d w
B b d
L
D d b b d d w d H
S-201
S-301
S-501
EACHEA
DRAWINGDWG
BOTTOM OF STEEL
DITTO (SAME AS ABOVE)
COMPLETE PENETRATION, CAP PLATE
DIMENSION
DIAMETER
DETAIL
DIM
DET
CONCRETE
CAST IN PLACE
DEPRESSEDDEP
BOTH SIDES
BASEMENT
COLUMN
CENTIMETER
,CL>
COL
CM
BEAM
BOTH FACE
ANCHOR BOLT
BLK BLOCK
BASE PLATE, BEARING PLATE, BENT PLATE
CA COLUMN ABOVE
CB COLUMN BELOW
CONTROL JOINT, CONTRACTION JOINT
CMU CONCRETE MASONRY UNIT
CONST CONSTRUCTION
CONTINUOUS
CAPILLARY WATER BARRIER
/DIA ,0
DEAD LOAD
DWL DOWEL
DOWN
AB
BF
BM
BOS
BP
BS
BSMT
CIP
CJ
CP
CWB
DL
DO
DP
CONC
CONT
DN
DROP PANEL
EXPANSION JOINT
EACH WAY
EXTERIOREXT
EQUAL
EXPANSIONEXP
ELEVATION
EACH SIDE
ELEVATOR
ELECTRICALELECT
ENCLOSURE
EQUIP EQUIPMENT
EXISTING
EXPANSION JOINT
EL
EXST
EJ
ELEV
ENCL
EQ
ES
EXP JT
EW
EACH FACEEF
EGL EXISTING GRADE LEVEL
CENTER LINE, CL
ALTERNATEALT
DIAGONALDIAG
ANTI-TERRORISM/FORCE PROTECTIONAT/FP
S T R U C T U R A L A B B R E V I A T I O N S
MEZZANINE
MACHINE BOLT
LEVEL
INTERIOR
INSIDE DIAMETER
METER
MOMENT CONNECTION
LOW POINT
MAXIMUM
KNEE BRACING
HIGH STRENGTH BOLT
HORIZONTAL
HIGH POINT
HOR
GRADE, GROUND
FAR SIDE
MMAX
LEV
INT.
FOOT
FTG FOOTING
FXD FIXED
GROUND LEVEL, GRADE LINE
HEX HEXAGON
HOOKED
IN. INCH
JT. JOINT
KOREAN STANDARD
LBS
LONG
POUNDS (OR #)
LIVE LOAD
MECHANICAL
FT
GL
GR
HP
HSB
ID
KB
KS
LG
LP
LL
FS
HK
MB
MC
MECH
MEZZ
FULL PENETRATION
FINISHEDFIN
FFL FINISHED FLOOR (ARCH.FL.)
FDN FOUNDATION
FRAMING
FL
FR
FLOOR, FINISH LEVEL
FP
NOT TO SCALE
MILI-METERMM
MISCELLANEOUS
MPH MILE PER HOUR
NEAR SIDE
NFSM NON-FROST SUSCEPTIBLE MATERIAL
NIC NOT IN CONTRACT
NUMBER
OPPOSITE HANDOPP H
OPENING
ON CENTER
OUTSIDE DIMENSION
PED PEDESTAL
NS
NTS
MISC
NO
OPNG
OC
OD
NLB NON-LOAD BEARING
MINIMUMMIN
LLV LONG LEG VERTICAL
MCJ MASONRY CONTROL JOINT
MTS
PRECAST CONCRETE
PLATE
REVISION
REQUIRED
REV
REQ'D
PEJ PREMOLDED EXPANSION JOINT
PC
ROOFRF
STEEL
SECTION
SQUARE
STANDARD
UNLESS NOTED OTHERWISE
TOP OF STEEL
TOP OF WALL
TOP AND BOTTOM
TYPICAL
TOP OF CONCRETE
SYMMETRY
THICKNESS
STIFFENER
SHEAR CONNECTOR
SPACING
TYP
THK
SYM
STL
STIFF
STD
SFL STRUCTURAL FLOOR
SB STEEL BEAM
SIM SIMILAR
SLP SLOPED
SPEC(S) SPECIFICATION(S)
SRC STEEL AND REINFORCED CONCRETE
STRUCTURAL
TEMPERATURE
THRU THROUGH
UNIFORM
SC
SL
SPCG
TOC
TOS
TOW
T & B
SECT
SQ
STRUCT
SLAB
TEMP
UNIF
UNO
W/ WITH
WF WALL FOOTING
WB WALL BELOW
WORKING POINT, WATER-PROOF
W/O WITHOUT
AT THE PITCH OF@
WWF WELDED WIRE FABRIC
WP
VERTICALVERT
VB VAPOR BARRIER
SLV SHORT LEG VERTICAL
VER VERIFY
RADIUS, REACTION
PARTIAL PENETRATION
R
PSF POUND PER SQUARE FOOT
PSI POUND PER SQUARE INCH
REINFORCED CONCRETE
REINF REINFORCEMENT
PP
RC
VAR VARIES
STIRR STIRRUP
S T R U C T U R A L L E G E N D
A. GENERAL
C. STRUCTURAL STEEL
4. ALL STEEL SHALL BE SHOP COATED PER SSPC PAINT 25.
D. MECHANICAL EQUIPMENT SUPPORTING PAD
3. CONSTRUCTION JOINTS;
B. CONCRETE
OPENINGS AND WALL OPENINGS FOR DOORS, WINDOWS AND LOUVERS.
2. REFER TO ARCHITECTURAL / MECHANICAL DRAWINGS FOR THE EXACT LOCATIONS AND SIZES OF THE SLAB
CONCRETE PLACEMENT.
b. WALL CONSTRUCTION JOINTS SHALL BE LOCATED SO AS TO PROVIDE A 24 METERS MAXIMUM LENGTH OF
AND NO OTHER HORIZONTAL CONSTRUCTION JOINT SHALL BE PERMITTED.
c. CONSTRUCTION JOINTS SHOWN IN STRUCTURAL DRAWINGS SHALL BE INCORPORATED INTO CONSTRUCTION
OF THE STRUCTURE.
d. VERTICAL CONSTRUCTION JOINTS SHALL BE SO MADE AND LOCATED AS NOT TO IMPAIR THE STRENGTH
TO SUIT THE SELECTED EQUIPMENT.
THE ACTUAL SIZE AND LOCATION SHALL BE DETERMINED AFTER COORDINATING WITH MECHANICAL CONTRACTOR
1. THE CONCRETE PAD FOR MECHANICAL EQUIPMENT SHOWN IN PLAN ARE FOR INFORMATION PURPOSE ONLY.
RAMP AND OTHER SLAB-ON-GRADE IF SHOWN ON THE DRAWINGS.
JOINTS AND PEJ DETAILS SHOWN IN THE DRAWINGS ARE ONLY FOR NON-STRUCTURAL SLAB SUCH AS STOOP, NEITHER PEJ (PREMOLDED EXPANSION JOINTS) AT THE PERIMETER. THE TYPICAL DETAILS FOR CONTRACTION
2. STRUCTURAL SLAB INCLUDING STRUCTURAL SLAB-ON-GRADE SHALL NOT HAVE ANY CONTRACTION JOINTS AND
ATTENTION OF CONTRACTING OFFICER.
DIMENSIONS BETWEEN STRUCTURAL AND ARCHITECTURAL DRAWINGS OCCUR, THEY SHALL BE BROUGHT TO THE
1. ALL DIMENSIONS SHALL BE VERIFIED AGAINST ARCHITECTURAL DRAWINGS. IF ANY CONFLICTS OF
ATTENTION OF CONTRACTING OFFICER PRIOR TO POURING CONCRETE.
REQUIRED FOR DUCTS OR PIPES IN ACCORDANCE WITH MECHANICAL DRAWINGS SHALL BE BROUGHT TO
3. ADDITIONAL OPENINGS IN SLAB OR WALL WHICH ARE NOT SHOWN IN STRUCTURAL DRAWINGS, BUT ARE
STEEL ANCHORS REQ'D FOR ARCHITECTURAL WORK.
LOCATION OF NON-LOAD BEARING CMU WALLS, ALSO REFER TO ARCHITECTURAL DRAWINGS FOR EMBEDED
4. SEE ARCHITECTURAL DRAWINGS FOR THE EXACT LOCATION OF SLAB DEPRESSION, STAIR DIMENSION AND
ACI 301-05 IN ADDITION TO PROJECT SPECIFICATIONS.
1. ALL WORK FOR CONCRETE AND REINFORCING STEEL SHALL CONFORM TO ACI STANDARDS, ACI 318-05 AND
APPROVAL BY THE CONTRACTING OFFICER.
SHOWING CONSTRUCTION JOINT LOCATIONS ALONG WITH THE SEQUENCE OF POURS FOR REVIEW AND
a. PROVIDE CONSTRUCTION JOINTS IN ACCORDANCE WITH ACI-318 CHAPTER 6.4. SUBMIT SHOP DRAWINGS
OFFICER.
VERIFIED BY CONTRACTING OFFICER'S REPRESENTATIVE OR ENGINEER DESIGNATED BY THE CONTRACTING
4. CONTRACTOR SHALL NOT COMMENCE CONCRETE WORK UNTIL REINFORCING BAR PLACEMENTS ARE INSPECTED AND
ROOF, FLOOR OR WALL.
2. SEE MECHANICAL DRAWINGS FOR ADDITIONAL PIPES, RISERS, VENTS, AND DUCTS WHICH PENETRATE THE
TWO-SIDED WEB ANGLE OR SINGLE PLATE CONNECTIONS AS SHOWN ON THE TYPICAL DETAILS.
WELDED. ALL BEAM TO BEAM, BEAM TO COLUMN AND BEAM TO TRUSS TOP CHORD CONNECTIONS SHALL BE
3. SHOP AND FIELD CONNECTIONS NOT SPECIFICALLY DETAILED ON THE DRAWINGS SHALL BE BOLTED OR
TO DEVELOP THE FULL STRENGTH OF THE STUD. FILLET WELDING OF STUDS TO STEEL IS NOT ACCEPTABLE.
5. STUDS SHALL BE AUTOMATIC WELDED TO STEEL (PER NELSON STUD WELDING METHOD OR APPROVED EQUAL)
OF EQUIPMENT PAD.
DRAWINGS. A MINIMUM DISTANCE OF 100mm SHALL BE MAINTAINED FROM CENTER OF ANCHOR BOLT TO EDGE
2. ANCHOR BOLTS SHALL BE SIZED AND LOCATED AS REQUIRED BY THE EQUIPMENT MANUFACTURER'S SHOP
S T R U C T U R A L G E N E R A L N O T E S
(AMERICAN INSTITUTE OF STEEL CONSTRUCTION) 13TH EDITION.
1. ALL STRUCTURAL STEEL SHALL BE FABRICATED AND ERECTED IN CONFORMANCE WITH AISC
(KOREAN STANDARD)
(KS)
FROM ROLLED SHAPE
STRUCTURAL STEEL CUT
PLb x L x t t b t
LIGHT GAGE COLD-FORMED SECTIONS
LIGHT CHANNEL SECTION
LIGHT LIP CHANNEL SECTION
HSS D x t
C-d x b x t
C-d x b x c x t t t t c c
STEEL BEAM SPLICE
STEEL SIMPLE CONNECTION (PIN)
STEEL BEAM CONTINUOUS
SLOPE 1:2
STEEL MOMENT CONNECTION
fy = YIELD STRESS OF REINFORCING STEEL
Fy = YIELD STRESS OF STRUCTURAL STEEL
ANCHOR BOLT (IN PLAN)
WALL / COLUMN LEGEND :
CONCRETE WALL
200 mm THK LOAD BEARING CMU WALL
200 mm THK NON LOAD BEARING CMU WALL
USING FILLET SIZE OF a (mm)
FILLET WELD AT BOTH SIDES
TITLE
STRENGTH AT 28 DAYS
f'c = SPECIFIED CONCRETE COMPRESSIVE f'm = SPECIFIED MASONRY COMPRESSIVE STRENGTH tw tw tw tf t
LH x B x t
Wd x wt
WTd x wt
(L-H x B x t)
(PL-b x L x t)
(KS)
STANDARD SECTION
CHANNEL HOT ROLLED
(KS)
STANDARD SECTION
ANGLE
(KS)
STANDARD TUBE SECTION
AISC
(KS)
STEEL PLATE
(KS)
ROUND SECTION
D = OUTER DIAMETER
HSS d x b x t
SEE ELEVATION 1 ON DRAWING NO S-201
SEE SECTION 1 ON DRAWING NO S-301
SEE DETAIL 1 ON DRAWING NO S-501
AMPLITUDE OF 6mm (MINIMUM).
e. CONSTRUCTION JOINTS SHALL BE CLEAN AND FREE OF LAITANCE AND INTENTIONALLY ROUGHENED TO AN
(TS-d x b x t)
AMERICAN STANDARD
ROLLED BEAM SECTION
,PLPL
Dxx DEFORMED REINFORCING BAR w/ xx DIA IN MM a tf tf w f(H-d x w x t x t )
Cd x wt w f( -d x w x t x t ) w f(CT-d x w x t x t )
(O-D x t)
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
A
B C D
E F G H
YI, KS
STRUCTURAL
214621
S-1
AND GENERAL NOTES
STRUCTURAL ABBREVIATIONS, LEGEND
DORMITORY OF NEW FIRE STATION, K-16
CONSTRUCT BUILDING FOR OFFICES AND
FY19
1289003793.LN
Text Box
BELOW PWO #214621 SHOWN ON THIS PROJECT DRAWINGS IS REPLACED BY PWO #214261.
ZONE
ZONE
m a' = 1.8
CONCRETE :
REINFORCING STEEL :
LOADS :
MASONRY WORK :
SEISMIC USE GROUP
SEISMIC MCE S 1
SEISMIC DESIGN CATEGORY
SITE CLASSIFICATION
B. SNOW (AT GROUND) 1.0 kPa
27 MPa
BASIC WIND SPEED 168 KPH, EXPOSURE "C"
CLASS D
S = 0.17g, S = 0.07g
C
STRUCTURAL SHAPES AND PLATES :
BOLTS :
SHALL CONFORM TO ASTM A325, DIA 20 mm UNLESS NOTED
OTHERWISE. BOLTS FOR SECONDARY CONNECTIONS SUCH AS FOR
PURLINS MAY BE ASTM A 307.
A. COMPRESSIVE STRENGTH AT 28 DAYS
SHALL BE HEADED TYPE AND CONFORM TO ASTM A 307.
ALL WELDING WORKS SHALL BE DONE IN COMFORMANCE WITH
AWS D1.1 CODE AND AWS D1.3 CODE. WELDING ELECTRODES
SHALL BE E70xx SERIES (LOW HYDROGEN).
WELD :
ANCHOR BOLTS :
I
II
III
IV
V
VI
VII
VIII
IX
C. WIND LOAD (PER UFC 1-200-01) :
D. SEISMIC LOAD (PER UFC 3-310-04) :
SHALL CONFORM TO ASTM A615, GRADE 60, OR KS D3504 SD40 WITH
MINIMUM fy = 390 MPa, UNLESS NOTED OTHERWISE.
A. ALL MASONRY UNITS SHALL CONFORM TO ASTM C90 WITH A
MINIMUM PRISM STRENGTH, f'm = 10.3 MPa
B. ALL MORTAR SHALL BE TYPE "M"
C. ALL GROUT SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH,
f'c = 13.8 MPa
1.0 kPa
3.0 kPa
5.0 kPa
7.5 kPa
ROOF
12.5 kPa
6.0 kPa
OFFICE AND TOILET
STORAGE
KITCHEN 7.5 kPa
2.0 kPa
STAIRS & CORRIDORS
DORM
FLOOR (FIRE TRUCK)
A. LIVE LOAD :
X HIGH WIND SUCTION ON ROOF FOR METAL DECKS :
S T R U C T U R A L D E S I G N C R I T E R I A
WIND UPLIFT PRESSURE
(KPa)
WIND UPLIFT PRESSURE
(KPa)
ROOF PLAN
IIIE
-1.25
-1.76
-2.79
-3.04 (OVERHANG)
-3.43 (OVERHANG)
-1.73
-2.24
-3.26
STRUCTURAL SHAPE AND PLATE ASTM A36, Fy=250MPa
STRUCTURAL PIPES ASTM A53 GRADE B, Fy=240MPa
STRUCTURAL TUBING ASTM A500 GRADE B, Fy=320MPa
CODE : UNIFIED FACILITY CRITERIA, UFC 1-200-01 (27 NOV, 2007)
a a a a a a
2 a m a = 1.5
'3
'3
'3
'3
'2
'2
'2
1'
'2
'2
1'
'2
'3
'2
'3
'3
'2
'3 a a a a a' a'
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
A
B C D
E F G H
S T R U C T U R A L G E N E R A L N O T E S
E. TEMPORARY BRACING AND SHORING
F. FOUNDATION NOTE
G. FORMWORK FOR CONCRETE FINISH SURFACE
CLASS D : ROUGH SURFACE
CLASS C : CONCEALED SURFACE
CLASS B : EXPOSED BUT NOT TO PUBLIC VIEW
CLASS A : EXPOSED TO PUBLIC VIEW
SANDBLAST OR OTHER REQUIREMENTS
ARCH CONC FINISH : SEE ARCH DWGS FOR TEXTURES WITH LINERS,
200 kPa (CONTINUOUS FOOTING)
1. ALLOWABLE SOIL BEARING PRESSURE - - - - - 300 kPa (SPREAD FOOTING)
2. FROST PENETRATION - - - - - - - - - - - - 1220mm
MAINTAINED UNTIL ERECTION OF THE ENTIRE STRUCTURE IS COMPLETED.
STRUCTURAL MEMBERS FOR SAFETY. STABILITY OF STRUCTURE SHALL BE
1. PROVIDE TEMPORARY BRACING AND SHORING DURING ERECTION OF
RE-INSPECTED.
CONTRACTOR IS RESPONSIBLE FOR CORRECTING THE DISTURBED SOIL AND SHALL BE
IF INSPECTED EXCAVATION IS DISTRUBED,
OFFICEDR'S REPRESENTATIVE PRIOR TO PLACEMENT OF REINFORCING BARS.
3. THE FOOTING EXCAVATION AND BACKFILL SHALL BE INSPECTED BY THE CONTACTING
YI, KS
STRUCTURAL
214621
STRUCTURAL DESIGN CRITERIA
S-2242
SCHEDULE #2 (CONSTRUCT/ALTERATION)
SCOPE OF WORK
NOTE:
PRIOR TO THE START OF WORK INCLUDING PERFORMANCE METHOD AND SCHEDULE
1. CONTRACTOR SHALL SUBMIT DETAIL SHOP DRAWINGS TO COR AND GET APPROVAL
3. DISPOSE REMOVED ALL CONSTRUCTION DEBRIS TO OUTSIDE OF COMPOUND
ALL NECESSARY WORKS AS SHOWN ON THE DRAWINGS
2. INSTALL NEW FIRST FLOOR, SECOND FLOOR, WALL, RAMP, AND STAIR INCLUDING
AND CANOPY INCLUDING ALL NECESSARY WORKS AS SHOWN ON THE DRAWINGS
1. INSTALL NEW FOUNDATION, COLUMN, BEAM, TRUSS, PURLIN, GIRT, BRACING,
MECHANICAL ROOM
DORMITORY OF NEW FIRE STATION, K-16
CONSTRUCT BUILDING FOR OFFICES AND
FY19
MCJ
MCJ
50 DEP
LEGEND :
NOTES :
UP
UP
R A
M P
D N
R A
C J
C J
CJ CJ
GB-9
G B
G
B
G
B
W F
W F
WF-1
WF-2
GB-1 GB-2 GB-3
G B
G
B
W F
TS-1
WF-1WF-1
W F
F-2
P-2
SC-2
F-3
P-3
SC-3
F-4
P-4
SC-4
F-1
P-5
SC-5
F-5
P-8
SC-6
F-1
P-1
SC-1
F-1
P-1
SC-1
F-5
P-8A
SC-6
F-1
P-6
SC-5
P-2
FR-2
F-7
F-8
P-1
FR-1
F-8
P-1
FR-1
F-8
P-1
FR-1
F-8
P-1
FR-1
F-8
P-2
FR-3
F-9
P-9
SC-7
F-8
P-2
FR-3
TRENCH
CONC PAD
GB-9 GB-10 GB-11
GB-10 GB-11
W F
W F
WF-1
S L
O
E
S L
O
E
SC-10
SC-10
P-7
C-1
SC-10
SC-10
F-6
P-10
SC-9
SC-8 SC-8 SC-8 SC-8
F-7
P-2
FR-2
WF-1
WF-1
C J
C J
C J
C J
WF-1
CJ CJ
C J
C J
C J
C J
C J
C J
CJCJ
CJ
CJ
C J
C J
C J
C J
C J
C J
MCJ
MCJ
MCJ
MCJ
MCJ
SLOPE
@ TOP
2-D13x1200 LG
C J
TYP
(TYP)
(TYP)
SLOPE DETAIL)
ARCH DWG FOR
PLACES (SEE
TYP OF 4
RAMP
CONC
(TYP)
ON VB & 150 THK CWB
150x150- W6.0xW6.0 WWF
130 THK SLAB w/
ON VB & 150 THK CWB
150x150- W6.0xW6.0 WWF
200 THK SLAB w/
CWB (TYP)
& 150 THK
WWF ON VB
W6.0xW6.0 w/ 150x150-
150 THK SLAB
C J
C J
SC-10
(TYP)
@ TOP
2-D16x1200LG
SEE
CONC STOOP
SEE
CONC STOOP
SEE
CONC STOOP
SEE
CONC RAMP
SEE
CONC RAMP
200 1200 300
5360 2750 350 1750
500 500
23460
1200 300 4400 3360 4300
3250 1990 2680 2680 3100 1750 4900 2360 5300
200 7400 200 2400
1000 3000 1800 5900
200 600
5240350
13700
500500
1800 800
A B C D E E1 F G
A A7 B B6 C E E1 F G
C J
C J
CJ
F-9
P-9
SC-7
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
CJ
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
CJ
C J
C J
R A
C J
C J
R A
NC
J
R A
C J
C J
R A
C J
4400 1540
4900 1190 350
37160
4400 3360 4300
4900 2360 5300
500500 500
4400 1540
4900 1190 350
H I J
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
A
B C D
E F G H
YI, KS
STRUCTURAL
SCALE: 1:80
1000 2000 4000
GRAPHIC SCALE
FRAMING PLAN
FOUNDATION AND FIRST FLOOR
214621
H I JI9
I9
SCALE = 1 : 80
FOUNDATION AND FIRST FLOOR FRAMING PLAN
S-3243
PLATE AND PEDESTALS.
3. SEE S-23 FOR STEEL COLUMN BASE
2. SEE S-22 FOR TS-1 DETAIL
GRADE BEAM SCHEDULE
1. SEE S-22 FOR FOOTING AND
S-22
S-22
S-22
S-16
S-16
S-16
S-16
S-16
S-16
4A
S-9
S-22
S-22
S-22
S-16
EXT STAIR1
S-14
S-15
F-8
P-1
FR-1
F-8
P-1
FR-1
F-8
P-1
FR-1
F-8
P-1
FR-1
OUT OF CONTRACT
DORMITORY OF NEW FIRE STATION, K-16
TS200x100x6
TS200x100x6
R=20 kN
R=20 kN
R=20 kN
R=20 kN
SEE
CANOPY FRAME
DN DN
OPEN
SC-2 2G-1 2G-1 2G-2
SC-3
2G-6
B
B
B
B
B
B
B
SC-4
2G-12G-1
SC-1 SC-1
SC-5 SC-5
SC-7
SC-7
2B-3
2G-5
F R
B
F R
B
B
B
B
B
B
G
2B-6
G
SEE DET
LEDGER
SC-10
SC-10
SEE
BRACING
VERT
`-50x50x6
C-1
FR-2
FR-2
SC-10
SC-10
FR-3
FR-3
FR-1
FR-1FR-1
FR-1
2G-5 2G-5 2G-5 2G-5
2G-6
(BELOW)
SC-6
(BELOW)
SC-6
SEE
BRACING
VERT
MCJ
MCJ
B
SIM
`-50x50x6
SD-1
B
B
SC-10
2B-5
2B-9A
TYP
& 150x150-W6.0xW6.0 WWF
50 COMPOSITE STEEL DECK (SD-1)
T=150 CONC SLAB w/
C200x75x25x5
PURLIN
@1000 MAX
C-200x75x25x5
PURLINS
C-200x75x25x5
C200x75x25x5
PURLIN
SD-1SD-1
@500 MAX
C-200x75x25x5
PURLINS
C-200x75x25x5
SC-7
5240 5360 2750 350 1750 4900 2360 5300 1190 350
9631850 1540 1787 1787 1787
1500 170
3250 1990 2680 2680 3100
1750 4900 2360 5300 1190
23460
1500 170
36960
17871850
13700
L x x x
C O
N T
L x x x
C O
N T
L x x x
C O
N T
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
A
B C D
E F G H
SCALE: 1:80
1000 2000 4000
GRAPHIC SCALE
SEE
BRACING
VERT
FR-1FR-1
FR-1FR-1
SEE
BRACING
VERT
2360 4900
2360 4900
NOTES :
SECOND FLOOR FRAMING PLAN
YI, KS
STRUCTURAL
209625
SECOND FLOOR FRAMING PLAN
A A7 B B6 C
E E1 F G H I J
A B C D E E1
G H JI I9F
I9
SCALE = 1 : 80
S-4244
CONNECTION.
FOR EMBED PLATE
BEAM REACTIONS. SEE DETAIL
3. R= kN, REFERS TO STEEL
2. SEE FOR STEEL DECK
SCHEDULE
1. SEE S-24 FOR STEEL BEAM
S-19
S-18
1 1
6 3
S-8 S-12 S-9
S-19
S-19
S-12
S-21
S-18
S-18
S-6 S-6
S-6S-6
EXT STAIR
INT STAIR
S-15
S-14
BLDG S-256, K-16
EXPAND FIRE STATION,
OUT OF CONTRACT
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
A
B C D
E F G H
SCALE: 1:80
1000 2000 4000
GRAPHIC SCALE
YI, KS
STRUCTURAL
214621
R=20 kN
R=20 kN
T
T
F R
F R
F R
MID SPAN
SAG ROD AT
BRACING
VERT
BRACING
VERT
F R
S
B
SB-3
SB-6 SB-6 SB-7
SB-6SB-6 SB-3
S B
S B
SB-3 SB-3
SB-4
FR-4
S B
SB-2 SB-3
SB-5
F R
FR-4
SB-4
SB-3 SB-3
S B
S B
S B
SB-5
R I
D G
E
SB-9 SB-9
TYP
SEE
PURLINS,
BLOCKING AT
MID SPAN
SAG ROD AT
`s-150x150x10
HOR BRACING
`s-150x150x10
HOR BRACING
@ 500 MAX (TYP)
C-200x75x25x5
PURLINS
@ 1000 MAX (TYP)
C-200x75x25x5
PURLINS
SB-3
SB-3SB-3
C-200x75x25x5
`s-50x50x6
@500 MAX (TYP)
C-200x75x25x5
PURLINS
4@500 MAX (TYP)
C-200x75x25x5
PURLINS
C-200x75x25x5
PURLINS
@1000 MAX (TYP)
C-200x75x25x5
PURLINS
SEE
CANOPY FRAME
5240 5360 2750 350 1750 4900 2360 5300
5360 3100
1750 4900 2360 5300
2250 2650 26502650
2250 2650 2650
3503 2087
37160
1750350
T Y
P
CONT L200x70x7x10
FR-4
SB-4
SB-3 SB-3
S B
S B
S B
T Y
P
FR-4
SB-4
SB-3 SB-3
S B
S B
S B
T Y
P
BRACING
VERT
SB-5
S B
S B
SB-3 SB-3
SB-4
FR-4
S B
S B
S B
SB-3 SB-3
SB-4
FR-4
S B
SB-3SB-2 SB-2
SB-2 SB-2
SB-2
SB-3
SB-3
F R
F R
F R
F R
F R
13350
2360 4900
22502650
2360 4900
2650 2250
1190 350
6A
HOR BRACING
@500 (TYP)
C-200x75x25x5
PURLINS
MATCH PURLIN SIZE
BLOCKING TO
TYP
3 PL w/ 2-013 BOLTS
1.6 THK LIGHT GAGE
PURLIN
NOTES :
CONNECTION.
FOR EMBED PLATE
BEAM REACTIONS. SEE DETAIL
3. R= kN, REFERS TO STEEL
2. SEE S-401 FOR TRUSS AND FRAME ELEVATIONS
1. SEE S-603 FOR STEEL BEAM SCHEDULE
ROOF FRAMING PLAN
A A7 B B6 C
E E1 F G H I JI9
A B C D E E1 F G
H JI I9
SCALE = 1 : 80
S-5245
ROOF FRAMING PLAN
S-18
S-20
S-5 S-21
S-10
S-21 S-21S-21
S-21
S-21
S-20
S-21
S-21
S-21
S-20
S-21
S-21
S-12
BLOCKING AT PURLINS
SCALE = NONE
SB-5
OUT OF CONTRACT
DORMITORY OF NEW FIRE STATION, K-16
UP
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
A
B C D
E F G H
SCALE: 1:80
1000 2000 4000
GRAPHIC SCALE
YI, KS
STRUCTURAL
214621
SECOND FLOOR
TOP OF STEEL
FIRST FLOOR
TOP OF STEEL
w/ 2-016 BOLTS x9x150 LG
CLIP `150x100 w/ 2-016 BOLTS x9x150 LG
CLIP `150x100
H-150x150x7x10 H-150x150x7x10
SC-10 SC-10
TS-200x100x6
(LLV)
2`s-150x90x9
BRACING
FLOOR
FIRST
H-150x150x7x10
H-150x150x7x10
TOP OF STEEL
SC-7 SC-7
FR-3
(TYP)
O16 SAGROD
MCJ MCJ MCJ
FLOOR
FIRST
90 30
G
(TYP)
L200x80x7.5x11
(TYP)
@1200 MAX
L200x80x7.5x11
(TYP)
@1200 MAX
L200x80x7.5x11
BUILDING ELEVATION
BUILDING ELEVATION
KEY PLAN
BUILDING ELEVATIONS-1
SCALE = 1 : 80
SCALE = 1 : 80
S-6246
H I I9 J
9 7 4 1
S-10
S-21
S-21
S-6
S-6
S-21
DETAIL
SCALE = 1:8
SCALE = 1:8
SECTION
A B C E E1 F G
S-6
S-6
OUT OF CONTRACT
OUT OF CONTRACT
DORMITORY OF NEW FIRE STATION, K-16
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
A
B C D
E F G H
YI, KS
STRUCTURAL
214621
BUILDING ELEVATIONS-2
LG AB
w/ 4-016X200
BP200x400x16
LG AB
w/ 4-016X200
BP200x400x16
H-150x150x7x10
(TYP)
L200x80x7.5x11
H-150x150x7x10
SC-10
OC (TYP)
016 SAG RODS/
TOP OF STEEL
SECOND FLOOR
FLOOR
FIRST
(TYP)
@1200 MAX
L200x80x7.5x11
2G-3
2ND FLR
PL 10
TS200x100x6
PL 10
TS200x100x6
SC-10
SC-10
SHRINK GROUT
25 NON
SC-10
x10x150 LG
`150x150
CONC WALL
GRADE BEAM/
CONC WALL
GRADE BEAM/
S-201
A
FIRST FLOOR
TOP OF STEEL
SC-10
H-150x150x7x10
STEEL
TOP OF
STEEL
TOP OF
FLOOR
FIRST
STEEL
TOP OF
FLOOR
SECOND
FLOOR
FIRST
(TYP)
@1200 MAX
L200x80x7.5x11
SC-10
O16 SAG RODS
TS-200x100x6
SIM
KEY PLAN
BUILDING ELEVATION
BUILDING ELEVATION
SCALE: 1:80
1000 2000 4000
GRAPHIC SCALE
SCALE = 1 : 80
SCALE = 1 : 80
S-7247
HII9J ABCEE1FG D
S-10
S-20
S-7
S-7
S-7
62 3 8
SCALE = 1:10
SECTION
SCALE = 1:10
SECTION
SCALE = 1:10
DETAIL
SCALE = 1:10
SECTION
4A
SCALE = 1:10
SECTION
S-7
S-7
OUT OF CONTRACT
OUT OF CONTRACT
DORMITORY OF NEW FIRE STATION, K-16
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
A
B C D
E F G H
FIRST FLOOR
SECOND FLOOR
TOP OF STL
FIRST FLOOR
TOP OF STL
TOP OF STL
FIRST FLOOR
TOP OF STL
SECOND FLOOR
FIRST FLOOR
TOP OF STL (BEYOND)
TS-1
EW & EF
D13@300
@400 0C (TYP)
BARS & HOR JT REINF
w/ D13@800 OC VERT
200 THK CMU WALL
2B-9A
2G-5
BENT PL 6
@1200
PL300x150x6
@ 1200
`80x80x6x300 LG
STEEL
TOP OF
FLOOR
SECOND
FLOOR
FIRST
STEEL COL.
w/ 2-O16 BOLTS
150x100x9x150 LG
CLIP L
FIRST FLOOR
TOP OF STL
TOP OF STL
TS-1
3 SIDES
SIM
GIRT
C L
KEY PLAN
SCALE: 1:50
500 1000 2000 8004000 200
SCALE: 1:20
4002000 100
SCALE: 1:10
GRAPHIC SCALE
SCALE = 1 : 50
BUILDING SECTION
SCALE = 1 : 50
BUILDING SECTION
BUILDING SECTION1
SCALE = 1 : 50
YI, KS
STRUCTURAL
S-824
BUILDING SECTIONS-1
S-8 S-8
S-8
S-8
S-20
S-12
3 268 8 6
S-8
S-21
S-10
S-12
258 6
SCALE = 1 : 10
DETAIL
SCALE = 1 : 10
DETAIL
214621
DORMITORY OF NEW FIRE STATION, K-16
| 214261_CONST-OFFICE-FIRE-STATION-K16_DWG-STRU 1 |
| 214261_CONST-OFFICE-FIRE-STATION-K16_DWG-STRU 2 |
| 214261_CONST-OFFICE-FIRE-STATION-K16_DWG-STRU 3 |
| 214261_CONST-OFFICE-FIRE-STATION-K16_DWG-STRU 4 |
| 214261_CONST-OFFICE-FIRE-STATION-K16_DWG-STRU 5 |
| 214261_CONST-OFFICE-FIRE-STATION-K16_DWG-STRU 6 |
| 214261_CONST-OFFICE-FIRE-STATION-K16_DWG-STRU 7 |
| 214261_CONST-OFFICE-FIRE-STATION-K16_DWG-STRU 8 |
File details come from the government source that posted it.