SCHEDULE OF DRAWINGS
RING NO. REF. NO.REVISION STATUSDWG. NO. SHT. NO.REF. NO.
T - 1
RING NO.
ELECTRICAL
A - 1
A - 2
A - 3
ARCHITECTURAL
DESCRIPTION OF DRAWINGS DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REVISION STATUS
T-1
A - 4
A - 5
A - 6
A - 7
A - 8
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
A - 12
E - 1
E - 2
E - 3
E - 4
E - 5
E - 6
E - 7
E - 8
E - 9
A - 13
LEGEND, GENERAL NOTES AND SCOPE OF WORK
ELEVATIONS
MISC DETAILS - 3
FEWR NO. 209625
S - 1
S - 2
S - 3
S - 4
S - 5
S - 6
S - 7
S - 8
S - 9
S - 10
S - 11
STRUCTURAL
S - 12
S - 13
S - 14
S - 15
S - 16
S - 17
S - 18
S - 19
STRUCTUAL ABBREVIATION, LEGENDS AND GENERAL NOTES
STRUCTUAL DESIGN CRITERIA
FOUNDATION AND FIRST FLOOR FRAMING PLAN
SECOND FLOOR FRAMING PLAN
ROOF FRAMING PLAN
BUILDING ELEVATIONS - 1
BUILDING ELEVATIONS - 2
TYPICAL STEEL DETAILS - 1
TYPICAL STEEL DETAILS - 2
DETAILS - 1
DETAILS - 2
FOOTING, GRADE BEAM SCHEDULE AND DETAILS
STEEL BEAM SCHEDULE
SECTIONS & DETAILS
EXTERIOR WALL SECTIONS & DETAIL
EXTERIOR & INTERIOR WALL SECTIONS
INTERIOR WALL SECTIONS - 1
NEW 2ND FLOOR PLAN & SCOPE OF WORK
A - 15
A - 16
A - 17
A - 18
A - 21
A - 22
A - 23
A - 24
A - 25
ROOF & CANOPY DETAILS
METAL ROOF PANEL DETAILS
COLUMN DETAILS
MISC DETAILS - 1
MISC DETAILS - 2
SCHEDULE
INTERIOR, EXTERIOR FINISH SCHEDULE AND MATERIAL & COLOR
TITLE SHEET - 1
TITLE SHEET - 1
M - 1
M - 2
M - 3
MECHANICAL
GENERAL NOTES & SCOPE OF WORK
MECHANICAL MATERIAL INDICATIONS & SYMBOLS AND ABBREVIATIONS
EXIST/NEW EXTERIOR ELECTRICAL DISTRIBUTION PLAN
BUILDING SECTIONS-4
TRUSS AND FRAME DETAILS
BUILDING SECTIONS-1
BUILDING SECTIONS-2
BUILDING SECTIONS-3
RIGID FRAME ELEVATION, SECTIONS AND DETAIL
STAIR-1 PARTIAL PLANS, SECTIONS AND DETAILS
STAIR-2 PARTIAL PLANS, SECTIONS AND DETAILS
TYPICAL CONCRETE DETAILS
TYPICAL CMU DETAILS
S - 20
S - 21
S - 22
S - 23
S - 24
SCHEDULE
PEDESTAL, CONCRETE COLUMN, STEEL COLUMN AND BASE PLATE
NEW 1ST FLOOR PLAN & GENERAL NOTES
NEW ROOF PLAN
SIGNAGES SCHEDULE
DOOR, WINDOW, LOUVER SCHEDULE & DETAILS
HARDWARES SCHEDULE AND NOTES
& NOTES
INTERIOR, EXTERIOR FINISH SCHEDULE AND MATERIAL, COLOR SCHEDULE
DETAILS-2
DETAILS-3
DETAILS-4
DETAILS-5
DETAILS-6
OF NEW FIRE STATION, K-16
CONSTRUCTION BUILDING FOR BAYS
OF NEW FIRE STATION, K-16
CONSTRUCTION BUILDING FOR BAYS
KWON, CH
209625
LIGHTING FIXTURE DETAILS
"LC" DIAGRAM
NEW LIGHTING FIXTURE SCHEDULE & NEW EXTERIOR LIGHTING CONTRACTOR
NEW GROUND FLOOR LIGHTING
NEW GROUND FLOOR POWER PLAN
NEW GROUND FLOOR POWER/CONTROL PLAN FOR MECHANICAL SYSTEM
EXIST/NEW POWER ONE-LINE DIAGRAM
NEW PANELBOARD "M4" AND "PP" LOAD SCHEDULE
M - 4
M - 5
M - 6
M - 7
M - 8
M - 9
M - 11
M - 12
M - 10
NEW 2ND FL HVAC PLAN - 2 AND NOTES
EQUIPMENT SCHEDULE
NEW 1ST FL HVAC PLAN - 1 AND NOTES
NEW 1ST FL PLUMBING PIPING PLAN - 1 & 2 AND NOTES
HEAT DESTRATIFICATION FAN AND UNIT HEATER CONTROL