01_22_00.pdf

PDF 19 KB Posted

Attached to
REPAIR BUILDING ENVELOPE, BUILDING 1 Federal contract opportunity
Solicitation number
W91SMC-15-R-0005
Issued by
Department of the Army Illinois Army National Guard

About this file

SECTION 01 22 00 - UNIT PRICES

View the file

Other files for this federal contract opportunity

Other files attached to REPAIR BUILDING ENVELOPE, BUILDING 1, newest first.
File Type Posted
RFI_2_Clarification_Repair_Building_Envelope _P-1.pdf PDF
RFI_2_Repair_Building_Envelope _P-1.pdf PDF
RFI_1_Repair_Building_Envelope _P-1.pdf PDF
Exhibit_C1__Past_Performance_Questionaire.pdf PDF
Exhibit_C__info_FormsSSS__SA_and_UR_Mar_2013.pdf PDF
Soils_Exploration_Report_-_Bldg_1_Envelope.pdf PDF
Site_Visit_Minutes_23_Jun_15.pdf PDF
Site_Visit_Sign-In_23_Jun_15.pdf PDF
Preproposal_slides_P1_Hangar_23_Jun_15.pdf PDF
W91SMC-15-R-0005-0001_Repair_Building_Envelope _P-1.pdf PDF
Site_Visit_Minutes_18_JUNE.pdf PDF
Site_Visit_Sign-in_18_JUNE_2015.pdf PDF
Preproposal_slides_P1_Hangar.pdf_18_June.pdf PDF
02_82_33.13_20.pdf PDF
01_21_00.pdf PDF
01_00_00.pdf PDF
01_35_26.pdf PDF
02_82_14.00_10.pdf PDF
01_20_00.00_20.pdf PDF
01_73_29.pdf PDF
Amend_01.pdf PDF
SITE_VISIT.pdf PDF
SPECIFICATIONS_Section_012100-Allowances.pdf PDF
COMBINED.pdf PDF
Combined Drawings.pdf PDF
Combined Drawings.pdf PDF
Combined Drawings.pdf PDF
EXHIBIT_A_relevancy_SSS_SA_and_UR_Mar_13.pdf PDF
EXHIBIT_B_consent_form__SSS_SA_and_UR_May_13.pdf PDF
Exhibit_C1__Past_Performance_Questionaire.pdf PDF
Exhibit_C__info_FormsSSS__SA_and_UR_Mar_2013.pdf PDF
EXHIBIT_F_Proposal_Inquiry_Format.pdf PDF
W91SMC-15-R-0005_Repair_Building_Envelope _P1.pdf PDF
Combined Drawings.pdf PDF
Sole_Source_Justification_Advantor-REDACTED.pdf PDF
Sole_Source_Justification_TAC_Direct_Digital_Controls_DDC-REDACTED.pdf PDF
BRAND_NAME_Justification_Best_Locks-REDACTED.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Illinois Air National Guard Repair Building Envelope, P-1 Hangar Abraham Lincoln Capital Airport Project No. DCFT092011 Springfield, Illinois W90FYQ-09-D-0006-9E07

04 April 2014 UNIT PRICES Type B-3 Final 012200 - 1

SECTION 01 22 00 - UNIT PRICES

PART 1 GENERAL

1.1. RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2. SUMMARY

A. General: Section includes administrative and procedural requirements for unit prices.

B. Related Requirements: Refer to project General Requirements and Conditions, "Contract

Modification Procedures" for procedures for submitting and handling Contract Modifications.

1.3. DEFINITIONS

A. Unit Price: Amount incorporated in the Agreement, applicable during the duration of the Work as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased.

1.4. PROCEDURES

A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead, and profit.

B. Measurement and Payment: See individual Specification Sections for work that requires establishment of unit prices. Methods of measurement and payment for unit prices are specified in those Sections.

C. Government reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Goverment's expense, by an independent surveyor acceptable to Contractor.

D. List of Unit Prices: A schedule of unit prices is included in Part 3. Specification Sections referenced in the schedule contain requirements for materials described under each unit price.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

A. SCHEDULE OF UNIT PRICES

1. Unit Price No. 1: Remove Lead Based Paint

a. Description: Lead Based Paint removal from structural steel, steel joists, metal deck, metal siding, and related structural elements as required for attachment, connection, or welding of work of this project to the existing structural elements. Comply with Federal, Illinois Air National Guard Repair Building Envelope, P-1 Hangar Abraham Lincoln Capital Airport Project No. DCFT092011 Springfield, Illinois W90FYQ-09-D-0006-9E07

04 April 2014 UNIT PRICES Type B-3 Final 012200 - 2

State, Local regulations and military standards applicable to removal of Lead Based Paint in buildings and other sections of these specifications.

b. Unit of Measurement: Additive Cost per Square Foot of Steel Surface if more than 500 SF of steel surface requires removal of Lead Based Paint as specified in Section 01 21 00

ALLOWANCES.

c. Unit of Measurement: Deductive Cost per Square Foot of Steel Surface if less than 500 SF of steel surface requires removal of Lead Based Paint as specified in Section 01 21 00

ALLOWANCES.

2. Unit Price No. 2: Remove Asbestos Containing Material

a. Description: As described in and other sections of these specifications and in

"ASBESTOS ABATEMENT SPECIFICATIONS - IL Air National Guard - Removal of Approximately 1,200 SF - Asbestos Containing Ceiling Material / Mastic and Associated Asbestos Contaminated Materials".

b. Unit of Measurement: Additive Cost per Square Foot of Surface if more than 1,200 SF of surface requires removal of Asbestos Containing Floor materials as specified in Section 01 21 00 ALLOWANCES. Additional cost per lineal foot of pipe insulation beyond the 200 LF specified in 012100 ALLOWANCES that needs to be removed to support project scope.

c. Unit of Measurement: Deductive Cost per Square Foot of Surface if less than 1,200 SF of surface requires removal of Asbestos Containing .materials as specified in Section 01 21 00 ALLOWANCES. Additional cost per lineal foot of pipe insulation beyond the 200 LF specified in 012100 ALLOWANCES that needs to be removed to support project scope.

3. Unit Price No. 3: Hazardous Material Testing

a. Description: As described in and other sections of these specifications and in

"ASBESTOS ABATEMENT SPECIFICATIONS - IL Air National Guard - Removal of Approximately 1,200 SF - Asbestos Containing Ceiling Material / Mastic and Associated Asbestos Contaminated Materials".

b. Unit of Measurement: Additive cost per additional test if less than 20 additional samples need to be tested.

c. Unit of Measurement: Deductive cost per additional test if less than 20 additional samples need to be tested.

End of Section 012200

PART 1 GENERAL
1.1. RELATED DOCUMENTS
1.2. SUMMARY
1.3. DEFINITIONS
1.4. PROCEDURES
PART 2 PRODUCTS
PART 3 EXECUTION