WEST_SUNSET_LS_-_100%.pdf

PDF 7 MB Posted

Attached to
West Sunset Lift Station
Solicitation number
ITB WS 79-26
Issued by
Okaloosa County, Florida

About this file

This is a 100% Design document for a wastewater infrastructure project prepared for Okaloosa County Water & Sewer in Fort Walton Beach, Florida. The West Sunset Lift Station project involves the design and construction of a replacement lift station located at 1804 Lewis Turner Boulevard, Fort Walton Beach, FL 32547. The project scope includes furnishing and installing a tremie-style wetwell along with pumps and an electrical system to replace the existing lift station. The design document, prepared by Ardurra (1988 Lewis Turner Boulevard, Suite 3, Fort Walton Beach, FL 32547), establishes comprehensive technical specifications, site plans, structural details, and electrical requirements for the lift station replacement. The document contains 12 sheets detailing civil, structural, and electrical components, including existing site surveys, demolition plans, proposed site yard piping plans, lift station plans and sections, and detailed electrical schematics. The design is dated September 2026 with a revision date of April 23, 2019, indicating this is a forward-looking design document prepared well in advance of the projected implementation timeline.

The design specifications require extensive coordination and compliance with multiple regulatory and operational requirements. Construction activities are subject to detailed general coordination notes requiring 24-hour to 72-hour advance notifications to various utilities including FPL, Okaloosa Gas District, and AT&T, as well as local police, fire, and school departments. The contractor is responsible for obtaining all necessary licenses and permits, conducting preconstruction meetings with owner and engineer representatives, and maintaining strict adherence to erosion control measures, land disturbance limitations, and site restoration standards. Fill areas under paved surfaces must be compacted to 98% standard Proctor density, with shoulder areas at 85% minimum. All disturbed areas require permanent sodding, and driveways must be restored to preconstruction conditions with milling required prior to asphalt resurfacing. The project emphasizes environmental compliance, including wetland protection requirements, tree save area identification with protective fencing, and maintenance of drainage systems throughout construction.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NO. DATE REVISION BY

G0.00

100% DESIGN

SEPTEMBER 2026

Ju ly

0, Y

:\B U

F\ P ro je ct F ile s\

O

C W

S G en er al S er vi ce s

-2

7\

TO

W es t S un se t L

S \3

D es ig n\

P re lim in ar y D ra w in gs

\0

C iv il

D em o\ G

-C V

.d w g

DATE:

JOB NO:

SEPTEMBER 2026

100508.13

CHAIRMAN

CAROLYN KETCHEL

BOARD MEMBERS

PAUL MIXON

ROBERT A. "TREY" GOODWIN, III

DREW PALMER (VICE CHAIRMAN)

SHERRI COX

CLERK

BRAD EMBRY

COUNTY ADMINISTRATOR

JOHN HOFSTAD

OKALOOSA COUNTY

MIKE HACKETT, DIRECTOR

WATER AND SEWER

(DISTRICT 1)

(DISTRICT 4)

(DISTRICT 5)

(DISTRICT 3)

(DISTRICT 2)

SEPTEMBER 2026

Sheet List Table

Sheet Number Sheet Title

GENERAL

G0.00 COVER

G1.00 SYMBOLS

G2.00 NOTES

CIVIL

C1.00 EXISTING SITE SURVEY

C2.00 DEMOLITION PLAN

C3.00 PROPOSED SITE YARD PIPING PLAN

C4.00 PROPOSED LIFT STATION PLAN

C5.00 PROPOSED LIFT STATION SECTION

CD1.00 DETAILS

CD2.00 DETAILS II

CD3.00 DETAILS III

STRUCTURAL

S1.00 STRUCTURAL NOTES AND DETAILS

ELECTRICAL

E-1 LEGEND & SYMBOLS

E-2 LEGEND AND SYMBOLS

E-3 ABBREVIATIONS AND NOTES

E-4 SINGLE LINE AND DETAILS

E-5 OVERALL ELECTRICAL SITE PLAN

E-6 LS ELECTRICAL SITE PLAN

E-7 EQUIPMENT RACK DETAILS

E-8 CONTROL PANEL LAYOUT

E-9 CONTROL PANEL WIRING DIAGRAM

LOCATION MAP

FOR:

PROJECT

SITE

1804 LEWIS TURNER BLVD

FORT WALTON BEACH, FL 32547

WEST SUNSET LIFT STATION

OKALOOSA COUNTY WATER & SEWER

Ju ly

0, Y

:\B U

F\ P ro je ct F ile s\

O

C W

S G en er al S er vi ce s

-2

7\

TO

W es t S un se t L

S \3

D es ig n\

P re lim in ar y D ra w in gs

\0

C iv il

D em o\ G

-C V

.d w g

KNOW WHAT'S BELOW

ALWAYS CALL 811

BEFORE YOU DIG

It's fast. It's free. It's the law.

www.callsunshine.com

100% DESIGN

1988 Lewis Turner Blvd., Unit 3 Fort Walton Beach, Florida 32547

Phone: (850) 244-5800 www.Ardurra.com

ARDURRA

1988 LEWIS TURNER BLVD, SUITE 3

FORT WALTON, FL 32547

(850) 244-5800

THE INDIVIDUAL ABOVE SHALL BE THE RESPONSIBLE ENGINEER

OF RECORD FOR THE FOLLOWING SHEETS INCLUDED HEREIN:

ON THE DATE ADJACENT TO THE SEAL

THE OFFICIAL RECORD OF THIS SHEET IS THE ELECTRONIC FILE DIGITALLY

SIGNED AND SEALED UNDER RULE 61G15-23.004, FAC.

PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND

SEALED AND THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.

AutoCAD SHX Text R

AutoCAD SHX Text S.S.O.C.O.F. TICKET No. - DATE: -

A pr il

, 2

Y

:\B U

F\ P ro je ct F ile s\

O

C W

S G en er al S er vi ce s

-2

7\

TO

W es t S un se t L

S \3

D es ig n\

P re lim in ar y D ra w in gs

\0

C iv il

D em o\ G

-C V

.d w g

B

C

D

E

F

G

H

2 3 4 5 6 7 8 9 10 11 12

1 2 3 4 5 6 7 8 9 10 11 12

N O

D

A

TE

R E

V

IS

IO

N

B Y

G1.00

100% DESIGN

SEPTEMBER 2026

1988 Lewis Turner Blvd.

Fort Walton Beach, FL 32547

Phone: (850) 244-5800 www.Ardurra.com

DATE:

JOB NO:

SEPTEMBER 2026

100508.13

W E

S T

S U

N S

E T

LI

FT

S

TA

TI

O

N

0% D

E S

IG

N

S Y

M B

O

LS

OKALOOSA COUNTY

WATER & SEWER

1804 LEWIS TURNER BLVD

FORT WALTON BEACH, FL

32547

AutoCAD SHX Text

NUMERICAL INDICATOR FOR MULTIPLE IDENTICAL FLOWSTREAMS

AutoCAD SHX Text

NOMINAL PIPE SIZE

AutoCAD SHX Text

PIPE MATERIAL SEE ABBREVIATIONS AND DEFINITIONS (OPTIONAL)

AutoCAD SHX Text

PROCESS FLOW STREAM SEE ABBREVIATIONS AND DEFINITIONS

AutoCAD SHX Text

(3) 3/4" SHC-CPVC

AutoCAD SHX Text

EXISTING TO REMAIN

AutoCAD SHX Text

LINE WORK FOR EXIST ITEMS SHALL BE SHOWN AS CONTINUOUS LIGHT LINE

AutoCAD SHX Text

FUTURE LINE WORK SHOULD BE SHOWN IN A PHANTOM LINE. ITEMS SHOULD BE LABELED

AutoCAD SHX Text

EXISTING OR FUTURE CONDITION DESIGNATION

AutoCAD SHX Text CALL OUTS FOR NEW WORK SHALL BE VERTICAL CAPS, TEXT NOTATION FOR FUTURE CONDITIONS SHALL BE A WITH A FIFTEEN DEGREE OBLIQUING ANGLE

AutoCAD SHX Text

NEW WORK

AutoCAD SHX Text

FUTURE EXPANSION

AutoCAD SHX Text

PIPE TAG

AutoCAD SHX Text

SECTION NUMBER

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

SUBTITLE OR DESCRIPTION (AS REQ'D)

AutoCAD SHX Text

SCALE: 1/2" = 1'-0"

AutoCAD SHX Text

SHEET WHERE CUT IS TAKEN

AutoCAD SHX Text

SECTION

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text M-6

AutoCAD SHX Text

AutoCAD SHX Text

DETAIL

AutoCAD SHX Text A

AutoCAD SHX Text M-5

AutoCAD SHX Text 1/4" = 1'-0"

AutoCAD SHX Text IF SECTION OR DETAIL IS DRAWN ON THE SAME SHEET THAT IT IS TAKEN FROM, REPLACE SHEET NUMBER WITH A HYPHEN. IF THE SECTION IS REFERENCED ON MULTIPLE SHEETS, THE SHEET NUMBER SHOWN SHOULD INDICATE THE FIRST SHEET THE SECTION IS TAKEN FROM.

AutoCAD SHX Text

SHEET WHERE DETAIL IS TAKEN

AutoCAD SHX Text

DRAWING, SECTION AND DETAIL TITLES

AutoCAD SHX Text M-4

AutoCAD SHX Text

AutoCAD SHX Text

SECTION LINE

AutoCAD SHX Text

SECTION CUT SYMBOLS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

45° FROM DIRECTIONOF SECTION VIEW

AutoCAD SHX Text

SECTION NUMBER

AutoCAD SHX Text SHEET WHERE SECTION IS LOCATED. IF THE SECTION IS SHOWN ON THE SAME SHEET IT IS CUT, THE SHEET NUMBER SHOULD BE REPLACED WITH A HYPHEN

AutoCAD SHX Text

THIS SYMBOLOGY TO BE USED FOR SHORT CUTS ONLY

AutoCAD SHX Text

MD-1

AutoCAD SHX Text F

AutoCAD SHX Text

MD-2

AutoCAD SHX Text G

AutoCAD SHX Text

SHEET WHERE DETAIL IS LOCATED

AutoCAD SHX Text

DETAIL LETTER

AutoCAD SHX Text IF MULTIPLE DETAILS REFER TO THE SAME ARE OF THE DRAWING, THE BUBBLES SHOULD BE STACKED SIDE BY SIDE.

AutoCAD SHX Text

LEADER LINE

AutoCAD SHX Text

DETAIL CALL OUT SYMBOLS

AutoCAD SHX Text

VALVE TAG (OPTIONAL)

AutoCAD SHX Text

16"-SBT-BV-4

AutoCAD SHX Text

BM

AutoCAD SHX Text

CM

AutoCAD SHX Text

LP

AutoCAD SHX Text

SP

AutoCAD SHX Text

PP

AutoCAD SHX Text

JB

AutoCAD SHX Text

CO

AutoCAD SHX Text

MH

AutoCAD SHX Text

WM

AutoCAD SHX Text

CB

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

NEW

AutoCAD SHX Text

WATER VALVE

AutoCAD SHX Text

WATER METER

AutoCAD SHX Text

FIRE HYDRANT

AutoCAD SHX Text

AIR RELEASE VALVE (BOX)

AutoCAD SHX Text

GRAVITY SEWER LINE

AutoCAD SHX Text

FORCE MAIN

AutoCAD SHX Text

SEWER MANHOLE

AutoCAD SHX Text

CLEAN OUT

AutoCAD SHX Text

STORM DRAIN

AutoCAD SHX Text

CATCH BASIN

AutoCAD SHX Text

JUNCTION BOX

AutoCAD SHX Text

GAS LINE

AutoCAD SHX Text

GAS VALVE

AutoCAD SHX Text

PAVED ROAD

AutoCAD SHX Text

CURB & GUTTER

AutoCAD SHX Text

DIRT/GRAVEL ROAD

AutoCAD SHX Text

SIDEWALK

AutoCAD SHX Text

GUARD RAIL

AutoCAD SHX Text

FENCE LINE (LINK)

AutoCAD SHX Text

FENCE LINE (WOOD)

AutoCAD SHX Text

TREE LINE

AutoCAD SHX Text

SIFT FENCE

AutoCAD SHX Text

UNDERGROUND FIBER OPTIC

AutoCAD SHX Text

ARV

AutoCAD SHX Text

WV

AutoCAD SHX Text G

AutoCAD SHX Text

18SD

AutoCAD SHX Text

DIRT ROAD

AutoCAD SHX Text

FO

AutoCAD SHX Text

8FM

AutoCAD SHX Text 8S

AutoCAD SHX Text N8S

AutoCAD SHX Text

N8FM

AutoCAD SHX Text

N18SD

AutoCAD SHX Text

SF

AutoCAD SHX Text

POWER POLE

AutoCAD SHX Text

SERVICE POLE

AutoCAD SHX Text

LIGHT POLE

AutoCAD SHX Text

CONCRETE MONUMENT

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text

%%UMATERIALS

AutoCAD SHX Text

EARTH OR GRADE

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

ASPHALTIC PAVEMENT

AutoCAD SHX Text 2G

AutoCAD SHX Text N2G

AutoCAD SHX Text

BENCHMARK

AutoCAD SHX Text

GRATING

AutoCAD SHX Text

WM

AutoCAD SHX Text

FH

AutoCAD SHX Text

MH

AutoCAD SHX Text

CB

AutoCAD SHX Text

JB

AutoCAD SHX Text

FH

AutoCAD SHX Text GENERAL NOTES: 1. SIMPLIFIED JOINT SYMBOL IS USED FOR ALL SINGLE SIMPLIFIED JOINT SYMBOL IS USED FOR ALL SINGLE LINE PIPING SHOWN ON THE INTERIOR AND EXTERIOR PIPING DRAWINGS. 2. BOTH SIMPLIFIED AND COMPLEX JOINT BOTH SIMPLIFIED AND COMPLEX JOINT REPRESENTATIONS MAY BE SHOWN ON THE DRAWINGS. 3. UNLESS MODIFIED BY THE GENERAL PROJECT NOTES UNLESS MODIFIED BY THE GENERAL PROJECT NOTES OR DETAILED ON THE LAYOUT AND SCHEMATIC DRAWINGS PIPE AND FITTING JOINT REQUIREMENTS FOR THE VARIOUS PIPE MATERIALS ARE DEFINED IN THE SPECIFICATIONS. 4. THE CONTRACTOR SHALL CLEAN AND THE CONTRACTOR SHALL CLEAN AND BACTERIOLOGICALLY CLEAR ALL POTABLE WATER LINES IN ACCORDANCE WITH AWWA C651, LATEST EDITION.

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

PROPOSED

AutoCAD SHX Text

FUTURE STRUCTURES

AutoCAD SHX Text

VALVE SYMBOLOGY

AutoCAD SHX Text

GENERAL SYMBOLS

AutoCAD SHX Text

PIPING SYMBOLOGY

AutoCAD SHX Text

GENERAL SYMBOLS

AutoCAD SHX Text

SINGLE LINE SYMBOL

AutoCAD SHX Text

FEATURE

AutoCAD SHX Text

SYMBOL

AutoCAD SHX Text

FEATURE

AutoCAD SHX Text

DOUBLE LINE SYMBOL

AutoCAD SHX Text 12.00

AutoCAD SHX Text

FLEXIBLE COUPLING OR

AutoCAD SHX Text

(SLEEVE TYPE)

AutoCAD SHX Text

EXPANSION JOINT

AutoCAD SHX Text

FLEXIBLE COUPLING OR

AutoCAD SHX Text

EXPANSION JOINT

AutoCAD SHX Text

(BELLOWS TYPE)

AutoCAD SHX Text

FLOW METER, GENERAL SYMBOL

AutoCAD SHX Text

VENTURI FLOW METER

AutoCAD SHX Text

MECHANICAL JOINT COMPLEX

AutoCAD SHX Text

REPRESENTATION.

AutoCAD SHX Text

REPRESENTATION.

AutoCAD SHX Text

DIRECTION OF FLOW

AutoCAD SHX Text

FLANGED JOINT COMPLEX

AutoCAD SHX Text

FLANGED JOINT SIMPLIFIED

AutoCAD SHX Text

REPRESENTATION.

AutoCAD SHX Text

REFER TO SPECS

AutoCAD SHX Text

TYPE IDENTIFICATION

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

SOLENOID VALVE

AutoCAD SHX Text

AIR RELEASE VALVE

AutoCAD SHX Text

CALIBRATION CYLINDER

AutoCAD SHX Text

MUD VALVE

AutoCAD SHX Text

MOTOR OPERATED VALVE

AutoCAD SHX Text

FLOOR DRAIN

AutoCAD SHX Text

BALL CHECK VALVE

AutoCAD SHX Text

CHECK VALVE

AutoCAD SHX Text

PLUG VALVE, GENERAL SYMBOLS

AutoCAD SHX Text

BUTTERFLY VALVE

AutoCAD SHX Text

DIAPHRAGM VALVE

AutoCAD SHX Text

PINCH VALVE

AutoCAD SHX Text

NEEDLE VALVE

AutoCAD SHX Text

4-WAY BALL VALVE

AutoCAD SHX Text

3-WAY BALL VALVE

AutoCAD SHX Text

BALL VALVE

AutoCAD SHX Text

GLOBE VALVE

AutoCAD SHX Text

KNIFE GATE VALVE

AutoCAD SHX Text

GATE VALVE

AutoCAD SHX Text

TELESCOPING VALVE

AutoCAD SHX Text

FLOW METER

AutoCAD SHX Text

DRAWINGS ADJACENT TO SYMBOL

AutoCAD SHX Text

UNCLASSIFIED. TYPE AS SHOWN ON THE

AutoCAD SHX Text K

AutoCAD SHX Text S

AutoCAD SHX Text M

AutoCAD SHX Text

VALVE SIZE

AutoCAD SHX Text

UNIQUE NUMBER ASSIGNED

AutoCAD SHX Text

(OPTIONAL IF NO SCHEDULE)

AutoCAD SHX Text

NUMERICAL INDICATOR

AutoCAD SHX Text

TO EACH GATE USED

AutoCAD SHX Text TYPE OF VALVE, i.e. GATE, AutoCAD SHX Text

ABBREVIATION INDICATING

AutoCAD SHX Text

PLUG, BUTTERFLY, ETC

AutoCAD SHX Text

PROCESS FLOW STREAM

AutoCAD SHX Text

OR STRUCTURE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 12.00

AutoCAD SHX Text

(TO BE MODIFIED)

AutoCAD SHX Text

EXISTING STRUCTURES

AutoCAD SHX Text

EXISTING STRUCTURES

AutoCAD SHX Text

(TO BE REMOVED)

AutoCAD SHX Text

EXISTING SPOT ELEVATION

AutoCAD SHX Text

NEW CONTOUR

AutoCAD SHX Text

EXISTING CONTOUR

AutoCAD SHX Text

NEW SPOT ELEVATION

AutoCAD SHX Text

PIEZOMETER

AutoCAD SHX Text

SOIL BORING

NEW MAIN THIS PROJECT

pr il

, 2

Y

:\B U

F\ P ro je ct F ile s\

O

C W

S G en er al S er vi ce s

-2

7\

TO

W es t S un se t L

S \3

D es ig n\

P re lim in ar y D ra w in gs

\0

C iv il

D em o\ G

-C V

.d w g

B

C

D

E

F

G

H

2 3 4 5 6 7 8 9 10 11 12

1 2 3 4 5 6 7 8 9 10 11 12

N O

D

A

TE

R E

V

IS

IO

N

B Y

G2.00

100% DESIGN

SEPTEMBER 2026

1988 Lewis Turner Blvd.

Fort Walton Beach, FL 32547

Phone: (850) 244-5800 www.Ardurra.com

DATE:

JOB NO:

SEPTEMBER 2026

100508.13

W E

S T

S U

N S

E T

LI

FT

S

TA

TI

O

N

0% D

E S

IG

N

N O

TE

S

OKALOOSA COUNTY

WATER & SEWER

1804 LEWIS TURNER BLVD

FORT WALTON BEACH, FL

32547

GENERAL COORDINATION NOTES: 1. NOTIFY OWNER INSPECTIONS OF THE FOLLOWING AT THE INDICATED TIME INTERVAL. INSPECTION POINT NOTIFY OWNER INSPECTIONS OF THE FOLLOWING AT THE INDICATED TIME INTERVAL. INSPECTION POINT OWNER INSPECTIONS OF THE FOLLOWING AT THE INDICATED TIME INTERVAL. INSPECTION POINT OWNER INSPECTIONS OF THE FOLLOWING AT THE INDICATED TIME INTERVAL. INSPECTION POINT INSPECTIONS OF THE FOLLOWING AT THE INDICATED TIME INTERVAL. INSPECTION POINT INSPECTIONS OF THE FOLLOWING AT THE INDICATED TIME INTERVAL. INSPECTION POINT OF THE FOLLOWING AT THE INDICATED TIME INTERVAL. INSPECTION POINT OF THE FOLLOWING AT THE INDICATED TIME INTERVAL. INSPECTION POINT THE FOLLOWING AT THE INDICATED TIME INTERVAL. INSPECTION POINT THE FOLLOWING AT THE INDICATED TIME INTERVAL. INSPECTION POINT FOLLOWING AT THE INDICATED TIME INTERVAL. INSPECTION POINT FOLLOWING AT THE INDICATED TIME INTERVAL. INSPECTION POINT AT THE INDICATED TIME INTERVAL. INSPECTION POINT AT THE INDICATED TIME INTERVAL. INSPECTION POINT THE INDICATED TIME INTERVAL. INSPECTION POINT THE INDICATED TIME INTERVAL. INSPECTION POINT INDICATED TIME INTERVAL. INSPECTION POINT INDICATED TIME INTERVAL. INSPECTION POINT TIME INTERVAL. INSPECTION POINT TIME INTERVAL. INSPECTION POINT INTERVAL. INSPECTION POINT INTERVAL. INSPECTION POINT INSPECTION POINT INSPECTION POINT INSPECTION POINT POINT POINT OF CONTACT WILL BE PROVIDED AT PRE-CONSTRUCTION MEETING. a. 24 HOURS BEFORE THE BEGINNING OF EACH PHASE OF CONSTRUCTION. 24 HOURS BEFORE THE BEGINNING OF EACH PHASE OF CONSTRUCTION. b. 72 HOURS IN ADVANCE, A REQUEST MUST BE PLACED TO THE INSPECTOR FOR APPROVAL TO 72 HOURS IN ADVANCE, A REQUEST MUST BE PLACED TO THE INSPECTOR FOR APPROVAL TO HOURS IN ADVANCE, A REQUEST MUST BE PLACED TO THE INSPECTOR FOR APPROVAL TO HOURS IN ADVANCE, A REQUEST MUST BE PLACED TO THE INSPECTOR FOR APPROVAL TO IN ADVANCE, A REQUEST MUST BE PLACED TO THE INSPECTOR FOR APPROVAL TO IN ADVANCE, A REQUEST MUST BE PLACED TO THE INSPECTOR FOR APPROVAL TO ADVANCE, A REQUEST MUST BE PLACED TO THE INSPECTOR FOR APPROVAL TO ADVANCE, A REQUEST MUST BE PLACED TO THE INSPECTOR FOR APPROVAL TO A REQUEST MUST BE PLACED TO THE INSPECTOR FOR APPROVAL TO A REQUEST MUST BE PLACED TO THE INSPECTOR FOR APPROVAL TO REQUEST MUST BE PLACED TO THE INSPECTOR FOR APPROVAL TO REQUEST MUST BE PLACED TO THE INSPECTOR FOR APPROVAL TO MUST BE PLACED TO THE INSPECTOR FOR APPROVAL TO MUST BE PLACED TO THE INSPECTOR FOR APPROVAL TO BE PLACED TO THE INSPECTOR FOR APPROVAL TO BE PLACED TO THE INSPECTOR FOR APPROVAL TO PLACED TO THE INSPECTOR FOR APPROVAL TO PLACED TO THE INSPECTOR FOR APPROVAL TO TO THE INSPECTOR FOR APPROVAL TO TO THE INSPECTOR FOR APPROVAL TO THE INSPECTOR FOR APPROVAL TO THE INSPECTOR FOR APPROVAL TO INSPECTOR FOR APPROVAL TO INSPECTOR FOR APPROVAL TO FOR APPROVAL TO FOR APPROVAL TO APPROVAL TO APPROVAL TO TO TO REMOVE OR DISTURB SIGNS, MAILBOXES, FENCING, LANDSCAPING, ETC. APPROVAL OF REQUEST IS OR DISTURB SIGNS, MAILBOXES, FENCING, LANDSCAPING, ETC. APPROVAL OF REQUEST IS OR DISTURB SIGNS, MAILBOXES, FENCING, LANDSCAPING, ETC. APPROVAL OF REQUEST IS DISTURB SIGNS, MAILBOXES, FENCING, LANDSCAPING, ETC. APPROVAL OF REQUEST IS DISTURB SIGNS, MAILBOXES, FENCING, LANDSCAPING, ETC. APPROVAL OF REQUEST IS SIGNS, MAILBOXES, FENCING, LANDSCAPING, ETC. APPROVAL OF REQUEST IS SIGNS, MAILBOXES, FENCING, LANDSCAPING, ETC. APPROVAL OF REQUEST IS MAILBOXES, FENCING, LANDSCAPING, ETC. APPROVAL OF REQUEST IS MAILBOXES, FENCING, LANDSCAPING, ETC. APPROVAL OF REQUEST IS FENCING, LANDSCAPING, ETC. APPROVAL OF REQUEST IS FENCING, LANDSCAPING, ETC. APPROVAL OF REQUEST IS LANDSCAPING, ETC. APPROVAL OF REQUEST IS LANDSCAPING, ETC. APPROVAL OF REQUEST IS ETC. APPROVAL OF REQUEST IS ETC. APPROVAL OF REQUEST IS APPROVAL OF REQUEST IS APPROVAL OF REQUEST IS APPROVAL OF REQUEST IS OF REQUEST IS OF REQUEST IS REQUEST IS REQUEST IS IS IS REQUIRED BEFORE PERFORMING RELATED WORK. c. 7 DAYS IN ADVANCE, COORDINATE PLANNED SHUT OFF OF SERVICES AND/OR WET CUT-INS WITH 7 DAYS IN ADVANCE, COORDINATE PLANNED SHUT OFF OF SERVICES AND/OR WET CUT-INS WITH DAYS IN ADVANCE, COORDINATE PLANNED SHUT OFF OF SERVICES AND/OR WET CUT-INS WITH DAYS IN ADVANCE, COORDINATE PLANNED SHUT OFF OF SERVICES AND/OR WET CUT-INS WITH IN ADVANCE, COORDINATE PLANNED SHUT OFF OF SERVICES AND/OR WET CUT-INS WITH IN ADVANCE, COORDINATE PLANNED SHUT OFF OF SERVICES AND/OR WET CUT-INS WITH ADVANCE, COORDINATE PLANNED SHUT OFF OF SERVICES AND/OR WET CUT-INS WITH ADVANCE, COORDINATE PLANNED SHUT OFF OF SERVICES AND/OR WET CUT-INS WITH COORDINATE PLANNED SHUT OFF OF SERVICES AND/OR WET CUT-INS WITH COORDINATE PLANNED SHUT OFF OF SERVICES AND/OR WET CUT-INS WITH PLANNED SHUT OFF OF SERVICES AND/OR WET CUT-INS WITH PLANNED SHUT OFF OF SERVICES AND/OR WET CUT-INS WITH SHUT OFF OF SERVICES AND/OR WET CUT-INS WITH SHUT OFF OF SERVICES AND/OR WET CUT-INS WITH OFF OF SERVICES AND/OR WET CUT-INS WITH OFF OF SERVICES AND/OR WET CUT-INS WITH OF SERVICES AND/OR WET CUT-INS WITH OF SERVICES AND/OR WET CUT-INS WITH SERVICES AND/OR WET CUT-INS WITH SERVICES AND/OR WET CUT-INS WITH AND/OR WET CUT-INS WITH AND/OR WET CUT-INS WITH WET CUT-INS WITH WET CUT-INS WITH CUT-INS WITH CUT-INS WITH WITH WITH THE INSPECTOR. REQUIRES A FOLLOW UP NOTIFICATION TO INSPECTOR AND AFFECTED CUSTOMERS INSPECTOR. REQUIRES A FOLLOW UP NOTIFICATION TO INSPECTOR AND AFFECTED CUSTOMERS INSPECTOR. REQUIRES A FOLLOW UP NOTIFICATION TO INSPECTOR AND AFFECTED CUSTOMERS REQUIRES A FOLLOW UP NOTIFICATION TO INSPECTOR AND AFFECTED CUSTOMERS REQUIRES A FOLLOW UP NOTIFICATION TO INSPECTOR AND AFFECTED CUSTOMERS REQUIRES A FOLLOW UP NOTIFICATION TO INSPECTOR AND AFFECTED CUSTOMERS A FOLLOW UP NOTIFICATION TO INSPECTOR AND AFFECTED CUSTOMERS A FOLLOW UP NOTIFICATION TO INSPECTOR AND AFFECTED CUSTOMERS FOLLOW UP NOTIFICATION TO INSPECTOR AND AFFECTED CUSTOMERS FOLLOW UP NOTIFICATION TO INSPECTOR AND AFFECTED CUSTOMERS UP NOTIFICATION TO INSPECTOR AND AFFECTED CUSTOMERS UP NOTIFICATION TO INSPECTOR AND AFFECTED CUSTOMERS NOTIFICATION TO INSPECTOR AND AFFECTED CUSTOMERS NOTIFICATION TO INSPECTOR AND AFFECTED CUSTOMERS TO INSPECTOR AND AFFECTED CUSTOMERS TO INSPECTOR AND AFFECTED CUSTOMERS INSPECTOR AND AFFECTED CUSTOMERS INSPECTOR AND AFFECTED CUSTOMERS AND AFFECTED CUSTOMERS AND AFFECTED CUSTOMERS AFFECTED CUSTOMERS AFFECTED CUSTOMERS CUSTOMERS CUSTOMERS A MINIMUM OF 24 HOURS PRIOR TO LOSS OF SERVICE. OWNER REPRESENTATIVE MUST BE MINIMUM OF 24 HOURS PRIOR TO LOSS OF SERVICE. OWNER REPRESENTATIVE MUST BE MINIMUM OF 24 HOURS PRIOR TO LOSS OF SERVICE. OWNER REPRESENTATIVE MUST BE OF 24 HOURS PRIOR TO LOSS OF SERVICE. OWNER REPRESENTATIVE MUST BE OF 24 HOURS PRIOR TO LOSS OF SERVICE. OWNER REPRESENTATIVE MUST BE 24 HOURS PRIOR TO LOSS OF SERVICE. OWNER REPRESENTATIVE MUST BE 24 HOURS PRIOR TO LOSS OF SERVICE. OWNER REPRESENTATIVE MUST BE HOURS PRIOR TO LOSS OF SERVICE. OWNER REPRESENTATIVE MUST BE HOURS PRIOR TO LOSS OF SERVICE. OWNER REPRESENTATIVE MUST BE PRIOR TO LOSS OF SERVICE. OWNER REPRESENTATIVE MUST BE PRIOR TO LOSS OF SERVICE. OWNER REPRESENTATIVE MUST BE TO LOSS OF SERVICE. OWNER REPRESENTATIVE MUST BE TO LOSS OF SERVICE. OWNER REPRESENTATIVE MUST BE LOSS OF SERVICE. OWNER REPRESENTATIVE MUST BE LOSS OF SERVICE. OWNER REPRESENTATIVE MUST BE OF SERVICE. OWNER REPRESENTATIVE MUST BE OF SERVICE. OWNER REPRESENTATIVE MUST BE SERVICE. OWNER REPRESENTATIVE MUST BE SERVICE. OWNER REPRESENTATIVE MUST BE OWNER REPRESENTATIVE MUST BE OWNER REPRESENTATIVE MUST BE OWNER REPRESENTATIVE MUST BE REPRESENTATIVE MUST BE REPRESENTATIVE MUST BE MUST BE MUST BE BE BE PRESENT AT WET CUT-INS AND ANY OTHER ACTIVITY THAT REQUIRES THE SERVICES TO BE SHUT AT WET CUT-INS AND ANY OTHER ACTIVITY THAT REQUIRES THE SERVICES TO BE SHUT AT WET CUT-INS AND ANY OTHER ACTIVITY THAT REQUIRES THE SERVICES TO BE SHUT WET CUT-INS AND ANY OTHER ACTIVITY THAT REQUIRES THE SERVICES TO BE SHUT WET CUT-INS AND ANY OTHER ACTIVITY THAT REQUIRES THE SERVICES TO BE SHUT CUT-INS AND ANY OTHER ACTIVITY THAT REQUIRES THE SERVICES TO BE SHUT CUT-INS AND ANY OTHER ACTIVITY THAT REQUIRES THE SERVICES TO BE SHUT AND ANY OTHER ACTIVITY THAT REQUIRES THE SERVICES TO BE SHUT AND ANY OTHER ACTIVITY THAT REQUIRES THE SERVICES TO BE SHUT ANY OTHER ACTIVITY THAT REQUIRES THE SERVICES TO BE SHUT ANY OTHER ACTIVITY THAT REQUIRES THE SERVICES TO BE SHUT OTHER ACTIVITY THAT REQUIRES THE SERVICES TO BE SHUT OTHER ACTIVITY THAT REQUIRES THE SERVICES TO BE SHUT ACTIVITY THAT REQUIRES THE SERVICES TO BE SHUT ACTIVITY THAT REQUIRES THE SERVICES TO BE SHUT THAT REQUIRES THE SERVICES TO BE SHUT THAT REQUIRES THE SERVICES TO BE SHUT REQUIRES THE SERVICES TO BE SHUT REQUIRES THE SERVICES TO BE SHUT THE SERVICES TO BE SHUT THE SERVICES TO BE SHUT SERVICES TO BE SHUT SERVICES TO BE SHUT TO BE SHUT TO BE SHUT BE SHUT BE SHUT SHUT SHUT OFF. 2. THE CONTRACTOR SHALL VERIFY LOCATIONS OF EXISTING UTILITIES AND CONTACT THE FLORIDA ONE THE CONTRACTOR SHALL VERIFY LOCATIONS OF EXISTING UTILITIES AND CONTACT THE FLORIDA ONE CONTRACTOR SHALL VERIFY LOCATIONS OF EXISTING UTILITIES AND CONTACT THE FLORIDA ONE CONTRACTOR SHALL VERIFY LOCATIONS OF EXISTING UTILITIES AND CONTACT THE FLORIDA ONE SHALL VERIFY LOCATIONS OF EXISTING UTILITIES AND CONTACT THE FLORIDA ONE SHALL VERIFY LOCATIONS OF EXISTING UTILITIES AND CONTACT THE FLORIDA ONE VERIFY LOCATIONS OF EXISTING UTILITIES AND CONTACT THE FLORIDA ONE VERIFY LOCATIONS OF EXISTING UTILITIES AND CONTACT THE FLORIDA ONE LOCATIONS OF EXISTING UTILITIES AND CONTACT THE FLORIDA ONE LOCATIONS OF EXISTING UTILITIES AND CONTACT THE FLORIDA ONE OF EXISTING UTILITIES AND CONTACT THE FLORIDA ONE OF EXISTING UTILITIES AND CONTACT THE FLORIDA ONE EXISTING UTILITIES AND CONTACT THE FLORIDA ONE EXISTING UTILITIES AND CONTACT THE FLORIDA ONE UTILITIES AND CONTACT THE FLORIDA ONE UTILITIES AND CONTACT THE FLORIDA ONE AND CONTACT THE FLORIDA ONE AND CONTACT THE FLORIDA ONE CONTACT THE FLORIDA ONE CONTACT THE FLORIDA ONE THE FLORIDA ONE THE FLORIDA ONE FLORIDA ONE FLORIDA ONE ONE ONE CALL/SUNSHINE 811 A MINIMUM OF 72 HOURS PRIOR TO BEGINNING CONSTRUCTION. 3. THE CONTRACTOR SHALL NOTIFY THE FOLLOWING UTILITIES 24 HOURS PRIOR TO CONSTRUCTION IN THE CONTRACTOR SHALL NOTIFY THE FOLLOWING UTILITIES 24 HOURS PRIOR TO CONSTRUCTION IN CONTRACTOR SHALL NOTIFY THE FOLLOWING UTILITIES 24 HOURS PRIOR TO CONSTRUCTION IN CONTRACTOR SHALL NOTIFY THE FOLLOWING UTILITIES 24 HOURS PRIOR TO CONSTRUCTION IN SHALL NOTIFY THE FOLLOWING UTILITIES 24 HOURS PRIOR TO CONSTRUCTION IN SHALL NOTIFY THE FOLLOWING UTILITIES 24 HOURS PRIOR TO CONSTRUCTION IN NOTIFY THE FOLLOWING UTILITIES 24 HOURS PRIOR TO CONSTRUCTION IN NOTIFY THE FOLLOWING UTILITIES 24 HOURS PRIOR TO CONSTRUCTION IN THE FOLLOWING UTILITIES 24 HOURS PRIOR TO CONSTRUCTION IN THE FOLLOWING UTILITIES 24 HOURS PRIOR TO CONSTRUCTION IN FOLLOWING UTILITIES 24 HOURS PRIOR TO CONSTRUCTION IN FOLLOWING UTILITIES 24 HOURS PRIOR TO CONSTRUCTION IN UTILITIES 24 HOURS PRIOR TO CONSTRUCTION IN UTILITIES 24 HOURS PRIOR TO CONSTRUCTION IN 24 HOURS PRIOR TO CONSTRUCTION IN 24 HOURS PRIOR TO CONSTRUCTION IN HOURS PRIOR TO CONSTRUCTION IN HOURS PRIOR TO CONSTRUCTION IN PRIOR TO CONSTRUCTION IN PRIOR TO CONSTRUCTION IN TO CONSTRUCTION IN TO CONSTRUCTION IN CONSTRUCTION IN CONSTRUCTION IN IN IN AREAS WHERE THE UTILITIES ARE SHOWN OR SUSPECTED TO BE. THE LIST IS BASED ON BEST WHERE THE UTILITIES ARE SHOWN OR SUSPECTED TO BE. THE LIST IS BASED ON BEST WHERE THE UTILITIES ARE SHOWN OR SUSPECTED TO BE. THE LIST IS BASED ON BEST THE UTILITIES ARE SHOWN OR SUSPECTED TO BE. THE LIST IS BASED ON BEST THE UTILITIES ARE SHOWN OR SUSPECTED TO BE. THE LIST IS BASED ON BEST UTILITIES ARE SHOWN OR SUSPECTED TO BE. THE LIST IS BASED ON BEST UTILITIES ARE SHOWN OR SUSPECTED TO BE. THE LIST IS BASED ON BEST ARE SHOWN OR SUSPECTED TO BE. THE LIST IS BASED ON BEST ARE SHOWN OR SUSPECTED TO BE. THE LIST IS BASED ON BEST SHOWN OR SUSPECTED TO BE. THE LIST IS BASED ON BEST SHOWN OR SUSPECTED TO BE. THE LIST IS BASED ON BEST OR SUSPECTED TO BE. THE LIST IS BASED ON BEST OR SUSPECTED TO BE. THE LIST IS BASED ON BEST SUSPECTED TO BE. THE LIST IS BASED ON BEST SUSPECTED TO BE. THE LIST IS BASED ON BEST TO BE. THE LIST IS BASED ON BEST TO BE. THE LIST IS BASED ON BEST BE. THE LIST IS BASED ON BEST BE. THE LIST IS BASED ON BEST THE LIST IS BASED ON BEST THE LIST IS BASED ON BEST THE LIST IS BASED ON BEST LIST IS BASED ON BEST LIST IS BASED ON BEST IS BASED ON BEST IS BASED ON BEST BASED ON BEST BASED ON BEST ON BEST ON BEST BEST BEST INFORMATION AVAILABLE BUT IS NOT GUARANTEED TO BE COMPLETE. 3.1. FPL FPL 3.2. OKALOOSA GAS DISTRICT OKALOOSA GAS DISTRICT 3.3. AT&T AT&T 4. THE CONTRACTOR SHALL NOTIFY THE LOCAL POLICE DEPARTMENT, FIRE DEPARTMENT, SCHOOL SYSTEM THE CONTRACTOR SHALL NOTIFY THE LOCAL POLICE DEPARTMENT, FIRE DEPARTMENT, SCHOOL SYSTEM CONTRACTOR SHALL NOTIFY THE LOCAL POLICE DEPARTMENT, FIRE DEPARTMENT, SCHOOL SYSTEM CONTRACTOR SHALL NOTIFY THE LOCAL POLICE DEPARTMENT, FIRE DEPARTMENT, SCHOOL SYSTEM SHALL NOTIFY THE LOCAL POLICE DEPARTMENT, FIRE DEPARTMENT, SCHOOL SYSTEM SHALL NOTIFY THE LOCAL POLICE DEPARTMENT, FIRE DEPARTMENT, SCHOOL SYSTEM NOTIFY THE LOCAL POLICE DEPARTMENT, FIRE DEPARTMENT, SCHOOL SYSTEM NOTIFY THE LOCAL POLICE DEPARTMENT, FIRE DEPARTMENT, SCHOOL SYSTEM THE LOCAL POLICE DEPARTMENT, FIRE DEPARTMENT, SCHOOL SYSTEM THE LOCAL POLICE DEPARTMENT, FIRE DEPARTMENT, SCHOOL SYSTEM LOCAL POLICE DEPARTMENT, FIRE DEPARTMENT, SCHOOL SYSTEM LOCAL POLICE DEPARTMENT, FIRE DEPARTMENT, SCHOOL SYSTEM POLICE DEPARTMENT, FIRE DEPARTMENT, SCHOOL SYSTEM POLICE DEPARTMENT, FIRE DEPARTMENT, SCHOOL SYSTEM DEPARTMENT, FIRE DEPARTMENT, SCHOOL SYSTEM DEPARTMENT, FIRE DEPARTMENT, SCHOOL SYSTEM FIRE DEPARTMENT, SCHOOL SYSTEM FIRE DEPARTMENT, SCHOOL SYSTEM DEPARTMENT, SCHOOL SYSTEM DEPARTMENT, SCHOOL SYSTEM SCHOOL SYSTEM SCHOOL SYSTEM SYSTEM SYSTEM FOR BUSES AT LEAST 48 HOURS PRIOR TO CONSTRUCTION WHENEVER ANY STREET IS TO BE BUSES AT LEAST 48 HOURS PRIOR TO CONSTRUCTION WHENEVER ANY STREET IS TO BE BUSES AT LEAST 48 HOURS PRIOR TO CONSTRUCTION WHENEVER ANY STREET IS TO BE AT LEAST 48 HOURS PRIOR TO CONSTRUCTION WHENEVER ANY STREET IS TO BE AT LEAST 48 HOURS PRIOR TO CONSTRUCTION WHENEVER ANY STREET IS TO BE LEAST 48 HOURS PRIOR TO CONSTRUCTION WHENEVER ANY STREET IS TO BE LEAST 48 HOURS PRIOR TO CONSTRUCTION WHENEVER ANY STREET IS TO BE 48 HOURS PRIOR TO CONSTRUCTION WHENEVER ANY STREET IS TO BE 48 HOURS PRIOR TO CONSTRUCTION WHENEVER ANY STREET IS TO BE HOURS PRIOR TO CONSTRUCTION WHENEVER ANY STREET IS TO BE HOURS PRIOR TO CONSTRUCTION WHENEVER ANY STREET IS TO BE PRIOR TO CONSTRUCTION WHENEVER ANY STREET IS TO BE PRIOR TO CONSTRUCTION WHENEVER ANY STREET IS TO BE TO CONSTRUCTION WHENEVER ANY STREET IS TO BE TO CONSTRUCTION WHENEVER ANY STREET IS TO BE CONSTRUCTION WHENEVER ANY STREET IS TO BE CONSTRUCTION WHENEVER ANY STREET IS TO BE WHENEVER ANY STREET IS TO BE WHENEVER ANY STREET IS TO BE ANY STREET IS TO BE ANY STREET IS TO BE STREET IS TO BE STREET IS TO BE IS TO BE IS TO BE TO BE TO BE BE BE PARTIALLY BLOCKED. 5. CONTRACTOR IS TO NOTIFY AFFECTED CUSTOMERS 24 HOURS IN ADVANCE OF BLOCKING ACCESS TO CONTRACTOR IS TO NOTIFY AFFECTED CUSTOMERS 24 HOURS IN ADVANCE OF BLOCKING ACCESS TO IS TO NOTIFY AFFECTED CUSTOMERS 24 HOURS IN ADVANCE OF BLOCKING ACCESS TO IS TO NOTIFY AFFECTED CUSTOMERS 24 HOURS IN ADVANCE OF BLOCKING ACCESS TO TO NOTIFY AFFECTED CUSTOMERS 24 HOURS IN ADVANCE OF BLOCKING ACCESS TO TO NOTIFY AFFECTED CUSTOMERS 24 HOURS IN ADVANCE OF BLOCKING ACCESS TO NOTIFY AFFECTED CUSTOMERS 24 HOURS IN ADVANCE OF BLOCKING ACCESS TO NOTIFY AFFECTED CUSTOMERS 24 HOURS IN ADVANCE OF BLOCKING ACCESS TO AFFECTED CUSTOMERS 24 HOURS IN ADVANCE OF BLOCKING ACCESS TO AFFECTED CUSTOMERS 24 HOURS IN ADVANCE OF BLOCKING ACCESS TO CUSTOMERS 24 HOURS IN ADVANCE OF BLOCKING ACCESS TO CUSTOMERS 24 HOURS IN ADVANCE OF BLOCKING ACCESS TO 24 HOURS IN ADVANCE OF BLOCKING ACCESS TO 24 HOURS IN ADVANCE OF BLOCKING ACCESS TO HOURS IN ADVANCE OF BLOCKING ACCESS TO HOURS IN ADVANCE OF BLOCKING ACCESS TO IN ADVANCE OF BLOCKING ACCESS TO IN ADVANCE OF BLOCKING ACCESS TO ADVANCE OF BLOCKING ACCESS TO ADVANCE OF BLOCKING ACCESS TO OF BLOCKING ACCESS TO OF BLOCKING ACCESS TO BLOCKING ACCESS TO BLOCKING ACCESS TO ACCESS TO ACCESS TO TO TO PROPERTY OR TRAFFIC ROADWAYS. FULL ACCESS TO PROPERTY MUST BE RESTORED BY THE END OF OR TRAFFIC ROADWAYS. FULL ACCESS TO PROPERTY MUST BE RESTORED BY THE END OF OR TRAFFIC ROADWAYS. FULL ACCESS TO PROPERTY MUST BE RESTORED BY THE END OF TRAFFIC ROADWAYS. FULL ACCESS TO PROPERTY MUST BE RESTORED BY THE END OF TRAFFIC ROADWAYS. FULL ACCESS TO PROPERTY MUST BE RESTORED BY THE END OF ROADWAYS. FULL ACCESS TO PROPERTY MUST BE RESTORED BY THE END OF ROADWAYS. FULL ACCESS TO PROPERTY MUST BE RESTORED BY THE END OF FULL ACCESS TO PROPERTY MUST BE RESTORED BY THE END OF FULL ACCESS TO PROPERTY MUST BE RESTORED BY THE END OF FULL ACCESS TO PROPERTY MUST BE RESTORED BY THE END OF ACCESS TO PROPERTY MUST BE RESTORED BY THE END OF ACCESS TO PROPERTY MUST BE RESTORED BY THE END OF TO PROPERTY MUST BE RESTORED BY THE END OF TO PROPERTY MUST BE RESTORED BY THE END OF PROPERTY MUST BE RESTORED BY THE END OF PROPERTY MUST BE RESTORED BY THE END OF MUST BE RESTORED BY THE END OF MUST BE RESTORED BY THE END OF BE RESTORED BY THE END OF BE RESTORED BY THE END OF RESTORED BY THE END OF RESTORED BY THE END OF BY THE END OF BY THE END OF THE END OF THE END OF END OF END OF OF OF THE WORKDAY. GENERAL CONSTRUCTION NOTES: 1. ALL CONSTRUCTION TO COMPLY WITH OWNER STANDARDS. ALL CONSTRUCTION TO COMPLY WITH OWNER STANDARDS. 2. ALL CONSTRUCTION SHALL COMPLY WITH THE CONTRACT PLANS, CONTRACT SPECIFICATIONS, PERMIT ALL CONSTRUCTION SHALL COMPLY WITH THE CONTRACT PLANS, CONTRACT SPECIFICATIONS, PERMIT CONSTRUCTION SHALL COMPLY WITH THE CONTRACT PLANS, CONTRACT SPECIFICATIONS, PERMIT CONSTRUCTION SHALL COMPLY WITH THE CONTRACT PLANS, CONTRACT SPECIFICATIONS, PERMIT SHALL COMPLY WITH THE CONTRACT PLANS, CONTRACT SPECIFICATIONS, PERMIT SHALL COMPLY WITH THE CONTRACT PLANS, CONTRACT SPECIFICATIONS, PERMIT COMPLY WITH THE CONTRACT PLANS, CONTRACT SPECIFICATIONS, PERMIT COMPLY WITH THE CONTRACT PLANS, CONTRACT SPECIFICATIONS, PERMIT WITH THE CONTRACT PLANS, CONTRACT SPECIFICATIONS, PERMIT WITH THE CONTRACT PLANS, CONTRACT SPECIFICATIONS, PERMIT THE CONTRACT PLANS, CONTRACT SPECIFICATIONS, PERMIT THE CONTRACT PLANS, CONTRACT SPECIFICATIONS, PERMIT CONTRACT PLANS, CONTRACT SPECIFICATIONS, PERMIT CONTRACT PLANS, CONTRACT SPECIFICATIONS, PERMIT PLANS, CONTRACT SPECIFICATIONS, PERMIT PLANS, CONTRACT SPECIFICATIONS, PERMIT CONTRACT SPECIFICATIONS, PERMIT CONTRACT SPECIFICATIONS, PERMIT SPECIFICATIONS, PERMIT SPECIFICATIONS, PERMIT PERMIT PERMIT REQUIREMENTS, AND ALL APPLICABLE STATE, FEDERAL, AND LOCAL CODES. NO ADDITIONAL PAYMENT AND ALL APPLICABLE STATE, FEDERAL, AND LOCAL CODES. NO ADDITIONAL PAYMENT AND ALL APPLICABLE STATE, FEDERAL, AND LOCAL CODES. NO ADDITIONAL PAYMENT ALL APPLICABLE STATE, FEDERAL, AND LOCAL CODES. NO ADDITIONAL PAYMENT ALL APPLICABLE STATE, FEDERAL, AND LOCAL CODES. NO ADDITIONAL PAYMENT APPLICABLE STATE, FEDERAL, AND LOCAL CODES. NO ADDITIONAL PAYMENT APPLICABLE STATE, FEDERAL, AND LOCAL CODES. NO ADDITIONAL PAYMENT STATE, FEDERAL, AND LOCAL CODES. NO ADDITIONAL PAYMENT STATE, FEDERAL, AND LOCAL CODES. NO ADDITIONAL PAYMENT FEDERAL, AND LOCAL CODES. NO ADDITIONAL PAYMENT FEDERAL, AND LOCAL CODES. NO ADDITIONAL PAYMENT AND LOCAL CODES. NO ADDITIONAL PAYMENT AND LOCAL CODES. NO ADDITIONAL PAYMENT LOCAL CODES. NO ADDITIONAL PAYMENT LOCAL CODES. NO ADDITIONAL PAYMENT CODES. NO ADDITIONAL PAYMENT CODES. NO ADDITIONAL PAYMENT NO ADDITIONAL PAYMENT NO ADDITIONAL PAYMENT NO ADDITIONAL PAYMENT ADDITIONAL PAYMENT ADDITIONAL PAYMENT PAYMENT PAYMENT WILL BE GIVEN FOR ANY COST INCURRED TO COMPLY WITH REQUIREMENTS SET BY THE BE GIVEN FOR ANY COST INCURRED TO COMPLY WITH REQUIREMENTS SET BY THE BE GIVEN FOR ANY COST INCURRED TO COMPLY WITH REQUIREMENTS SET BY THE GIVEN FOR ANY COST INCURRED TO COMPLY WITH REQUIREMENTS SET BY THE GIVEN FOR ANY COST INCURRED TO COMPLY WITH REQUIREMENTS SET BY THE FOR ANY COST INCURRED TO COMPLY WITH REQUIREMENTS SET BY THE FOR ANY COST INCURRED TO COMPLY WITH REQUIREMENTS SET BY THE ANY COST INCURRED TO COMPLY WITH REQUIREMENTS SET BY THE ANY COST INCURRED TO COMPLY WITH REQUIREMENTS SET BY THE COST INCURRED TO COMPLY WITH REQUIREMENTS SET BY THE COST INCURRED TO COMPLY WITH REQUIREMENTS SET BY THE INCURRED TO COMPLY WITH REQUIREMENTS SET BY THE INCURRED TO COMPLY WITH REQUIREMENTS SET BY THE TO COMPLY WITH REQUIREMENTS SET BY THE TO COMPLY WITH REQUIREMENTS SET BY THE COMPLY WITH REQUIREMENTS SET BY THE COMPLY WITH REQUIREMENTS SET BY THE WITH REQUIREMENTS SET BY THE WITH REQUIREMENTS SET BY THE REQUIREMENTS SET BY THE REQUIREMENTS SET BY THE SET BY THE SET BY THE BY THE BY THE THE THE AFOREMENTIONED ITEMS. 3. APPROVAL OF THESE PLANS DOES NOT CONSTITUTE APPROVAL BY OWNER OF ANY LAND DISTURBING APPROVAL OF THESE PLANS DOES NOT CONSTITUTE APPROVAL BY OWNER OF ANY LAND DISTURBING OF THESE PLANS DOES NOT CONSTITUTE APPROVAL BY OWNER OF ANY LAND DISTURBING OF THESE PLANS DOES NOT CONSTITUTE APPROVAL BY OWNER OF ANY LAND DISTURBING THESE PLANS DOES NOT CONSTITUTE APPROVAL BY OWNER OF ANY LAND DISTURBING THESE PLANS DOES NOT CONSTITUTE APPROVAL BY OWNER OF ANY LAND DISTURBING PLANS DOES NOT CONSTITUTE APPROVAL BY OWNER OF ANY LAND DISTURBING PLANS DOES NOT CONSTITUTE APPROVAL BY OWNER OF ANY LAND DISTURBING DOES NOT CONSTITUTE APPROVAL BY OWNER OF ANY LAND DISTURBING DOES NOT CONSTITUTE APPROVAL BY OWNER OF ANY LAND DISTURBING NOT CONSTITUTE APPROVAL BY OWNER OF ANY LAND DISTURBING NOT CONSTITUTE APPROVAL BY OWNER OF ANY LAND DISTURBING CONSTITUTE APPROVAL BY OWNER OF ANY LAND DISTURBING CONSTITUTE APPROVAL BY OWNER OF ANY LAND DISTURBING APPROVAL BY OWNER OF ANY LAND DISTURBING APPROVAL BY OWNER OF ANY LAND DISTURBING BY OWNER OF ANY LAND DISTURBING BY OWNER OF ANY LAND DISTURBING OWNER OF ANY LAND DISTURBING OWNER OF ANY LAND DISTURBING OF ANY LAND DISTURBING OF ANY LAND DISTURBING ANY LAND DISTURBING ANY LAND DISTURBING LAND DISTURBING LAND DISTURBING DISTURBING DISTURBING ACTIVITIES WITHIN WETLAND AREAS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR DISTURBING THE WITHIN WETLAND AREAS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR DISTURBING THE WITHIN WETLAND AREAS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR DISTURBING THE WETLAND AREAS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR DISTURBING THE WETLAND AREAS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR DISTURBING THE AREAS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR DISTURBING THE AREAS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR DISTURBING THE IT IS THE RESPONSIBILITY OF THE CONTRACTOR DISTURBING THE IT IS THE RESPONSIBILITY OF THE CONTRACTOR DISTURBING THE IT IS THE RESPONSIBILITY OF THE CONTRACTOR DISTURBING THE IS THE RESPONSIBILITY OF THE CONTRACTOR DISTURBING THE IS THE RESPONSIBILITY OF THE CONTRACTOR DISTURBING THE THE RESPONSIBILITY OF THE CONTRACTOR DISTURBING THE THE RESPONSIBILITY OF THE CONTRACTOR DISTURBING THE RESPONSIBILITY OF THE CONTRACTOR DISTURBING THE RESPONSIBILITY OF THE CONTRACTOR DISTURBING THE OF THE CONTRACTOR DISTURBING THE OF THE CONTRACTOR DISTURBING THE THE CONTRACTOR DISTURBING THE THE CONTRACTOR DISTURBING THE CONTRACTOR DISTURBING THE CONTRACTOR DISTURBING THE DISTURBING THE DISTURBING THE THE THE LAND TO CONTACT THE APPROPRIATE REGULATORY AGENCY FOR APPROVAL OF ANY WETLAND AREA TO CONTACT THE APPROPRIATE REGULATORY AGENCY FOR APPROVAL OF ANY WETLAND AREA TO CONTACT THE APPROPRIATE REGULATORY AGENCY FOR APPROVAL OF ANY WETLAND AREA CONTACT THE APPROPRIATE REGULATORY AGENCY FOR APPROVAL OF ANY WETLAND AREA CONTACT THE APPROPRIATE REGULATORY AGENCY FOR APPROVAL OF ANY WETLAND AREA THE APPROPRIATE REGULATORY AGENCY FOR APPROVAL OF ANY WETLAND AREA THE APPROPRIATE REGULATORY AGENCY FOR APPROVAL OF ANY WETLAND AREA APPROPRIATE REGULATORY AGENCY FOR APPROVAL OF ANY WETLAND AREA APPROPRIATE REGULATORY AGENCY FOR APPROVAL OF ANY WETLAND AREA REGULATORY AGENCY FOR APPROVAL OF ANY WETLAND AREA REGULATORY AGENCY FOR APPROVAL OF ANY WETLAND AREA AGENCY FOR APPROVAL OF ANY WETLAND AREA AGENCY FOR APPROVAL OF ANY WETLAND AREA FOR APPROVAL OF ANY WETLAND AREA FOR APPROVAL OF ANY WETLAND AREA APPROVAL OF ANY WETLAND AREA APPROVAL OF ANY WETLAND AREA OF ANY WETLAND AREA OF ANY WETLAND AREA ANY WETLAND AREA ANY WETLAND AREA WETLAND AREA WETLAND AREA AREA AREA DISTURBANCE. 4. THE CONTRACTOR SHALL IMMEDIATELY INFORM THE ENGINEER OF ANY DISCREPANCIES OR ERRORS THE CONTRACTOR SHALL IMMEDIATELY INFORM THE ENGINEER OF ANY DISCREPANCIES OR ERRORS CONTRACTOR SHALL IMMEDIATELY INFORM THE ENGINEER OF ANY DISCREPANCIES OR ERRORS CONTRACTOR SHALL IMMEDIATELY INFORM THE ENGINEER OF ANY DISCREPANCIES OR ERRORS SHALL IMMEDIATELY INFORM THE ENGINEER OF ANY DISCREPANCIES OR ERRORS SHALL IMMEDIATELY INFORM THE ENGINEER OF ANY DISCREPANCIES OR ERRORS IMMEDIATELY INFORM THE ENGINEER OF ANY DISCREPANCIES OR ERRORS IMMEDIATELY INFORM THE ENGINEER OF ANY DISCREPANCIES OR ERRORS INFORM THE ENGINEER OF ANY DISCREPANCIES OR ERRORS INFORM THE ENGINEER OF ANY DISCREPANCIES OR ERRORS THE ENGINEER OF ANY DISCREPANCIES OR ERRORS THE ENGINEER OF ANY DISCREPANCIES OR ERRORS ENGINEER OF ANY DISCREPANCIES OR ERRORS ENGINEER OF ANY DISCREPANCIES OR ERRORS OF ANY DISCREPANCIES OR ERRORS OF ANY DISCREPANCIES OR ERRORS ANY DISCREPANCIES OR ERRORS ANY DISCREPANCIES OR ERRORS DISCREPANCIES OR ERRORS DISCREPANCIES OR ERRORS OR ERRORS OR ERRORS ERRORS ERRORS DISCOVERED IN THE CONTRACT DOCUMENTS. ANY DEVIATION FROM THE PLANS WITHOUT PRIOR IN THE CONTRACT DOCUMENTS. ANY DEVIATION FROM THE PLANS WITHOUT PRIOR IN THE CONTRACT DOCUMENTS. ANY DEVIATION FROM THE PLANS WITHOUT PRIOR THE CONTRACT DOCUMENTS. ANY DEVIATION FROM THE PLANS WITHOUT PRIOR THE CONTRACT DOCUMENTS. ANY DEVIATION FROM THE PLANS WITHOUT PRIOR CONTRACT DOCUMENTS. ANY DEVIATION FROM THE PLANS WITHOUT PRIOR CONTRACT DOCUMENTS. ANY DEVIATION FROM THE PLANS WITHOUT PRIOR DOCUMENTS. ANY DEVIATION FROM THE PLANS WITHOUT PRIOR DOCUMENTS. ANY DEVIATION FROM THE PLANS WITHOUT PRIOR ANY DEVIATION FROM THE PLANS WITHOUT PRIOR ANY DEVIATION FROM THE PLANS WITHOUT PRIOR ANY DEVIATION FROM THE PLANS WITHOUT PRIOR DEVIATION FROM THE PLANS WITHOUT PRIOR DEVIATION FROM THE PLANS WITHOUT PRIOR FROM THE PLANS WITHOUT PRIOR FROM THE PLANS WITHOUT PRIOR THE PLANS WITHOUT PRIOR THE PLANS WITHOUT PRIOR PLANS WITHOUT PRIOR PLANS WITHOUT PRIOR WITHOUT PRIOR WITHOUT PRIOR PRIOR PRIOR CONSENT OF ENGINEER MAY BE CAUSE FOR THE WORK TO BE UNACCEPTABLE. 5. ALL NECESSARY LICENSES AND PERMITS SHALL BE OBTAINED BY THE CONTRACTOR AT THE ALL NECESSARY LICENSES AND PERMITS SHALL BE OBTAINED BY THE CONTRACTOR AT THE NECESSARY LICENSES AND PERMITS SHALL BE OBTAINED BY THE CONTRACTOR AT THE NECESSARY LICENSES AND PERMITS SHALL BE OBTAINED BY THE CONTRACTOR AT THE LICENSES AND PERMITS SHALL BE OBTAINED BY THE CONTRACTOR AT THE LICENSES AND PERMITS SHALL BE OBTAINED BY THE CONTRACTOR AT THE AND PERMITS SHALL BE OBTAINED BY THE CONTRACTOR AT THE AND PERMITS SHALL BE OBTAINED BY THE CONTRACTOR AT THE PERMITS SHALL BE OBTAINED BY THE CONTRACTOR AT THE PERMITS SHALL BE OBTAINED BY THE CONTRACTOR AT THE SHALL BE OBTAINED BY THE CONTRACTOR AT THE SHALL BE OBTAINED BY THE CONTRACTOR AT THE BE OBTAINED BY THE CONTRACTOR AT THE BE OBTAINED BY THE CONTRACTOR AT THE OBTAINED BY THE CONTRACTOR AT THE OBTAINED BY THE CONTRACTOR AT THE BY THE CONTRACTOR AT THE BY THE CONTRACTOR AT THE THE CONTRACTOR AT THE THE CONTRACTOR AT THE CONTRACTOR AT THE CONTRACTOR AT THE AT THE AT THE THE THE CONTRACTOR'S OWN EXPENSE. 6. A PRECONSTRUCTION MEETING MUST BE HELD WITH MEMBERS OF OWNER, ENGINEER, AND THE A PRECONSTRUCTION MEETING MUST BE HELD WITH MEMBERS OF OWNER, ENGINEER, AND THE PRECONSTRUCTION MEETING MUST BE HELD WITH MEMBERS OF OWNER, ENGINEER, AND THE PRECONSTRUCTION MEETING MUST BE HELD WITH MEMBERS OF OWNER, ENGINEER, AND THE MEETING MUST BE HELD WITH MEMBERS OF OWNER, ENGINEER, AND THE MEETING MUST BE HELD WITH MEMBERS OF OWNER, ENGINEER, AND THE MUST BE HELD WITH MEMBERS OF OWNER, ENGINEER, AND THE MUST BE HELD WITH MEMBERS OF OWNER, ENGINEER, AND THE BE HELD WITH MEMBERS OF OWNER, ENGINEER, AND THE BE HELD WITH MEMBERS OF OWNER, ENGINEER, AND THE HELD WITH MEMBERS OF OWNER, ENGINEER, AND THE HELD WITH MEMBERS OF OWNER, ENGINEER, AND THE WITH MEMBERS OF OWNER, ENGINEER, AND THE WITH MEMBERS OF OWNER, ENGINEER, AND THE MEMBERS OF OWNER, ENGINEER, AND THE MEMBERS OF OWNER, ENGINEER, AND THE OF OWNER, ENGINEER, AND THE OF OWNER, ENGINEER, AND THE OWNER, ENGINEER, AND THE OWNER, ENGINEER, AND THE ENGINEER, AND THE ENGINEER, AND THE AND THE AND THE THE THE CONTRACTOR PRIOR TO COMMENCING WORK. 7. ALL CONSTRUCTION ACTIVITIES SHALL BE LIMITED TO PROPERTY OWNED BY OWNER, PUBLIC ALL CONSTRUCTION ACTIVITIES SHALL BE LIMITED TO PROPERTY OWNED BY OWNER, PUBLIC CONSTRUCTION ACTIVITIES SHALL BE LIMITED TO PROPERTY OWNED BY OWNER, PUBLIC CONSTRUCTION ACTIVITIES SHALL BE LIMITED TO PROPERTY OWNED BY OWNER, PUBLIC ACTIVITIES SHALL BE LIMITED TO PROPERTY OWNED BY OWNER, PUBLIC ACTIVITIES SHALL BE LIMITED TO PROPERTY OWNED BY OWNER, PUBLIC SHALL BE LIMITED TO PROPERTY OWNED BY OWNER, PUBLIC SHALL BE LIMITED TO PROPERTY OWNED BY OWNER, PUBLIC BE LIMITED TO PROPERTY OWNED BY OWNER, PUBLIC BE LIMITED TO PROPERTY OWNED BY OWNER, PUBLIC LIMITED TO PROPERTY OWNED BY OWNER, PUBLIC LIMITED TO PROPERTY OWNED BY OWNER, PUBLIC TO PROPERTY OWNED BY OWNER, PUBLIC TO PROPERTY OWNED BY OWNER, PUBLIC PROPERTY OWNED BY OWNER, PUBLIC PROPERTY OWNED BY OWNER, PUBLIC OWNED BY OWNER, PUBLIC OWNED BY OWNER, PUBLIC BY OWNER, PUBLIC BY OWNER, PUBLIC OWNER, PUBLIC OWNER, PUBLIC PUBLIC PUBLIC RIGHT-OF-WAYS AND ACQUIRED EASEMENTS. WORK IS TO BE PERFORMED IN CONFORMITY WITH ALL AND ACQUIRED EASEMENTS. WORK IS TO BE PERFORMED IN CONFORMITY WITH ALL AND ACQUIRED EASEMENTS. WORK IS TO BE PERFORMED IN CONFORMITY WITH ALL ACQUIRED EASEMENTS. WORK IS TO BE PERFORMED IN CONFORMITY WITH ALL ACQUIRED EASEMENTS. WORK IS TO BE PERFORMED IN CONFORMITY WITH ALL EASEMENTS. WORK IS TO BE PERFORMED IN CONFORMITY WITH ALL EASEMENTS. WORK IS TO BE PERFORMED IN CONFORMITY WITH ALL WORK IS TO BE PERFORMED IN CONFORMITY WITH ALL WORK IS TO BE PERFORMED IN CONFORMITY WITH ALL IS TO BE PERFORMED IN CONFORMITY WITH ALL IS TO BE PERFORMED IN CONFORMITY WITH ALL TO BE PERFORMED IN CONFORMITY WITH ALL TO BE PERFORMED IN CONFORMITY WITH ALL BE PERFORMED IN CONFORMITY WITH ALL BE PERFORMED IN CONFORMITY WITH ALL PERFORMED IN CONFORMITY WITH ALL PERFORMED IN CONFORMITY WITH ALL IN CONFORMITY WITH ALL IN CONFORMITY WITH ALL CONFORMITY WITH ALL CONFORMITY WITH ALL WITH ALL WITH ALL ALL ALL APPLICABLE PERMITS, AGREEMENTS, AND EASEMENT STIPULATIONS. CONTRACTOR SHALL NOT ENTER PERMITS, AGREEMENTS, AND EASEMENT STIPULATIONS. CONTRACTOR SHALL NOT ENTER PERMITS, AGREEMENTS, AND EASEMENT STIPULATIONS. CONTRACTOR SHALL NOT ENTER AGREEMENTS, AND EASEMENT STIPULATIONS. CONTRACTOR SHALL NOT ENTER AGREEMENTS, AND EASEMENT STIPULATIONS. CONTRACTOR SHALL NOT ENTER AND EASEMENT STIPULATIONS. CONTRACTOR SHALL NOT ENTER AND EASEMENT STIPULATIONS. CONTRACTOR SHALL NOT ENTER EASEMENT STIPULATIONS. CONTRACTOR SHALL NOT ENTER EASEMENT STIPULATIONS. CONTRACTOR SHALL NOT ENTER STIPULATIONS. CONTRACTOR SHALL NOT ENTER STIPULATIONS. CONTRACTOR SHALL NOT ENTER CONTRACTOR SHALL NOT ENTER CONTRACTOR SHALL NOT ENTER CONTRACTOR SHALL NOT ENTER SHALL NOT ENTER SHALL NOT ENTER NOT ENTER NOT ENTER ENTER ENTER OR OCCUPY ANY EASEMENT WITHOUT FIRST CONFIRMING WITH OWNER THAT SUCH EASEMENT IS FULLY OCCUPY ANY EASEMENT WITHOUT FIRST CONFIRMING WITH OWNER THAT SUCH EASEMENT IS FULLY OCCUPY ANY EASEMENT WITHOUT FIRST CONFIRMING WITH OWNER THAT SUCH EASEMENT IS FULLY ANY EASEMENT WITHOUT FIRST CONFIRMING WITH OWNER THAT SUCH EASEMENT IS FULLY ANY EASEMENT WITHOUT FIRST CONFIRMING WITH OWNER THAT SUCH EASEMENT IS FULLY EASEMENT WITHOUT FIRST CONFIRMING WITH OWNER THAT SUCH EASEMENT IS FULLY EASEMENT WITHOUT FIRST CONFIRMING WITH OWNER THAT SUCH EASEMENT IS FULLY WITHOUT FIRST CONFIRMING WITH OWNER THAT SUCH EASEMENT IS FULLY WITHOUT FIRST CONFIRMING WITH OWNER THAT SUCH EASEMENT IS FULLY FIRST CONFIRMING WITH OWNER THAT SUCH EASEMENT IS FULLY FIRST CONFIRMING WITH OWNER THAT SUCH EASEMENT IS FULLY CONFIRMING WITH OWNER THAT SUCH EASEMENT IS FULLY CONFIRMING WITH OWNER THAT SUCH EASEMENT IS FULLY WITH OWNER THAT SUCH EASEMENT IS FULLY WITH OWNER THAT SUCH EASEMENT IS FULLY OWNER THAT SUCH EASEMENT IS FULLY OWNER THAT SUCH EASEMENT IS FULLY THAT SUCH EASEMENT IS FULLY THAT SUCH EASEMENT IS FULLY SUCH EASEMENT IS FULLY SUCH EASEMENT IS FULLY EASEMENT IS FULLY EASEMENT IS FULLY IS FULLY IS FULLY FULLY FULLY EXECUTED. CONTRACTOR SHALL NOT ENTER OR OCCUPY ANY LAND OUTSIDE OF THE EASEMENTS AND CONTRACTOR SHALL NOT ENTER OR OCCUPY ANY LAND OUTSIDE OF THE EASEMENTS AND CONTRACTOR SHALL NOT ENTER OR OCCUPY ANY LAND OUTSIDE OF THE EASEMENTS AND CONTRACTOR SHALL NOT ENTER OR OCCUPY ANY LAND OUTSIDE OF THE EASEMENTS AND SHALL NOT ENTER OR OCCUPY ANY LAND OUTSIDE OF THE EASEMENTS AND SHALL NOT ENTER OR OCCUPY ANY LAND OUTSIDE OF THE EASEMENTS AND NOT ENTER OR OCCUPY ANY LAND OUTSIDE OF THE EASEMENTS AND NOT ENTER OR OCCUPY ANY LAND OUTSIDE OF THE EASEMENTS AND ENTER OR OCCUPY ANY LAND OUTSIDE OF THE EASEMENTS AND ENTER OR OCCUPY ANY LAND OUTSIDE OF THE EASEMENTS AND OR OCCUPY ANY LAND OUTSIDE OF THE EASEMENTS AND OR OCCUPY ANY LAND OUTSIDE OF THE EASEMENTS AND OCCUPY ANY LAND OUTSIDE OF THE EASEMENTS AND OCCUPY ANY LAND OUTSIDE OF THE EASEMENTS AND ANY LAND OUTSIDE OF THE EASEMENTS AND ANY LAND OUTSIDE OF THE EASEMENTS AND LAND OUTSIDE OF THE EASEMENTS AND LAND OUTSIDE OF THE EASEMENTS AND OUTSIDE OF THE EASEMENTS AND OUTSIDE OF THE EASEMENTS AND OF THE EASEMENTS AND OF THE EASEMENTS AND THE EASEMENTS AND THE EASEMENTS AND EASEMENTS AND EASEMENTS AND AND AND RIGHT-OF-WAY, SHOULD THE CONTRACTOR DESIRE OR REQUIRE ADDITIONAL SPACE, THE CONTRACTOR SHOULD THE CONTRACTOR DESIRE OR REQUIRE ADDITIONAL SPACE, THE CONTRACTOR SHOULD THE CONTRACTOR DESIRE OR REQUIRE ADDITIONAL SPACE, THE CONTRACTOR THE CONTRACTOR DESIRE OR REQUIRE ADDITIONAL SPACE, THE CONTRACTOR THE CONTRACTOR DESIRE OR REQUIRE ADDITIONAL SPACE, THE CONTRACTOR CONTRACTOR DESIRE OR REQUIRE ADDITIONAL SPACE, THE CONTRACTOR CONTRACTOR DESIRE OR REQUIRE ADDITIONAL SPACE, THE CONTRACTOR DESIRE OR REQUIRE ADDITIONAL SPACE, THE CONTRACTOR DESIRE OR REQUIRE ADDITIONAL SPACE, THE CONTRACTOR OR REQUIRE ADDITIONAL SPACE, THE CONTRACTOR OR REQUIRE ADDITIONAL SPACE, THE CONTRACTOR REQUIRE ADDITIONAL SPACE, THE CONTRACTOR REQUIRE ADDITIONAL SPACE, THE CONTRACTOR ADDITIONAL SPACE, THE CONTRACTOR ADDITIONAL SPACE, THE CONTRACTOR SPACE, THE CONTRACTOR SPACE, THE CONTRACTOR THE CONTRACTOR THE CONTRACTOR CONTRACTOR CONTRACTOR MUST ARRANGE FOR SUCH A SPACE WITH THE EASEMENT OWNER AT CONTRACTOR'S EXPENSE. 8. LAND DISTURBANCE SHALL BE LIMITED TO THOSE AREAS INDICATED ON THE PLANS FOR ACCESS, LAND DISTURBANCE SHALL BE LIMITED TO THOSE AREAS INDICATED ON THE PLANS FOR ACCESS, DISTURBANCE SHALL BE LIMITED TO THOSE AREAS INDICATED ON THE PLANS FOR ACCESS, DISTURBANCE SHALL BE LIMITED TO THOSE AREAS INDICATED ON THE PLANS FOR ACCESS, SHALL BE LIMITED TO THOSE AREAS INDICATED ON THE PLANS FOR ACCESS, SHALL BE LIMITED TO THOSE AREAS INDICATED ON THE PLANS FOR ACCESS, BE LIMITED TO THOSE AREAS INDICATED ON THE PLANS FOR ACCESS, BE LIMITED TO THOSE AREAS INDICATED ON THE PLANS FOR ACCESS, LIMITED TO THOSE AREAS INDICATED ON THE PLANS FOR ACCESS, LIMITED TO THOSE AREAS INDICATED ON THE PLANS FOR ACCESS, TO THOSE AREAS INDICATED ON THE PLANS FOR ACCESS, TO THOSE AREAS INDICATED ON THE PLANS FOR ACCESS, THOSE AREAS INDICATED ON THE PLANS FOR ACCESS, THOSE AREAS INDICATED ON THE PLANS FOR ACCESS, AREAS INDICATED ON THE PLANS FOR ACCESS, AREAS INDICATED ON THE PLANS FOR ACCESS, INDICATED ON THE PLANS FOR ACCESS, INDICATED ON THE PLANS FOR ACCESS, ON THE PLANS FOR ACCESS, ON THE PLANS FOR ACCESS, THE PLANS FOR ACCESS, THE PLANS FOR ACCESS, PLANS FOR ACCESS, PLANS FOR ACCESS, FOR ACCESS, FOR ACCESS, ACCESS, ACCESS, STAGING, AND CONSTRUCTION. 9. ALL BUFFERS AND TREE SAVE AREAS ARE TO BE CLEARLY IDENTIFIED WITH TREE PROTECTIVE FENCING ALL BUFFERS AND TREE SAVE AREAS ARE TO BE CLEARLY IDENTIFIED WITH TREE PROTECTIVE FENCING BUFFERS AND TREE SAVE AREAS ARE TO BE CLEARLY IDENTIFIED WITH TREE PROTECTIVE FENCING BUFFERS AND TREE SAVE AREAS ARE TO BE CLEARLY IDENTIFIED WITH TREE PROTECTIVE FENCING AND TREE SAVE AREAS ARE TO BE CLEARLY IDENTIFIED WITH TREE PROTECTIVE FENCING AND TREE SAVE AREAS ARE TO BE CLEARLY IDENTIFIED WITH TREE PROTECTIVE FENCING TREE SAVE AREAS ARE TO BE CLEARLY IDENTIFIED WITH TREE PROTECTIVE FENCING TREE SAVE AREAS ARE TO BE CLEARLY IDENTIFIED WITH TREE PROTECTIVE FENCING SAVE AREAS ARE TO BE CLEARLY IDENTIFIED WITH TREE PROTECTIVE FENCING SAVE AREAS ARE TO BE CLEARLY IDENTIFIED WITH TREE PROTECTIVE FENCING AREAS ARE TO BE CLEARLY IDENTIFIED WITH TREE PROTECTIVE FENCING AREAS ARE TO BE CLEARLY IDENTIFIED WITH TREE PROTECTIVE FENCING ARE TO BE CLEARLY IDENTIFIED WITH TREE PROTECTIVE FENCING ARE TO BE CLEARLY IDENTIFIED WITH TREE PROTECTIVE FENCING TO BE CLEARLY IDENTIFIED WITH TREE PROTECTIVE FENCING TO BE CLEARLY IDENTIFIED WITH TREE PROTECTIVE FENCING BE CLEARLY IDENTIFIED WITH TREE PROTECTIVE FENCING BE CLEARLY IDENTIFIED WITH TREE PROTECTIVE FENCING CLEARLY IDENTIFIED WITH TREE PROTECTIVE FENCING CLEARLY IDENTIFIED WITH TREE PROTECTIVE FENCING IDENTIFIED WITH TREE PROTECTIVE FENCING IDENTIFIED WITH TREE PROTECTIVE FENCING WITH TREE PROTECTIVE FENCING WITH TREE PROTECTIVE FENCING TREE PROTECTIVE FENCING TREE PROTECTIVE FENCING PROTECTIVE FENCING PROTECTIVE FENCING FENCING FENCING PRIOR TO COMMENCEMENT OF ANY LAND DISTURBANCE. 10. INSTALLATION OF EROSION CONTROL MEASURES AND PRACTICES SHALL TAKE PLACE PRIOR TO AND INSTALLATION OF EROSION CONTROL MEASURES AND PRACTICES SHALL TAKE PLACE PRIOR TO AND OF EROSION CONTROL MEASURES AND PRACTICES SHALL TAKE PLACE PRIOR TO AND OF EROSION CONTROL MEASURES AND PRACTICES SHALL TAKE PLACE PRIOR TO AND EROSION CONTROL MEASURES AND PRACTICES SHALL TAKE PLACE PRIOR TO AND EROSION CONTROL MEASURES AND PRACTICES SHALL TAKE PLACE PRIOR TO AND CONTROL MEASURES AND PRACTICES SHALL TAKE PLACE PRIOR TO AND CONTROL MEASURES AND PRACTICES SHALL TAKE PLACE PRIOR TO AND MEASURES AND PRACTICES SHALL TAKE PLACE PRIOR TO AND MEASURES AND PRACTICES SHALL TAKE PLACE PRIOR TO AND AND PRACTICES SHALL TAKE PLACE PRIOR TO AND AND PRACTICES SHALL TAKE PLACE PRIOR TO AND PRACTICES SHALL TAKE PLACE PRIOR TO AND PRACTICES SHALL TAKE PLACE PRIOR TO AND SHALL TAKE PLACE PRIOR TO AND SHALL TAKE PLACE PRIOR TO AND TAKE PLACE PRIOR TO AND TAKE PLACE PRIOR TO AND PLACE PRIOR TO AND PLACE PRIOR TO AND PRIOR TO AND PRIOR TO AND TO AND TO AND AND AND CONCURRENT WITH LAND DISTURBING ACTIVITIES. ALL EROSION AND SEDIMENT CONTROL MEASURES WITH LAND DISTURBING ACTIVITIES. ALL EROSION AND SEDIMENT CONTROL MEASURES WITH LAND DISTURBING ACTIVITIES. ALL EROSION AND SEDIMENT CONTROL MEASURES LAND DISTURBING ACTIVITIES. ALL EROSION AND SEDIMENT CONTROL MEASURES LAND DISTURBING ACTIVITIES. ALL EROSION AND SEDIMENT CONTROL MEASURES DISTURBING ACTIVITIES. ALL EROSION AND SEDIMENT CONTROL MEASURES DISTURBING ACTIVITIES. ALL EROSION AND SEDIMENT CONTROL MEASURES ACTIVITIES. ALL EROSION AND SEDIMENT CONTROL MEASURES ACTIVITIES.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .