CONTRACT_CHANGE_REQUEST.pdf
PDF 32 KB Posted
- Solicitation number
- 24-ENG-07b1
- Issued by
- Hamilton County, Indiana
About this file
This is a Contract Change Request form from the City of Carmel, Indiana, used to document modifications to an existing construction contract for the Raised Crosswalk Improvements project at Gray Road and Hazel Dell Roundabouts. The form provides a standardized template for requesting changes to the scope of work, which includes construction of raised crosswalks at six intersections: 116th Street & Gray Road, 126th Street & Gray Road, Main Street & Gray Road, 116th Street & Hazel Dell Parkway, 126th Street & Hazel Dell Parkway, and Cherry Creek & Hazel Dell Parkway. Associated work includes installation of storm sewer, full depth patching, replacement of curb and gutter, and sidewalk construction. The form requires documentation of the requested change scope, reasons for the modification, and identification of any related contracts.
The Contract Change Request form captures critical project management information including the approximate cost change to the contract price, whether additional time is required to complete the work (with calendar days specified if applicable), and whether additional personnel will be needed for implementation. The form also requires identification of trade classifications and the number of personnel needed if applicable, along with the duration of such assignments. Attachments must be identified and documented, and the form requires review and approval from both the preparing engineer and a reviewing authority, with space provided for engineer comments and recommendations regarding the proposed contract change.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF CARMEL
TO: CONTRACT CHANGE REQUEST NO.:
DATE:
PROJECT NAME:
FROM:
IT IS REQUESTED THAT A CONTRACT CHANGE BE MADE TO THE ABOVE
REFERENCED CONTRACT.
1. SCOPE OF WORK (USE ADDITIONAL PAGES IF REQUIRED. ALSO LIST OTHER
CONTRACTS INVOLVED.)
2. REASON FOR CHANGE:
3. APPROXIMATE COST CHANGE TO CONTRACT PRICE: _____________________
4. WILL THE CONTRACT NEED ADDITIONAL CONTRACT TIME TO COMPLETE
THE CHANGE IN WORK SCOPE? _____ -YES _____ -NO _____ -(CALENDAR
DAYS)
5. WILL THE CONTRACTOR NEED ADDITIONAL PERSONNEL TO COMPLETE
THE CHANGE IN WORK SCOPE? _____ -YES _____ -NO
IF NO, TRADE(S): _____________________________________
NO. OF PERSONNEL: _________________________________
DURATION: ______________________________________
6. IDENTIFICATION OF ATTACHMENTS:
DATE: _______________________ DATE: ________________________
PREPARED
REVIEWED BY:____________ REVIEWED BY:____________________________
ENGINEER
Comments and Recommendation: