About this file

214261_MECH-2

View the file

Other files

File Type Posted
A21_W91QVN19R01840001.pdf PDF
209625_TITLE.pdf PDF
214261_STRUCTURAL-1.pdf PDF
209625_ARCH-2.pdf PDF
209625_MECH-2.pdf PDF
A02_214261_CONST-OFFICE-FIRE-STATION-K16-256_MMTL-ARCH.xlsx XLSX spreadsheet
214261_TITLE_R1.pdf PDF
214261_CIVIL-1.pdf PDF
A02_209625_CONST-BAYS-FIRE-STATION-K16-256_MMTL-CIVIL.xlsx XLSX spreadsheet
214261_ELEC_1.pdf PDF
214261_ARCH-2.pdf PDF
A02_209625_CONST-BAYS-FIRE-STATION-K16-256_MMTL-MECH.xlsx XLSX spreadsheet
A02_209625_CONST-BAYS-FIRE-STATION-K16-256_MMTL-ARCH.xlsx XLSX spreadsheet
209625_STRUC-2.pdf PDF
214261_ELEC_3.pdf PDF
214261_CIVIL-2.pdf PDF
209625_ELEC.PDF PDF
209625_STRUC-1.pdf PDF
A02_214261_CONST-OFFICE-FIRE-STATION-K16-256_MMTL-MECH.xlsx XLSX spreadsheet
214261_ARCH-3.pdf PDF
214261_ARCH-1.pdf PDF
A02_209625_CONST-BAYS-FIRE-STATION-K16-256_MMTL-ELEC.xlsx XLSX spreadsheet
214261_STRUCTURAL-2.pdf PDF
214261_STRUCTURAL-3.pdf PDF
214261_ELEC_2.pdf PDF
A02_214261_CONST-OFFICE-FIRE-STATION-K16-256_MMTL-CIVIL.xlsx XLSX spreadsheet
209625_STRUC-3.pdf PDF
214261_MECH-1.pdf PDF
A02_214261_CONST-OFFICE-FIRE-STATION-K16-256_MMTL-STRU.xlsx XLSX spreadsheet
209625_ARCH-1.pdf PDF
A02_214261_CONST-OFFICE-FIRE-STATION-K16-256_MMTL-ELEC.xlsx XLSX spreadsheet
A02_209625_CONST-BAYS-FIRE-STATION-K16-256_MMTL-STRU.xlsx XLSX spreadsheet
A21_W91QVN19R0184.pdf PDF
209625_MECH-1.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

DN DN

STAIR-2 TOILET

MEN

SHOWER

VD

VD

VD

HF

OAU

HPUHPUHPU

HPUHPU

HPU

RG: O 12.7

RL: O 6.35

D: O25

D: O25

D: O32 D: O32

D: O32

RL: O 9.52

RG: O 15.88

RL: O 9.52

RG: O 15.88

RG: O 15.88

RL: O 9.52

RG: O 19.05

RL: O 9.52

RG: O 19.05

RL: O 9.52

RL: O 6.35

RG: O 12.7

TOILET

OFFICE

OFFICE

LEADER

SHIFT

DISPATCH

SHOWER

TOILET

CORRIDOR-3

DAYROOM

KITCHEN/DINING

CHIEF SUITE

STAIR-2

STAIR-1

APPARATUS

(BELOW)

SCALE : 1 / 100M11

NEW 2ND FL HVAC PLAN - 6

T

TT

T

T

T

M-11

1.

NOTES:

CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND DIRECTION

2.

OF HEAT PUMP SYSTEM IN FIELD(TYP)

CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR HEATPUMP SYSTEM.

PRIOR TO HEATPUMP SYSTEM INSTALLATION.

NEW 2ND FL HVAC PLAN-6 AND NOTES

11 11 11

M M

M M

OUT OF CONTRACT

DORMITORY OF NEW FIRE STATION, K16

CONSTRUCT BUILDING FOR OFFICES AND

CHONG, ST

214621

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

UP

UP

DORM DORM DORM

COMM RM

TRAINING RM

PHYSICAL

MECH RM

SHOWER

TOILET

WOMEN

STAIR-1

STORAGE

SUPPLY

MEDICAL

STAIR-2

APPARATUS-2

JC

LAUNDRY

MEN TOILET

SHOWER

ROOM

FIRE INSPECTORS

CORRIDOR-2

SS

VALVE

3-WAY MIXING

MECH RM

25 20

E

E

32 40 25

MECH RM

E

E

CONN, TO EXIST COLD WATER LINE

SEE CIV. DWG.

80 32

65 40

65 40

50 4040322032

20 25

40 32

HB-3

HB-2

FOR CONT., SEE

UP TO SECOND FLOOR

CW PIPE RISER FOR CONT., SEE

SECOND FLOOR

PIPE RISERS UP TO

CW & DHWS

254032

25 20

EWC

UP

UP

DORM DORM DORM

COMM RM

TRAINING RM

PHYSICAL

SHOWER

TOILET

WOMEN

STAIR-1

STORAGE

SUPPLY

MEDICAL

STAIR-2

APPARATUS-2

JC

LAUNDRY

MEN TOILET

SHOWER

114116

ROOM

FIRE INSPECTORS

CORRIDOR-1

S S

S S

S S

S S

SS

S S

S S

S S

SS

S S

S S

S S

SS

MECH RM

E

E

HB-3

HB-2

HB-2

SEE CIV. DWG.

CONN, TO EXIST SEWER WATER LINE

SS

SS SS

CONN, TO 100 DRAIN PIPE

SEE CIV. DWG.

100 FCO

100 FD

100 FD

50 FD50 FD

50 FD

50 FD

100 FCO

100S S

100 FCO

80 FCO

100 SEWER PIPE RISERS

FROM SECOND FLOOR

FOR CONT.,

40 50

65 VENT PIPE RISER

UP TO SECOND FLOOR

EMERGENCY EYEWASH/SHOWER

EES

HB-3

A C

P-1 P-1

P-1 P-1

P-5

P-5 P-3

P-3

P-5

P-5

P-8

P-12

P-12

P-13 P-13

P-13P-13

EWC

P DOMESTIC HOT WATER

CIRC. PUMP

INTAKE (W/ WIRE MESH)

150mmDIA COMBUSTION AIR

DOMESTIC HOT WATER

RE-CIRC. PUMP

P

STORAGE TANK

DOMESTIC HOT WATERDT

DWH DOMESTIC HOT WATER

HEATER

CONC. PAD

CONC. PAD

MOUNTED ON CEILING

GAS LEAK DETECTOR

200mm FLUE VENT

UP THRU ROOF SEE DETAIL

AUTOMATIC SHUT OFF VALVE

G

M

G

SEE CIV. DWG.

CONN, TO GAS LINE

GAS ALARM GONG

GAS LEAK DETECTION CONTROL PANEL

GAS FILTER

GAS REGULATOR

VALVE CABINET

GAS METER

GAS METER CABINET

SHUT UP VALVE

SCALE : 1 / 100M12

- SCALE : 1 / 100M12

NEW 1ST FL PLUMBING PIPING PLAN-1

NEW 1ST FL PLUMBING PIPING PLAN-2

- SCALE : 1 / 50M12

M-12

ENLARGED MECH ROOM PLAN 3

SEE -

M23

M23

-SEE

1.

NOTES:

CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND DIRECTION

2.

OF GAS PIPING, FLUE VENT, INTAKE, HW, CW, SEWER AND VENT PIPING IN FIELD(TYP)

(HOT & COLD WATER PIPING, SEWER, VENT PIPING & GAS SYSTEM)

CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR PLUMBING SYSTEM & GAS SYSTEM

PRIOR TO HOT, COLD, SEWER, VENT PIPING & GAS SYSTEM INSTALLATION.

NEW 1ST FL PLUMBING PIPING PLAN-1 & 2

ENLARGED MECH ROOM AND NOTES

M12

M12

POC

OUT OF CONTRACT

OUT OF CONTRACT

DORMITORY OF NEW FIRE STATION, K16

CONSTRUCT BUILDING FOR OFFICES AND

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

1.

NOTES:

CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND DIRECTION

2.

OF GAS PIPING, FLUE VENT, INTAKE, HW, CW, SEWER AND VENT PIPING IN FIELD(TYP)

(HOT & COLD WATER PIPING, SEWER, VENT PIPING & GAS SYSTEM)

CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR PLUMBING SYSTEM & GAS SYSTEM

PRIOR TO HOT, COLD, SEWER, VENT PIPING & GAS SYSTEM INSTALLATION.

APPARATUS

(BELOW)

DN DN

OFFICE OFFICE

LEADER

SHIFT

TOILET

CHIEF SUITE

STAIR-2

DISPATCH

STAIR-1

210202

TOILET

CORRIDOR-3

DAYROOM

KITCHEN/DINING

WALL MOUNTED STAINLESS STEEL TYPE

FLOOR MOUNTED TYPE

KITCHEN SINK

4015 75

COUNTER TOP.

4 WATER CLOSET

LAVATORY

F I X T U R E

SYMBOL QTY.

REQUIREMENTS.

NOTES :

C.W.

1. QUANTITIES ARE SHOWN FOR ESTIMATION PURPOSE ONLY, THE CONTRACTOR SHALL BE

RESPONSIBLE FOR VERIFYING ACTUAL QUANTITIES BASED ON THE CONTRACT DOCUMENTS

R E M A R K S

BACK

VENTH.W.

PIPE CONNECTION

15 40

WASTE

FLUSH TANK,

7515 40P-7

SERVICE SINK

1 15

1 WASHER

PLUMBING FIXTURE SCHEDULE

155 SHOWER 4015 50

STAINLESS STEEL TYPE, DOUBLE BOWL

FLUSH VALVE, WALL HUNG.15URINALP-3 - 40 501

20 20 40 50 O.S.D

P-1

50 FD

50 FD

50 FD

15CW & 15HW PIPE RISERS

FROM FIRST FLOOR FOR CONT.,

32CW & 20HW PIPE RISERS

FROM FIRST FLOOR FOR CONT.,

32 20

15CW & 15HW PIPE RISERS

FROM FIRST FLOOR FOR CONT.,

15CW & 15HW PIPE RISERS

FROM FIRST FLOOR FOR CONT.,

15CW & 15HW PIPE RISERS

FROM FIRST FLOOR FOR CONT.,

100VTR

100SEWER PIPE RISERS

DOWN TO FIRST FLOOR

65VENT PIPE RISER

FROM FIRST FLOOR

40 50

1P-12 LAUNDRY SINK 15 15 40 50 SINGLE BOWL

EES

EMERGENCY SHOWER

& EYE WASH

32 -- -1 FREE STAND TYPE

C

B

QTY REMARKS

1-11

12-32 20

SYMBOL

P.D.I

RATING

FU

CONNECTION

PIPE

33-60 32

WITH EXPANSION BELLOWS.

PRESSURIZED COMPRESSION CHAMBER

STAINLESS STEEL CONSTRUCTION

WATER HAMMER ARRESTER SCHEDULE

A

A

A P-1

P-1

P-5

P-5

P-5

P-7

P-8

P-13

P-13

P-13

P-13

SCALE : 1 / 100M13

NEW 2ND FL PLUMBING PIPING PLAN-3

M-13

NEW 2ND FL PLUMBING PIPING PLAN-3,

PLUMBING FIXTURE SCH., WATER HAMMER

ARRESTER SCH. AND NOTES

OUT OF CONTRACT

DORMITORY OF NEW FIRE STATION, K16

CONSTRUCT BUILDING FOR OFFICES AND

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

UNIT HEATER SUBJECT TO MANUFACTURE'S BUILT-IN SAFETIES

C. SAFETIES:

THE OCCUPANT-ADJUSTABLE SETPOINT VIA THE WALL-MOUNTED SPACE THERMOSTAT.

SHALL CYCLE THE UNIT HEATER FAN (ON-OFF) TO MAINTAIN SPACE TEMPERATURE AT

SET ELECTRIC UNIT HEATER "ON-OFF" SWITCH TO "ON" POSITION, BUILT-IN THERMOSTAT

B. SPACE TEMPERATURE CONTROL:

THIS SEQUENCE OF OPERATION.

CONTRACTOR SHALL INSTALL MANUFACTURER'S CONTROL HARDWARE TO PERFORM

A. GENERAL:

UNIT HEATER(S) CONTROL

SEQUENCE OF OPERATION

HORIZONTAL TYPE

UNIT HEATER

M

T BUILT-IN THERMOSTAT

T

E.A.

T

T-1

EF-2

O.A.

DM

DM

N

F

G

M

OL'S

1PH 120VAC

BACKDRAFT DAMPER

DAMPER MOTOR

SET AT 35.0 DEG. C.

VENTILATION THERMOSTAT(T-1)

MAN. MTR STARTER

W/A.O.H. SEL. SW

ROOF EXH. FAN

GREEN PILOT LAMP

O.A.

A

OFF

H

H

VENT THERMOSTAT

MOTORIZED O.A.

DAMPER

FOR MECH.RM.

LOUVER W/BIRDSCREEN

OUTSIDE AIR INTAKE

SEQUENCE OF OPERATION

WHEN SPACE TEMP. RISES ABOVE 35 DEG.C, ROOF EXHAUST FAN

SHALL OPERATE AND OPEN O.A. INTAKE DAMPER AND MOTORIZED

BACKDRAFT DAMPER VENTILATION TO MAINTAIN T-1 SETPOINT.

- M14

1 ELECTRIC UNIT HEATER CONTROL DIAGRAM

BACKDRAFT DAMPER

- M14

2 MECH RM VENT SYS CONTROL DIAGRAM

NOT TO SCALE

NOT TO SCALE

M-14

ELECTRIC UNIT HEATER CONTROL DIAGRAM,

MECH RM VENT SYS CONTROL DIA.,

COMPRESSED AIR PIPING SYSTEM DIA.

DORMITORY OF NEW FIRE STATION, K16

CONSTRUCT BUILDING FOR OFFICES AND

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

MECH RM. GAS PIPING DIAGRAM

"A" - DETAIL

GAS SUPPLY INLET

CAP

TEE FITTING

(M

IN

TO EQUIPMENT

GAS METER

PVC BOX

PVC BOX

SHUT OFF VALVE

GAS REGULATOR

FILTER

VALVE CABINET

METER CABINET

INLET

ALL GAS VALVE BOX CABINETS AND GAS METER

NOTE:

CABINET AND GAS METER CABINET FOR ALL BUILDINGS.

PROVIDE WEATHER PROOF TYPE GAS VALVE BOX

CABINETS TYPE, MATERIAL AND SIZE SHALL BE

COORDINATED WITH LOCAL GAS COMPANY

GAS MAIN PIPING

SHUT OFF VALVE

NOTE:

1. GAS PIPING UP TO 1M ABOVE GROUND.

SLEEVE RUBBER RING

WELLDING

T/F FITTING

HEAT FUSIONLOCATING-WIRE

UNDERGROUND GAS PIPE

GAS LEAK DETECTION ALARM SEQUENCE DIAGRAM/SPECS

NOT TO SCALE

- M15

NOT TO SCALE

- M15

ALL GAS VALVE CABINETS AND GAS METER CABINETS

SHALL BE INSTALLED AS PER LOCAL GAS COMPANY'S

NOTE:

RECOMMENDATIONS.

1,500

CONTROLLER

,5

(V

A R

SHUT OFF VALVE

GAS REGULATOR

GAS METER

ALARM GONG

GAS LEAK DETECTION

FIRED EQUIPMENT

CONNECT TO GAS

GAS FIRED EQUIPMENT

"B"

M

FL

AUTOMATIC SHUT OFF VALVE

GAS LEAK DETECTOR

FILTER

GAS MAIN PIPING

P

EW503-MAIN : ALARM UNIT

EW503-UNIT : GAS CONCENTRATION DISPLAY UNIT

EWASV503-I : CONTROLLER FOR A.S.V

EW503-MAIN EW503-UNIT EWASV503-I

AGOO

W

E

II

d xE ?

R O

T C

E T

E D

S

B T4

GAS LEAK DETECTOR

WATER & DUST PROOF IP56

BODY-MAKER STANDARD

CURRENT

PROTECTION GRADE

VOLT.

USE

CABLE ENTRY

AC110V

PG19

COLOR

MATERIAL

BELL-STEEL

BODY-ABS

MAX. 0.15A

SOUND LEVEL 90 dB

MODEL NO SAB130

LENS-RED

BELL-RED

140 * 117 * 77 mm

Within 10 Sec

CURRENT

Dimensions(W*H*D)

VOLT.

USE

Weight(g)

DC 24V

858g

Respons Time

MATERIAL ALUMINUM

MAX. 0.15A

EXPLOSION PROOF Exd II B T6

MODEL NO EWEX II B100

STAINLESS

WITHIN 30 SEC

CURRENT

CASE materials

VOLT.

USE

CABLE ENTRY

DC 60V

1/2" PT

Pipe Size 200A

32A~

MAX. 2 A

VALVE TYPE Ball Valve

MODEL NO EW32A ~200A

S45C

BODY:AL or STEEL

CABLE F-CVV 1.5 SQ * 2 WIRE

CABLE F-CVV 1.5 SQ * 3 WIRE

CABLE F-CVV 1.5 SQ * 2 WIRE

A.S.V(AUTO SHUT-OFF VALVE)

GAS LEAK DETECTOR

MODEL : EWEX II B100

MODEL : EW32A~200A

DETECTABLE GAS LNG, CITY GAS.

Operational Temp -20 DEG.C TO +40 DEG.C

Operational Humidity

DC 24V

DC 80V

MAX. 3 A

MAX. 1.5A

32~65A

80~100A

125~200A

Pipe

Size

OPEN/CLOSE TIME

Gear materials

BODY materials

EW503-MAIN : ALARM UNIT

EW503-UNIT

CONTROLLER

ALARM SOUND : OVER 90 dB

MOUNTING TYPE : WALL MOUNTING

MODEL NO : EW503

OPERATING TEMPERATURE : -10 DEG.C TO +40 DEG.C

EWASV503-I : CONTROLLER FOR A.S.V

GAS CONCENTRATION DISPLAY UNIT

OPERATING POWER : 110 VAC, 60HZ

AC 110V 60Hz

M-15

"B" - DETAIL

MECH RM. GAS PIPING DIAGRAM AND GAS

LEAK DETECTION ALARM SEQUENCE DIA.

DORMITORY OF NEW FIRE STATION, K16

CONSTRUCT BUILDING FOR OFFICES AND

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

RESET SCHEDULE AS INDICATED.

SUPPLY TEMPERATURE SETPOINT SHALL BE DETERMINED FROM A LINEAR

MAINTAIN HOT WATER SUPPLY TEMPERATURE AT SETPOINT. THE HOT WATER

THE BOILER BUILT-IN CONTROL SHALL MODULATE THE BOILER CONTROL TO

2. HOT WATER TEMPERATURE RESET CONTROL

1.1

1.

SET BOILER B-1 "HAND-AUTO" SWITCH TO AUTO POSITION, BOILER STARTS WHEN

WINTER SEASON

POSITION, PUMP STARTS AND RUNS CONTINOUSLY WHEN O.A. THERMOSTAT

SET EXISTING HOT WATER CIRC PUMP "HAND-OFF-AUTO" SWITCH TO "AUTO"

DROPS BELOW IT'S SETPOINT OF 15.6 DEG.C.

EXISTING HOT WATER CIRC PUMP IS ENERGIZED. BOILER PACKAGE CONTROL SHALL

SEQUENCE OF OPERATION

1.3

BOILER SYSTEM CONTROL EQUIPMENT SCHEDULE

1. O.A. THERMOSTAT:

SPDT SWTCH WHICH MAKES CIRCUIT ON TEMPERATURE FALL,

REMOTE BULB ELECTRIC TYPE THERMOSTAT, STANDARD RESPONSE

CONTROL RANGE 0-100 DEG F, 5 FEET COPPER CAPILLARY TUVBING,

DIFF= 1.0 DEG.F. ADJ. AND 8 AMPS AT 120VAC.

MAINTAIN BOILER HOT WATER SUPPLY TEMPERATURE AT 80 DEG. C.

NOT TO SCALEM16

CONNECTION POINT DIAGRAM FOR NEW HOT WATER BOILER(TYPICAL)

HOT WATER BOILER

GAS FIRED CONDENSING

B

SUNSHIELD

(W/REMOTE BULB)

OUTDOOR AIR THERMOSTAT

T O

E

HWR

HWS

HWR

HWS

HEATING SYSTEM

FROM/TO BLDG.

PRESSURE REDUCING

BACK FLOW PREVENTER

MAKE UP COLD WATER

CONTROL PANEL

H W

R

H W

S

EXISTING HOT WATER

EXPANSION

CHEMICAL FEEDER

O

SENSER (PT1000)

T

EXISTING SUNSHIELD

O.A. TEMP.

MOTOR STARTER

CIRC. PUMP

VALVE

ASSEMBLY

M-16

CONNECTION POINT DIA. FOR NEW HOT

(T

YP.

DI

RT

LE

G

(T

YP.

DI

RT

LE

G

G

G

FOR CONT.

SEE CIVIL DW

G

M

GAS M

ETER

(TYP.)

DIRT LEG

FILTER

G

GAS REGULATOR

00 00m m

SHUT OFF VALVE

VALVE CABINET

GAS M

ETER CABINET

G

CONTROL PANEL

GAS LEAK DETECTION

GAS ALARM

GONG

G

AUTOM

ATI

C

SHUT

OFF

V

ALVE

B

HOT

W

ATE

R

BOI

LE

R

DW

H

DOM

ES

TI

C

HOT

W

AER

HEATE

R

NOT TO SCALEM16

MECH RM GAS PIPING ISOMETRIC DIAGRAM

WATER BOILER, SEQUENCE OF OPERAYION ,

BOILER SYSTEM CONTROL EQUIPMENT SCH.

AND MECH RM GAS PIPING ISOMETRIC DIA.

1.

NOTES:

CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND DIRECTION

2.

OF GAS PIPING AND ACCESSORIES IN FIELD(TYP)

AND GAS ALARM GONG)

AUTOMATIC SHUT OFF VALVE, GAS LEAK DETECTION PANEL, GAS LEAK DETECTOR

(GAS PIPING, SHUT OFF VALVE, VALVE CABINET, FILTER, GAS REGULATOR

CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR GAS PIPING SYSTEM.

GAS

L

EAK

DET

EC

TO

R

MOUNTE

D

ON

CEIL

IN

G

TANK

DORMITORY OF NEW FIRE STATION, K16

CONSTRUCT BUILDING FOR OFFICES AND

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

NH

1PH 120VAC

L4080

(BUILT IN CONTROL)

DOM H.W. HEATER

RELAY

WELL

THERMOSTAT 26.7 DEG C. TO 82.2 DEG C . RANGE,

T-# SHALL BE A REMOTE BULB

CONTROL

TRANSFORMER

O/L

120V

FOR P-2

G

C

MOTOR STARTER

HOLDING COIL

FUSE

SEE ELECTRICAL

DRAWING

O

A

P

N O T E ;

H

TYPICAL

T-1

1.66 DEG C. DIFFERENTIAL, WIRE TO MAKE ON FALL.

MOUNT ON DOMESTIC HOT WATER

MOUNT IN HWR PIPING (P-3)

8 FL AMPS AT 120VOLTS.

STORAGE TEMP(P-2).

GROUNDLIGHT

P

TO MAINTAIN ITS SET POINT,

P

2 CONTROL

SEQUENCE OF OPERATION

SHALL BE SIMILAR.

T-1

T-2

AS FOLLOWS ;

PUMP

AQUASTAT SHALL CONTROL PUMP

140 DEG F FOR PUMP P-2

100 DEG F FOR PUMP P-3

GREEN PILOT

43.3 DEG.C ENTIRE BLDG

PLUMBING SYSTEM

RECIRC. PUMP

DOMESTIC H.W.

P

DOMESTIC H.W.

CIRC. PUMP

P

STORAGE TANK

DOMETIC HOT WATER

DT

ET

DOMETIC HOT WATER

NOT TO SCALE- M17

1 DOMESTIC HOT WATER SYSTEM CONTROL DIAGRAM

M-17

CONTROL DIA.

DOMESTIC HOT WATER SYSTEM

HEATER

DORMITORY OF NEW FIRE STATION, K16

CONSTRUCT BUILDING FOR OFFICES AND

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

9. ELEVATOR FIRE SPRINKLER SHALL BE IN ACCORDANCE WITH UFC 3-600-01

AUTOMATIC FIRE SUPPRESSION(S) GENERAL NOTES:

1. THE CONTRACTOR SHALL PROVIDE AND INSTALL AN AUTOMATIC WET PIPE SPRINKLER SYSTEM

TO FULLY PROTECT THIS FACILITY. THE FIRE SPRINKLER SYSTEM SHOWN THESE DRAWING IS

PERFORMANCE BASED WHICH MEANS CONCEPTUAL REQUIREMENT ONLY. THE SPRINKLER

CONTRACTOR SHALL SUBMIT A COMPLETE FIRE SPRINKLER SYSTEM SHOPDRAWINGS BASED ON

NFPA 13 AND SPECIFICATION REQUIREMENTS AND SUBMIT FOR APPROVAL PRIOR TO

INSTALLATION. THE EQUIPMENT SHOWN ARE SUGGESTED LOCATIONS HOWEVER FINAL LAYOUT

SHALL BE IN ACCORDANCE WITH APPLICABLE CODES, MANUFACTURER'S RECOMMENDATIONS, AND

EQUIPMENT LISTINGS. CONTRACTOR SHALL COORDINATE SPRINKLER HEADS LOCATIONS WITH,

CEILING PANELS, LIGHTING FIXTURES, AND HVAC AIR DEVICES. ALL EQUIPMENT SHALL BE UL

LISTED AND FM APPROVED IN ACCORDANCE WITH NFPA 13 AND THE PROJECT SPECIFICATION.

2. THE CONTRACTOR SHALL CONDUCT WATER SUPPLY HYDRANT TEST FOR THIS PROJECT BASED

ON NFPA 291 REQUIREMENTS AND UTILIZE THIS DATA TO DESIGN THE SPRINKLER SYSTEM.

THE HYDRANT LOCATIONS, FLOW TESTS, AND DATE SHALL BE INDICATED ON THE

SHOPDRAWINGS. AUTOMATIC SPRINKLER PROTECTION SYSTEM IS REQUIRED TO PROTECT THIS

ENTIRE FACILITY. A MINIMUM 10% SAFETY FACTOR IS REQUIRED BETWEEN THE AVAILABLE

WATER SUPPLY AND THE SPRINKLER SYSTEM DEMAND.

INSTALLED IN THE HORIZONTAL POSITION.

7. ALL AUTOMATIC SPRINKLER DRAIN VALVES FOR FIRE DEPARTMENT CONNECTIONS SHALL BE

BE INSTALLED ON THE EXTERIOR.

DRAINS, BUT MUST TERMINATE TO THE BUILDING EXTERIOR. SPRINKLER RISERS SHALL NOT

AND MAINTENANCE. TEST DRAINS ARE NOT TO BE TERMINATED AT WALL SINKS OR FLOOR

6. PROVIDE MINIMUM 1M X 2M SPACE FOR EACH FIRE SPRINKLER RISER FOR INSTALLATION

AS-BUILT DRAWINGS FOR THIS PROJECT.

CONTRACTOR SHALL CONFORM TO THE SYMBOLS INDICATED IN NFPA 170 TO DEVELOP THE

22-"PLANS AND CALCULATIONS" PRIOR TO SPRINKLER PIPING INSTALLATION. THE

5. CONTRACTOR SHALL SUBMIT HYDRAULIC CALCULATIONS AS REQUIRED BY NFPA 13 CHAPTER

4. FIRE PROTECTION PLANS SHOWN ARE USED FOR COST ESTIMATE PURPOSE ONLY.

WITH O-RINGS ARE NOT PERMITTED.

BRACING CALCULATION IN ACCORDANCE WITH NFPA 13 REQUIREMENTS; SPRINKLERS

3. PROVIDE EARTHQUAKE PROTECTION (SWAY BRACING), END OF BRANCH LINE AND SEISMIC

8. FLEXIBLE COUPLINGS SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 13

10. ALL PIPING, SANITARY, VENT, WASTE, PLUMBING, OTHER PIPING, POWER OR CONTROL CIRCUTS, OR DUCT SHALL PENETRATE ANY STAIR OR EXIT PASSAGEWAY ENCLOSURE UNLESS IT SERVES

AN APPLIANCE WITHIN THE ENCLOSURE AND DEAD ENDS IN THE ENCLOSURE.

SP

D

SPRINKLER

MAIN SUPPLY SPRINKLER

PENDENT SPRINKLER(K=5.6)

UPRIGHT SPRINKLER(K=5.6)

CUTTING POINT

CAP

FIRE DEPARTMENT CONNECTION

(2-WAY SHOWN)

VALVES

CHECK VALVE

FITTING

WALL MOUNTED TEST HEADER

CONNECTION, TOP

ELBOW, 90

ELBOW, TURNED UP

ELBOW, TURNED DOWN

TEE

TEE, OUTLET UP

TEE, OUTLET DOWN

CONNECTION, BOTTOM

RISER

TEST VALVE

DRAIN VALVE

TYPICALTYP.

NO

EXST EXISTING

ABBREVIATIONS

MAX MAXIMUM

MIN MINIMUM

DRAIN PIPE

NUMBER

DRAWINGDWG

CONN

CONT CONTINUE/CONTINUATION

CONNECTION

RM ROOM

W/ WITH

W/O WITHOUT

SCH SCHEDULE

RESIDENTIAL PENDENT SPRINKLER(K=4.9)

UPRIGHT SPRINKLER(K=8.0)

SIDEWALL SPRINKLER(K=5.6)

OS&Y GATE VALVE(N.O.)

W/TAMPER SWITCH

OS&Y GATE VALVE(N.C.)

W/TAMPER SWITCH

VERIFYING ACTUAL QUANTITIES BASED ON THE CONTRACT DOCUMENT REQUIRMENTS.

1. QUANTITIES ARE SHOWN FOR ESTIMATING PURPOSE ONLY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR

NOTE

M-18

FIRE PROTECTION LEGEND & ABBREVIATION

FIRE PROTECTION LEGEND & ABBREVIATION,

AUTOMATIC FIRE SUPPRESSION GENERAL

NOTES, SPRINKLER Q'TY LIST AND NOTE

SPRINKLER Q'TY LIST

SPRINKLER HEAD TYPE

US/(METRIC)

"K" FACTOR

SIZE

A R E ASYMBOL

THREAD

SPRINKLER Q'TY LIST

TOTAL

MECH RM, APPARATUS, COMM RMQUICK RESPONSE UPRIGHT TYPE SPRINKLER HEAD 8.0/(115)3/4" NPT

5.6/(80)1/2" NPTQUICK RESPONSE PENDENT TYPE SPRINKLER HEAD

TOTAL NUMBER OF SPRINKLER OF SYSTEM 85

FIRE INSPECTORS, DORM, DISPATCH, CORRIDOR, TOILET, SHOWER, OFFICE, KIT/DINING DAYROOM, STAIR-1 33

8.0/(115)3/4" NPTQUICK RESPONSE PENDENT TYPE SPRINKLER HEAD MEDICAL SUPPLY STORAGE, LAUNDRY 3

STAIR-1QUICK RESPONSE SIDEWALL TYPE SPRINKLER HEAD 5.6/(80)1/2" NPT 1

DORMITORY OF NEW FIRE STATION, K16

CONSTRUCT BUILDING FOR OFFICES AND

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

102103

EWC

UP

UP

DORM DORM DORM

COMM RM

TRAINING RM

PHYSICAL

MECH RM

SHOWER

TOILET

WOMEN

STORAGE

SUPPLY

MEDICAL

STAIR-2

APPARATUS-2

JC

LAUNDRY

MEN TOILET

SHOWER

ROOM

FIRE INSPECTORS

CORRIDOR-1

SST SHLEF

JC

100 100

5 2

5 2

32 50 2540 32

S P (W

M-19

SCALE : 1 / 100M19

1ST FLOOR FIRE PROTECTION PIPING PLAN - 1

15mm QUICK RESPONSE CONCEALED

PENDENT TYPE SPRINKLER HEAD

20mm QUICK RESPONSE CONCEALED

PENDENT TYPE SPRINKLER HEAD

UPRIGHT TYPE SPRINKLER HEAD

20mm QUICK RESPONSE

SEE

M21

1ST FL FIRE PROTECTION PIPING PLAN-1

DORMITORY OF NEW FIRE STATION, K16

CONSTRUCT BUILDING FOR OFFICES AND

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

MECHANICAL

APPARATUS

(BELOW)

DN DN

OFFICE OFFICE

LEADER

SHIFT

TOILET

CHIEF SUITE

STAIR-2

DISPATCH

STAIR-1

210202

TOILET

CORRIDOR-3

DAYROOM

KITCHEN/DINING

SHOWER

DN

DISPATCH

200 200200

100 100

0 5

2525 25 252525

2525 25 252525

SP

(W

M-20

SCALE : 1 / 100M20

2ND FLOOR FIRE PROTECTION PIPING PLAN - 1

15mm QUICK RESPONSE CONCEALED

PENDENT TYPE SPRINKLER HEAD

SYSTEM TEST CONNECTION

ON WET SPRINKLER SYSTEM

UPRIGHT TYPE SPRINKLER HEAD

20mm QUICK RESPONSE

2ND FL FIRE PROTECTION PIPING PLAN-1

DORMITORY OF NEW FIRE STATION, K16

CONSTRUCT BUILDING FOR OFFICES AND

214621_CONSTRUCT BUILDING FOR OFFICES AND DORMITORY OF NEW FIRE STATION, K16_M11
214621_CONSTRUCT BUILDING FOR OFFICES AND DORMITORY OF NEW FIRE STATION, K16_M12
214621_CONSTRUCT BUILDING FOR OFFICES AND DORMITORY OF NEW FIRE STATION, K16_M13
214621_CONSTRUCT BUILDING FOR OFFICES AND DORMITORY OF NEW FIRE STATION, K16_M14
214621_CONSTRUCT BUILDING FOR OFFICES AND DORMITORY OF NEW FIRE STATION, K16_M15
214621_CONSTRUCT BUILDING FOR OFFICES AND DORMITORY OF NEW FIRE STATION, K16_M16
214621_CONSTRUCT BUILDING FOR OFFICES AND DORMITORY OF NEW FIRE STATION, K16_M17
214621_CONSTRUCT BUILDING FOR OFFICES AND DORMITORY OF NEW FIRE STATION, K16_M18
214621_CONSTRUCT BUILDING FOR OFFICES AND DORMITORY OF NEW FIRE STATION, K16_M19
214621_CONSTRUCT BUILDING FOR OFFICES AND DORMITORY OF NEW FIRE STATION, K16_M20

File details come from the government source that posted it.