MANUFACTURERS_LIST.pdf

PDF 59 KB Posted

Attached to
116th Street and Hoover Road Roundabout Construction State and local contract opportunity
Solicitation number
22-ENG-03
Issued by
Hamilton County, Indiana

About this file

This is a Manufacturers List form for the City of Carmel, Indiana's Board of Public Works and Safety for the 116th Street and Hoover Road Roundabout Construction project. Bidders are required to identify the specific manufacturer for each listed equipment item in the spaces provided on the form. The project involves constructing a single-lane roundabout at the intersection of 116th Street and Hoover Road, including HMA pavement, curb and gutter, a shared-use path, an enclosed storm sewer system, lighting, landscaping, water main relocation, and raised crosswalks. Sealed bids will be accepted through the City's e-Procurement Portal until 9:00 am on Wednesday, February 4, 2026.

Bidders must enter only one manufacturer name per equipment item, and failure to provide a manufacturer name for each listed item may render the bid non-responsive if such omission is deemed material. Upon contract award, each listed equipment item must be furnished by the named manufacturer unless specifically authorized otherwise. Equipment substitutions are permitted only with the Owner's prior written consent. Preliminary acceptance of equipment based on the manufacturer's name does not waive compliance with the project drawings and specifications; final acceptance will be based on full conformity with all specified requirements.

View the file

Other files for this state and local contract opportunity

Other files attached to 116th Street and Hoover Road Roundabout Construction, newest first.
File Type Posted
116th_Street_and_Hoover_Road_Roundabout_Construction.pdf PDF
116th_Street_and_Hoover_Road_Roundabout_Construction.pdf PDF
22-ENG-03_FT_Plans.pdf PDF
22-ENG-03_FT_Plans.pdf PDF
22-ENG-03_FT_Technical_Specifications.pdf PDF
22-ENG-03_FT_Technical_Specifications.pdf PDF
22-ENG-03_FT_Permits.pdf PDF
Exhibit_D_E-Verify-1.PDF PDF
22-ENG-03_FT_Utility_Workplans.pdf PDF
Exhibit_D_E-Verify-1.PDF PDF
MANUFACTURERS_LIST.pdf PDF
PAYMENT_BOND.pdf PDF
WORK_DIRECTIVE_CHANGE.pdf PDF
22-ENG-03_FT_Utility_Workplans.pdf PDF
CONTRACT_CHANGE_ORDER.pdf PDF
FIELD_ORDER.pdf PDF
MAINTENANCE_BOND.pdf PDF
PAYMENT_BOND.pdf PDF
RIGHT_OF_ENTRY.pdf PDF
SAMPLE_AGREEMENT.pdf PDF
CONTRACT_CHANGE_ORDER.pdf PDF
MAINTENANCE_BOND.pdf PDF
PERFORMANCE_BOND.pdf PDF
REQUEST_FOR_PROPOSAL_CHANGE.pdf PDF
SAMPLE_AGREEMENT.pdf PDF
SCREENSHOT_INSTRUCTIONS_-_FOR_BIDS.pdf PDF
SUBCONTRACTORS_LIST.pdf PDF
REQUEST_FOR_PROPOSAL_CHANGE.pdf PDF
SAMPLE_OF_MOU_FOR_E-VERIFY.pdf PDF
WORK_DIRECTIVE_CHANGE.pdf PDF
CONTRACT_CHANGE_REQUEST.pdf PDF
NON_COLLUSION_AFFIDAVIT.pdf PDF
RIGHT_OF_ENTRY.pdf PDF
SAMPLE_OF_MOU_FOR_E-VERIFY.pdf PDF
CONTRACT_CHANGE_REQUEST.pdf PDF
NON_COLLUSION_AFFIDAVIT.pdf PDF
PERFORMANCE_BOND.pdf PDF
SCREENSHOT_INSTRUCTIONS_-_FOR_BIDS.pdf PDF
SUBCONTRACTORS_LIST.pdf PDF
22-ENG-03_FT_Permits.pdf PDF
FIELD_ORDER.pdf PDF
6._Comprehensive_Set_of_Technical_Specifications_2021-04-28_(V2.7).docx DOCX document
6._Comprehensive_Set_of_Technical_Specifications_2021-04-28_(V2.7).docx DOCX document
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MANUFACTURERS LIST

Instructions To Bidders:

The Bidder shall enter, in the spaces provided below, the name of the manufacturer of equipment that the Bidder proposes to furnish for each item of equipment listed in the Manufacturers List which follows. The Bidder shall enter the name of only one manufacturer for each listed equipment item. Failure to enter a manufacturer’s name for each listed equipment item may render the Bid non-responsive if it is determined that such omission is material by affording the Bidder a substantial advantage over other Bidders.

Upon award of a contract, each listed equipment item shall be furnished by the named manufacturer, unless changes are specifically authorized. Equipment substitutions will be permitted only with the OWNER’s prior consent.

Preliminary acceptance of equipment listed by the manufacturer’s name shall not in any way constitute a waiver of the Drawing and Specification requirements covering such equipment. Acceptance will be based on full conformity with the Drawings and Specifications covering the equipment.

Equipment Item (Contract Items) Manufacturer

File details come from the government source that posted it. Updated .