About this file

214261_CIVIL-1

View the file

Other files

File Type Posted
A21_W91QVN19R01840001.pdf PDF
209625_TITLE.pdf PDF
214261_STRUCTURAL-1.pdf PDF
209625_ARCH-2.pdf PDF
209625_MECH-2.pdf PDF
A02_214261_CONST-OFFICE-FIRE-STATION-K16-256_MMTL-ARCH.xlsx XLSX spreadsheet
214261_TITLE_R1.pdf PDF
A02_209625_CONST-BAYS-FIRE-STATION-K16-256_MMTL-CIVIL.xlsx XLSX spreadsheet
214261_ELEC_1.pdf PDF
214261_ARCH-2.pdf PDF
A02_209625_CONST-BAYS-FIRE-STATION-K16-256_MMTL-MECH.xlsx XLSX spreadsheet
A02_209625_CONST-BAYS-FIRE-STATION-K16-256_MMTL-ARCH.xlsx XLSX spreadsheet
209625_STRUC-2.pdf PDF
214261_ELEC_3.pdf PDF
214261_CIVIL-2.pdf PDF
209625_ELEC.PDF PDF
209625_STRUC-1.pdf PDF
A02_214261_CONST-OFFICE-FIRE-STATION-K16-256_MMTL-MECH.xlsx XLSX spreadsheet
214261_ARCH-3.pdf PDF
214261_ARCH-1.pdf PDF
A02_209625_CONST-BAYS-FIRE-STATION-K16-256_MMTL-ELEC.xlsx XLSX spreadsheet
214261_STRUCTURAL-2.pdf PDF
214261_STRUCTURAL-3.pdf PDF
214261_ELEC_2.pdf PDF
A02_214261_CONST-OFFICE-FIRE-STATION-K16-256_MMTL-CIVIL.xlsx XLSX spreadsheet
214261_MECH-2.pdf PDF
209625_STRUC-3.pdf PDF
214261_MECH-1.pdf PDF
A02_214261_CONST-OFFICE-FIRE-STATION-K16-256_MMTL-STRU.xlsx XLSX spreadsheet
209625_ARCH-1.pdf PDF
A02_214261_CONST-OFFICE-FIRE-STATION-K16-256_MMTL-ELEC.xlsx XLSX spreadsheet
A02_209625_CONST-BAYS-FIRE-STATION-K16-256_MMTL-STRU.xlsx XLSX spreadsheet
A21_W91QVN19R0184.pdf PDF
209625_MECH-1.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

- 1 SCALE = 1 : 3,000

N

CIVIL

C-1

GENERAL NOTES :

SUBMISSION OF CONTRACT PROPOSAL.

DIMENSIONS AT THE PROJECT SITE ORIENTATION PRIOR TO

1. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND

PRIOR TO COMMENCING WORK ON THE PROJECT.

INDICATED BY THE COR AND SHALL BE APPROVED BY THE COR

UNDETAILED PORTION OF THE JOB INCLUDING OTHER AREAS

2. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ANY

EXPENSE TO THE SATISFACTION OF THE CONTRACTING OFFICER.

DISMANTLING, DEMOLISHING, OR REMOVING AT THE CONTRACTOR'S

TO THEIR ORIGINAL CONDITIONS OF THE ITEMS DAMAGED BY

3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR/RESTORATION

TO THE PROJECT CONTRACT.

TO ACCOMPLISH THE CIVIL SCOPE OF WORK AT NO ADDITIONAL COST

FORM ARE A PART OF THIS PROJECT. THE DETAILS WILL BE UTILIZED

OF THE REPLACEATION MANAGEMENT AGENCY, KOREA REGION OFFICE"

DRAWINGS, FOR OM&A PROJECTS, KOREA, OCTOBER 2003, DEPARTMENT

6. THE CIVIL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL

LOCATION PLAN

ITEMS WHICH WILL INTERFERE WITH THE REPLACEION OPERATIONS.

UNDER GROUND ROCK BASE, EXISTING UTILITY LINES, AND OTHER

CLEARED/REROUTED OF ALL NATURAL OBSTRUCTIONS, SUCH AS

5. THE SITE INDICATED ON THE DRAWINGS SHALL BE GRADED AND

ADDITIONAL COST.

EXISTING SITE CONDITIONS PRIOR TO START OF WORK AT NO

CHECK THE OTHER REPLACEION REQUIREMENTS IN MEETING THE

FOR GOOD SURFACE RUN-OFF DISCHARGE CONDITIONS AND ALSO

7. THE CONTRACTOR SHALL PERFORM TOPOGRAPHIC SURVEY TO VERIFY

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

FORCE PROTECTION

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

AS SHOWN

COVERED WITH TOP SOIL AND SOLID SODDED.

4. ALL UNPAVED AREAS WITHIN THE GRADING LIMIT LINES SHALL BE

REPRESENTATIVE.

A CLEAN CONDITION ACCEPTABLE TO THE OWNER OR OWNER'S

MATERIALS, EQUIPMENT AND DEBRIS AND LEAVE THE PREMISES IN

ALL TIMES AND AT COMPLETION OF WORK, REMOVE ALL SURPLUS

8. THE CONTRACTOR SHALL KEEP THE CONSTRUCTION AREA CLEAN AT

ADDITIONAL COST.

EXISTING SITE CONDITIONS PRIOR TO START OF WORK AT NO

CHECK THE OTHER CONSTRUCTION REQUIREMENTS IN MEETING THE

FOR GOOD SURFACE RUN-OFF DISCHARGE CONDITIONS AND ALSO

7. THE CONTRACTOR SHALL PERFORM TOPOGRAPHIC SURVEY TO VERIFY

THIS PROJECT

LOCATION PLAN AND GENERAL NOTES

SCALE IN FEET

200 0 200 400 600

ACC

ACC

A C

C

201 2

WALL W/FENCE

ACC

GRASS

ACC

KEPCO

SUB-

STATION

WALL W/FFENCE

SEWAGE

LIFT

STATION

W A

L L W /F

E N

C E

W A

L L W /F

E N

C E

WALL W/FENCE

RETAINING WALL

RETAINING WALL

W

ACC

H 147' LINE

WALL W/FENCE

WALL W/FENCE

262 263 264 265

RETAINING WALL

COMMISSARY

W A

L L W /F

E N

C E

ACC

ACC

528 514 245 515

ACC

ACC

A C

C

201 2

WALL W/FENCE

ACC

GRASS

ACC

KEPCO

SUB-

STATION

WALL W/FFENCE

SEWAGE

LIFT

STATION

W A

L L W /F

E N

C E

W A

L L W /F

E N

C E

WALL W/FENCE

RETAINING WALL

RETAINING WALL

W

ACC

H 147' LINE

WALL W/FENCE

WALL W/FENCE

262 263 264 265

RETAINING WALL

COMMISSARY

W A

L L W /F

E N

C E

ACC

ACC

A C

C

201 2

WALL W/FENCE

ACC

GRASS

ACC

KEPCO

SUB-

STATION

WALL W/FFENCE

SEWAGE

LIFT

STATION

W A

L L W /F

E N

C E

W A

L L W /F

E N

C E

WALL W/FENCE

RETAINING WALL

RETAINING WALL

W

ACC

H 147' LINE

WALL W/FENCE

WALL W/FENCE

262 263 264 265

317RETAINING WALL

356 357

COMMISSARY

W A

L L W /F

E N

C E

G

S-55

S-53

S-61

SEWAGE

TREATMENT

PLANT

SEWAGE

TREATMENT

PLANT

SEWAGE

TREATMENT

PLANT

S-800

S-341

S-342

S-336

903904

RCP

RCP

RCP

CLA

(JCI)

CHOE, S M

214621

DOMITORY OF NEW FIRE STATION, K-16

CONSTRUCT BUILDING FOR OFFICE AND

CIVIL

C-2

AS SHOWN

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

FORCE PROTECTION

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

REMOVAL PLAN1

-2

SCALE: 1 / 300

REMOVAL PLAN

100.0 LM

1 EA

1 CHAIN LINK FENCE

REMOVAL SCHEDULE

ITEM QTY REMARKNO.

1:300

0 20M15105

3 EA

N

.3

.7

6 2 .7

.6

.6

.5

.5

.6

.6

.4

.5

.3

.6

.6

.5

.5

.6

.6

.6

.3

.5

.5

.6

.3

.6

.4

.5

.9

.1

.1

.3

.3

.4

.4

.4

.4

.4

.4

.3

.3

.5

.6

.3

.2

.4

.5

.5

.3

.3

.6

.6

.4

.4

.4

.4

.5

.5

.6

.5

.2

.1

.0

.2

.3

.3

.2

.9

.0

.3

.3

.1

.2

.2

.2

.2

.2

.2

.3

.1

.0

.9

.4

.8

.4

.4

.3

.5

.5

.6

C P .1

N : 5

,3

.3

E : 2

,7

.9

E L . 2

.0

H A

N D

R A

IL

D

B O

A R

D S

IG

N

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

B O

L L

A R

D

D

D

D

D

D

.6

.6

.5

.5

.5

.7

.7

.5

.6

.7

.6

.5

.5

.6

.6

.7

.6

.6

.6

.6

.6

3 2 .6

.6

.5

.4

.4

.4

.5

.6

.6

.6

.6

.6

.6

.6

.6

.6

.6

.7

.6

.3

.4

.3

.4

.9

.0

.8

.2

.4

.4

.0

.6

.7

.7

.7

.6

.6

.6

B O

A R

D S

T O

P

.3

W M

H

.7

.6

.6

.6

.8

.9

.9

.8

.8

.8

.8

.7

.7

.7

.5

.5

.4

.3

.3

.2

.3

.2

.3

.4

.3

.2

.2

.3

.1

6 2 .2

.3

.4

.3

.2

6 2 .3

.3

.3

.3

.4

.3

.5

.4

.4

.3

.4

.3

.3

.3

.4

.5

.3

.1

.4

.7

.6

.3

.3

.3

.3

.3

.9

.6

.3

.3

.3

.3

.3

.2

.2

.2

.3

.0

.0

.3

.2

.3

.3

.1

.4

.2

.6

.4

.4

.0

.6

.0

.6

.1

.5

.8

.4

.5

.9

.9

.0

.0

.9

.2

.3

.2

.1

.1

.1

.9

.5

.7

.0

.7

.6

.8

.5

.8

.1

.1

.2

.8

.4

.1

.2

.1

.2

.4

.2

.2

.1

.3

.4

.3

.3

.2

.1

.3

.5

.3

.1

.3

.5

.3

D

D

D

D

D

D

D

D

S-0256

FFE 20.636

D

D

T O

P

.6

T M

H

T O

P

.6

T M

H

W P

C

C

S

C B

T O

P

.3

W M

H

W

T O

P

.1

E M

H

E

W

D

C

P

D 250 PVC S

S

S

D 200 PVC

D

P

V C

G

S

G

S

G

S

100 GS

80 GS

(W

L "H

200 (WL "H")

S b in tr a s h c h il le r

.2

D

TR

E

CONTAINER BLDG

W

W

S/C

E

E.P E.P

E.P

AC AREA

AC AREA

AC AREA

AC AREA AC AREA

PCC AREA PCC AREA PCC AREA

TURF AREA

TURF AREA

CONTAINER BLDG W/ PAD

1 EA

2 EAELEC. M/H

2 EA

1 EA

1 EA

FUEL TANK W/ DIKE AND FUEL LINE

TREE

CHILLER W/ PAD

TRANSFORMER W/ PAD

ELEC. POLE W/ TRANSFORMER

1 EA 12.2 X 2.45M

WEATHER ANTENNA

SEE ELEC. DWG

SEE ELEC. DWG

SEE ELEC. DWG

SEE ELEC. DWG

SEE MECH. DWG

TRANSPLANT

1,000 GAL

AC PAVEMENT

PCC PAVEMENT

SIDEWALK

40.0 SM

600.0 SM

90.0 SM

G

S

CON'C OPEN CHANNEL CON'C OPEN CHANNEL

CHOE, S M

214621

DOMITORY OF NEW FIRE STATION, K-16

CONSTRUCT BUILDING FOR OFFICE AND

5-1

1 EAFUEL TANK W/ DIKE AND FUEL LINE5-1

5. THE CONTRACTOR SHALL COORDINATE WITH COR FOR FUEL TANK RELOCATION.

4. THE CONTRACTOR SHALL COORDINATE WITH COR FOR TREE TRANSPLANT.

3. THE CONTRACTOR SHALL RETURN FUEL TANKS TO DPW WITH CLEANING.

WITH COR.

IN CASE OF DIFFERENT CONDITION, CONTRACTOR SHALL COORDINATE

2. CONTRACTOR SHALL CONFIRM THE UTILITIES BEFORE REMOVE.

THE CONTRACTOR SHALL VERIFY ACTUAL QUANTITIES.

1. QUANTITIES ARE REPLACED FOR THE CONTRACTOR'S CONVENIENCE,

NOTE:

RELOCATE, 1,000 GAL

AS SHOWN

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

FORCE PROTECTION

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

C-3

SITE LAYOUT PLAN

SCOPE OF WORK

SCHEDULE #1 (REPAIR/MAINTENANCE)

SCALE: 1 / 300

1:300

0 20M15105

SCHEDULE #2 (CONSTRUCT/ALTERATION)

SITE LAYOUT PLAN AND SCOPE OF WORK

N

APPROX. 56.0 LM.

150MM THK REFLECTIVE WHITE,

PAINT PARKING LINE W/

21 -

.3

.7

6 2 .7

.6

.6

.5

.5

.6

.6

.4

.5

.3

.6

.6

.5

.5

.6

.6

.6

.3

.5

.5

.6

.3

.6

.4

.5

.9

.1

.1

.3

.3

.4

.4

.4

.4

.4

.4

.3

.3

.5

.6

.3

.2

.4

.5

.5

.3

.3

.6

.6

.4

.4

.4

.4

.5

.5

.6

.5

.2

.1

.0

.2

.3

.3

.2

.9

.0

.3

.3

.1

.2

.2

.2

.2

.2

.2

.3

.1

.0

.9

.4

.8

.4

.4

.3

.5

.5

.6

C P .1

N : 5

,3

.3

E : 2

,7

.9

E L . 2

.0

H A

N D

R A

IL

D

B O

A R

D S

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

B O

L L

A R

D

D

D

D

D

D

.6

.6

.5

.5

.5

.7

.7

.5

.6

.7

.6

.5

.5

.6

.6

.7

.6

.6

.6

.6

.6

3 2 .6

.6

.5

.4

.4

.4

.5

.6

.6

.6

.6

.6

.6

.6

.6

.6

.6

.7

.6

.3

.4

.3

.4

.9

.0

.8

.2

.4

.4

.0

.6

.7

.7

.7

.6

.6

.6

B O

A R

D S

T O

P

.3

W M

H

.7

.6

.6

.6

.8

.9

.9

.8

.8

.8

.8

.7

.7

.7

.5

.5

.4

.3

.3

.2

.3

.2

.3

.4

.3

.2

.2

.3

.1

6 2 .2

.3

.4

.3

.2

6 2 .3

.3

.3

.3

.4

.3

.5

.4

.4

.3

.4

.3

.3

.3

.4

.5

.3

.1

.4

.7

.6

.3

.3

.3

.3

.3

.9

.6

.3

.3

.3

.3

.3

.2

.2

.2

.3

.0

.0

.3

.2

.3

.3

.1

.4

.2

.6

.4

.4

.0

.6

.0

.6

.1

.5

.8

.4

.5

.9

.9

.0

.0

.9

.2

.3

.2

.1

.1

.1

.9

.5

.7

.0

.7

.6

.8

.5

.8

.1

.1

.2

.8

.4

.1

.2

.1

.2

.4

.2

.2

.1

.3

.4

.3

.3

.2

.1

.3

.5

.3

.1

.3

.5

.3

D

D

D

D

D

D

D

D

S-0256

FFE 20.636

T O

P

.6

T M

H

T O

P

.6

T M

H

P

C

S

C B

T O

P

.3

W M

H

W

TOP 20.167

EMH

E

W

D

C

P

D 250 PVC S

S

S

D 200 PVC

D

P

V C

G

S

G

S

100 GS

80 GS

(W

L "H

200 (WL "H")

S

.2

S/C

E.P E.P

E.P

AC AREA

AC AREA

AC AREA

AC AREA

PCC AREA PCC AREA

TURF AREA

G

S

- 5

GRADE LIMIT LINE

GRADE LIMIT LINE

S

4.00 9.00

.0

APPROX. 1,090.0 SM

REPLACE AC PAVEMENT,

DITCH, APPROX. 22.0 LM

CONSTRUCT 0.3M W STEEL GRATING

APPROX. 14.0 SM

REPLACE CON'C SIDEWALK,

APPROX. 10.0 LM

CONSTRUCT CON'C CURB,

CON'C OPEN CHANNEL CON'C OPEN CHANNEL

APPROX. 220.0 SM

RESTORE SOLID SODDING,

1. REPLACE AC PAVEMENT.

2. REPLACE CON'C SIDEWALK.

REFLECTIVE WHITE.

4. PAINT PARKING LINE W/ 150MM THK

6. RESTORE SOLID SODDING.

1. CONSTRUCT 0.3M W STEEL GRATING DITCH.

3. CONSTRUCT CON'C CURB.

APPROX, 6.0 LM

W/ 1.2M W SINGLE SWING GATE (FE-5)

CONSTRUCT 2.1M H CHAIN LINK FENCE

W/ 1.2M W SINGLE SWING GATE (FE-5).

4. CONSTRUCT 2.1M H CHAIN LINK FENCE

DOUBLE SWING GATE.

3. REPLACE CHAIN LINK FENCE(FE-5) W/ 3.0M W

5. RESTORE CHAIN LINK FENCE(FE-10).

2.70

.5

TBM: 20.636

FFE 20.636

STAIR-2

TRUCK

LADDER

SUV

OPER

EWC UP

UP

DORMDORMDORM

CORRIDOR

COMM RM

TRAINING RM

PHYSICAL

LAUNDRY

JC

MECH RM

TOILET

MEN

SHOWER

TOILET

WOMEN

STAIR-1

STORAGE

SUPPLY

MEDICAL

APPARATUS

REF

CORRIDOR

TRAINING ROOM

PHYSICAL

STORAGE

MEZZ

FIRE INSPECTORS

SHOWER

DORMDORMDORMDORMDORMDORM

DORM DORM

WATCH/ALARM ROOM

SHOWER

MECH RM

DRYING RM

TOILET

MEN

DAYROOM

KIT/DINING

CORRIDOR

ENGINE

FIRE

SUV

OPER

APPARATUS

ENGINE

FIRE

F/E REPAIR ROOM

SS

FEC

FEC

FEC

LAUNDRY

FEC

FEC

FEC

FEC

W

W

RM

SQUAD STOR

STOR

RM

AIR COMP

RM

SQUAD

RM

SQUAD

RM

SQUAD

D

D

BOX-CULVERT.

AND 0.3M DIA RCP TO CONNECT TO NEW

2. CONSTRUCT THREE(3) SURFACE INLET(0.5X0.5M)

CHOE, S M

HIGHER THAN EXST GROUND LEVEL.

5. CONSTRUCT 300MM THK CON'C PAD 300MM

B I N

T R

A S

H

AC AREA

BOX-CULVERT

APPROX. 9.0 LM

CONSTRUCT CON'C CURB,

APPROX. 25.0 LM.

AND 0.3M DIA RCP TO CONNECT TO BOX-CULVERT,

CONSTRUCT THREE(3) SURFACE INLET(0.5X0.5M)

APPROX. 81.0 SM

300MM HIGHER THAN EXST GROUND LEVEL.

CONSTRUCT 300MM THK CON'C PAD W/ RAMP

APPROX. 36.0 LM

DOUBLE SWING GATE ON CON'C PAD,

REPLACE CHAIN LINK FENCE(FE-5) W/ 3.0M W

6,7

6,14

214621

DOMITORY OF NEW FIRE STATION, K-16

CONSTRUCT BUILDING FOR OFFICE AND

APPROX. 15.0 LM

RESTORE CHAIN LINK FENCE(FE-10),

COORDINATE W/ COR FOR LOCATION

UNDERGROUND POWER WIRING

AND FUEL DISPENSER INCLUDING

RELOCATE EXST FUEL TANK W/ DIKE

UNDERGROUND POWER WIRING.

AND FUEL DISPENSER INCLUDING

7. RELOCATE EXST FUEL TANK W/ DIKE

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

FORCE PROTECTION

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

N

UTILITY PLAN

C-4

SCALE: 1 / 150

1:150

0 10M7.552.5

W

S S

AC AREA

S

CON'C OPEN CHANNEL

STAIR-2

TRUCK

LADDER

SUV

OPER

EWC

UP

UP

DORMDORMDORM

CORRIDOR

COMM RM

TRAINING RM

PHYSICAL

LAUNDRY

JC

MECH RM

TOILET

MEN

SHOWER

TOILET

WOMEN

STAIR-1

STORAGE

SUPPLY

MEDICAL

REF

TRAINING ROOM

PHYSICAL

STORAGE

MEZZ

FIRE INSPECTORS

SHOWER

DORMDORM

SHOWER

MECH RM

DRYING RM

TOILET

MEN

DAYROOM

KIT/DINING

CORRIDOR

ENGINE

FIRE

SUV

OPER

APPARATUS

ENGINE

FIRE

F/E REPAIR ROOM

SS

STORAGE

FEC

LAUNDRY

D

W

W

D

FEC

FEC

FEC

FEC

200 (WL "H")

G

S

1-50mm GAS VALVE W/ BOX 1-50X50X50mm TEE CONN TO EXIST 50mm DIA GL

STA 0+00 GL "A"

SCOPE OF WORK

1-150mm DIA PIV

STA 0+18.50 WL "A"

1-CONC THRUST BLOCK

BEND4

11-150mm X

STA 0+15.00 WL "A"

BEND4

11-50mm X

STA 0+04.40 GL "A"

BEND4

11-50mm X

STA 0+28.30 GL "A"

1-CONC THRUST BLOCK

BEND4

11-75mm X

STA 0+29.80 WL "B"

1-CONC THRUST BLOCK

BEND4

11-150mm X

STA 0+34.50 WL "A"

1-75mm DIA GATE VALVE W/ BOX

STA 0+39.80 WL "B"

SEWER M/H

APPROX. 36.0 LM

150MM DIA PVC SEWER LINE,

2. INSTALL 150MM DIA PVC WATER LINE W/ PIV.

3. INSTALL 75MM DIA PVC WATER LINE W/ GATE VALVE.

CONNECT TO MECH RM

STA 0+47.20 WL "B"

CONNECT TO MECH RM

STA 0+20.00 WL "A-1"

1-CONC THRUST BLOCK

BEND4

11-75mm X

STA 0+45.70 WL "B"

CONNECT TO MECH RM

STA 0+34.30 GL "A"

1-CONC THRUST BLOCK

BEND4

11-150mm X

STA 0+17.50 WL "A-1"

1-CONC THRUST BLOCK

BEND4

11-75mm X

STA 0+14.30 WL "B"

UTILITY PLAN AND SCOPE OF WORK

1-CONC THRUST BLOCK

BEND4

11-150mm X

STA 0+86.70 WL "A"

-20

1-CONC THRUST BLOCK

1-150X150X150MM TEE

STA 0+00.00 WL "A-1"

STA 0+32.00 WL "A"

12.50

CHOE, S M

WATER LINE

CONNECT TO EXST 150MM

STA 0+00.00 WL "A"

WATER LINE

CONNECT TO EXST 75MM

STA 0+00.00 WL "B"

W

M

M

W

M M

SCHEDULE #1 (CONSTRUCT/ALTERATION)

CONNECT TO MECH RM

STA 0+93.50 WL "A"

1. INSTALL 50MM DIA PE GAS LINE W/ GAS VALVE.

4. INSTALL 150MM DIA PVC SEWER LINE W/ ONE(1) SWER M/H.

214621

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

FORCE PROTECTION

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

E L

E V

A T I O

N

I

M E

T E

R S

GRADING SECTION

SCALE: HORI = 1 / 150

VERT = 1 / 30

1:150

0 10M7.552.5

1:30

0 2M1.510.5

FFE 20.636

FIRE STATION

C-5

GRADING SECTION

EXST CON'C HELIPAD

CON'C BARRICADE

AC PAVEMENTCON'C RAMPAC PAVEMENT CON'C RAMP

G.L

ORIGINAL

EXST CON'C CHANNEL

WATER LINE

EXST 200MM DIA

BOX-CULVERT

G.L

ORIGINAL

RCP

0.3M DIA

SURFACE INLET SURFACE INLET

SURFACE INLET

CHOE, S M

WATER LINE

EXST 75MM DIA

WATER LINE

EXST 150MM DIA

214621

FABRIC

WIRE TIES FOR TOP OR BRACE RAIL

1G

TYPE FE-5

OUTSIDEINSIDE

FENCE CORNER

GATE

G A T E

(MIN)

CAST IN-PLACE

CONC FOOTING

HINGE

TOP RAIL (TYP)

FINISH GRADE

12001500

(MIN) (MIN)

(MIN)

CHAIN LINK FABRIC

IS

G

R E

A T

E R

W H

IC

H E

V E

R

O R F

R O

S T D

E P

T H

M

IN

GATE LATCH

GATE POST (TYP)

BRACE

40mm DIA (MIN) OC

SECURITY BRACE PIPE

60mm DIA (MIN)

10 DIA TRUSS

RODS(TYP)

SECURITY BRACE PIPE

60mm DIA (MIN)

4-STRETCHER BAR BANDS AS

SHOWN 100 FROM TOP & BOT

FRAME AND OF EQUAL

SPACES (TYP)

STRETCHER BAR TO

ENGAGE EACH FABRIC

BRACE

40mm DIA (MIN) OC

1B1 1B2

#2 AWG STRANDED

BARE COPPER WIRE

FUSION

WEKDING

COPPER CLAD STEEL GROUND

ROD 18 X 2,400 LENGTH

BOLTED SOLDERLESS

CLAMP

TIE WIRE AS SPECIFIED

600 OC. MAX.

COPPER CLAD STEEL

GROUND ROD 19 X

3000 LENGTH

FUSION

WELDING

#2 AWG STRANDED

BARE COPPER WIRE

FLEXIBLE

COPPER BRAID

(TYP)

BOLTED SOLDERLESS

CLAMP

TOP BARCAP

FABRIC

TRUSS ROD

FENCE POST

CLAMP (TYP)

1F

FENCE POST

BRACE RAIL

BAND

STRETCHER BAR BAND

1E

FABRIC

CLAMP FOR BRACE RAIL H-BEAM

STRETCHER BAR BAND

TO BE 100mm

MAX X 6mm THK.

FROM TOP AND BOTTOM AND

SPACED 375mm OC MAX

STRETCHER BAR TO ENGAGE

EACH FABRIC LINK

STRETCHER BAR

100mm X 6mm THK

1A

ELEVATION

1B

TYPICAL LINE POST

1C

GROUNDING

1D

STRETCHER BAR ANCHOR

2.1M CHAIN LINK FENCE AND SINGLE GATE - 1

NOT TO SCALE

(M A

X

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

AS SHOWN

CIVIL

1H

C-18

- 6

C-6

AND SINGLE GATE - 1

2.1M CHAIN LINK FENCE

CHOE, S M

214621

2.1M CHAIN LINK FENCE AND SINGLE GATE - 2

NOT TO SCALE

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

AS SHOWN

CIVIL

AND SINGLE GATE - 2

2.1M CHAIN LINK FENCE

1.2M W SINGLE GATE

1I P L A N

EXIST BLDG

(VARIABLE)

1.2M W SINGLE GATE

EXIST BLDG

(VARIABLE)

EXIST BLDG

(VARIABLE)

GAS LINE

TYPE 1

1I1

TYPE 2

1I2

TYPE 3

1I3

1.2M W SINGLE GATE

GAS LINE

GAS LINE

SEE

NOT TO SCALE

TYPICAL GAS PIPE RISER

LOCATING-WIRE

HEAT FUSION

WELLDING

T/F FITTING

RUBBER RING

SLEEVE

UNDERGROUND GAS PIPE

CAP PIPING

FOR FUTURE

CONNECTION

2 SEE 2

CAP GAS PIPING FOR

FUTURE CONNECTION

SEE DETAIL

NOTE: NOTE:

GAS PIPING UP TO 1M ABOVE GROUND.

ELEVATION

P L A N

PEEN END (TYP)

LATCH MOVEMENT DIRECTION

13mmX88mm BOLT WITH NUT & 3 WASHERS

13mmX25mmX140mm STRAP

13mmX38mmX50mm P NOTCHED EACH SIDE

GATE FRAME

LATCH

L

1H

GATE LATCH

1H2

1H1

13mmX38mm STRAP BENT AS

SHOWN-2 EA-LEGEND

VARIES

13mm HOLE FOR PADLOCK

(EACH SIDE)

2 WASHER

(TYP)

GATE

POST (TYP)

13mmX100mm BOLT WITH

NUT & 6 WASHERS

NOTES:

1. TYPE FE-5 CHAIN LINK FENCE SHALL BE INSTALLED

AROUND BLDG PAD FOR MECH EQUIPMENT.

2. ALL FABRIC SHALL BE 28mm GAGE WOVEN IN A 50MM MESH.

3. SINGLE EXTENSION ARMS SHALL POINT OUT WARD AND

12 GAGE PRESSED STEEL.

4. ALL THREADED ENDS OF FENCE CONNECTOR BOLTS SHALL BE PEENED.

5. CONCRETE FENCE POST FOOTING

a. CONCRETE FOOTING SHALL BE CAST-IN-PLACE AGAINST

UNDISTURBED SOIL (PRE-CAST CONCRETE FOOTINGS ARE NOT ALLOWED).

b. THE POST HOLE SHALL BE EXCAVATED BY AUGER OR SHOVEL.

c. THE METAL FENCE POST SHALL BE SET PLUMB IN THE POST HOLE.

6. LONG FENCE RUNS MAY USE 22mm COIL WIRE WHEN APPROVED

CONTRACTING OFFICER.

7. EXTENSION ARMS AND BARBED WIRE DO NOT OCCUR AT CHAIN LINK

FENCE TYPE FE-5.

8. DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE NOTED.

FINAL LOCATION, TYPE AND SIZE OF CHAIN LINK FENCE SHALL BE

COORDINATED WITH LOCAL GAS COMPANY AND CONTRACTING OFFICER.

3000±

3000±

3000±

- 7

C-7

CHOE, S M

214621

214921-C1
214921-C2
214921-C3
214921-C4
214921-C5
214921-C6
214921-C7

File details come from the government source that posted it.