WORK_DIRECTIVE_CHANGE.pdf
PDF 48 KB Posted
- Solicitation number
- 24-ENG-07b1
- Issued by
- Hamilton County, Indiana
About this file
This is a Work Directive Change form used by the City of Carmel, Indiana's Board of Public Works and Safety to authorize modifications to construction contracts. The form serves as a template for documenting changes to project scope, specifications, or drawings prior to the issuance of formal contract change orders. The document requires completion of project identification information, a detailed description of the work covered by the directive change, the reason for the order, and specification or drawing references. The form indicates that a formal Contract Change Order will be issued subsequently to cover the financial impact of the work directive change, with provisions to note whether the change adds or deducts days from the project completion date. The form must be approved by the City Engineer, the Presiding Officer of the Board of Public Works and Safety, and Board members James Barlow and Alan Potasnik, with attestation by the City Clerk Jacob Quinn.
The Work Directive Change form does not contain pricing information, set-asides, incumbent vendor information, or funding details, as it functions as a change authorization mechanism rather than a procurement document. This template is associated with the Raised Crosswalk Improvements project at Gray Road and Hazel Dell Roundabouts, a municipal infrastructure project involving construction of raised crosswalks at six intersections in Carmel with a substantial completion deadline of August 10, 2026. The form's version date of September 23, 2024, indicates it represents current City of Carmel procedures for managing contract modifications during active construction projects.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF CARMEL
TO: WORK DIRECTIVE CHANGE NO.______________
DATE: ______________________________________
PROJECT NAME:_____________________________
PROJECT NO.: _______________________________
Specification Reference
Drawing Reference:
DESCRIPTION OF WORK COVERED BY THIS DIRECTIVE CHANGE:
REASON FOR THIS ORDER:
AUTHORIZATION:
THIS WORK DIRECTIVE CHANGE AUTHORIZES THE WORK TO BE COMPLETED AS
OUTLINED. A Contract Change Order in the amount of $______________ will be issued to you in the near future to cover this Work Directive Change.
PROJECT COMPLETION DATE: ADD/DEDUCT/UNCHANGED ___________ DAYS.
By:_______________________________ Approved By:
Owner’s Representative
CITY OF CARMEL
BOARD OF PUBLIC
WORKS AND SAFETY
By:__________________________
Laura Campbell, Presiding Officer
By:__________________________ James Barlow, Member
By:__________________________ Alan Potasnik, Member
By:__________________________ Brad Pease, PE, City Engineer
DATE:_______________________
ATTEST:
DATE:_______________________
Jacob Quinn, Clerk
Version 2024-09-23