WORK_DIRECTIVE_CHANGE.pdf

PDF 48 KB Posted

Attached to
116th Street and Hoover Road Roundabout Construction
Solicitation number
22-ENG-03
Issued by
Hamilton County, Indiana

About this file

This is a Work Directive Change form issued by the City of Carmel, Board of Public Works and Safety, located in Hamilton County, Indiana, for use on the 116th Street and Hoover Road Roundabout Construction project. The form serves as a template for documenting authorized changes to project work, including modifications to scope of work, specifications, drawings, and project timeline. The document requires completion of project identification information, detailed description of work covered by the directive change, and the reason for the order. Changes to project completion dates must be specified as additions, deductions, or no change in days. A formal Contract Change Order will be issued to cover the financial impact of the Work Directive Change, with the amount to be determined and documented separately. Authorization requires approval from the City of Carmel Board of Public Works and Safety, including signature by the Presiding Officer (Laura Campbell), members (James Barlow and Alan Potasnik), and City Engineer (Brad Pease, PE), along with attestation by the City Clerk (Jacob Quinn).

The form contains no specific pricing information, set-asides, or funding details, as it is a blank template for documenting future changes rather than an individual change order. The document version is dated September 23, 2024, and will be used for administering changes to the roundabout construction project that was originally bid with a sealed bid deadline of February 4, 2026, and a project timeline from August 31, 2026, through May 1, 2027.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF CARMEL

TO: WORK DIRECTIVE CHANGE NO.______________

DATE: ______________________________________

PROJECT NAME:_____________________________

PROJECT NO.: _______________________________

Specification Reference

Drawing Reference:

DESCRIPTION OF WORK COVERED BY THIS DIRECTIVE CHANGE:

REASON FOR THIS ORDER:

AUTHORIZATION:

THIS WORK DIRECTIVE CHANGE AUTHORIZES THE WORK TO BE COMPLETED AS

OUTLINED. A Contract Change Order in the amount of $______________ will be issued to you in the near future to cover this Work Directive Change.

PROJECT COMPLETION DATE: ADD/DEDUCT/UNCHANGED ___________ DAYS.

By:_______________________________ Approved By:

Owner’s Representative

CITY OF CARMEL

BOARD OF PUBLIC

WORKS AND SAFETY

By:__________________________

Laura Campbell, Presiding Officer

By:__________________________ James Barlow, Member

By:__________________________ Alan Potasnik, Member

By:__________________________ Brad Pease, PE, City Engineer

DATE:_______________________

ATTEST:

DATE:_______________________

Jacob Quinn, Clerk

Version 2024-09-23