About this file
This is a Manufacturers List form for the City of Carmel, Indiana's Board of Public Works and Safety for the 116th Street and Hoover Road Roundabout Construction project. Bidders are required to identify the specific manufacturer for each listed equipment item in the spaces provided on the form. The project involves constructing a single-lane roundabout at the intersection of 116th Street and Hoover Road, including HMA pavement, curb and gutter, a shared-use path, an enclosed storm sewer system, lighting, landscaping, water main relocation, and raised crosswalks. Sealed bids will be accepted through the City's e-Procurement Portal until 9:00 am on Wednesday, February 4, 2026.
Bidders must enter only one manufacturer name per equipment item, and failure to provide a manufacturer name for each listed item may render the bid non-responsive if such omission is deemed material. Upon contract award, each listed equipment item must be furnished by the named manufacturer unless specifically authorized otherwise. Equipment substitutions are permitted only with the Owner's prior written consent. Preliminary acceptance of equipment based on the manufacturer's name does not waive compliance with the project drawings and specifications; final acceptance will be based on full conformity with all specified requirements.
View the file
Other files for this state and local contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MANUFACTURERS LIST
Instructions To Bidders:
The Bidder shall enter, in the spaces provided below, the name of the manufacturer of equipment that the Bidder proposes to furnish for each item of equipment listed in the Manufacturers List which follows. The Bidder shall enter the name of only one manufacturer for each listed equipment item. Failure to enter a manufacturer’s name for each listed equipment item may render the Bid non-responsive if it is determined that such omission is material by affording the Bidder a substantial advantage over other Bidders.
Upon award of a contract, each listed equipment item shall be furnished by the named manufacturer, unless changes are specifically authorized. Equipment substitutions will be permitted only with the OWNER’s prior consent.
Preliminary acceptance of equipment listed by the manufacturer’s name shall not in any way constitute a waiver of the Drawing and Specification requirements covering such equipment. Acceptance will be based on full conformity with the Drawings and Specifications covering the equipment.
Equipment Item (Contract Items) Manufacturer