XHZG162001 Type B-3 Specifications-EP.pdf
PDF 4 MB Posted
- Attached to
- Energy Project - HVAC Controls Federal contract opportunity
- Solicitation number
- W50S8U20B0001
- Issued by
- Department of the Army National Guard
About this file
This document outlines specifications for an energy project to upgrade HVAC and DDC systems base-wide. Key requirements include replacing the hydronic system with split systems in one building, replacing RTUs and split systems and modifying ductwork in another building, and replacing a boiler in a third building. The project also requires contractors to provide temporary equipment to maintain temperatures during the upgrade period. Options specified include using Automated Logic Controls systems. The solicitation includes drawings, specifications, and provides details on maintenance of affected facilities during the upgrade. It was issued by the Department of the Army National Guard.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1619 XHZG162001 Energy: 03/27/2019 Upgrade HVAC and DDC Systems Base Wide
TABLE OF CONTENTS
00 0110 - 1
DIVISION 00 – INTRODUCTORY INFORMATION
00 0110 TABLE OF CONTENTS
MECHANICAL CONSULTANT INDEX/ SIGNATURE AND SEAL PAGE
ELECTRICAL CONSULTANT INDEX/ SIGNATURE AND SEAL PAGE
SUBMITTAL REGISTER
DIVISION 01 – GENERAL REQUIREMENTS
01 2100 ALLOWANCES
01 3114 FACILITY SERVICES COORDINATION
01 4000 QUALITY REQUIREMENTS
01 4100 REGULATORY REQUIREMENTS
01 4216 DEFINITIONS
01 4219 REFERENCE STANDARDS
01 7000 EXECUTION AND CLOSEOUT REQUIREMENTS
01 7800 CLOSEOUT SUBMITTALS
01 7900 DEMONSTRATION AND TRAINING
DIVISION 02 – EXISTING CONDITIONS
02 4100 DEMOLITION
DIVISION 03 – CONCRETE
03 3000 CAST-IN-PLACE CONCRETE
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 1000 ROUGH CARPENTRY
00 0110 - 2
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 2100 THERMAL INSULATION
07 9005 JOINT SEALERS
DIVISION 09 – FINISHES
09 2116 GYPSUM BOARD ASSEMBLIES
09 5100 ACOUSTICAL CEILINGS
09 9000 PAINTING AND COATING
DIVISION 22 - PLUMBING
22 0500 COMMON WORK RESULTS FOR PLUMBING
22 0523 GENERAL-DUTY VALVES FOR PLUMBING PIPING
22 0529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
22 0553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
22 0700 PLUMBING INSULATION
22 1116 DOMESTIC WATER PIPING
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 0500 COMMON WORK RESULTS FOR HVAC
23 0513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
23 0519 METERS AND GAGES FOR HVAC PIPING
23 0529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
23 0553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
23 0593 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 0700 HVAC INSULATION
23 0923 DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC
23 2113 HYDRONIC PIPING
23 2114 COOLING COIL/CONDENSATE DRAIN PIPING
23 2116 HYDRONIC PIPING SPECIALTIES
23 2123 HYDRONIC PUMPS
00 0110 - 3
23 2513 WATER TREATMENT FOR CLOSED LOOP HYDRONIC SYSTEMS
23 3113 METAL DUCTS
23 3300 AIR DUCT ACCESSORIES
23 3423 HVAC POWER VENTILATORS
23 3600 AIR TERMINAL UNITS
23 3713 DIFFUSERS, REGISTERS, AND GRILLES
23 3723 HVAC GRAVITY VENTILATORS
23 5216 CONDENSING BOILERS
23 5500 FUEL FIRED UNIT HEATERS
23 6331 GAS AND ELECTRIC FURNACES
23 6333 CONDENSING UNITS/ HEAT PUMPS
23 6426.13 AIR-COOLED, SCROLL CHILLERS
DIVISION 26 - ELECTRICAL
26 0500 COMMON WORK RESULTS FOR ELECTRICAL
26 0519 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26 0526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 0533 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS
26 2810 OVERCURRENT PROTECTIVE DEVICES
26 2816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
00 0110 - 4
(a
(b
(c
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
(r
Li ne
A ct i vi ty
T ra ns m itt al
S pe ci fic at io n
S ec tio n
S D
S ub m itt al D es cr ip tio n It em S ub m itt ed
P ar ag ra ph
C la ss ifi ca ti on
G O
V or
A /E
R ev w r S ub m it
A pp ro va l N ee de d B y
M at er ia l N ee de d B y A ct io n C od e
D at e O f A ct io n
D at e F
W to
P
P ut h D at e
R C
D F ro m
O N
T R
D at e F
W D
T o
O th er w r
D at e R
F th er w r A ct io n C od e
D at e O f A ct io n
M ai le d
T o
C O
N T
R
D at e R
F
P P ut ho rit y R em ar ks
P ro du ct
D at a M an uf ac tu re r's
D at a 1.
.A
G O
M ix
D es ig n
C on cr et e M ix D es ig n 1.
.B
G O
D es ig n
M ix tu re s A lte rn at e
D es ig n
M ix tu re s 1.
.C
G O
S ho p D ra w in gs
S te el R ei nf or ce m en t 1.
.D
G O
C er tif ic at e
W el di ng
C er tif ic at es
1.
.E G
O
P ro je ct
R ec or d
D oc um en ts P ro je ct R ec or d D oc um en ts
1.
.F G
O
T es t an d In sp ec tio n
R ep or ts
T es t an d In sp ec tio n
R ep or ts
1.
.G G
O
P ro du ct
D at a W oo d
P re se rv at iv es
A pp lic at io n
1.
.A G
O
P ro du ct
D at a P er fo rm an ce
L im ita tio ns 1.
.A
G O
In st al la tio n In st ru ct io ns S pe ci al C on di tio ns
T ec hn iq ue s 1.
.B
G O
C er tif ic at io n
C er tif y
E xc ee d
R eq ui re m en ts 1.
.C
G O
P ro du ct D at a
C ha ra ct er is tic s, P er fo rm an ce
Li ita tio ns 1.
.A
G O
S am pl es C ol or s 1.
.B
G O
In st al la tio n In st ru ct io ns S pe ci al P ro ce du re s 1.
.C
G O
W ar ra nt y ye ar D ef ec tiv e
W or k
F ai lu re
1.
G O
P ro du ct D at a
M at er ia ls 1.
.A
G O
P ro du ct D at a
C on ne ct or s
1.
.B G
O
T es t
R ep or ts
S tu d H ei gh ts
S pa ci ng
D ef le ct io n 1.
.C
G O
P ro du ct D at a
S us pe ns io n
A co us tic al
U ni ts 1.
.A
G O
S am pl es A co us tic al
U ni ts 1.
.B
G O
S am pl es S us pe ns io n S ys te m 1.
.C
G O
In st al la tio n In st ru ct io ns S pe ci al P ro ce du re s 1.
.D
G O
P ro du ct D at a
Li st
A ll
P ro du ct s U se d
1.
.A G
O
S am pl es C ol or
D ra w D ow ns
1.
.B G
O
P ro du ct D at a
F in is hi ng P ro du ct s, V O
C C on te nt 1.
.C
G O
C er tif ic at io n
V O
C C om pl ia nc e 1.
.D
G O
M an uf ac tu re r's
I ns tr uc tio ns
S pe ci al
P ro ce du re s
1.
.E G
O
M ai nt en an ce D at a
F in is h
S ch ed ul e w ith L oc at io n, ec hn ic al
D at a S he et s, M
S D
S
C ar e le an in g
In st ru ct io ns
T ou ch
-u p
P ro ce du re s, C ol or S am pl es
1.
.F G
O
M ai nt en an ce M at er ia l
G al lo n E ac h
C ol or 1.
.G
G O
P ro du ct
D at a V al ve s 1.
G
O
P ro du ct
D at a H an ge rs a nd S up po rt s
1.
G O
P ro du ct
D at a La be ls a nd
T ag s 1.
G
O
P re co ns ct ru ct io n S ub m itt al
V al ve N um be rin g
S ch em e
1.
G O
V T
A P
P R
O V
IN
G
A U
T H
O R
IT
Y
(d
C O
N T
R A
C T
O R
S C
H E
D U
L E
T
E S
C O
N T
R A
C T
T
IO
N
P R
O
JE
C T
N U
M B
E R
P
N
X H
Z G
S U
B M
IT
T
A L
R E
G
IS
T E
R P
R O
JE
C
T T
IT
L
E
E n e rg y:
U p g ra d e H
V A
C a n d
D D
C S ys te m s
B a se W id e
L O
C A
T
IO
N
T ul sa A ir N at io na l G ua rd
B as e C
O N
T R
A C
T N
O
C O
N T
R A
C T
O R
P ag e o f
(b
(c
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
(r
A P
P R
O V
IN
G
A U
T H
O R
IT
Y
(d
C O
N T
R A
C T
O R
S C
H E
D U
T
E S
C O
N T
R A
C T
T
IO
N
P R
O
JE
C T
N U
M B
E R
P
N
X H
Z G
S U
B M
IT
T
A L
R E
G
IS
T E
R P
R O
JE
C
T T
IT
L
E
E n e rg y:
U p g ra d e H
V A
C a n d
D D
C S ys te m s
B a se W id e
L O
C A
T
IO
N
T ul sa A ir N at io na l G ua rd
B as e C
O N
T R
A C
T N
O
C O
N T
R A
C T
O
P re co ns ct ru ct io n S ub m itt al
V al ve S ch ed ul es
1.
G O
P ro du ct
D at a P ip in g In su la tio n
1.
G O
P ro du ct
D at a P ip in g 1.
G
O
P ro du ct
D at a P ip in g F itt in gs 1.
G
O
P ro du ct
D at a M et er s an d G ag es
1.
G O
O pe ra tio n an d M ai nt en an ce D at a
O pe ra tio n an d M ai nt en an ce M an ua ls 1.
G
O
P ro du ct
D at a H an ge rs a nd S up po rt s
1.
G O
S ho p D ra w in gs
T ra pe ze
P ip e H an ge rs 1.
G
O
S ho p D ra w in gs
M et al F ra m in g
S ys te m s 1.
G
O
S ho p
D ra w in gs F ib er gl as s S tr ut
S ys te m s 1.
G
O
S ho p D ra w in gs
P ip e S ta nd s 1.
G
O
S ho p D ra w in gs
E qu ip m en t
S up po rt s 1.
G
O
P ro du ct
D at a La be ls a nd
T ag s 1.
G
O
P re co ns ct ru ct io n S ub m itt al
E qu ip m en t
La be l S ch ed ul e 1.
G
O
P re co ns ct ru ct io n S ub m itt al
V al ve N um be rin g
S ch em e
1.
G O
P re co ns ct ru ct io n S ub m itt al
V al ve S ch ed ul es
1.
G O
P re co ns ct ru ct io n S ub m itt al
In st ru m en t
C al ib ra tio n
1.
G O
P re co ns ct ru ct io n S ub m itt al
T A
B R ep or t F or m s 1.
G
O
C er tif ic at es
N E
B B
C er tif ic at es
1.
G O
T es t R ep or ts F ie ld
R ep or ts
1.
G O
T es t R ep or ts D ra ft
T A
B R ep or t 1.
G
O
T es t R ep or ts F in al
T A
B R ep or t 1.
G
O
O pe ra tio n an d M ai nt en an ce D at a
O pe ra tio n an d M ai nt en an ce M an ua ls 1.
G
O
P ro du ct
D at a H
V A
C I ns ul at io n 1.
G
O
P ro du ct
D at a D
D C
S ys te m
H ar dw ar e 1.
G
O
P ro du ct
D at a C en tr al S ys te m H ar dw ar e an d
S of tw ar e 1.
G
O
S ho p D ra w in gs
C on tr ol le d
S ys te m s 1.
G
O
P re co ns ct ru ct io n S ub m itt al
S ch ed ul es 1.
G
O
C er tif ic at es
P ro je ct
R ec or d
D oc um en ts 1.
G
O
C lo se ou t S ub m itt al s T ra in in g
M at er ia ls 1.
G
O
P ro du ct
D at a P ip in g 1.
G
O
P ro du ct
D at a V al ve s 1.
G
O
P ro du ct
D at a H an ge rs a nd S up po rt s
1.
G O
C er tif ic at es
M an uf ac tu re r's C er tif ic at e 1.
G
O
C er tif ic at es
P ro je ct
R ec or d
D oc um en ts 1.
G
O
O pe ra tio n an d M ai nt en an ce D at a
O pe ra tio n an d M ai nt en an ce M an ua ls 1.
G
O
P ro du ct
D at a P ip in g 1.
G
O
P ro du ct D at a
H yd ro ni c P ip in g S pe ci al tie s 1.
G
O
C er tif ic at es P ro je ct R ec or d D oc um en ts
1.
G O
O pe ra tio n an d M ai nt en an ce D at a
O pe ra tio n an d M ai nt en an ce M an ua ls 1.
G
O
P ro du ct
D at a H yd ro ni c
P um ps 1.
G
O
S ho p
D ra w in gs W iri ng
D ia gr am s 1.
G
O V
T
P ag e o
(b
(c
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
(r
A P
P R
O V
IN
G
A U
T H
O R
IT
Y
(d
C O
N T
R A
C T
O R
S C
H E
D U
T
E S
C O
N T
R A
C T
T
IO
N
P R
O
JE
C T
N U
M B
E R
P
N
X H
Z G
S U
B M
IT
T
A L
R E
G
IS
T E
R P
R O
JE
C
T T
IT
L
E
E n e rg y:
U p g ra d e H
V A
C a n d
D D
C S ys te m s
B a se W id e
L O
C A
T
IO
N
T ul sa A ir N at io na l G ua rd
B as e C
O N
T R
A C
T N
O
C O
N T
R A
C T
O
O pe ra tio n an d M ai nt en an ce D at a
O pe ra tio n an d M ai nt en an ce M an ua ls 1.
G
O
P ro du ct
D at a W at er
T re at m en t
E qu ip m en t
1.
G O
S ho p D ra w in gs
P re tr ea tm en t an d C he m ic al
T re at m en t
E qu ip m en t
1.
G O
C er tif ic at es
W at er A na ly si s
P ro vi de r Q ua lif ic at io ns
1.
G O
C er tif ic at es
W at er T re at m en t P ro gr am 1.
G
O
C er tif ic at es
W at er A na ly si s
1.
G O
O pe ra tio n an d M ai nt en an ce D at a
O pe ra tio n an d M ai nt en an ce M an ua ls 1.
G
O
P ro du ct
D at a M et al
D uc ts 1.
G
O
P ro du ct
D at a Li ne rs a nd
A dh es iv es 1.
G
O
P ro du ct
D at a S ea la nt s an d
G as ke ts
1.
G O
P ro du ct
D at a A ir D uc t
A cc es so rie s
1.
G O
O pe ra tio n an d M ai nt en an ce D at a
O pe ra tio n an d M ai nt en an ce M an ua ls 1.
G
O
P ro du ct
D at a H
V A
C P ow er
V en til at or s
1.
G O
O pe ra tio n an d M ai nt en an ce D at a
O pe ra tio n an d M ai nt en an ce M an ua ls 1.
G
O
P ro du ct
D at a A ir T er m in al
U ni ts 1.
G
O
P ro du ct
D at a M an uf ac tu re r's
I ns ta lla tio n
In st ru ct io ns
1.
G O
O pe ra tio n an d M ai nt en an ce D at a
O pe ra tio n an d M ai nt en an ce M an ua ls 1.
G
O
P ro du ct
D at a O ut le ts a nd I nl et s 1.
G
O
O pe ra tio n an d M ai nt en an ce D at a
O pe ra tio n an d M ai nt en an ce M an ua ls 1.
G
O
P ro du ct
D at a Lo uv er s 1.
G
O
P ro du ct D at a
B oi le rs
1.
G O
O pe ra tio n an d M ai nt en an ce D at a
O pe ra tio n an d M ai nt en an ce M an ua ls 1.
G
O
P ro du ct
D at a W ar ra nt y
1.
G O
P ro du ct
D at a U ni t
H ea te rs
1.
G O
O pe ra tio n an d M ai nt en an ce D at a
O pe ra tio n an d M ai nt en an ce M an ua ls 1.
G
O
P ro du ct
D at a G as F ur na ce s
1.
G O
C er tif ic at es
A H
R I
C er tif ic at es
1.
G O
O pe ra tio n an d M ai nt en an ce D at a
O pe ra tio n an d M ai nt en an ce M an ua ls 1.
G
O
P ro du ct
D at a C on de ns in g U ni ts
1.
G O
C er tif ic at es
A H
R I
C er tif ic at es
1.
G O
O pe ra tio n an d M ai nt en an ce D at a
O pe ra tio n an d M ai nt en an ce M an ua ls 1.
G
O
6.
P ro du ct D at a
A ir
C oo le d
S cr ol l C hi lle rs 1.
G
O
6.
C er tif ic at es
P ro du ct
C er tif ic at es
1.
G O
6.
P ro du ct D at a
S am pl e
W ar ra nt y 1.
G
O
6.
O pe ra tio n an d
M ai nt en an ce
D at a O pe ra tio n an d
M ai nt en an ce
M an ua ls
1.
G O
P ro du ct
D at a
C on du ct or
C ab le s, S pl ic es
Jo in ts
C on tr ol W iri ng
C om m un ic at io n an d S ig na l W iri ng
W ire
L ub ric at in g
C om po un d, F ire pr oo fin g T ap e
1.
2;
.3
G O
P ro du ct
D at a C on du ct or s, G ro un d B us
G ro un d
R od s, C on ne ct or s 1.
G
O
S ho p D ra w in gs
A s-
B ui lt D at a
1.
G O
T es t R ep or ts T es t
R ec or ds
1.
G O
V T
P ag e o
(b
(c
(e
(f
(g
(h
(i
(j
(k
(l
(m
(n
(o
(p
(q
(r
A P
P R
O V
IN
G
A U
T H
O R
IT
Y
(d
C O
N T
R A
C T
O R
S C
H E
D U
T
E S
C O
N T
R A
C T
T
IO
N
P R
O
JE
C T
N U
M B
E R
P
N
X H
Z G
S U
B M
IT
T
A L
R E
G
IS
T E
R P
R O
JE
C
T T
IT
L
E
E n e rg y:
U p g ra d e H
V A
C a n d
D D
C S ys te m s
B a se W id e
L O
C A
T
IO
N
T ul sa A ir N at io na l G ua rd
B as e C
O N
T R
A C
T N
O
C O
N T
R A
C T
O
P ro du ct
D at a W ire w ay s an d
F itt in gs
1.
G O
P ro du ct
D at a F lo or
B ox es 1.
G
O
P ro du ct
D at a H in ge d- C ov er ed E nc lo su re s 1.
G
O
P ro du ct
D at a C ab in et s
1.
G O
S ho p D ra w in gs
C us to m
E nc lo su re s an d
C ab in et s 1.
G
O
S ho p D ra w in gs
C oo rd in at io n D ra w in gs
1.
G O
C er tif ic at es
S ei sm ic
Q ua lif ic at io n C er tif ic at es 1.
G
O
P ro du ct
D at a O ve rc ur re nt P ro te ct io n D ev ic es 1.
G
O
O pe ra tio n an d M ai nt en an ce D at a
O pe ra tio n an d M ai nt en an ce M an ua ls 1.
G
O
P ro du ct
D at a E nc lo se d
S w itc he s 1.
G
O
P ro du ct
D at a C irc ui t B re ak er s
1.
G O
P ro du ct
D at a A cc es so rie s 1.
G
O
P ro du ct
D at a C om po ne nt s 1.
G
O
S ho p
D ra w in gs E nc lo se d
S w itc he s 1.
G
O
S ho p
D ra w in gs C irc ui t B re ak er s
1.
G O
O pe ra tio n an d M ai nt en an ce D at a
O pe ra tio n an d M ai nt en an ce M an ua ls 1.
G
O V
T
P ag e o
ALLOWANCES
01 2100 - 1
SECTION 01 2100
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Cash allowances.
B. Contingency allowance.
C. Payment and modification procedures relating to allowances.
1.02 CASH ALLOWANCES
A. Costs Included in Cash Allowances: Cost of product to Contractor or subcontractor, less applicable trade discounts, less applicable taxes. Product delivery to site and handling at the site, including unloading, uncrating, and storage; protection of products from elements and from damage; and labor for installation and finishing.
C. Architect Responsibilities:
1. Consult with Owner for selection of products, suppliers, and installers.
2. Select products in consultation with Owner and transmit decision to Contractor.
3. Prepare Change Order.
D. Contractor Responsibilities:
1. Execute purchase agreement with designated supplier and installer.
2. Arrange for and process shop drawings, product data, and samples. Arrange for delivery.
3. Promptly inspect products upon delivery for completeness, damage, and defects. Submit claims for transportation damage.
E. Differences in costs will be adjusted by Change Order.
1.03 ALLOWANCES SCHEDULE
A. Controls Allowance: Include in the Base Bid the stipulated sum of $1,326,544.14 for controls by the Owner's vendor.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
END OF SECTION
01 2100 - 2
FACILITY SERVICES COORDINATION
01 3114 - 1
SECTION 01 3114
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Services of a coordinator for facility services construction.
B. Coordination documents.
1.02 RELATED REQUIREMENTS
A. Section 01 6000 - Product Requirements: Spare parts and maintenance materials.
B. Section 01 7000 - Execution and Closeout Requirements: Starting of Systems. Systems Demonstration.
C. Section 01 7800 - Closeout Submittals: Project record documents.
1.03 MECHANICAL AND ELECTRICAL COORDINATOR
A. The Contractor will employ and pay for services of a person, technically qualified and administratively experienced in field coordination of the type of work required to be coordinated, for the duration of the Work.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 COORDINATION REQUIRED
A. Coordinate the work listed below:
1. Fire Suppression: Division 21.
2. Plumbing: Division 22.
3. Heating, Ventilating, and Air Conditioning: Division 23.
4. Electrical: Division 26.
5. Communications: Division 27.
6. Electronic Safety and Security: Division 28.
B. Coordinate progress schedules, including dates for submittals and for delivery of products.
C. Conduct meetings among separate contractors and others concerned, to establish and maintain coordination and schedules, and to resolve coordination matters in dispute.
D. Participate in progress meetings. Report on progress of work to be adjusted under coordination requirements, and any required changes in schedules. Transmit minutes of meetings and reports to concerned parties.
3.02 COORDINATION DOCUMENTS
A. Prepare coordination drawings to organize installation of products for efficient use of available space, for proper sequence of installation, and to identify potential conflicts.
B. Prepare a master schedule identifying responsibilities for activities that directly relate to this work, including submittals and temporary utilities; organize by specification section.
C. Identify electrical power characteristics and control wiring required for each item of equipment.
D. Maintain documents for the duration of the work, recording changes due to site instructions, modifications or adjustments.
3.03 COORDINATION OF SUBMITTALS
A. Review shop drawings, product data, and samples for compliance with Contract Documents and for coordination with related work. Transmit copies of reviewed documents to Architect.
B. Check field dimensions and clearances and relationship to available space and anchors.
C. Check compatibility with equipment and work of other sections, electrical characteristics, and operational control requirements.
D. Check motor voltages and control characteristics.
01 3114 - 2
E. Coordinate controls, interlocks, wiring of switches, and relays.
F. Coordinate wiring and control diagrams.
G. When changes in the work are made, review their effect on other work.
H. Verify information and coordinate maintenance of record documents.
3.04 COORDINATION OF SUBSTITUTIONS AND MODIFICATIONS
A. Review proposals and requests for substitution prior to submission to Architect.
B. Verify compliance with Contract Documents and for compatibility with work of other sections.
C. Submit with recommendation for action.
3.05 OBSERVATION OF WORK
A. Observe work for compliance with Contract Documents.
B. Maintain a list of observed deficiencies and defects; promptly submit.
3.06 DOCUMENTATION
A. Observe and maintain a record of tests. Record:
1. Specification section number and product name.
2. Name of Contractor, subcontractor.
3. Name of testing agency and name of inspector.
4. Name of manufacturer's representative present.
5. Date, time, and duration of tests.
6. Type of test, and results.
7. Retesting required.
B. Assemble background documentation for dispute and claim settlement.
C. Submit copies of documentation to Architect upon request.
3.07 EQUIPMENT START-UP
A. Verify utilities, connections, and controls are complete and equipment is in operable condition as required by Section 01 7000.
B. Observe start-up and adjustments, test run, record time and date of start-up, and results.
C. Observe equipment demonstrations made to Owner; record times and additional information required for operation and maintenance manuals.
3.08 INSPECTION AND ACCEPTANCE OF EQUIPMENT
A. Prior to inspection, verify that equipment is tested, operational, clean, and ready for operation.
B. Assist Architect with review. Prepare list of items to be completed and corrected.
QUALITY REQUIREMENTS
01 4000 - 1
SECTION 01 4000
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Submittals.
B. Mock-ups.
C. Control of installation.
D. Tolerances.
E. Testing and inspection services.
F. Manufacturers' field services.
1.02 RELATED REQUIREMENTS
A. Section 01 4216 - Definitions.
B. Section 01 4219 - Reference Standards.
C. Section 01 6000 - Product Requirements: Requirements for material and product quality.
1.03 REFERENCE STANDARDS
A. ASTM C1021 - Standard Practice for Laboratories Engaged in Testing of Building Sealants;
2008 (Reapproved 2014).
B. ASTM C1077 - Standard Practice for Laboratories Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Laboratory Evaluation; 2014.
C. ASTM D3740 - Standard Practice for Minimum Requirements for Agencies Engaged in the Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction;
2012a.
D. ASTM E329 - Standard Specification for Agencies Engaged in Construction Inspection and/or Testing; 2014a.
E. ASTM E543 - Standard Specification for Agencies Performing Nondestructive Testing; 2013.
1.04 SUBMITTALS
A. Testing Agency Qualifications:
1. Prior to start of Work, submit agency name, address, and telephone number, and names of full time registered Engineer and responsible officer.
2. Submit copy of report of laboratory facilities inspection made by NIST Construction
Materials Reference Laboratory during most recent inspection, with memorandum of remedies of any deficiencies reported by the inspection.
B. Design Data: Submit for Architect's knowledge as contract administrator for the limited purpose of assessing conformance with information given and the design concept expressed in the contract documents, or for Owner's information.
C. Test Reports: After each test/inspection, promptly submit two copies of report to Architect and to Contractor.
1. Include:
a. Date issued.
b. Project title and number.
c. Name of inspector.
d. Date and time of sampling or inspection.
e. Identification of product and specifications section.
f. Location in the Project.
g. Type of test/inspection.
h. Date of test/inspection.
i. Results of test/inspection.
01 4000 - 2
j. Conformance with Contract Documents.
k. When requested by Architect, provide interpretation of results.
2. Test report submittals are for Architect's knowledge as contract administrator for the limited purpose of assessing conformance with information given and the design concept expressed in the contract documents, or for Owner's information.
D. Certificates: When specified in individual specification sections, submit certification by the manufacturer and Contractor or installation/application subcontractor to Architect, in quantities specified for Product Data.
1. Indicate material or product conforms to or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate.
2. Certificates may be recent or previous test results on material or product, but must be acceptable to Architect.
E. Manufacturer's Instructions: When specified in individual specification sections, submit printed instructions for delivery, storage, assembly, installation, start-up, adjusting, and finishing, for the Owner's information. Indicate special procedures, perimeter conditions requiring special attention, and special environmental criteria required for application or installation.
F. Manufacturer's Field Reports: Submit reports for Architect's benefit as contract administrator or for Owner.
1. Submit report within 15 days days of observation to Architect for information.
2. Submit for information for the limited purpose of assessing conformance with information given and the design concept expressed in the contract documents.
1.05 REFERENCES AND STANDARDS - SEE SECTION 01 4219
1.06 TESTING AND INSPECTION AGENCIES
B. As indicated in individual specification sections, Contractor shall employ and pay for services of an independent testing agency to perform other specified testing.
C. Employment of agency in no way relieves Contractor of obligation to perform Work in accordance with requirements of Contract Documents.
D. Contractor Employed Agency:
1. Testing agency: Comply with requirements of ASTM E329, ASTM E543, ASTM C1021, ASTM C1077, and ASTM C1093.
2. Inspection agency: Comply with requirements of ASTM D3740 and ASTM E329.
3. Laboratory: Authorized to operate in Oklahoma.
4. Laboratory Staff: Maintain a full time registered Engineer on staff to review services.
5. Testing Equipment: Calibrated at reasonable intervals either by NIST or using an NIST established Measurement Assurance Program, under a laboratory measurement quality assurance program.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 CONTROL OF INSTALLATION
A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce Work of specified quality.
B. Comply with manufacturers' instructions, including each step in sequence.
C. Should manufacturers' instructions conflict with Contract Documents, request clarification from Architect before proceeding.
D. Comply with specified standards as minimum quality for the Work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.
E. Have Work performed by persons qualified to produce required and specified quality.
01 4000 - 3
F. Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer.
G. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, and disfigurement.
3.02 TOLERANCES
A. Monitor fabrication and installation tolerance control of products to produce acceptable Work.
Do not permit tolerances to accumulate.
B. Comply with manufacturers' tolerances. Should manufacturers' tolerances conflict with Contract Documents, request clarification from Architect before proceeding.
C. Adjust products to appropriate dimensions; position before securing products in place.
3.03 TESTING AND INSPECTION
A. See individual specification sections for testing and inspection required.
B. Testing Agency Duties:
1. Provide qualified personnel at site. Cooperate with Architect and Contractor in performance of services.
2. Perform specified sampling and testing of products in accordance with specified standards.
3. Ascertain compliance of materials and mixes with requirements of Contract Documents.
4. Promptly notify Architect and Contractor of observed irregularities or non-conformance of
Work or products.
5. Perform additional tests and inspections required by Architect.
6. Submit reports of all tests/inspections specified.
C. Limits on Testing/Inspection Agency Authority:
1. Agency may not release, revoke, alter, or enlarge on requirements of Contract
Documents.
2. Agency may not approve or accept any portion of the Work.
3. Agency may not assume any duties of Contractor.
4. Agency has no authority to stop the Work.
D. Contractor's Responsibilities:
1. Deliver to agency at designated location, adequate samples of materials proposed to be used that require testing, along with proposed mix designs.
2. Cooperate with laboratory personnel, and provide access to the Work and to manufacturers' facilities.
3. Provide incidental labor and facilities:
a. To provide access to Work to be tested/inspected.
b. To obtain and handle samples at the site or at source of Products to be tested/inspected.
c. To facilitate tests/inspections.
d. To provide storage and curing of test samples.
4. Notify Architect and laboratory 24 hours prior to expected time for operations requiring testing/inspection services.
5. Employ services of an independent qualified testing laboratory and pay for additional samples, tests, and inspections required by Contractor beyond specified requirements.
6. Arrange with Owner's agency and pay for additional samples, tests, and inspections required by Contractor beyond specified requirements.
E. Re-testing required because of non-conformance to specified requirements shall be performed by the same agency on instructions by Architect.
F. Re-testing required because of non-conformance to specified requirements shall be paid for by Contractor.
01 4000 - 4
3.04 MANUFACTURERS' FIELD SERVICES
A. When specified in individual specification sections, require material or product suppliers or manufacturers to provide qualified staff personnel to observe site conditions, conditions of surfaces and installation, quality of workmanship, start-up of equipment, test, adjust and balance of equipment as applicable, and to initiate instructions when necessary.
B. Report observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturers' written instructions.
3.05 DEFECT ASSESSMENT
A. Replace Work or portions of the Work not conforming to specified requirements.
B. If, in the opinion of Architect, it is not practical to remove and replace the Work, Architect will direct an appropriate remedy or adjust payment.
REGULATORY REQUIREMENTS
01 4100 - 1
SECTION 01 4100
PART 1 GENERAL
1.01 SUMMARY
A. Regulatory requirements applicable to this project are the following:
B. 28 CFR 35 - Nondiscrimination on the Basis of Disability in State and Local Government Services; Final Rule; Department of Justice; current edition.
C. 28 CFR 36 - Nondiscrimination by Public Accommodations and in Commercial Facilities; Final Rule; Department of Justice; current edition.
D. 36 CFR 1191 - Americans with Disabilities Act (ADA) Accessibility Guidelines for Buildings and Facilities; Architectural Barriers Act (ABA) Accessibility Guidelines; current edition.
E. ADA Standards - Americans with Disabilities Act (ADA) Standards for Accessible Design; 2010.
F. ATBCB ADAAG - Americans with Disabilities Act Accessibility Guidelines; 2002.
G. 29 CFR 1910 - Occupational Safety and Health Standards; current edition.
H. State of Oklahoma amendments to some or all of the following.
I. ICC A117.1 - Accessible and Usable Buildings and Facilities; 2009.
J. ICC (IFC) - International Fire Code; 2015.
K. ICC (IBC) - International Building Code; 2015.
L. ICC (IPC) - International Plumbing Code; 2015.
M. ICC (IMC) - International Mechanical Code; 2015.
N. NFPA 70 - National Electrical Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.
O. ICC (IECC) - International Energy Conservation Code; 2006.
P. NFPA 10 - Standard for Portable Fire Extinguishers, 2012.
Q. NFPA 13 - Standard for the Installation of Sprinkler Systems, 2013.
R. NFPA 101 – 2015, Life Safety Code.
S. ANG ETL 15-01, Air National Guard Design Policy (Tab D), 1 May 2015.
T. ASHRAE Handbook of Fundamentals – 2013 Edition.
U. ASHRAE Standard 62.1 - 2010 Edition.
V. ASHRAE Standard 90.1 - 2010 Edition.
W. Unified Facilities Criteria (UFC) 1-200-02 High Performance and Sustainable Building Requirements, 01 December 2016, including change 1, 1 October 2017.
X. UFC 4-010-01 DOD Minimum Antiterrorism Standards for Buildings, 9 February 2012, including change 1, 1 October 2013.
Y. UFC 3-410-01 Heating, Ventilating, and Air Conditioning Systems, 1 July 2013, including Change 4, 01 November 2017.
Z. UFC 3-410-02 Direct Digital Control for HVAC and Other Building Control Systems, 18 July 2018.
A1. UFC 3-470-01 Utility Monitoring and Control System (UMCS) Front End and Integration, 12 January 2018.
A2. UFC 4-010-06 Cybersecurity of Facility-Related Control Systems, 19 September 2016, including Change 1, 18 January 2017.
A3. AFI 17-101 Risk Management Framework (RMF) for Air Force Information Technology (IT).
A4. AFI 33-200 Air Force Cybersecurity Program Management.
01 4100 - 2
A5. ETL 11-1 Civil Engineer Industrial Control System Information Assurance Compliance, 30 March 2011.
A6. NIST 800-82 Guide to Industrial Control Systems (ICS) Security.
A7. NIST 800-171 Protecting Controlled Unclassified Information in Nonfederal Systems and Organizations.
1.02 RELATED REQUIREMENTS
A. Section 01 4000 - Quality Requirements.
1.03 QUALITY ASSURANCE
A. Designer Qualifications: Where delegated engineering design is to be performed under the construction contract provide the direct supervision of a Professional Engineer experienced in design of this type of work and licensed in Oklahoma.
PART 2 PRODUCTS - NOT USED
DEFINITIONS
01 4216 - 1
SECTION 01 4216
PART 1 GENERAL
1.01 SUMMARY
A. This section supplements the definitions contained in the General Conditions.
B. Other definitions are included in individual specification sections.
1.02 DEFINITIONS
A. Furnish: To supply, deliver, unload, and inspect for damage.
B. Install: To unpack, assemble, erect, apply, place, finish, cure, protect, clean, start up, and make ready for use.
C. Product: Material, machinery, components, equipment, fixtures, and systems forming the work result. Not materials or equipment used for preparation, fabrication, conveying, or erection and not incorporated into the work result. Products may be new, never before used, or re-used materials or equipment.
D. Project Manual: The book-sized volume that includes the procurement requirements (if any), the contracting requirements, and the specifications.
E. Provide: To furnish and install.
F. Supply: Same as Furnish.
PART 2 PRODUCTS - NOT USED
01 4216 - 2
REFERENCE STANDARDS
01 4219 - 1
SECTION 01 4219
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Requirements relating to referenced standards.
1.02 QUALITY ASSURANCE
A. For products or workmanship specified by reference to a document or documents not included in the Project Manual, also referred to as reference standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.
B. Conform to reference standard of date of issue specified in the individual specification sections, except where a specific date is established by applicable code.
C. Should specified reference standards conflict with Contract Documents, request clarification from the Architect before proceeding.
D. Neither the contractual relationships, duties, or responsibilities of the parties in Contract nor those of the Architect shall be altered by the Contract Documents by mention or inference otherwise in any reference document.
01 4219 - 2
EXECUTION AND CLOSEOUT REQUIREMENTS
01 7000 - 1
SECTION 01 7000
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Examination, preparation, and general installation procedures.
B. Requirements for alterations work, including selective demolition, except removal, disposal, and/or remediation of hazardous materials and toxic substances.
C. Pre-installation meetings.
D. Cutting and patching.
E. Surveying for laying out the work.
F. Cleaning and protection.
G. Starting of systems and equipment.
H. Demonstration and instruction of Owner personnel.
I. Closeout procedures, except payment procedures.
J. General requirements for maintenance service.
1.02 RELATED REQUIREMENTS
A. Section 01 4000 - Quality Requirements: Testing and inspection procedures.
B. Section 01 7800 - Closeout Submittals: Project record documents, operation and maintenance data, warranties and bonds.
C. Section 02 4100 - Demolition: Demolition of whole structures and parts thereof; site utility demolition.
1.03 REFERENCE STANDARDS
A. NFPA 241 - Standard for Safeguarding Construction, Alteration, and Demolition Operations;
2013.
1.04 SUBMITTALS
A. Survey work: Submit name, address, and telephone number of Surveyor before starting survey work.
1. On request, submit documentation verifying accuracy of survey work.
2. Submit a copy of site drawing signed by the Land Surveyor, that the elevations and locations of the work are in conformance with Contract Documents.
3. Submit surveys and survey logs for the project record.
B. Demolition Plan: Submit demolition plan as specified by OSHA and local authorities.
1. Indicate extent of demolition, removal sequence, bracing and shoring, and location and construction of barricades and fences. Include design drawings and calculations for bracing and shoring.
2. Identify demolition firm and submit qualifications.
3. Include a summary of safety procedures.
C. Cutting and Patching: Submit written request in advance of cutting or alteration that affects:
1. Structural integrity of any element of Project.
2. Integrity of weather exposed or moisture resistant element.
3. Efficiency, maintenance, or safety of any operational element.
4. Visual qualities of sight exposed elements.
5. Work of Owner or separate Contractor.
6. Include in request:
a. Identification of Project.
b. Location and description of affected work.
c. Necessity for cutting or alteration.
01 7000 - 2
d. Description of proposed work and products to be used.
e. Effect on work of Owner or separate Contractor.
f. Written permission of affected separate Contractor.
g. Date and time work will be executed.
D. Project Record Documents: Accurately record actual locations of capped and active utilities.
1.05 QUALIFICATIONS
A. For demolition work, employ a firm specializing in the type of work required.
1. Minimum of 5 years of documented experience.
B. For survey work, employ a land surveyor registered in Oklahoma and acceptable to Architect.
Submit evidence of Surveyor's Errors and Omissions insurance coverage in the form of an Insurance Certificate.
C. For field engineering, employ a professional engineer of the discipline required for specific service on Project, licensed in Oklahoma.
D. For design of temporary shoring and bracing, employ a Professional Engineer experienced in design of this type of work and licensed in Oklahoma.
1.06 PROJECT CONDITIONS
A. Use of explosives is not permitted.
B. Grade site to drain. Maintain excavations free of water. Provide, operate, and maintain pumping equipment.
C. Protect site from puddling or running water. Provide water barriers as required to protect site from soil erosion.
D. Perform dewatering activities, as required, for the duration of the project.
E. Ventilate enclosed areas to assist cure of materials, to dissipate humidity, and to prevent accumulation of dust, fumes, vapors, or gases.
F. Dust Control: Execute work by methods to minimize raising dust from construction operations.
Provide positive means to prevent air-borne dust from dispersing into atmosphere and over adjacent property.
1. Provide dust-proof enclosures to prevent entry of dust generated outdoors.
2. Provide dust-proof barriers between construction areas and areas continuing to be occupied by Owner.
G. Erosion and Sediment Control: Plan and execute work by methods to control surface drainage from cuts and fills, from borrow and waste disposal areas. Prevent erosion and sedimentation.
1. Minimize amount of bare soil exposed at one time.
2. Provide temporary measures such as berms, dikes, and drains, to prevent water flow.
3. Periodically inspect earthwork to detect evidence of erosion and sedimentation; promptly apply corrective measures.
H. Noise Control: Provide methods, means, and facilities to minimize noise produced by construction operations.
1. At All Times: Excessively noisy tools and operations will not be tolerated inside the building at any time of day; excessively noisy includes jackhammers, pile drivers, pneumatic hammers, air-operated nail guns, and diesel engines.
I. Pest and Rodent Control: Provide methods, means, and facilities to prevent pests and insects from damaging the work.
J. Rodent Control: Provide methods, means, and facilities to prevent rodents from accessing or invading premises.
K. Pollution Control: Provide methods, means, and facilities to prevent contamination of soil, water, and atmosphere from discharge of noxious, toxic substances, and pollutants produced by construction operations. Comply with federal, state, and local regulations.
01 7000 - 3
1.07 COORDINATION
A. Coordinate scheduling, submittals, and work of the various sections of the Project Manual to ensure efficient and orderly sequence of installation of interdependent construction elements, with provisions for accommodating items installed later.
B. Notify affected utility companies and comply with their requirements.
C. Verify that utility requirements and characteristics of new operating equipment are compatible with building utilities. Coordinate work of various sections having interdependent responsibilities for installing, connecting to, and placing in service, such equipment.
D. Coordinate space requirements, supports, and installation of mechanical and electrical work that are indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduit, as closely as practicable; place runs parallel with lines of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs.
E. In finished areas except as otherwise indicated, conceal pipes, ducts, and wiring within the construction. Coordinate locations of fixtures and outlets with finish elements.
F. Coordinate completion and clean-up of work of separate sections.
G. After Owner occupancy of premises, coordinate access to site for correction of defective work and work not in accordance with Contract Documents, to minimize disruption of Owner's activities.
PART 2 PRODUCTS
2.01 PATCHING MATERIALS
A. New Materials: As specified in product sections; match existing products and work for patching and extending work.
B. Type and Quality of Existing Products: Determine by inspecting and testing products where necessary, referring to existing work as a standard.
C. Product Substitution: For any proposed change in materials, submit request for substitution.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent work.
Start of work means acceptance of existing conditions.
B. Verify that existing substrate is capable of structural support or attachment of new work being applied or attached.
C. Examine and verify specific conditions described in individual specification sections.
D. Take field measurements before confirming product orders or beginning fabrication, to minimize waste due to over-ordering or misfabrication.
E. Verify that utility services are available, of the correct characteristics, and in the correct locations.
F. Prior to Cutting: Examine existing conditions prior to commencing work, including elements subject to damage or movement during cutting and patching. After uncovering existing work, assess conditions affecting performance of work. Beginning of cutting or patching means acceptance of existing conditions.
3.02 PREPARATION
A. Clean substrate surfaces prior to applying next material or substance.
B. Seal cracks or openings of substrate prior to applying next material or substance.
C. Apply manufacturer required or recommended substrate primer, sealer, or conditioner prior to applying any new material or substance in contact or bond.
01 7000 - 4
3.03 PREINSTALLATION MEETINGS
A. When required in individual specification sections, convene a preinstallation meeting at the site prior to commencing work of the section.
B. Require attendance of parties directly affecting, or affected by, work of the specific section.
C. Notify Architect four days in advance of meeting date.
D. Prepare agenda and preside at meeting:
1. Review conditions of examination, preparation and installation procedures.
2. Review coordination with related work.
E. Record minutes and distribute copies within two days after meeting to participants, with two copies to Architect, Owner, participants, and those affected by decisions made.
3.04 LAYING OUT THE WORK
A. Verify locations of survey control points prior to starting work.
B. Promptly notify Architect of any discrepancies discovered.
C. Contractor shall locate and protect survey control and reference points.
D. Control datum for survey is that established by Owner provided survey.
E. Protect survey control points prior to starting site work; preserve permanent reference points during construction.
F. Promptly report to Architect the loss or destruction of any reference point or relocation required because of changes in grades or other reasons.
G. Replace dislocated survey control points based on original survey control. Make no changes without prior written notice to Architect.
H. Utilize recognized engineering survey practices.
I. Establish a minimum of two permanent bench marks on site, referenced to established control points. Record locations, with horizontal and vertical data, on project record documents.
J. Establish elevations, lines and levels. Locate and lay out by instrumentation and similar appropriate means:
1. Site improvements including pavements; stakes for grading, fill and topsoil placement;
utility locations, slopes, and invert elevations.
2. Grid or axis for structures.
3. Building foundation, column locations, ground floor elevations.
4. Controlling lines and levels required for mechanical and electrical trades.
K. Periodically verify layouts by same means.
L. Maintain a complete and accurate log of control and survey work as it progresses.
3.05 GENERAL INSTALLATION REQUIREMENTS
A. In addition to compliance with regulatory requirements, conduct construction operations in compliance with NFPA 241, including applicable recommendations in Appendix A.
B. Install products as specified in individual sections, in accordance with manufacturer's instructions and recommendations, and so as to avoid waste due to necessity for replacement.
C. Make vertical elements plumb and horizontal elements level, unless otherwise indicated.
D. Install equipment and fittings plumb and level, neatly aligned with adjacent vertical and horizontal lines, unless otherwise indicated.
E. Make consistent texture on surfaces, with seamless transitions, unless otherwise indicated.
F. Make neat transitions between different surfaces, maintaining texture and appearance.
3.06 ALTERATIONS
A. Drawings showing existing construction and utilities are based on casual field observation and existing record documents only.
01 7000 - 5
1. Verify that construction and utility arrangements are as shown.
2. Report discrepancies to Architect before disturbing existing installation.
3. Beginning of alterations work constitutes acceptance of existing conditions.
B. Keep areas in which alterations are being conducted separated from other areas that are still occupied.
1. Provide, erect, and maintain temporary dustproof partitions of construction.
C. Maintain weatherproof exterior building enclosure except for interruptions required for replacement or modifications; take care to prevent water and humidity damage.
1. Where openings in exterior enclosure exist, provide construction to make exterior enclosure weatherproof.
2. Insulate existing ducts or pipes that are exposed to outdoor ambient temperatures by alterations work.
D. Remove existing work as indicated and as required to accomplish new work.
1. Remove rotted wood, corroded metals, and deteriorated masonry and concrete; replace with new construction specified.
2. Remove items indicated on drawings.
3. Relocate items indicated on drawings.
4. Where new surface finishes are to be applied to existing work, perform removals, patch, and prepare existing surfaces as required to receive new finish; remove existing finish if necessary for successful application of new finish.
5. Where new surface finishes are not specified or indicated, patch holes and damaged surfaces to match adjacent finished surfaces as closely as possible.
E. Services (Including but not limited to HVAC, Plumbing, Fire Protection, Electrical, and Telecommunications): Remove, relocate, and extend existing systems to accommodate new construction.
1. Maintain existing active systems that are to remain in operation; maintain access to equipment and operational components; if necessary, modify installation to allow access or provide access panel.
2. Where existing systems or equipment are not active and Contract Documents require reactivation, put back into operational condition; repair supply, distribution, and equipment as required.
3. Where existing active systems serve occupied facilities but are to be replaced with new services, maintain existing systems in service until new systems are complete and ready for service.
a. Disable existing systems only to make switchovers and connections; minimize duration of outages.
b. Provide temporary connections as required to maintain existing systems in service.
4. Verify that abandoned services serve only abandoned facilities.
5. Remove abandoned pipe, ducts, conduits, and equipment, including those above accessible ceilings; remove back to source of supply where possible, otherwise cap stub and tag with identification; patch holes left by removal using materials specified for new construction.
F. Protect existing work to remain.
1. Prevent movement of structure; provide shoring and bracing if necessary.
2. Perform cutting to accomplish removals neatly and as specified for cutting new work.
3. Repair adjacent construction and finishes damaged during removal work.
G. Adapt existing work to fit new work: Make as neat and smooth transition as possible.
1. When existing finished surfaces are cut so that a smooth transition with new work is not possible, terminate existing surface along a straight line at a natural line of division and make recommendation to Architect.
2. Where removal of partitions or walls results in adjacent spaces becoming one, rework floors, walls, and ceilings to a smooth plane without breaks, steps, or bulkheads.
01 7000 - 6
3. Where a change of plane of 1/4 inch or more occurs in existing work, submit recommendation for providing a smooth transition for Architect review and request instructions.
H. Patching: Where the existing surface is not indicated to be refinished, patch to match the surface finish that existed prior to cutting. Where the surface is indicated to be refinished, patch so that the substrate is ready for the new finish.
I. Refinish existing surfaces as indicated:
1. Where rooms or spaces are indicated to be refinished, refinish all visible existing surfaces to remain to the specified condition for each material, with a neat transition to adjacent finishes.
2. If mechanical or electrical work is exposed accidentally during the work, re-cover and refinish to match.
J. Clean existing systems and equipment.
K. Remove demolition debris and abandoned items from alterations areas and dispose of off-site;
do not burn or bury.
L. Do not begin new construction in alterations areas before demolition is complete.
M. Comply with all other applicable requirements of this section.
3.07 CUTTING AND PATCHING
A. Whenever possible, execute the work by methods that avoid cutting or patching.
B. See Alterations article above for additional requirements.
C. Perform whatever cutting and patching is necessary to:
1. Complete the work.
2. Fit products together to integrate with other work.
3. Provide openings for penetration of mechanical, electrical, and other services.
4. Match work that has been cut to adjacent work.
5. Repair areas adjacent to cuts to required condition.
6. Repair new work damaged by subsequent work.
7. Remove samples of installed work for testing when requested.
8. Remove and replace defective and non-conforming work.
D. Execute work by methods that avoid damage to other work and that will provide appropriate surfaces to receive patching and finishing. In existing work, minimize damage and restore to original condition.
E. Employ original installer to perform cutting for weather exposed and moisture resistant elements, and sight exposed surfaces.
F. Cut rigid materials using masonry saw or core drill. Pneumatic tools not allowed without prior approval.
G. Restore work with new products in accordance with requirements of Contract Documents.
H. Fit work air tight to pipes, sleeves, ducts, conduit, and other penetrations through surfaces.
I. At penetrations of fire rated walls, partitions, ceiling, or floor construction, completely seal voids with fire rated material, to full thickness of the penetrated element.
J. Patching:
1. Finish patched surfaces to match finish that existed prior to patching. On continuous surfaces, refinish to nearest intersection or natural break. For an assembly, refinish entire unit.
2. Match color, texture, and appearance.
3. Repair patched surfaces that are damaged, lifted, discolored, or showing other imperfections due to patching work.