Text version
This is not a change order, a construction change directive or a direction to proceed with work.
Leidos Engineering, LLC
622 Emerson Road, Suite 600 | St. Louis, MO 63141-6728 | tel: 314.821.7017 | fax: 314.821.8499 | leidos.com
Amendment
Amendment Number: 01 Client: Illinois Air National Guard, 183d Fighter Wing
Subject: Hazardous Materials Project: Repair Building Envelope, P1 Hangar
Written By: Samuel Strackeljahn, PE Leidos Project No: 6150930331
Date: 6/11/14 Client Project No: DCFT092011
Description:
Specifications
Add Specification Section 010000 General Requirements Add Specification Section 012000.0020 Price and Payment Procedures Add Specification Section 012100 Allowances Add Specification Section 012200 Unit Prices Add Specification Section 013526 Government Safety Requirements Add Specification Section 017329 Cutting and Patching Add Specification Section 028233.1320 Removal/Control and Disposal of Paint with Lead Add Specification Section 028214.0010 Asbestos Hazard Control Activities
Drawings
Revise the General Note 18 on A-001:
“Asbestos containing material and lead based paint will be disturbed and need to be abated as part of the scope of work. The contractor shall identify the extent of abatement that will be required to accomplish the scope of work described in the scope of work presented in the construction documents. The contractor is responsible to perform a survey, testing as much as required to identify the needed abatement during bidding. The contractor has the ability to extensively survey the building during bidding so all bidders have equal access to identify the needed abatement and the amount of abatement should be clearly identified in at proposal. Any additional abatement work will be limited and will be addressed through the Allowances and Unit Prices.”
Attachments: (Specification Sections)
010000 012000.0020 012100 012200 013526 017329 028233.1320 028214.0010