 56705-0000 MICROPILE LOAD

VERIFICATION TEST 1.000 EACH

A0580 56706-0000 MICROPILE PROOF

LOAD TEST 2.000 EACH

A0600 60101-0000 CONCRETE (Diversion Box Reconstruction)

(Diversion Box Reconstruction) 4.000 CUYD

A0620 62201-0050

DUMP TRUCK, 5

CUBIC YARD MINIMUM

CAPACITY

20.000 HOUR

A0640 62201-0450

BACKHOE LOADER, 4

CUBIC FOOT MINIMUM

RATED CAPACITY

BUCKET, 18-INCH

WIDTH

20.000 HOUR

A0660 62201-0950

WHEEL LOADER, 3

CUBIC YARD MINIMUM

RATED CAPACITY

20.000 HOUR

A0680 62201-2750 MOTOR GRADER 20.000 HOUR

A0700 62201-3000 HYDRAULIC

EXCAVATOR 20.000 HOUR

A0720 62301-0000 GENERAL LABOR 20.000 HOUR

A0740 62302-1100

SPECIAL LABOR,

HIRED SURVEY

SERVICES

20.000 HOUR

A0760 62303-1010

SPECIAL LABOR,

HIRED TECHNICAL

SERVICES,

BIOLOGICAL

SERVICES

ALL LPSM

A0780 62401-0400

PROVIDING AND

PLACING TOPSOIL, 6-

INCH DEPTH

1,360.000 SQYD

A0800 62405-0400

PLACING

CONSERVED

TOPSOIL, 6-INCH

DEPTH

164.000 SQYD

A0820 62511-1000 SEEDING, DRY

METHOD

(HAND SEEDING) 1,520.000 SQYD

A0840 62516-2000 MULCHING,

HYDRAULIC METHOD

(WOOD FIBER) 1,520.000 SQYD

A0860 62801-0000 TEMPORARY STREAM

DIVERSION ALL LPSM

A0880 63502-0600

TEMPORARY TRAFFIC

CONTROL,

BARRICADE TYPE 3

8.000 EACH

A0900 63502-1600

TEMPORARY TRAFFIC

CONTROL, WARNING

LIGHT TYPE B

2.000 EACH

A0920 63502-2000

TEMPORARY TRAFFIC

CONTROL, PORTABLE

CHANGEABLE

MESSAGE SIGN

2.000 EACH

Bid Schedule

A-9

A0940 63502-3900

TEMPORARY TRAFFIC

CONTROL,

CONSTRUCTION SIGN

6.000 EACH

A0960 63506-0500 TEMPORARY TRAFFIC

CONTROL, FLAGGER 40.000 HOUR

A0980 63610-0000 CONDUIT (government provided)

(government provided) 100.000 LNFT

A1000 63701-0000 FIELD OFFICE 1.000 EACH

A1020 64620-0000 REMOVE AND RESET (INFORMATION SIGN) 1.000 EACH

A1040 64620-0300 REMOVE AND RESET

BENCH 1.000 EACH

A1060 65001-1000 TEMPORARY TRAFFIC

DIVERSION ALL LPSM

Submitted By: Schedule Total:

Bid Schedule

A-10

Total-Schedule(s) and Option(s) Bid Total

Schedule A

BID SCHEDULE SUMMARY

Schedule Bid Total

Schedule A - Base

Bid Schedule

A-11

Corporate Certificate

Limited Liability Certificate

Authority to Bind Partnership

Authority to Bind Joint Venture

Sole Proprietorship Requirement

BUY AMERICAN ACT- CONSTRUCTION MATERIALS

NOTE TO CONTRACTOR:

[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] [Please include name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include all applicable supporting information.]

HAZARDOUS MATERIALS

BIOBASED PRODUCTS AND SUSTAINABLE PRODUCTS AND SERVICES

USE OF RECOVERED MATERIALS ON FEDERAL LANDS HIGHWAY PROJECTS

Comprehensive Guidelines for Procurement of Products Containing Recovered Materials

Bid Bond (See Instructions on Page 3)

Date Bond Executed (Must Not Be Later Than Bid Opening Date)

OMB Control Number: 9000-0001 Expiration Date: 1/31/2027

Principal (Legal Name And Business Address) Type Of Organization ("X" One) Individual Partnership Joint Venture Corporation Other (Specify)

State Of Incorporation

Surety(ies) (Name And Business Address)

Penal Sum Of Bond Bid Identification Percent Of Bid Price

Amount Not To Exceed Bid Date Invitation Number 6982AF27B000004 Million(s)

Thousand(s)

Hundred(s)

Cents

For (Construction , Supplies Or Services) Construction

Obligation:

We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.

Conditions:

The Principal has submitted the bid identified above.

Therefore:

The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the Principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.

Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government. Notice to the Surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.

Authorized For Local Reproduction STANDARD FORM 24 (REV. 10/2023) Previous Edition Is Not Usable Prescribed by GSA FAR (48 CFR) 53.228(a)

Witness:

The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.

Principal

Signature(s) 1.

(Seal)

2.

(Seal)

3.

(Seal) Corporate Seal Name(s)

And Title(s) (Typed)

1. 2. 3.

Individual Surety(ies)

Signature(s) 1. (Seal) 2. (Seal) Name(s) (Typed)

1. 2.

Corporate Surety(ies)

Su re ty A

Name And Address

State Of Incorporation Liability Limit ($)

Corporate Seal

Signature(s) 1. 2.

Name(s) And Title(s) (Typed)

1. 2.

Su re

B

State Of Incorporation Liability Limit ($)

Corporate Seal

Signature(s) 1. 2.

Name(s) And Title(s) (Typed)

1. 2.

Su re

C

State Of Incorporation Liability Limit ($)

Corporate Seal

Signature(s) 1. 2.

Name(s) And Title(s) (Typed)

1. 2.

Su re

D

State Of Incorporation Liability Limit ($)

Corporate Seal

Signature(s) 1. 2.

Name(s) And Title(s) (Typed)

1. 2.

STANDARD FORM 24 (REV. 10/2023) PAGE 2

Su re

E

State Of Incorporation Liability Limit ($)

Corporate Seal

Signature(s) 1. 2.

Name(s) And Title(s) (Typed)

1. 2.

Su re

F

State Of Incorporation Liability Limit ($)

Corporate Seal

Signature(s) 1. 2.

Name(s) And Title(s) (Typed)

1. 2.

Su re

G

State Of Incorporation Liability Limit ($)

Corporate Seal

Signature(s) 1. 2.

Name(s) And Title(s) (Typed)

1. 2.

1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.

2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).

4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the Liability

Limit block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.

STANDARD FORM 24 (REV. 10/2023) PAGE 3

(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "Corporate Surety(ies)." In the space designated

"Surety(ies)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.

(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form

28) for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New

Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include

"proposal" and "offeror."

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC §

3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number.

The OMB control number for this collection is 9000-0001. We estimate that it will take 1 hour to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General Services Administration, Regulatory Secretariat Division (MVCB), 1800 F

Street, NW, Washington, DC 20405.

STANDARD FORM 24 (REV. 10/2023) PAGE 4

BIDDER’S INFORMATION

52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. (SEP 2024)

52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements-Representation. (JAN 2017)

52.204-5 Women-Owned Business (Other Than Small Business). (OCT 2014)(DEVIATION

NOV 2025)

52.204-7 System for Award Management. (NOV 2024)(DEVIATION NOV 2025)

52.204-90 Offeror Identification (DEVIATION NOV 2025)

52.209-5 Certification Regarding Responsibility Matters. (AUG 2020)(DEVIATION SEP

2025)(DEVIAION JAN 2026)

52.209-7 Information Regarding Responsibility Matters (OCT 2018)(DEVIATION SEP

2025)(DEVIATION JAN 2026)

52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law (FEB 2016)(DEVIATION SEP 2025)(DEVIATION

JAN 2026)

52.209-13 Violation of Arms Control Treaties or Agreements – Certification (NOV

2021)(DEVIATION SEP 2025)(DEVIATION JAN 2026)

52.214-3 Amendments to Invitations for Bids. (DEC 2016)(DEVIATION OCT 2025)

52.214-4 False Statements in Bids. (APR 1984)(DEVIATION OCT 2025)

52.214-5 Submission of Bids. (DEC 2016)(DEVIATION OCT 2025)

52.214-6 Explanation to Prospective Bidders. (APR 1984)

52.214-7 Late Submissions, Modifications, and Withdrawals of Bids. (NOV

1999)(DEVIATION OCT 2025)

52.214-18 Preparation of Bids - Construction. (APR 1984)

52.214-19 Contract Award - Sealed Bidding - Construction. (AUG 1996)

52.214-34 Submission of Offers in the English Language. (APR 1991)

52.214-35 Submission of Offers in U.S. Currency. (APR 1991)

52.216-1 Type of Contract. (APR 1984)(DEVIATION OCT 2025)

FIRM FIXED PRICE

52.219-1 Small Business Program Representations (FEB 2024)(DEVIATION NOV 2025)

52.222-5 Construction Wage Rate Requirements Secondary Site of the Work. (MAY

2014)(DEVIATION OCT 2025)

52.223-1 Bio based Product Certification (MAY 2024)(DEVIATION FEB 2025)

(DEVIATION DEC 2025)

52.225-10 Notice of Buy American Requirement—Construction Materials (MAY 2014)

52.228-1 Bid Guarantee. (SEP 1996) e.g twenty (20%) percent $3,000,000.00

52.233-2 Service of Protest. (SEP 2006)(DEVIATION SEP 2025)

Mrs. Leslie Karsten Acting Acquisitions Branch Chief Federal Highway Administration 12300 West Dakota Avenue, Suite 360 Lakewood, Colorado 80228

52.240-90 Security Prohibitions and Exclusions Representations and Certifications.

(DEVIATION SEP 2025)

52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998) http://www.acquisition.gov/far https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52

52.252-3 Alterations in Solicitation. (APR 1984)

NONE

52.252-5 Authorized Deviations in Provisions. (NOV 2020)

1252.239–92 Information and Communication Technology Accessibility Notice (NOV 2022)

Contract Clauses

52.202-1 Definitions (JUN 2020)

52.203-3 Gratuities. (APR 1984)

52.203-5 Covenant Against Contingent Fees. (MAY 2014)

52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020)

52.203-7 Anti-Kickback Procedures. (JUN 2020)

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (MAY 2014)

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (MAY 2014)

52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (JUN 2020)

52.203-13 Contractor Code of Business Ethics and Conduct (NOV 2021)

52.203-14 Display of Hotline Poster(s) (NOV 2021)

Definition.

United States

Display of fraud hotline poster(s).

General Fraud https://www.oig.dot.gov/sites/default/files/files/OIG-generic-2.pdf

Subcontracts.

52.203-17 Contractor Employee Whistleblower Rights and Requirements to Inform Employees of Whistleblower Rights (NOV 2023)

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)

52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011)

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (JUN

2020)(DEVIATION NOV 2025)

52.204-13 System for Award Management Maintenance. (OCT 2018)(DEVIATION NOV

52.204-14 Service Contract Reporting Requirements (OCT 2016)(DEVIATION NOV 2025)

52.204-19 Incorporation by Reference of Representations and Certifications. (DEC

2014)(DEVIATION NOV 2025)

52.204-91 Contractor Identification (DEVIATION NOV 2025)

52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (JAN 2025)(DEVIATION

SEP 2025)(DEVIATION JAN 2026)

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations (NOV

2015)(DEVIATION SEP 2025)(DEVIATION JAN 2026)

52.211-12 Liquidated Damages - Construction. (SEP 2000)

4,000.00

52.211-13 Time Extensions. (SEP 2000)

52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns. (OCT 2022)(DEVIATION NOV 2025)

Waiver of evaluation preference

Joint venture.

52.219-8 Utilization of Small Business Concerns (JAN 2025)(DEVIATION NOV 2025)

52.219-14 Limitations on Subcontracting (OCT 2022)(DEVIATION NOV 2025)

52.219-27 Notice of Set-Aside for, or Sole -Source Award to, Service-Disabled Veteran- Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (FEB

2024)(DEVIATION NOV 2025)

52.219-28 Post-Award Small Business Program Rerepresentation (JAN 2025)(DEVAITION

NOV 2025)

52.222-1 Notice to the Government of Labor Disputes. (FEB 1997)(DEVIATION OCT 2025)

52.222-3 Convict Labor. (JUN 2003)(DEVIATION OCT 2025)

52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation. (MAY 2018)(DEVIATION OCT 2025)

52.222-6 Construction Wage Rate Requirements. (AUG 2018)(DEVIATION FEB

2025)(DEVIATION OCT 2025)

52.222-7 Withholding of Funds. (MAY 2014)(DEVIATION OCT 2025)

52.222-8 Payrolls and Basic Records. (JUL 2021)(DEVIATION OCT 2025)

52.222-10 Compliance with Copeland Act Requirements. (FEB 1988)(DEVIATION OCT 2025)

52.222-11 Subcontracts (Labor Standards). (MAY 2014)(DEVIATION FEB

2025)(DEVIATION OCT 2025)

52.222-12 Contract Termination - Debarment. (MAY 2014)(DEVIATION FEB 2025)

52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. (MAY 2014)

52.222-14 Disputes Concerning Labor Standards. (FEB 1988)(DEVIATION OCT 2025)

52.222-15 Certification of Eligibility. (MAY 2014)

52.222-35 Equal Opportunity for Veterans. (JUN 2020)(DEVIATION OCT 2025)

52.222-36 Affirmative Action for Workers with Disabilities. (JUN 2020)(DEVIATION OCT 2025)

52.222-37 Employment Reports on Veterans (JUN 2020)(DEVIATION OCT 2025)

52.222-40 Notification of Employee Rights Under the National Labor Relations Act (DEC

2010)(DEVIATION OCT 2025)

52.222-50 Combating Trafficking in Persons (OCT 2025)(DEVIATION OCT 2025)

52.222-54 Employment Eligibility Verification (JAN 2025)(DEVIATION OCT 2025)

52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2022)(DEVIATION OCT 2025)

52.222-90 Addressing DEI Discrimination by Federal Contractors (DEVIATION APR 2026)

Definitions Program participation

Racially discriminatory diversity, equity, and inclusion (DEI) activities e.g.

52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2024)

52.223-23 Sustainable Products and Services (May 2024)(DEVIATION FEB

2025)(DEVIATION DEC 2025)

52.223-2 Reporting of Biobased Products Under Service and Construction Contract. (MAY

2024)(DEVIATION FEB 2025)(DEVIATION DEC 2025)

(a) Definitions.

Biobased product

USDA-designated product category

(b) Requirement

52.223-3 Hazardous Material Identification and Material Safety Data. (FEB

2021)(DEVIATION DEC 2025)

Definitions.

(b) Requirements

52.224-1 Privacy Act Notification. (APR 1984)

52.224-2 Privacy Act. (APR 1984)

52.225-9 Buy American-Construction Materials (OCT 2022)(DEVIATION NOV 2025)

(a) Definitions

Commercially available off-the-shelf (COTS) item

"Construction material"

Cost of components means

Critical component

Critical item

Domestic construction material

Fastener

Foreign construction material

Foreign iron and steel

Predominantly of iron or steel or a combination of both

Steel

For domestic construction material that is not a critical item or does not contain critical components

(1)

(3 (2)

For domestic construction material that is a critical item or contains critical components

(1)

(2

(3 (2)

Data

Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued) List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information.

52.226-7 Drug Free Workplace (May 2024)

52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. (MAY 2024)

52.227-1 Authorization and Consent. (JUN 2020)

52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement. (JUN 2020)

52.227-4 Patent Indemnity--Construction Contracts. (DEC 2007)

52.228-2 Additional Bond Security. (OCT 1997)

52.228-5 Insurance - Work on a Government Installation. (JAN 1997)

52.228-11 Individual Surety - Pledges of Assets. (FEB 2021)

52.228-12 Prospective Subcontractor Requests for Bonds. (DEC 2022)

52.228-14 Irrevocable Letter of Credit (Nov 2014) 52.228-15 Performance and Payment Bonds - Construction. (JUN 2020)

52.229-3 Federal, State, and Local Taxes. (FEB 2013)(DEVIATION AUG 2025)

52.232-5 Payments under Fixed-Price Construction Contracts. (MAY 2014)

52.232-17 Interest. (MAY 2014)

52.232-23 Assignment of Claims. (MAY 2014)

52.232-27 Prompt Payment For Construction Contracts. (JAN 2017)

52.232-33 Payment by Electronic Funds Transfer – System for Award Management

(OCT 2018)

52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013)

52.232-40 Providing Accelerated Payments to Small Business Subcontractors (MAR 2023)

52.233-1 Disputes. (MAY 2014)(DEVIATION SEP 2025) - Alternate I (DEC

1991)(DEVIATION SEP 2025)

52.233-3 Protest after Award. (AUG 1996)(DEVIATION SEP 2025)

52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)(DEVIATION SEP 2025)

52.236-2 Differing Site Conditions. (APR 1984)(DEVIATION AUG 2025)

52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)(DEVIATION

AUG 2025)

52.236-5 Material and Workmanship. (APR 1984)(DEVIATION AUG 2025)

52.236-6 Superintendence by the Contractor. (APR 1984)(DEVIATION AUG 2025)

52.236-7 Permits and Responsibilities. (NOV 1991)(DEVIATION AUG 2025)

52.236-8 Other Contracts. (APR 1984)(DEVIATION AUG 2025)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984)(DEVIATION AUG 2025)

52.236-10 Operations and Storage Areas. (APR 1984)(DEVIATION AUG 2025)

52.236-11 Use and Possession Prior to Completion. (APR 1984)(DEVIATION AUG 2025) 52.236-12 Cleaning Up. (APR 1984)(DEVIATION AUG 2025)

52.236-13 Accident Prevention. (NOV 1991)(DEVIATION AUG 2025) Alternate I (NOV 1991)

52.236-15 Schedules for Construction Contracts. (APR 1984)(DEVIATION AUG 2025)

52.236-17 Layout of Work. (APR 1984)(DEVIATION AUG 2025)

52.236-21 Specifications and Drawings for Construction. (FEB 1997)(DEVIATION AUG 2025)

52.240-91 Security Prohibitions and Exclusions (DEVIATION SEP 2025)

52.242-13 Bankruptcy. (JUL 1995)

52.242-14 Suspension of Work. (APR 1984)

52.243-4 Changes. (JUN 2007)(DEVIATION JUL 2025)

52.243-6 Change Order Accounting. (APR 1984)(DEVIATION JUL 2025)

52.244-6 Subcontracts for Commercial Products and Commercial Services (OCT

2025)(DEVIATION APR 2026)

52.245-1 Government Property (SEP 2021) - Alternate I (APR 2012)

52.245-9 Use and Charges. (APR 2012)

52.246-12 Inspection of Construction. (AUG 1996)

52.247-64 Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV

2021)(DEVIATION OCT 2025)

52.248-3 Value Engineering - Construction. (OCT 2025)

52.249-2 Termination for Convenience of the Government (Fixed-Price). (APR 2012) - Alternate I (SEP 1996)

52.249-10 Default (Fixed-Price Construction). (APR 1984)

52.252-2 Clauses Incorporated by Reference. (FEB 1998) http://www.acquisition.gov/far and https://www.acquisition.gov/far-overhaul

52.252-4 Alterations in Contract. (APR 1984)

NONE

52.252-6 Authorized Deviations in Clauses. (NOV 2020)

52.253-1 Computer Generated Forms. (JAN 1991)(DEVIATION OCT 2025)

1252.201-70 Contracting Officer’s Representative (NOV 2022)

1252.223-70 Removal or Disposal of Hazardous Substances – Applicable Licenses and Permits (NOV 2022)

1252.223-71 Accident and Fire Reporting (NOV 2022)

1252.223-73 Seat Belt Use Policies and Programs (NOV 2022)

1252.228-74 Notification of Payment Bond Protection (NOV 2022)

1252.232–70 Electronic Submission of Payment Requests (NOV 2022)(DEVIATION AUG 2025)

Definitions.

Contract financing payment

Payment request

Electronic form

Invoice payment

Electronic payment requests.

Processing system.

iSupplier.

login.gov.

iSupplier www.login.gov.

Invoice requirements.

iSupplier

Payment system registration. iSupplier login.gov.

Electronic authentication. See www.login.gov www.login.gov www.login.gov iSupplier http://einvoice.esc.gov iSupplier

Training on DELPHI.

http://einvoice.esc.gov.

Account Management.

Waivers.

Exceptions and alternate payment procedures.

1252.239–93 Information and Communication Technology Accessibility (NOV 2022)

POST-AWARD EVALUATION OF CONTRACTOR PERFORMANCE

Contractor Performance Evaluations

D-1

D-2

D-3

D-4

D-5

D-6

D-7

SPECIAL CONTRACT REQUIREMENTS

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-24), Section 101. — TERMS, FORMAT, AND DEFINITIONS

101.02 Specifications Format.

101.03(a) Acronyms.

CDR

101.04 Definitions.

101.04 Definitions.

Masterworks

Section 102. — BID, AWARD, AND EXECUTION OF CONTRACT

102.02A Physical Data. (

(a)

(2)

(3)

(b)

(c)

(1)

(2)

(3)

(4)

(5)

(6)

Section 104. — CONTROL OF WORK

104.04 Electronic Documentation.

Masterworks User Account Form

104.08 Load Restrictions.

Section 105. — CONTROL OF MATERIAL

105.01 Source of Supply and Quality Requirements.

105.02(a) Government-furnished sources.

105.04 Handling and Storing Material.

Section 106. — ACCEPTANCE OF WORK

106.01 Conformity with Contract Requirements.

Field Materials Manual

106.03 Certification.

Table 106-3 Schedule For Full or Partial Acceptance by Materials Certification

Section Description Material Material Property Or Specification

Certification Frequency

Sample Frequency

Section Description Material Material Property Or Specification

Certification Frequency

Sample Frequency

Section Description Material Material Property Or Specification

Certification Frequency

Sample Frequency

106.03(b) Production certification. (3)

(3)

(a)

(b)

(c)

Section 107. — LEGAL RELATIONS

AND RESPONSIBILITY TO THE PUBLIC

107.01 Laws to be Observed.

(a) Section 401 and Section 404 of the Clean Water Act.

107.02 d) Utilities.

Utility Data Quality Certification

Table 107-2 Status of Utilities

Utility Type Company Contact Name Phone Number / Email Status(1)

107.03 Bulletin Board.

107.05 Responsibility for Damage Claims.

certificates of insurance

107.08 Sanitation, Health, and Safety.

107.10(a) Federal Water Pollution Control Act (Clean Water Act) 33 USC § 1251 et seq.

(4)

(5)

107.10(b) Oil and hazardous substances.

107.10(c) Dirt, plant, and foreign material.

107.10(d) Clearances for Contractor-selected, noncommercial areas.

(5) Any required certifications.

107.10(e) Project-specific commitments.

(a)

(1)

(2)

(3)

(b)

(2)

(a)

(b)

(c)

(b)

(4)

(5)

(6)

(a)

(b)

(c)

(a)

(b)

(c)

(d)

(e)

(f)

(g)

(h)

(7)

107.11 Protection of Forests, Parks, and Public Lands.

Section 108. — PROSECUTION AND PROGRESS

108.01 Commencement, Prosecution, and Completion of Work.

(a)

Table 108-2 Holidays and Surrounding Days

Holiday Time Remarks

108.03 Subcontracting.

108.04 Determination and Extension of Contract Time.

108.04(c) Time extensions.

108.05 Failure to Complete Work on Time.

Section 109. — MEASUREMENT AND PAYMENT

109.01 Measurement of Work.

109.01 Measurement of Work.

109.02(d)(1)(a) Average end area method.

(a) Average end area method.

109.06(c)(3) Profit.

(3) Profit.

109.06(d) Cost or pricing data.

(d) Cost or pricing data

109.06 Pricing of Adjustments.

(e) Variation in estimated quantity.

109.08(a) General.

109.08(b) Invoice requirements.

109.08(c) Government’s receiving report.

109.08(d) Closing date and invoice submittal date.

109.08(e)(1) Proper invoices.

(1) Invoices received by the 7th day following the closing date.

(a) Proper invoices.

(b) Defective invoices.

109.08(e)(2) Defective invoices.

(2) Invoices received between the 8th and 16th day following the closing date.

(a) Proper invoices.

(b) Defective invoices.

109.08(f) Partial payments.

(f) Partial payments.

(1)

(2)

Section 152. — CONSTRUCTION SURVEY AND STAKING

Construction Requirements

152.04 General.

152.05(b) Centerline establishment.

152.05(d)(2) Conventional survey methods.

152.05(f)(1) AMG method.

152.05 Survey and Staking Requirements.

(m) Centerline verification and staking.

(1)

Measurement

152.07

Section 153. — CONTRACTOR QUALITY CONTROL

Description

153.01

153.03(b) QC procedures.

153.03 Quality Control Plan.

(d) Subcontractors and suppliers.

153.03 Quality Control Plan.

153.05 Certifications and Submittals.

153.06 Prosecution of Work.

(a) Preparatory phase.

(1)

(2)

(3)

(4)

(5)

(6)

(b) Start-up phase.

(1)

(2)

(c) Production phase.

(1)

(4)

153.07 Sampling and Testing.

(a) Sample splitting.

(b) Testing.

153.08 Records and Control Charts.

(a) QC and construction operations reports.

(a) QC and construction operations reports.

(1) Subcontractor data.

(2) Labor/Equipment

(a)

(b)

(c)

“I certify that the information contained in this record is accurate and that work documented herein complies with the contract. Exceptions to this certification are documented as a part of this record.”

153.09 Acceptance.

Payment

153.11

(a)

(b)

(c)

Section 154. — CONTRACTOR SAMPLING AND TESTING

Construction Requirements

154.03 Sampling.

154.04B Laboratory (Contractor-Provided).

Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS

155.05 Baseline Construction Schedule.

155.06(d)(1) f f

Section 156. — PUBLIC TRAFFIC

156.04 Maintaining Roadways During Work.

156.06 Limitations on Construction Operations.

156.06 Limitations on Construction Operations.

(j)

(k)

156.07 Nighttime Operations.

156.08 Traffic Control Supervisor.

Section 157. — SOIL EROSION AND SEDIMENT CONTROL

157.04 General.

Section 203. — REMOVAL OF STRUCTURES AND OBSTRUCTIONS

203.03 Submittals.

(a) Bridge Removal Plan.

(4)

(c) Salvage Plan.

203.04 Salvaging Material.

203.05 Removing Material.

Payment 203.11

Section 204. — EXCAVATION AND EMBANKMENT

204.05 Conserved Topsoil.

204.16 (c)(1)(a).

(a)

Section 302. — CRUSHED AGGREGATE

302.06 Acceptance.

Table 302-1 Sampling, Testing, and Acceptance Requirements

Material or Product

Type of Acceptance (Subsection)

C ha ra ct er is tic

Test Methods Specifications

Sampling Frequency

Point of Sampling

Sp lit

S am pl e

Reporting Time

Production

Material or Product

Type of Acceptance (Subsection)

C ha ra ct er

Sampling Frequency

Point of Sampling

Sp lit

S am pl e

Reporting Time

Finished Product

Section 552. — STRUCTURAL CONCRETE

552.03(a)(12)(c) Hydration stabilizing admixtures.

(c) Hydration stabilizing admixtures.

552.03(a) Structural Concrete.

(17)

552.03(a) Structural Concrete.

(23) f'cr f'cr

Section 554. — REINFORCING STEEL

554.08 Placing and Fastening.

Section 555. — STEEL STRUCTURES

Description

555.01

555.03 Submittals.

555.03A General.

(b)

(c)

(d)

(e)

AASHTO LRFD Bridge Design Specifications.

(b)

(c)

(d)

(e)

(f)

(g) AASHTO LRFD Bridge Design Specifications

(h)

(i) AASHTO Manual for Bridge Evaluation

(j)

555.05 Inspection.

555.07 Fabrication.

Quality Certification Program

555.16(f)(7)(b) Threaded fasteners.

555.18 Erection.

Quality Certification Program

555.20 Acceptance.

555.21.

Section 564. — BEARING DEVICES

564.04 Elastomeric Bearings.

Rubber Handbook

Section 567. — MICROPILES

Construction Requirements

567.04 (c)

(c)

Section 601. — MINOR CONCRETE

Description

601.01

Material

601.02

601.04 General.

Table 601-2 Sampling, Testing, and Acceptance Requirements

Material or Product

(Subsection)

Type of Acceptance (Subsection)

C ha ra ct er

Sampling Frequency

Point of Sampling

Split Sample

R ep or tin g T im e

R em ar ks

Source

Mix Design

Production

601.07 Acceptance.

Section 623. — GENERAL LABOR

Construction Requirements

623.02 General.

623.03(b) Technical services.

(1) Biological services.

(a)

Section 624. — TOPSOIL

624.03 General

Section 625. — TURF ESTABLISHMENT

Construction Requirements

625.03 General.

625.07(a) Dry Method, (Hand Seeding).

625.08(b) Hydraulic method.

Measurement

625.11

Section 628. — TEMPORARY STREAM DIVERSIONS

628.04 General.

628.05(d) Bypass pumping diversion.

Section 635. — TEMPORARY TRAFFIC CONTROL

Construction Requirements

635.07 Construction Signs.

Section 637. — FACILITIES AND SERVICES

637.04(k)(1)

(1)

(a)

(1)

(2)

(b)

(1)

(2)

(3)

637.04(l) Telephone.

637.04

(n) Hygiene supplies.

(o) All-in-One (AIO) device.

(3)

(4)

(5)

(6)

(7)

(8)

Table 637-3 Services Provided for Facilities

Service Field Office

Section 646. — REMOVE AND RESET

(ADDED SECTION)

Description

646.01

646.02 General.

646.03 Removing and Resetting Information Signs and Benches.

646.04 Acceptance.

646.05

Payment

646.10

Section 650. — TEMPORARY TRAFFIC DIVERSIONS

(ADDED SECTION)

Description

650.01

Material

650.02

Design Requirements

650.03 Design.

650.04 Submittals.

(a)

(b)

650.05 General.

650.06 Maintenance.

650.07 Removal.

650.08 Acceptance.

650.09

Payment

650.10

(a)

(b)

Section 701. — CEMENTITIOUS MATERIAL

701.03 Pozzolans.

(a) Fly ash.

701.05(b) Packaged repair mortar.

Section 703. — AGGREGATE

703.01 Fine Aggregate for Concrete.

(c)

703.06 Crushed Aggregate.

Table 703-2a Surface Course Gradation and Plasticity Index

Sieve Size Percent by Mass Passing

Designated Sieve

(AASHTO T 27 & T 11)

Section 712. — JOINT MATERIAL

712.01 Sealants, Fillers, and Seals.

(h) Pre-compressed foam-supported silicone joint seal.

(3)

Table 712-3 Impregnated Foam Requirements

Property Test Method Minimum Requirement

Table 712-4 Epoxy Adhesive Requirements

Property Test Method Minimum Requirement

Table 712-5 Silicone Sealant Bands Requirements

Property Test Method Requirement

(i) Reserved.

Section 713. — ROADSIDE IMPROVEMENT MATERIAL

713.04 Seed.

713.05 Mulch.

(a) Wood fiber.

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(b) Bonded fiber matrix hydromulch.

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(c) Wood chips.

713.11 Tackifiers.

(a) Plant based tackifier.

(1) Psyllium.

713.12 Fiber Rolls.

(a) Excelsior fiber roles.

(b) Coir fiber rolls.

(c) Wattles/Sediment Logs.

(1)

(2)

(3)

(4)

(5)

(6)

713.17 Rolled Erosion Control Products.

(a) Erosion Control Blankets.

(7)

(8)

(9)

(10)

(11)

Section 714. — GEOSYNTHETIC MATERIAL

714.01(c) Geotextile filter.

(1)

(a) b)

(c)

(2)

(a)

APPENDIX A

ROCKY MOUNTAIN NATIONAL PARK

FIRE PREVENTION PLAN

Hot Work Permits

Smoking and Lunch Fires. on non-non-

Power Saws. -

(e)

APPENDIX

Have you visited an area where whirling disease, chytrid fungus, or New Zealand mudsnails are known or suspected to exist?

Are you moving within a drainage to sites that are more than 2.5 miles (4km) apart?

Are you visiting a new drainage?

Is this your first time in Rocky Mountain National Park?

Are you using equipment that has been previously used?

The Required Steps

Remove mud, snails, algae, and additional debris from nets, boots, waders, and other equipment.

1.

2. or

NOTE: When sensitive equipment cannot be soaked, liberally spray equipment with a 1:1 water to bleach solution.

Freeze gear overnight (most effective step 3 option).

Soak and agitate equipment for more than

10 minutes in a 1:1 solution of Formula 409 Antibacterial Formula (household cleaner).

Soak equipment for more than 1 minute in 120°F or warmer water

(dishwasher provides adequate heat).

3.

oror

Recommended: Allow equipment to air dry, preferably in direct sunlight at 84°F or warmer for more than 4 hours.

Wash all equipment (and tools used to clean equipment) with a 10% household bleach solution.

Soak equipment for 10 minutes.

Soak and agitate gear and equipment in a solution of 6 oz

Sparquat per gallon of water for more than 10 minutes.

Rocky Mountain National Park Aquatic Disinfection Guidelines

Rocky Mountain National Park 1000 U.S. Highway 36 Estes Park, CO 80517

For more information, call (970) 586-1285

National Park Service U.S. Department of the Interior

If you answered YES to any of these questions, you are REQUIRED to disinfect any equipment that has had contact with water and/or soil.

Do not use felt wading soles (highly recommended). If felt wading soles are used, freeze the waders as outlined in step 3 (required).

Start at the top of a drainage and work downstream (highly recommended). Aquatic threats are typically located in lower elevation areas and this will minimize spread.

Updated 2020-06-01 by AK

WILDLIFE CLEARANCE FORM – NESTS

***Please fill out this form for each clearance survey, even if no nests are detected. See back of datasheet for details*** Project/Area surveyed: Observer/s (FULL NAME):

Work Group:

Date:

Was a Nest Observed?

Yes No

***IF NO NEST WAS OBSERVED, NO NEED TO FILL OUT REMAINDER OF FORM. PLEASE KEEP FORM

AND FORWARD MONTHLY TO ALLIE KONKOWSKI (RS BUILDING)***

If a nest was detected, can cutting of affected tree/limb be avoided?

Yes No

***IF CUTTING OF TREE/LIMB CAN BE AVOIDED, NO NEED TO FILL OUT REMAINDER OF FORM.

PLEASE KEEP FORM AND FORWARD MONTHLY TO ALLIE KONKOWSKI (RS BUILDING)***

If nest cannot be avoided, please mark tree containing nest & describe mark (flagging, color, etc.)

Nest location (circle):

Tree (on branch) Tree (in trunk)

Shrub Ground Cliff

Stream Other_______________

Nest type (circle):

Ground Stick Scrape Cavity Other

Nest details (nest/cavity height, tree species, tree live/dead, etc.):

UTMs: Easting:

Northing:

Photographs:

Yes No

Bird Species # of Birds Life Stage (juvenile, adult, etc.)

Behavior

Status (circle):

Live/normal sick/injured disturbed dead

Comments:

Action taken (NPS USE ONLY):

***IF NEST WAS OBSERVED AND CANNOT BE AVOIDED, PLEASE RETURN FORM TO ALLIE

KONKOWSKI (RS BUILDING) RIGHT AWAY UPON COMPLETION OF SURVEY ***

Updated 2020-06-01 by AK

IF YOU OBSERVE A TREE CONTAINING A NEST:

IF YOU FELL A TREE CONTAINING A NEST:

December 16, 2025

SENT VIA EMAIL

Christina Schroeder U.S. Army Corps of Engineers Albuquerque District Christina.L.Schroeder@usace.army.mil

RE: Clean Water Act Section 401 Water Quality Certification of the U.S. Army Corps of Engineers 2026 Nationwide Permits in Colorado

Dear Ms. Schroeder:

Please find enclosed the water quality certification decisions consistent with Section 401 of the Clean Water Act (CWA) for the reissuance of the Nationwide Permits (NWP). On June 18, 2025, the U.S.

Environmental Protection Agency, Region 8 received the U.S. Army Corps of Engineers’ requests for water quality certification under CWA Section 401 for the proposed 2026 NWPs. The EPA reviewed the June 18, 2025, Federal Register1 notice announcing the reissuance of the NWPs, along with the regional conditions proposed by the Albuquerque District for Colorado. The enclosed CWA section 401 water quality certification decision applies where the EPA is the certifying authority and includes Indian country2 lands within the state of Colorado3 and lands of exclusive federal jurisdiction in relevant respects within the state of Colorado.4

Please provide this certification to any project proponent (or their designated agent) contacting the Corps regarding applicable projects that may be authorized under the 2026 NWPs. If a project proposal

1 See 90 FR 26100 (June 18, 2025).

2 Indian country is defined at 18 U.S.C. § 1151.

3 Indian country in Colorado generally includes: (1) lands within the exterior boundaries of the following Indian reservations located within Colorado: the Southern Ute Indian Reservation and the Ute Mountain Ute Reservation; (2) any land held in trust by the United States for an Indian tribe; and (3) any other areas that are “Indian country” within the meaning of 18 U.S.C. Section 1151. The enclosed CWA Section 401 certification document specifies where these decisions apply.

4 An inventory report compiled by the U.S. General Services Administration for federal properties as of 1962 identifies properties that may contain exclusive federal jurisdiction. This document is accessible at https://www.congress.gov/116/meeting/house/110088/documents/HHRG-116-II13-20191017-SD044.pdf. The EPA notes that this inventory report is not all-inclusive and that the information contained within it has not been recently confirmed and/or updated. Please contact EPA Region 8 at R8CWA401@epa.gov with questions regarding the jurisdictions where this certification decision applies.

The enclosed CWA section 401 water quality certification decision applies where the EPA is the certifying authority and includes of exclusive federal jurisdiction in relevant respects within the state of Colorado.4

Please provide this certification to any project proponent (or their designated agent) contacting the Corps regarding applicable projects that may be authorized under the 2026 NWPs.

does not meet either the general or NWP-specific certification conditions contained herein, the project proponent must request an individual certification from EPA Region 8 at R8CWA401@epa.gov. Project proponents are encouraged to contact EPA Region 8 during the project planning phase if there are any questions about relevant best management practices (e.g., bioengineering techniques, biodegradable erosion control measures, revegetation using native plant species, suitable fill materials, and disposal of debris/construction materials preventing runoff) and resources that can assist with compliance.

Prior to work commencing, EPA recommends that project proponents notify the appropriate Tribal Environmental Office, if applicable.

Thank you for your ongoing partnership and coordination in implementing CWA regulatory programs.

Please contact Tanya Code with any questions at (303) 312-6110 or Code.Tanya@epa.gov. If your staff have questions, please have them contact Estella Moore at (303) 312-6357 or R8CWA401@epa.gov.

Sincerely, Stephanie DeJong, Manager Clean Water Branch

Enclosure

CC: Mark Hutson, Environmental Programs Department Director, Southern Ute Indian Tribe

Mitch Dorsk, Water Quality and Remediation Division Head, Southern Ute Indian Tribe Geoff Hensgen, Water Quality Program Manager, Southern Ute Indian Tribe

STEPHANIE

DEJONG

Digitally signed by

STEPHANIE DEJONG

Date: 2025.12.16 16:25:23 -07'00'

U.S. Environmental Protection Agency Region 8’s Clean Water Act Section 401 Certification of the 2026 Nationwide

Permits in the State of Colorado

DDecemberr 16,, 20266

Clean Water Act (CWA) Section 401 requires applicants for Federal licenses or permits to conduct any activity which may result in any discharge into waters…