This is a Request for Proposal Change form issued by the City of Carmel, Indiana, Board of Public Works and Safety for the 116th Street and Hoover Road Roundabout Construction project. The form solicits contractor proposals for modifications to an existing contract, requiring submission within fifteen calendar days of the request date. Contractors must provide detailed cost and time impact analyses, including four copies of breakdowns showing quantities, material costs, equipment, labor, overhead, and profit. The proposal must address the effect of the proposed change on the project's Substantial Completion and Final Completion dates if accepted within a specified number of days. The roundabout construction project includes a single-lane roundabout at the intersection of 116th Street and Hoover Road, with work encompassing HMA pavement, curb and gutter, shared-use path, enclosed storm sewer system, lighting, landscaping, water main relocation, and raised crosswalks. Original sealed bids for the project were accepted through the City's e-Procurement Portal at https://procurement.opengov.com/portal/carmelin until 9:00 am on Wednesday, February 4, 2026.

The Change Request form explicitly states that submission of a proposal does not authorize the contractor to proceed with the proposed work or suspend previously scheduled work. Contract modifications will only be implemented upon approval through a formal Contract Change Order and issuance of a Notice to Proceed. The form requires specification of the proposed change, the reason for the change, and special instructions, with final approval authority designated to the Owner's Representative and Engineer. No pricing terms, funding sources, or contract award amounts are detailed in this change request document itself.

View the file

Other files for this state and local contract opportunity

Other files attached to 116th Street and Hoover Road Roundabout Construction, newest first.
File Type Posted
116th_Street_and_Hoover_Road_Roundabout_Construction.pdf PDF
116th_Street_and_Hoover_Road_Roundabout_Construction.pdf PDF
22-ENG-03_FT_Technical_Specifications.pdf PDF
22-ENG-03_FT_Technical_Specifications.pdf PDF
22-ENG-03_FT_Plans.pdf PDF
22-ENG-03_FT_Plans.pdf PDF
CONTRACT_CHANGE_REQUEST.pdf PDF
NON_COLLUSION_AFFIDAVIT.pdf PDF
PERFORMANCE_BOND.pdf PDF
SCREENSHOT_INSTRUCTIONS_-_FOR_BIDS.pdf PDF
SUBCONTRACTORS_LIST.pdf PDF
22-ENG-03_FT_Permits.pdf PDF
FIELD_ORDER.pdf PDF
22-ENG-03_FT_Permits.pdf PDF
Exhibit_D_E-Verify-1.PDF PDF
MANUFACTURERS_LIST.pdf PDF
22-ENG-03_FT_Utility_Workplans.pdf PDF
Exhibit_D_E-Verify-1.PDF PDF
MANUFACTURERS_LIST.pdf PDF
PAYMENT_BOND.pdf PDF
WORK_DIRECTIVE_CHANGE.pdf PDF
SAMPLE_OF_MOU_FOR_E-VERIFY.pdf PDF
WORK_DIRECTIVE_CHANGE.pdf PDF
CONTRACT_CHANGE_REQUEST.pdf PDF
NON_COLLUSION_AFFIDAVIT.pdf PDF
RIGHT_OF_ENTRY.pdf PDF
SAMPLE_OF_MOU_FOR_E-VERIFY.pdf PDF
22-ENG-03_FT_Utility_Workplans.pdf PDF
CONTRACT_CHANGE_ORDER.pdf PDF
FIELD_ORDER.pdf PDF
MAINTENANCE_BOND.pdf PDF
PAYMENT_BOND.pdf PDF
RIGHT_OF_ENTRY.pdf PDF
SAMPLE_AGREEMENT.pdf PDF
CONTRACT_CHANGE_ORDER.pdf PDF
MAINTENANCE_BOND.pdf PDF
PERFORMANCE_BOND.pdf PDF
REQUEST_FOR_PROPOSAL_CHANGE.pdf PDF
SAMPLE_AGREEMENT.pdf PDF
SCREENSHOT_INSTRUCTIONS_-_FOR_BIDS.pdf PDF
SUBCONTRACTORS_LIST.pdf PDF
6._Comprehensive_Set_of_Technical_Specifications_2021-04-28_(V2.7).docx DOCX document
6._Comprehensive_Set_of_Technical_Specifications_2021-04-28_(V2.7).docx DOCX document
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF CARMEL

TO: REQUEST FOR PROPOSAL NO

DATE:

PROJECT NAME:

PROJECT NO.:

Specification Reference:

Drawing Reference: _____________ Drawing Date:____________

Identification of Attachments:

Please submit within fifteen (15) calendar days of this request date a proposal showing increase, decrease or no change in Contract Price and/or Contract Time. Proposal shall be accompanied by four (4) copies of breakdown showing quantities, cost of material, equipment, labor, overhead, profit and basis for the additional time if any.

DESCRIPTION OF PROPOSED CHANGE COVERED BY THIS REQUEST:

REASON FOR CHANGE:

SPECIAL INSTRUCTIONS:

THIS REQUEST DOES NOT AUTHORIZE YOU TO PROCEED WITH THE ABOVE WORK

NOR STOP PREVIOUSLY SCHEDULED WORK. Upon approval a Contract Change Order and a Notice To Proceed will be issued.

Please state in your proposal the effect the acceptance of this Request will have on the Project’s Substantial Completion and Final Completion, if accepted within ___ days of proposal due date.

YOUR PROPOSAL DUE DATE: _____________________________________

By: _____________________________________ _________________ Engineer Date

Approved By: _________________________________ Owners Representative