W91QVN-19-R-0120.pdf
PDF 2 MB Posted
- Attached to
- Total Preventative Maintenance, Repair and Cleaning Services for Army Family Housing (AFH) at USAG Humphreys
- Solicitation number
- W91QVN-19-R-0120
About this file
Solicitation/PWS
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 11 Months Custodial Services
FFP
Custodial Services for Army Family Housing. All services shall be performed in accordance with para 7.2 of the PWS. (Firm Fixed Portion) FOB: Destination
PSC CD: Z2FA
NET AMT
0002 11 Months Police Call Services
FFP
Police Call Services shall be performed in accordance with para 7.3 of the PWS.
(Firm Fixed Portion)
0003 11 Months Service Call
FFP
Service Calls shall be performed in accordance with para 7.4 of the PWS. (Firm Fixed Price)
0004 11 Months Preventative Maintenance
FFP
Preventative Maintenance (PM) including Minor Repair Services for Buildings, 510,511, 512, 513, 514, 523, 5101, 5102, 5103, 5171, 8172, 8173 and underground parking facilities, AFH 050, 060 070 duplexes. All services shall be performed in accordance with para 7.5 of the PWS. (Firm Fixed Price)
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
Change of Occupancy Cleaning
FFP
Change of Occupancy Cleaning (COC). All work shall be performed in accordance with 7.6 of the PWS. (Requirement Portion) MFR PART NR: z2fa
ESTIMATED
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AA 8 Each COC, 2 Bedroom Type
FFP
All work shall be performed in accordance with section 7.6 of the PWS.
(Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AB 380 Each COC, 3 Bedroom Type
FFP
All work shall be performed in accordance with section 7.6 of the PWS.
(Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AC 136 Each COC, 4 Bedroom Type
FFP
COC, 4 Bedroom Type. All work shall be performed in accordance with section
7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AD 88 Each COC, 4 Bedroom Type Duplex
FFP
COC, 4 Bedroom Type (O6 Duplex Type).
All work shall be performed in accordance with section 7.6 of the PWS.
(Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AE 20 Each COC, 4 Bedroom Type GFOQ
FFP
COC, 4 Bedroom (FGOQ Duplex Type).
All work shall be performed in accordance with section 7.6 of the PWS.
(Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AF 2 Each COC, 4 Bedroom Type Single
FFP
COC, 4 Bedroom (GFOQ Single Type).
All work shall be performed in accordance with section 7.6 of the PWS.
(Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AG 8 Each COC, Super 4 Bedroom Type
FFP
COC, Super 4 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AH 36 Each COC, 5 Bedroom Type
FFP
COC, 5 Bedroom Type. All work shall be performed in accordance with section
7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
Change of Occupancy Maintenance
FFP
Change of Occupancy Maintenance. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0006AA 568 Each Change of Occupancy Maintenance (APT)
FFP
Change of Occupancy Maintenance (COM), Apartment Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0006AB 110 Each Change of Occupancy Maintenance (Single)
FFP
Change of Occupancy Maintenance (Single House Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
Change of Occupancy Painting(COP)
FFP
All work shall be performed in accordance with section 7.6 of the PWS.
(Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0007AA 8 Each COP, 2 Bedroom Type
FFP
COP, 2 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0007AB 380 Each COP, 3 Bedroom Type
FFP
COP, 3 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0007AC 136 Each COP, 4 Bedroom Type
FFP
COP, 4 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0007AD 88 Each COP, 4 Bedroom Type(O6 Duplex)
FFP
COP, 4 Bedroom (O6 Duplex Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0007AE 20 Each COP, 4 Bedroom Type(GFOQ Duplex)
FFP
COP, 4 Bedroom (GFOQ Duplex Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0007AF 2 Each COP, 4 Bedroom Type(GFOQ Single)
FFP
COP, 4 Bedroom (GFOQ Single Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0007AG 8 Each COP, Super 4 Bedroom Type
FFP
COP, Super 4 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0007AH 36 Each COP, 5 Bedroom Type
FFP
COP, 5 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
Project Works
FFP
Projects Works. All work shall be performed in accordance with section 7.7 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0008AA 50,000 Square Foot
Dryer Air Duct Cleaning
FFP
All work shall be performed in accordance with section 7.7.5 of the PWS.
(Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0008AB 50,000 Square
A/C Heating Duct Cleaning
A/C Heating Duct Cleaning. All work shall be performed in accordance with section 7.7.5 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0008AC 100,000 Square
Interior Painting, Latex-2 Coats
Interior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.7.2 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0008AD 100,000 Square
Exterior Painting, Latex-2 Coats
Exterior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.7.3 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0008AE 20,000 Square
Replace Vinyl Composition Floor
Replace Vinyl Composition Floor 12"x12"x1/8" with waxing. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)
0008AF 20,000 Square
Floor install or Replace
Floor installing or replacement (Meratone) QMS-1367. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)
0008AG 20,000 Square
Floor install or Replace
Floor installing or replacement (Meratone) QMS-3126. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)
0008AH 10,000 Square
Replace Ceramic Floor Tile
Replace ceramic floor tile. All work shall be performed in accordance with section
7.7.4.2 of the PWS. (Requirement Portion)
0008AJ 20 Each Replace Solid Core Single Door
FFP
Replace solid core wood single door flush type (600mm - 1475mm x 2100mm x 35mm thick). All work shall be performed in accordance with section 7.7.11 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0008AK 20 Each Replace Solid Core Single Door
FFP
Replace solid core wood single door flush type (600mm - 1300mm x 2100mm x 44.5mm thick). All work shall be performed in accordance with section 7.7.4.2 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0008AL 100 Each Replace Dishwasher
FFP
Replace dishwasher (using agency furnished) including water and drain connection. All work shall be performed in accordance with section 1.3.3.6.3 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0008AM 150 Each Replace Carbon Monoxide Sensor
FFP
Replace carbon monoxide sensor. All work shall be performed in accordance with section 7.7.6.2 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0008AN 150 Each Carbon Monoxide Sensor
FFP
Carbon Monoxide Sensor. All work shall be performed in accordance with section
7.7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0008AP 20,000 Square
Replace Wooden Flooring
Replace wooden flooring 1/4" thick. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
Major Repair
FFP
Major Repair. All work shall be performed in accordance with section 2.1.28 of the
UNIT UNIT PRICE ESTIMATED AMOUNT
0009AA 1 Lot Repair Elevator
FFP
Elevator Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.8.1 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW80,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0009AB 1 Lot Repair CCTV
FFP
CCTV Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.7.1 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW30,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
0009AC 1 Lot Repair DDC
FFP
DDC Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.8.2 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW30,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)
0010 1 Job Contractor Manpower Reporting
FFP
Contractor Manpower Reporting Application (CMRA). Requirement must be reported by 31 October of each calendar year during the life of the contract. See para 12.0 of the PWS for CMRA requirement herein. (Firm Fixed Portion)
NOTE: Not to exceed 20 Man hours for data collection and report.
Estimated Cost for War Hazard Loss
Estimated Cost for War Hazard Losses is Zero (0).
UNIT UNIT PRICE ESTIMATED AMOUNT
0012 1 Months Phase In/Out
FFP
DDC Repair. All work shall be performed in accordance with section1.3.6. of the PWS. (Firm Fixed Portion)
1001 12 Months OPTION Custodial Services
FFP
Custodial Services for Army Family Housing. All services shall be performed in accordance with para 7.2 of the PWS. (Firm Fixed Portion)
1002 12 Months OPTION Police Call Services
FFP
Police Call Services shall be performed in accordance with para 7.3 of the PWS.
(Firm Fixed Portion)
1003 12 Months OPTION Service Calls
FFP
Service Calls shall be performed in accordance with para 7.4 of the PWS. (Firm Fixed Price)
1004 12 Months OPTION Preventative Maintenance
FFP
Preventative Maintenance (PM) including Minor Repair Services for Buildings, 510,511, 512, 513, 514, 523, 5101, 5102, 5103, 5171, 8172, 8173 and underground parking facilities, AFH 050, 060 070 duplexes. All services shall be performed in accordance with para 7.5 of the PWS. (Firm Fixed Price)
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Change of Occupancy Cleaning
FFP
Change of Occupancy Cleaning (COC). All work shall be performed in accordance
UNIT UNIT PRICE ESTIMATED AMOUNT
1005AA 8 Each OPTION COC, 2 Bedroom Type
FFP
COC, 2 Bedroom Type. All work shall be performed in accordance with 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
1005AB 524 Each OPTION COC, 3 Bedroom Type
FFP
COC, 3 Bedroom Type. All work shall be performed in accordance with 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
1005AC 190 Each OPTION COC, 4 Bedroom Type
FFP
COC, 4 Bedroom Type. All work shall be performed in accordance with 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
1005AD 88 Each OPTION COC, 4 Bedroom Type Duplex
FFP
COC, 4 Bedroom (O6 Duplex Type). All work shall be performed in accordance with 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
1005AE 20 Each OPTION COC, 4 Bedroom Type GFOQ
FFP
COC, 4 Bedroom (FGOQ Duplex Type). All work shall be performed in accordance with 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
1005AF 2 Each OPTION COC, 4 Bedroom Type Single
FFP
COC, 4 Bedroom (GFOQ Single Type). All work shall be performed in accordance with 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
1005AG 8 Each OPTION COC, Super 4 Bedroom Type
FFP
COC, Super 4 Bedroom Type. All work shall be performed in accordance with 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
1005AH 54 Each OPTION COC, 5 Bedroom Type
FFP
COC, 5 Bedroom Type. All work shall be performed in accordance with 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Change of Occupancy Maintenance
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1006AA 784 Each OPTION Change of Occupancy Maintenance (APT)
FFP
Change of Occupancy Maintenance (COM), Apartment Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
1006AB 110 Each OPTION Change of Occupancy Maintenance (Single)
FFP
Change of Occupancy Maintenance (Single House Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Change of Occupancy Painting(COP)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1007AA 8 Each OPTION COP, 2 Bedroom Type
FFP
COP, 2 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
1007AB 524 Each OPTION COP, 3 Bedroom Type
FFP
COP, 3 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
1007AC 190 Each OPTION COP, 4 Bedroom Type
FFP
COP, 4 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
1007AD 88 Each OPTION COP, 4 Bedroom Type(O6 Duplex)
FFP
COP, 4 Bedroom (O6 Duplex Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
1007AE 20 Each OPTION COP, 4 Bedroom Type(GFOQ Duplex)
FFP
COP, 4 Bedroom (GFOQ Duplex Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
1007AF 2 Each OPTION COP, 4 Bedroom Type(GFOQ Single)
FFP
COP, 4 Bedroom (GFOQ Single Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
1007AG 8 Each OPTION COP, Super 4 Bedroom Type
FFP
COP, Super 4 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
1007AH 54 Each OPTION COP, 5 Bedroom Type
FFP
COP, 5 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Project Works
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1008AA 50,000 Square
OPTION Dryer Air Duct Cleaning
Dryer Air Duct Cleaning. All work shall be performed in accordance with section
7.7.5 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
1008AB 50,000 Square
OPTION A/C Heating Duct Cleaning
A/C Heating Duct Cleaning. All work shall be performed in accordance with section 7.7.5 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
1008AC 100,000 Square
OPTION Interior Painting, Latex-2 Coats
Interior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.7.2 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
1008AD 100,000 Square
OPTION Exterior Painting, Latex-2 Coats
Exterior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.7.3 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
1008AE 20,000 Square
OPTION Replace Vinyl Composition Floor
Replace Vinyl Composition Floor 12"x12"x1/8". All work shall be performed in accordance with section 7.7.4 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
1008AF 20,000 Square
OPTION Floor install or Replace
Floor installing or replacement (Meratone) QMS-1367. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
1008AG 20,000 Square
OPTION Floor Install or Replace
Floor installing or replacement (Meratone) QMS-3126. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
1008AH 10,000 Square
OPTION Replace Ceramic Floor Tile
Replace ceramic floor tile. All work shall be performed in accordance with section
7.7.4.2 of the PWS. (Requirement Portion)
1008AJ 20 Each OPTION Replace Solid Core Single Door
FFP
Replace solid core wood single door flush type (600mm - 1475mm x 2100mm x 35mm thick). All work shall be performed in accordance with section 7.7.11 of the PWS. (Requirement Portion)
1008AK 20 Each OPTION Replace Solid Core Single Door
FFP
Replace solid core wood single door flush type (600mm - 1300mm x 2100mm x 44.5mm thick). All work shall be performed in accordance with section 7.7.4.2 of the PWS. (Requirement Portion)
1008AL 100 Each OPTION Replace Dishwasher
FFP
Replace dishwasher (using agency furnished) including water and drain connection. All work shall be performed in accordance with section 1.3.3.6.3 of the PWS. (Requirement Portion)
1008AM 150 Each OPTION Replace Carbon Monoxide Sensor
FFP
Replace carbon monoxide sensor. All work shall be performed in accordance with section 7.7.6.2 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
1008AN 150 Each OPTION Carbon Monoxide Sensor
FFP
Carbon Monoxide Sensor. All work shall be performed in accordance with section
7.7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
1008AP 20,000 Square
OPTION Replace Wooden Flooring
Replace wooden flooring 1/4" thick. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Major Repair
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1009AA 1 Lot OPTION Repair Elevator
FFP
Elevator Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.8.1 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW80,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
1009AB 1 Lot OPTION Repair CCTV
FFP
CCTV Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.7.1 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW 30,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
1009AC 1 Lot OPTION Repair DDC
FFP
DDC Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.8.2 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW30,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)
1010 1 Job OPTION Contractor Manpower Reporting
FFP
Contractor Manpower Reporting Application (CMRA). Requirement must be reported by 31 October of each calendar year during the life of the contract. See para 12.0 of the PWS for CMRA requirement herein. (Firm Fixed Portion)
NOTE: Not to exceed 20 Man hours for data collection and report.
OPTION Estimated Cost for War Hazard Loss
2001 12 Months OPTION Custodial Services
FFP
Custodial Services for Army Family Housing. All services shall be performed in accordance with para 7.2 of the PWS. (Firm Fixed Portion)
2002 12 Months OPTION Police Call Services
FFP
Police Call Services for Army Family Housing. All services shall be performed in accordance with para 7.3 of the PWS. (Firm Fixed Portion)
2003 12 Months OPTION Service Calls
FFP
Services Calls shall be performed in accordance with para 7.4 of the PWS. (Firm Fixed Portion)
2004 12 Months OPTION Preventative Maintenance
FFP
Preventative Maintenance (PM) including Minor Repair Services for Buildings, 510,511, 512, 513, 514, 523, 5101, 5102, 5103, 5171, 8172, 8173 and underground parking facilities, AFH 050, 060 070 duplexes. All services shall be performed in accordance with para 7.5 of the PWS. (Firm Fixed Price)
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Change of Occupancy Cleaning
FFP
Change of Occupancy Cleaning (COC). All work shall be performed in accordance
UNIT UNIT PRICE ESTIMATED AMOUNT
2005AA 8 Each OPTION COC, 2 Bedroom Typ
FFP
All work shall be performed in accordance with section 7.6 of the PWS.
(Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
2005AB 668 Each OPTION COC, 3 Bedroom Type
FFP
All work shall be performed in accordance with section 7.6 of the PWS.
(Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
2005AC 244 Each OPTION COC, 4 Bedroom Type
FFP
COC, 4 Bedroom Type. All work shall be performed in accordance with section
7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
2005AD 88 Each OPTION COC, 4 Bedroom Type Duplex
FFP
COC, 4 Bedroom Type (O6 Duplex Type).
All work shall be performed in accordance with section 7.6 of the PWS.
(Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
2005AE 20 Each OPTION COC, 4 Bedroom Type GFOQ
FFP
COC, 4 Bedroom (FGOQ Duplex Type).
UNIT UNIT PRICE ESTIMATED AMOUNT
2005AF 2 Each OPTION COC, 4 Bedroom Type Single
FFP
COC, 4 Bedroom (GFOQ Single Type).
UNIT UNIT PRICE ESTIMATED AMOUNT
2005AG 8 Each OPTION COC, Super 4 Bedroom Type
FFP
COC, Super 4 Bedroom Type.
UNIT UNIT PRICE ESTIMATED AMOUNT
2005AH 72 Each OPTION COC, 5 Bedroom Type
FFP
COC, 5 Bedroom Type.
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Change of Occupancy Maintenance
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2006AA 1,000 Each OPTION Change of Occupancy Maintenance (APT)
FFP
Change of Occupancy Maintenance (COM), Apartment Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
2006AB 110 Each OPTION Change of Occupancy Maintenance (Single)
FFP
Change of Occupancy Maintenance (Single House Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Change of Occupancy Painting(COP)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2007AA 8 Each OPTION COP, 2 Bedroom Type
FFP
COP, 2 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
2007AB 668 Each OPTION COP, 3 Bedroom Type
FFP
COP, 3 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
2007AC 244 Each OPTION COP, 4 Bedroom Type
FFP
COP, 4 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
2007AD 88 Each OPTION COP, 4 Bedroom Type(O6 Duplex)
FFP
COP, 4 Bedroom (O6 Duplex Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
2007AE 20 Each OPTION COP, 4 Bedroom Type(GFOQ Duplex)
FFP
COP, 4 Bedroom (GFOQ Duplex Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
2007AF 2 Each OPTION COP, 4 Bedroom Type(GFOQ Single)
FFP
COP, 4 Bedroom (GFOQ Single Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
2007AG 8 Each OPTION COP, Super 4 Bedroom Type
FFP
COP, Super 4 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
2007AH 72 Each OPTION COP, 5 Bedroom Type
FFP
COP, 5 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Project Works
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2008AA 50,000 Square
Dryer Air Duct Cleaning. All work shall be performed in accordance with section
7.7.5 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
2008AB 50,000 Square
A/C Heating Duct Cleaning. All work shall be performed in accordance with section 7.7.5 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
2008AC 100,000 Square
Interior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.7.2 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
2008AD 100,000 Square
Exterior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.7.3 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
2008AE 20,000 Square
Replace Vinyl Composition Floor 12"x12"x1/8". All work shall be performed in accordance with section 7.7.4 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
2008AF 20,000 Square
Floor installing or replacement (Meratone) QMS-1367. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
2008AG 20,000 Square
Floor installing or replacement (Meratone) QMS-3126. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
2008AH 10,000 Square
Replace ceramic floor tile. All work shall be performed in accordance with section
7.7.4.2 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
2008AJ 20 Each OPTION Replace Solid Core Single Door
FFP
Replace solid core wood single door flush type (600mm - 1475mm x 2100mm x 35mm thick). All work shall be performed in accordance with section 7.7.11 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
2008AK 20 Each OPTION Replace Solid Core Single Door
FFP
Replace solid core wood single door flush type (600mm - 1300mm x 2100mm x 44.5mm thick). All work shall be performed in accordance with section 7.7.4.2 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
2008AL 100 Each OPTION Replace Dishwasher
FFP
Replace dishwasher (using agency furnished) including water and drain connection. All work shall be performed in accordance with section 1.3.3.6.3 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
2008AM 215 Each OPTION Replace Carbon Monoxide Sensor
FFP
Replace carbon monoxide sensor. All work shall be performed in accordance with section 7.7.6.2 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
2008AN 280 Each OPTION Carbon Monoxide Sensor
FFP
Carbon Monoxide Sensor. All work shall be performed in accordance with section
7.7.6 of the PWS. (Requirement Portion)
2008AP 20,000 Square
Replace wooden flooring 1/4" thick. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)
Major Repair
FFP
2009AA 1 Lot OPTION Repair Elevator
FFP
Elevator Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.8.1 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW80,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)
2009AB 1 Lot OPTION Repair CCTV
FFP
CCTV Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.7.1 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW 30,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
2009AC 1 Lot OPTION Repair DDC
FFP
DDC Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.8.2 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW30,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)
2010 1 Job OPTION Contractor Manpower Reporting
FFP
Contractor Manpower Reporting Application (CMRA). Requirement must be reported by 31 October of each calendar year during the life of the contract. See para 12.0 of the PWS for CMRA requirement herein. (Firm Fixed Portion)
NOTE: Not to exceed 20 Man hours for data collection and report.
OPTION Estimated Cost for War Hazard Loss
3001 12 Months OPTION Custodial Services
FFP
Custodial Services for Army Family Housing. All services shall be performed in accordance with para 7.2 of the PWS. (Firm Fixed Portion)
3002 12 Months OPTION Police Call Services
FFP
Police Call Services shall be performed in accordance with para 7.3 of the PWS.
(Firm Fixed Portion)
3003 12 Months OPTION Service Calls
FFP
Police Call Services shall be performed in accordance with para 7.4 of the PWS.
(Firm Fixed Portion)
3004 12 Months OPTION Change of Occupancy Maintenance
FFP
Preventative Maintenance (PM) including Minor Repair Services for Buildings, 510,511, 512, 513, 514, 523, 5101, 5102, 5103, 5171, 8172, 8173 and underground parking facilities, AFH 050, 060 070 duplexes. All services shall be performed in accordance with para 7.5 of the PWS. (Firm Fixed Price)
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Change of Occupancy Cleaning
FFP
Change of Occupancy Cleaning (COC). All work shall be performed in accordance
UNIT UNIT PRICE ESTIMATED AMOUNT
3005AA 8 Each OPTION COC, 2 Bedroom Type
FFP
All work shall be performed in accordance with section 7.6 of the PWS.
(Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3005AB 668 Each OPTION COC, 3 Bedroom Type
FFP
All work shall be performed in accordance with section 7.6 of the PWS.
(Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3005AC 244 Each OPTION COC, 4 Bedroom Type
FFP
COC, 4 Bedroom Type. All work shall be performed in accordance with section
7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3005AD 88 Each OPTION COC, 4 Bedroom Type Duplex
FFP
COC, 4 Bedroom Type (O6 Duplex Type).
All work shall be performed in accordance with section 7.6 of the PWS.
(Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3005AE 20 Each OPTION COC, 4 Bedroom Type GFOQ
FFP
COC, 4 Bedroom (FGOQ Duplex Type).
All work shall be performed in accordance with section 7.6 of the PWS.
(Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3005AF 2 Each OPTION COC, 4 Bedroom Type Single
FFP
COC, 4 Bedroom (GFOQ Single Type).
All work shall be performed in accordance with section 7.6 of the PWS.
(Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3005AG 8 Each OPTION COC, Super 4 Bedroom Type
FFP
COC, Super 4 Bedroom Type.
All work shall be performed in accordance with section 7.6 of the PWS.
(Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3005AH 72 Each OPTION COC, 5 Bedroom Type
FFP
COC, 5 Bedroom Type.
All work shall be performed in accordance with section 7.6 of the PWS.
(Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Change of Occupancy Maintenance
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3006AA 1,000 Each OPTION Change of Occupancy Maintenance(APT)
FFP
Change of Occupancy Maintenance (COM), Apartment Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3006AB 110 Each OPTION Change of Occupancy Maintenance(Single)
FFP
Change of Occupancy Maintenance (Single House Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Change of Occupancy Painting(COP)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3007AA 8 Each OPTION COP, 2 Bedroom Type
FFP
COP, 2 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3007AB 668 Each OPTION COP, 3 Bedroom Type
FFP
COP, 3 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3007AC 244 Each OPTION COP, 4 Bedroom Type
FFP
COP, 4 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3007AD 88 Each OPTION COP, 4 Bedroom Type(O6 Duplex)
FFP
COP, 4 Bedroom (O6 Duplex Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3007AE 20 Each OPTION COP, 4 Bedroom Type(GFOQ Duplex)
FFP
COP, 4 Bedroom (GFOQ Duplex Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3007AF 2 Each OPTION COP, 4 Bedroom Type(GFOQ Single)
FFP
COP, 4 Bedroom (GFOQ Single Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3007AG 8 Each OPTION COP, Super 4 Bedroom Type
FFP
COP, Super 4 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3007AH 72 Each OPTION COP, 5 Bedroom Type
FFP
COP, 5 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Project Works
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3008AA 50,000 Square
Dryer Air Duct Cleaning. All work shall be performed in accordance with section
7.7.5 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3008AB 50,000 Square
A/C Heating Duct Cleaning. All work shall be performed in accordance with section 7.7.5 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3008AC 100,000 Square
Interior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.7.2 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3008AD 100,000 Square
Exterior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.7.3 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3008AE 20,000 Square
Replace Vinyl Composition Floor 12"x12"x1/8". All work shall be performed in accordance with section 7.7.4 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3008AF 20,000 Square
Floor installing or replacement (Meratone) QMS-1367. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3008AG 20,000 Square
Floor installing or replacement (Meratone) QMS-3126. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3008AH 10,000 Square
Replace ceramic floor tile. All work shall be performed in accordance with section
7.7.4.2 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3008AJ 20 Each OPTION Replace Solid Core Single Door
FFP
Replace solid core wood single door flush type (600mm - 1475mm x 2100mm x 35mm thick). All work shall be performed in accordance with section 7.7.11 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3008AK 20 Each OPTION Replace Solid Core Single Door
FFP
Replace solid core wood single door flush type (600mm - 1300mm x 2100mm x 44.5mm thick). All work shall be performed in accordance with section 7.7.4.2 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3008AL 100 Each OPTION Replace Dishwasher
FFP
Replace dishwasher (using agency furnished) including water and drain connection. All work shall be performed in accordance with section 1.3.3.6.3 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3008AM 215 Each OPTION Replace Carbon Monoxide Sensor
FFP
Replace carbon monoxide sensor. All work shall be performed in accordance with section 7.7.6.2 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3008AN 280 Each OPTION Carbon Monoxide Sensor
FFP
Carbon Monoxide Sensor. All work shall be performed in accordance with section
7.7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
3008AP 20,000 Square
Replace wooden flooring 1/4" thick. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Major Repair
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3009AA 1 Lot OPTION Repair Elevator
FFP
Elevator Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.8.1 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW80,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)
3009AB 1 Lot OPTION Repair CCTV
FFP
CCTV Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.7.1 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW 30,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)
3009AC 1 Lot OPTION Repair DDC
FFP
DDC Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.8.2 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW30,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)
3010 1 Job OPTION Contractor Manpower Reporting
FFP
Contractor Manpower Reporting Application (CMRA). Requirement must be reported by 31 October of each calendar year during the life of the contract. See para 12.0 of the PWS for CMRA requirement herein. (Firm Fixed Portion)
NOTE: Not to exceed 20 Man hours for data collection and report.
OPTION Estimated Cost for War Hazard Loss
4001 12 Months OPTION Custodial Services
FFP
Custodial Services for Army Family Housing. All services shall be performed in accordance with para 7.2 of the PWS. (Firm Fixed Portion)
4002 12 Months OPTION Police Call Services
FFP
Police Call Services shall be performed in accordance with para 7.3 of the PWS.
(Firm Fixed Portion)
4003 12 Months OPTION Service Calls
FFP
Police Call Services shall be performed in accordance with para 7.3 of the PWS.
(Firm Fixed Portion)
4004 12 Mole
(mol)
OPTION Change of Occupancy Maintenance
Preventative Maintenance (PM) including Minor Repair Services for Buildings, 510,511, 512, 513, 514, 523, 5101, 5102, 5103, 5171, 8172, 8173 and underground parking facilities, AFH 050, 060 070 duplexes. All services shall be performed in accordance with para 7.5 of the PWS. (Firm Fixed Price)
OPTION Change of Occupancy Cleaning
FFP
Change of Occupancy Cleaning (COC). All work shall be performed in accordance
UNIT UNIT PRICE ESTIMATED AMOUNT
4005AA 8 Each OPTION COC, 2 Bedroom Type
FFP
All work shall be performed in accordance with section 7.6 of the PWS.
(Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4005AB 668 Each OPTION COC, 3 Bedroom Type
FFP
All work shall be performed in accordance with section 7.6 of the PWS.
(Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4005AC 244 Each OPTION COC, 4 Bedroom Type
FFP
COC, 4 Bedroom Type. All work shall be performed in accordance with section
7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4005AD 88 Each OPTION COC, 4 Bedroom Type Duplex
FFP
COC, 4 Bedroom Type (O6 Duplex Type).
All work shall be performed in accordance with section 7.6 of the PWS.
(Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4005AE 20 Each OPTION COC, 4 Bedroom Type GFOQ
FFP
COC, 4 Bedroom (FGOQ Duplex Type).
All work shall be performed in accordance with section 7.6 of the PWS.
(Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4005AF 2 Each OPTION COC, 4 Bedroom Type Single
FFP
COC, 4 Bedroom (GFOQ Single Type).
All work shall be performed in accordance with section 7.6 of the PWS.
(Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4005AG 8 Each OPTION COC, Super 4 Bedroom Type
FFP
COC, Super 4 Bedroom Type.
All work shall be performed in accordance with section 7.6 of the PWS.
(Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4005AH 72 Each OPTION COC, 5 Bedroom Type
FFP
COC, 5 Bedroom Type.
All work shall be performed in accordance with section 7.6 of the PWS.
(Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
Change of Occupancy Maintenance
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
4006AA 1,000 Each OPTION Change of Occupancy Maintenance(APT)
FFP
Change of Occupancy Maintenance (COM), Apartment Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4006AB 110 Each OPTION Change of Occupancy Maintenance(Single)
FFP
Change of Occupancy Maintenance (Single House Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Change of Occupancy Painting(COP)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
4007AA 8 Each OPTION COP, 2 Bedroom Type
FFP
COP, 2 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4007AB 668 Each OPTION COP, 3 Bedroom Type
FFP
COP, 3 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4007AC 244 Each OPTION COP, 4 Bedroom Type
FFP
COP, 4 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4007AD 88 Each OPTION COP, 4 Bedroom Type(O6 Duplex)
FFP
COP, 4 Bedroom (O6 Duplex Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4007AE 20 Each OPTION COP, 4 Bedroom Type(GFOQ Duplex)
FFP
COP, 4 Bedroom (GFOQ Duplex Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4007AF 2 Each OPTION COP, 4 Bedroom Type(GFOQ Single)
FFP
COP, 4 Bedroom (GFOQ Single Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4007AG 8 Each OPTION COP, Super 4 Bedroom Type
FFP
COP, Super 4 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4007AH 72 Each OPTION COP, 5 Bedroom Type
FFP
COP, 5 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Project Works
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
4008AA 50,000 Square
Dryer Air Duct Cleaning. All work shall be performed in accordance with section
7.7.5 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4008AB 50,000 Square
A/C Heating Duct Cleaning. All work shall be performed in accordance with section 7.7.5 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4008AC 100,000 Square
Interior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.7.2 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4008AD 100,000 Square
Exterior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.7.3 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4008AE 20,000 Square
Replace Vinyl Composition Floor 12"x12"x1/8". All work shall be performed in accordance with section 7.7.4 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4008AF 20,000 Square
Floor installing or replacement (Meratone) QMS-1367. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4008AG 20,000 Square
Floor installing or replacement (Meratone) QMS-3126. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4008AH 10,000 Square
Replace ceramic floor tile. All work shall be performed in accordance with section
7.7.4.2 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4008AJ 20 Each OPTION Replace Solid Core Single Door
FFP
Replace solid core wood single door flush type (600mm - 1475mm x 2100mm x 35mm thick). All work shall be performed in accordance with section 7.7.11 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4008AK 20 Each OPTION Replace Solid Core Single Door
FFP
Replace solid core wood single door flush type (600mm - 1300mm x 2100mm x 44.5mm thick). All work shall be performed in accordance with section 7.7.4.2 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4008AL 100 Each OPTION Replace Dishwasher
FFP
Replace dishwasher (using agency furnished) including water and drain connection. All work shall be performed in accordance with section 1.3.3.6.3 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4008AM 215 Each OPTION Replace Carbon Monoxide Sensor
FFP
Replace carbon monoxide sensor. All work shall be performed in accordance with section 7.7.6.2 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4008AN 280 Each OPTION Carbon Monoxide Sensor
FFP
Carbon Monoxide Sensor. All work shall be performed in accordance with section
7.7.6 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4008AP 20,000 Square
Replace wooden flooring 1/4" thick. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Major Repair
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
4009AA 1 Lot OPTION Repair Elevator
FFP
Elevator Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.8.1 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW80,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4009AB 1 Lot OPTION Repair CCTV
FFP
CCTV Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.7.1 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW 30,000,000.00 Do not propose a price for this CLIN. (Requirement Portion)
UNIT UNIT PRICE ESTIMATED AMOUNT
4009AC 1 Lot OPTION Repair DDC
FFP
DDC Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.8.2 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW30,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)
4010 1 Job OPTION Contractor Manpower Reporting
FFP
Contractor Manpower Reporting Application (CMRA). Requirement must be reported by 31 October of each calendar year during the life of the contract. See para 12.0 of the PWS for CMRA requirement herein. (Firm Fixed Portion)
NOTE: Not to exceed 20 Man hours for data collection and report.
OPTION Estimated Cost for War Hazard Loss
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT FOR TOTAL PREVENTATIVE MAINTENANCE,
REPAIR AND CLEANING SERVICES FOR ARMY FAMILY HOUSING (AFH) AT USAG
HUMPHREYS
1.1. GENERAL: This is a non-personal service contract is to provide Total Preventive Maintenance (PM) including minor repair and cleaning Services for AFH at USAG Humphreys. The contractor shall provide all personnel, equipment, tools, materials, supervision, and services necessary to perform as defined in this Performance Work Statement (PWS), except Government-Furnished Property (GFP) and services as specified in this PWS.
1.2. SCOPE OF WORK: The contractor shall perform the contracted services to the standards identified in this contract. The main functions are:
• Custodial services including, policing and ground maintenance services in Common Areas and Facilities.
• Routine Preventive Maintenance and Minor Repair: Maintenance of Common Areas, Maintenance and Operations of Heating, Ventilation and Air Conditioning (HVAC) Equipment, Elevator and Playground Safety Inspections of all Army Family Housing (AFH) Facilities.
• Customer Service Call System
• Change of Occupancy Maintenance (COM)
• Change of Occupancy Cleaning (COC)
• Change of Occupancy Painting (COP)
• Project Works
• Major Replacement/Repair Service
1.2.1. CONTRACTOR AND KEY PERSONNEL QUALIFICATION.
1.2.2. Contractor’s Qualification: Certificate of Business Registrations and Permission: The contractor shall submit all valid and current a Certificate of Business Registrations and Permission: The offeror shall provide all three (3) below identified requirements. For the ii) & iii) requirement, subcontractor’s registration and permission is allowable. In case of subcontractor(s) use, the offeror shall submit copies of the subcontract agreement with official companies who possess the registration and permission.
Additionally, the offeror shall submit copies of the subcontractor’s specific registration and permission issued by Republic of Korea (ROK).
1) Prime Contractor’s a valid Construction Business Registration (건설업등록증) for the business item category of “Building/Facilities Maintenance” (시설물유지관리업) in accordance with the Article 9 of
ROK Law "Framework Act on Construction Industry" (건설산업기본법).
2) Electric Work Business registration (전기공사업등록증) in accordance with the “Electric Work
Business Act (전기시공업), Article 4, Para 1 of the ROK Law.
3) Public Sanitation Control Business Permission (위생관리용역업신고)
1.2.2.1. Prior Experience: The contractor shall have at least two (2) years of verifiable experience in preventive maintenance & repair, custodial and PWS related services of various facilities within the last seven (7) years from the release date of this solicitation.
1.3. Key Personnel.
1.3.1. Key Personnel Qualification. The contractor shall provide sufficient personnel as a Preventive Maintenance and Repair Team which consists of at least Contract Manager (CM), Plumber(s), Quality Control Inspector, HVAC Mechanic(s), Electrician(s), Facility Repair Craftsman(s), Elevator Mechanic(s) and Service Call Receptionist(s) to accomplish the PWS requirements. All key personals has to be at the site during operation hours.
1.3.1.2. Contract Manager (CM). The Contractor shall provide an on-site Contract Manager (CM). The CM shall be physically present during normal duty hours (During normal duty hours (08:00-17:00 hrs, Monday thru Friday) to handle any problems /complaints that may occur, shall conduct overall management, coordination, furnish liaison with the Government and shall be responsible for the performance and management of Maintenance and Repairs services required under this contract. The CM shall be able to read, write, speak and understand English and shall fully understand the requirements of this contract. The contractor shall notify the COR of any changes in CM personnel. The CM shall have full authority and responsibility to act for the contractor on all contract matters relating to daily operations under this contract.
1.3.1.3. Quality Control Inspector. The contractor should provide an on-site QC. The QCI shall physically present during normal duty hours. The QCI should the Quality Control Plan (QCP) and insure daily reporting for quality control inspection.
1.3.1.4. Plumber. The plumbers shall possess technician licenses issued by ROK Government in plumbing repair (배관 기능사 자격증).
1.3.1.5. Heating, Ventilating and Air Conditioning (HVAC) Mechanic.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.