About this file

Solicitation/PWS

View the file

Other files

File Type Posted
W91QVN-19-R-0120-P0004.pdf PDF
W91QVN-19-R-0120-P0003pdf.pdf PDF
Exhibit_31_Elevator_Checklist.docx DOCX document
Exhibit_32_Maintenance-Control-Program-MCP.PDF PDF
A2___Exhibit_10_Historical_Vacate_Quarters_data_.pdf PDF
A2__Exhibit_27____Macarthur_Circle_Map(GFOQ)_(1).pptx PPTX presentation
A2__Exhibit_28____GFOQ_Duplex_Floor_Plan_(Single_floor_Type_&_duplex).pdf PDF
A2__Exhibit_29_Housing_Floorplans.pdf PDF
A2__Exhibit_30_AFH_Room_Information_(2).xlsx XLSX spreadsheet
W91QVN-19-R-0120-P0002.pdf PDF
B1__W91QVN-19-R-0120-P0001(v2).pdf PDF
W91QVN-19-R-0120-P0001.pdf PDF
A2__Exhibit_26____Duplex_floor_plan_in_Red_Cloud_Circle(O6_housing).pdf PDF
A2__Exhibit_22____Plans_for_Area_Site__5101,5102,5103,5171,5172,5173.pdf PDF
A2__Exhibit_20____AFH_bldg_510_Floor_Plans.pptx PPTX presentation
A2__Exhibit_17____Contract_Discepancy_Report_CDR.doc DOC document
A2__Exhibit_13____Customer_Complaint.doc DOC document
A2__Exhibit_21____511_&_512_Unit_floor_plan.pdf PDF
A2__Exhibit_25____Red_Cloud_Circle_Map(_O6_Housing).pptx PPTX presentation
A2__Exhibit_6____Quality_and_Standards_of_Work.docx DOCX document
A2__Exhibit_8____Change_of_Occupany_Painting_Check_List.docx DOCX document
A2__Exhibit_14____GFOQ_Monthly_Report.doc DOC document
A2__Exhibit_10___Historical_Vacate_Quarters_data.doc DOC document
A2__Exhibit_16____Heavy_Equipment_Check_Lists.docx DOCX document
A2__Exhibit_4___Monthly_Service_Order_Report.doc DOC document
A2__Exhibit_5___Change_of_Occupancy_Montly_Report.docx DOCX document
A2__Exhibit_18____Sample_NCIR.doc DOC document
A2__Exhibit_9____Change_of_Occupany_Maintenance_Checklist.docx DOCX document
A2__Exhibit_19____AFH_bldg_513_Garage_plan.pdf PDF
A2__Exhibit_11___Estimated_Service_Frequency.doc DOC document
A2__Exhibit_2___Deliverables(Data_Requirements).docx DOCX document
A2__Exhibit_27____Macarthur_Circle_Map(GFOQ)_(1).pptx PPTX presentation
A2__Exhibit_28____GFOQ_Duplex_Floor_Plan_(Single_floor_Type_&_duplex).pdf PDF
A2__Exhibit_24____Parking_Lot_floor_Plan_5101,5102,5103,5171,5172,5173_Area.pdf PDF
A2__Exhibit_3___Scheduled_Services.doc DOC document
A2__Exhibit_7____Change_of_Occupany_Cleaning_Check_List.xlsx XLSX spreadsheet
A2__Exhibit_23____Building_5101,5102,5103,5171,5172,5173_Flr_Plans.pdf PDF
A2__Exhibit_12____Daily_Contract_Inspection_Report.doc DOC document
A2__Exhibit_15____COM_Monthly_Report.xlsx XLSX spreadsheet
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 11 Months Custodial Services

FFP

Custodial Services for Army Family Housing. All services shall be performed in accordance with para 7.2 of the PWS. (Firm Fixed Portion) FOB: Destination

PSC CD: Z2FA

NET AMT

0002 11 Months Police Call Services

FFP

Police Call Services shall be performed in accordance with para 7.3 of the PWS.

(Firm Fixed Portion)

0003 11 Months Service Call

FFP

Service Calls shall be performed in accordance with para 7.4 of the PWS. (Firm Fixed Price)

0004 11 Months Preventative Maintenance

FFP

Preventative Maintenance (PM) including Minor Repair Services for Buildings, 510,511, 512, 513, 514, 523, 5101, 5102, 5103, 5171, 8172, 8173 and underground parking facilities, AFH 050, 060 070 duplexes. All services shall be performed in accordance with para 7.5 of the PWS. (Firm Fixed Price)

ITEM NO SUPPLIES/SERVICES ESTIMATED

QUANTITY

UNIT UNIT PRICE ESTIMATED AMOUNT

Change of Occupancy Cleaning

FFP

Change of Occupancy Cleaning (COC). All work shall be performed in accordance with 7.6 of the PWS. (Requirement Portion) MFR PART NR: z2fa

ESTIMATED

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AA 8 Each COC, 2 Bedroom Type

FFP

All work shall be performed in accordance with section 7.6 of the PWS.

(Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AB 380 Each COC, 3 Bedroom Type

FFP

All work shall be performed in accordance with section 7.6 of the PWS.

(Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AC 136 Each COC, 4 Bedroom Type

FFP

COC, 4 Bedroom Type. All work shall be performed in accordance with section

7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AD 88 Each COC, 4 Bedroom Type Duplex

FFP

COC, 4 Bedroom Type (O6 Duplex Type).

All work shall be performed in accordance with section 7.6 of the PWS.

(Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AE 20 Each COC, 4 Bedroom Type GFOQ

FFP

COC, 4 Bedroom (FGOQ Duplex Type).

All work shall be performed in accordance with section 7.6 of the PWS.

(Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AF 2 Each COC, 4 Bedroom Type Single

FFP

COC, 4 Bedroom (GFOQ Single Type).

All work shall be performed in accordance with section 7.6 of the PWS.

(Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AG 8 Each COC, Super 4 Bedroom Type

FFP

COC, Super 4 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0005AH 36 Each COC, 5 Bedroom Type

FFP

COC, 5 Bedroom Type. All work shall be performed in accordance with section

7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

Change of Occupancy Maintenance

FFP

Change of Occupancy Maintenance. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0006AA 568 Each Change of Occupancy Maintenance (APT)

FFP

Change of Occupancy Maintenance (COM), Apartment Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0006AB 110 Each Change of Occupancy Maintenance (Single)

FFP

Change of Occupancy Maintenance (Single House Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

Change of Occupancy Painting(COP)

FFP

All work shall be performed in accordance with section 7.6 of the PWS.

(Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0007AA 8 Each COP, 2 Bedroom Type

FFP

COP, 2 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0007AB 380 Each COP, 3 Bedroom Type

FFP

COP, 3 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0007AC 136 Each COP, 4 Bedroom Type

FFP

COP, 4 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0007AD 88 Each COP, 4 Bedroom Type(O6 Duplex)

FFP

COP, 4 Bedroom (O6 Duplex Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0007AE 20 Each COP, 4 Bedroom Type(GFOQ Duplex)

FFP

COP, 4 Bedroom (GFOQ Duplex Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0007AF 2 Each COP, 4 Bedroom Type(GFOQ Single)

FFP

COP, 4 Bedroom (GFOQ Single Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0007AG 8 Each COP, Super 4 Bedroom Type

FFP

COP, Super 4 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0007AH 36 Each COP, 5 Bedroom Type

FFP

COP, 5 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

Project Works

FFP

Projects Works. All work shall be performed in accordance with section 7.7 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0008AA 50,000 Square Foot

Dryer Air Duct Cleaning

FFP

All work shall be performed in accordance with section 7.7.5 of the PWS.

(Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0008AB 50,000 Square

A/C Heating Duct Cleaning

A/C Heating Duct Cleaning. All work shall be performed in accordance with section 7.7.5 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0008AC 100,000 Square

Interior Painting, Latex-2 Coats

Interior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.7.2 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0008AD 100,000 Square

Exterior Painting, Latex-2 Coats

Exterior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.7.3 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0008AE 20,000 Square

Replace Vinyl Composition Floor

Replace Vinyl Composition Floor 12"x12"x1/8" with waxing. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)

0008AF 20,000 Square

Floor install or Replace

Floor installing or replacement (Meratone) QMS-1367. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)

0008AG 20,000 Square

Floor install or Replace

Floor installing or replacement (Meratone) QMS-3126. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)

0008AH 10,000 Square

Replace Ceramic Floor Tile

Replace ceramic floor tile. All work shall be performed in accordance with section

7.7.4.2 of the PWS. (Requirement Portion)

0008AJ 20 Each Replace Solid Core Single Door

FFP

Replace solid core wood single door flush type (600mm - 1475mm x 2100mm x 35mm thick). All work shall be performed in accordance with section 7.7.11 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0008AK 20 Each Replace Solid Core Single Door

FFP

Replace solid core wood single door flush type (600mm - 1300mm x 2100mm x 44.5mm thick). All work shall be performed in accordance with section 7.7.4.2 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0008AL 100 Each Replace Dishwasher

FFP

Replace dishwasher (using agency furnished) including water and drain connection. All work shall be performed in accordance with section 1.3.3.6.3 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0008AM 150 Each Replace Carbon Monoxide Sensor

FFP

Replace carbon monoxide sensor. All work shall be performed in accordance with section 7.7.6.2 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0008AN 150 Each Carbon Monoxide Sensor

FFP

Carbon Monoxide Sensor. All work shall be performed in accordance with section

7.7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0008AP 20,000 Square

Replace Wooden Flooring

Replace wooden flooring 1/4" thick. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

Major Repair

FFP

Major Repair. All work shall be performed in accordance with section 2.1.28 of the

UNIT UNIT PRICE ESTIMATED AMOUNT

0009AA 1 Lot Repair Elevator

FFP

Elevator Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.8.1 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW80,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0009AB 1 Lot Repair CCTV

FFP

CCTV Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.7.1 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW30,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

0009AC 1 Lot Repair DDC

FFP

DDC Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.8.2 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW30,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)

0010 1 Job Contractor Manpower Reporting

FFP

Contractor Manpower Reporting Application (CMRA). Requirement must be reported by 31 October of each calendar year during the life of the contract. See para 12.0 of the PWS for CMRA requirement herein. (Firm Fixed Portion)

NOTE: Not to exceed 20 Man hours for data collection and report.

Estimated Cost for War Hazard Loss

Estimated Cost for War Hazard Losses is Zero (0).

UNIT UNIT PRICE ESTIMATED AMOUNT

0012 1 Months Phase In/Out

FFP

DDC Repair. All work shall be performed in accordance with section1.3.6. of the PWS. (Firm Fixed Portion)

1001 12 Months OPTION Custodial Services

FFP

Custodial Services for Army Family Housing. All services shall be performed in accordance with para 7.2 of the PWS. (Firm Fixed Portion)

1002 12 Months OPTION Police Call Services

FFP

Police Call Services shall be performed in accordance with para 7.3 of the PWS.

(Firm Fixed Portion)

1003 12 Months OPTION Service Calls

FFP

Service Calls shall be performed in accordance with para 7.4 of the PWS. (Firm Fixed Price)

1004 12 Months OPTION Preventative Maintenance

FFP

Preventative Maintenance (PM) including Minor Repair Services for Buildings, 510,511, 512, 513, 514, 523, 5101, 5102, 5103, 5171, 8172, 8173 and underground parking facilities, AFH 050, 060 070 duplexes. All services shall be performed in accordance with para 7.5 of the PWS. (Firm Fixed Price)

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Change of Occupancy Cleaning

FFP

Change of Occupancy Cleaning (COC). All work shall be performed in accordance

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AA 8 Each OPTION COC, 2 Bedroom Type

FFP

COC, 2 Bedroom Type. All work shall be performed in accordance with 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AB 524 Each OPTION COC, 3 Bedroom Type

FFP

COC, 3 Bedroom Type. All work shall be performed in accordance with 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AC 190 Each OPTION COC, 4 Bedroom Type

FFP

COC, 4 Bedroom Type. All work shall be performed in accordance with 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AD 88 Each OPTION COC, 4 Bedroom Type Duplex

FFP

COC, 4 Bedroom (O6 Duplex Type). All work shall be performed in accordance with 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AE 20 Each OPTION COC, 4 Bedroom Type GFOQ

FFP

COC, 4 Bedroom (FGOQ Duplex Type). All work shall be performed in accordance with 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AF 2 Each OPTION COC, 4 Bedroom Type Single

FFP

COC, 4 Bedroom (GFOQ Single Type). All work shall be performed in accordance with 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AG 8 Each OPTION COC, Super 4 Bedroom Type

FFP

COC, Super 4 Bedroom Type. All work shall be performed in accordance with 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

1005AH 54 Each OPTION COC, 5 Bedroom Type

FFP

COC, 5 Bedroom Type. All work shall be performed in accordance with 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Change of Occupancy Maintenance

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

1006AA 784 Each OPTION Change of Occupancy Maintenance (APT)

FFP

Change of Occupancy Maintenance (COM), Apartment Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

1006AB 110 Each OPTION Change of Occupancy Maintenance (Single)

FFP

Change of Occupancy Maintenance (Single House Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Change of Occupancy Painting(COP)

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

1007AA 8 Each OPTION COP, 2 Bedroom Type

FFP

COP, 2 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

1007AB 524 Each OPTION COP, 3 Bedroom Type

FFP

COP, 3 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

1007AC 190 Each OPTION COP, 4 Bedroom Type

FFP

COP, 4 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

1007AD 88 Each OPTION COP, 4 Bedroom Type(O6 Duplex)

FFP

COP, 4 Bedroom (O6 Duplex Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

1007AE 20 Each OPTION COP, 4 Bedroom Type(GFOQ Duplex)

FFP

COP, 4 Bedroom (GFOQ Duplex Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

1007AF 2 Each OPTION COP, 4 Bedroom Type(GFOQ Single)

FFP

COP, 4 Bedroom (GFOQ Single Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

1007AG 8 Each OPTION COP, Super 4 Bedroom Type

FFP

COP, Super 4 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

1007AH 54 Each OPTION COP, 5 Bedroom Type

FFP

COP, 5 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Project Works

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

1008AA 50,000 Square

OPTION Dryer Air Duct Cleaning

Dryer Air Duct Cleaning. All work shall be performed in accordance with section

7.7.5 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

1008AB 50,000 Square

OPTION A/C Heating Duct Cleaning

A/C Heating Duct Cleaning. All work shall be performed in accordance with section 7.7.5 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

1008AC 100,000 Square

OPTION Interior Painting, Latex-2 Coats

Interior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.7.2 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

1008AD 100,000 Square

OPTION Exterior Painting, Latex-2 Coats

Exterior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.7.3 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

1008AE 20,000 Square

OPTION Replace Vinyl Composition Floor

Replace Vinyl Composition Floor 12"x12"x1/8". All work shall be performed in accordance with section 7.7.4 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

1008AF 20,000 Square

OPTION Floor install or Replace

Floor installing or replacement (Meratone) QMS-1367. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

1008AG 20,000 Square

OPTION Floor Install or Replace

Floor installing or replacement (Meratone) QMS-3126. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

1008AH 10,000 Square

OPTION Replace Ceramic Floor Tile

Replace ceramic floor tile. All work shall be performed in accordance with section

7.7.4.2 of the PWS. (Requirement Portion)

1008AJ 20 Each OPTION Replace Solid Core Single Door

FFP

Replace solid core wood single door flush type (600mm - 1475mm x 2100mm x 35mm thick). All work shall be performed in accordance with section 7.7.11 of the PWS. (Requirement Portion)

1008AK 20 Each OPTION Replace Solid Core Single Door

FFP

Replace solid core wood single door flush type (600mm - 1300mm x 2100mm x 44.5mm thick). All work shall be performed in accordance with section 7.7.4.2 of the PWS. (Requirement Portion)

1008AL 100 Each OPTION Replace Dishwasher

FFP

Replace dishwasher (using agency furnished) including water and drain connection. All work shall be performed in accordance with section 1.3.3.6.3 of the PWS. (Requirement Portion)

1008AM 150 Each OPTION Replace Carbon Monoxide Sensor

FFP

Replace carbon monoxide sensor. All work shall be performed in accordance with section 7.7.6.2 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

1008AN 150 Each OPTION Carbon Monoxide Sensor

FFP

Carbon Monoxide Sensor. All work shall be performed in accordance with section

7.7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

1008AP 20,000 Square

OPTION Replace Wooden Flooring

Replace wooden flooring 1/4" thick. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Major Repair

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

1009AA 1 Lot OPTION Repair Elevator

FFP

Elevator Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.8.1 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW80,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

1009AB 1 Lot OPTION Repair CCTV

FFP

CCTV Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.7.1 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW 30,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

1009AC 1 Lot OPTION Repair DDC

FFP

DDC Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.8.2 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW30,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)

1010 1 Job OPTION Contractor Manpower Reporting

FFP

Contractor Manpower Reporting Application (CMRA). Requirement must be reported by 31 October of each calendar year during the life of the contract. See para 12.0 of the PWS for CMRA requirement herein. (Firm Fixed Portion)

NOTE: Not to exceed 20 Man hours for data collection and report.

OPTION Estimated Cost for War Hazard Loss

2001 12 Months OPTION Custodial Services

FFP

Custodial Services for Army Family Housing. All services shall be performed in accordance with para 7.2 of the PWS. (Firm Fixed Portion)

2002 12 Months OPTION Police Call Services

FFP

Police Call Services for Army Family Housing. All services shall be performed in accordance with para 7.3 of the PWS. (Firm Fixed Portion)

2003 12 Months OPTION Service Calls

FFP

Services Calls shall be performed in accordance with para 7.4 of the PWS. (Firm Fixed Portion)

2004 12 Months OPTION Preventative Maintenance

FFP

Preventative Maintenance (PM) including Minor Repair Services for Buildings, 510,511, 512, 513, 514, 523, 5101, 5102, 5103, 5171, 8172, 8173 and underground parking facilities, AFH 050, 060 070 duplexes. All services shall be performed in accordance with para 7.5 of the PWS. (Firm Fixed Price)

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Change of Occupancy Cleaning

FFP

Change of Occupancy Cleaning (COC). All work shall be performed in accordance

UNIT UNIT PRICE ESTIMATED AMOUNT

2005AA 8 Each OPTION COC, 2 Bedroom Typ

FFP

All work shall be performed in accordance with section 7.6 of the PWS.

(Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

2005AB 668 Each OPTION COC, 3 Bedroom Type

FFP

All work shall be performed in accordance with section 7.6 of the PWS.

(Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

2005AC 244 Each OPTION COC, 4 Bedroom Type

FFP

COC, 4 Bedroom Type. All work shall be performed in accordance with section

7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

2005AD 88 Each OPTION COC, 4 Bedroom Type Duplex

FFP

COC, 4 Bedroom Type (O6 Duplex Type).

All work shall be performed in accordance with section 7.6 of the PWS.

(Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

2005AE 20 Each OPTION COC, 4 Bedroom Type GFOQ

FFP

COC, 4 Bedroom (FGOQ Duplex Type).

UNIT UNIT PRICE ESTIMATED AMOUNT

2005AF 2 Each OPTION COC, 4 Bedroom Type Single

FFP

COC, 4 Bedroom (GFOQ Single Type).

UNIT UNIT PRICE ESTIMATED AMOUNT

2005AG 8 Each OPTION COC, Super 4 Bedroom Type

FFP

COC, Super 4 Bedroom Type.

UNIT UNIT PRICE ESTIMATED AMOUNT

2005AH 72 Each OPTION COC, 5 Bedroom Type

FFP

COC, 5 Bedroom Type.

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Change of Occupancy Maintenance

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

2006AA 1,000 Each OPTION Change of Occupancy Maintenance (APT)

FFP

Change of Occupancy Maintenance (COM), Apartment Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

2006AB 110 Each OPTION Change of Occupancy Maintenance (Single)

FFP

Change of Occupancy Maintenance (Single House Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Change of Occupancy Painting(COP)

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

2007AA 8 Each OPTION COP, 2 Bedroom Type

FFP

COP, 2 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

2007AB 668 Each OPTION COP, 3 Bedroom Type

FFP

COP, 3 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

2007AC 244 Each OPTION COP, 4 Bedroom Type

FFP

COP, 4 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

2007AD 88 Each OPTION COP, 4 Bedroom Type(O6 Duplex)

FFP

COP, 4 Bedroom (O6 Duplex Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

2007AE 20 Each OPTION COP, 4 Bedroom Type(GFOQ Duplex)

FFP

COP, 4 Bedroom (GFOQ Duplex Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

2007AF 2 Each OPTION COP, 4 Bedroom Type(GFOQ Single)

FFP

COP, 4 Bedroom (GFOQ Single Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

2007AG 8 Each OPTION COP, Super 4 Bedroom Type

FFP

COP, Super 4 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

2007AH 72 Each OPTION COP, 5 Bedroom Type

FFP

COP, 5 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Project Works

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

2008AA 50,000 Square

Dryer Air Duct Cleaning. All work shall be performed in accordance with section

7.7.5 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

2008AB 50,000 Square

A/C Heating Duct Cleaning. All work shall be performed in accordance with section 7.7.5 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

2008AC 100,000 Square

Interior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.7.2 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

2008AD 100,000 Square

Exterior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.7.3 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

2008AE 20,000 Square

Replace Vinyl Composition Floor 12"x12"x1/8". All work shall be performed in accordance with section 7.7.4 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

2008AF 20,000 Square

Floor installing or replacement (Meratone) QMS-1367. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

2008AG 20,000 Square

Floor installing or replacement (Meratone) QMS-3126. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

2008AH 10,000 Square

Replace ceramic floor tile. All work shall be performed in accordance with section

7.7.4.2 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

2008AJ 20 Each OPTION Replace Solid Core Single Door

FFP

Replace solid core wood single door flush type (600mm - 1475mm x 2100mm x 35mm thick). All work shall be performed in accordance with section 7.7.11 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

2008AK 20 Each OPTION Replace Solid Core Single Door

FFP

Replace solid core wood single door flush type (600mm - 1300mm x 2100mm x 44.5mm thick). All work shall be performed in accordance with section 7.7.4.2 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

2008AL 100 Each OPTION Replace Dishwasher

FFP

Replace dishwasher (using agency furnished) including water and drain connection. All work shall be performed in accordance with section 1.3.3.6.3 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

2008AM 215 Each OPTION Replace Carbon Monoxide Sensor

FFP

Replace carbon monoxide sensor. All work shall be performed in accordance with section 7.7.6.2 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

2008AN 280 Each OPTION Carbon Monoxide Sensor

FFP

Carbon Monoxide Sensor. All work shall be performed in accordance with section

7.7.6 of the PWS. (Requirement Portion)

2008AP 20,000 Square

Replace wooden flooring 1/4" thick. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)

Major Repair

FFP

2009AA 1 Lot OPTION Repair Elevator

FFP

Elevator Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.8.1 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW80,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)

2009AB 1 Lot OPTION Repair CCTV

FFP

CCTV Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.7.1 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW 30,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

2009AC 1 Lot OPTION Repair DDC

FFP

DDC Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.8.2 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW30,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)

2010 1 Job OPTION Contractor Manpower Reporting

FFP

Contractor Manpower Reporting Application (CMRA). Requirement must be reported by 31 October of each calendar year during the life of the contract. See para 12.0 of the PWS for CMRA requirement herein. (Firm Fixed Portion)

NOTE: Not to exceed 20 Man hours for data collection and report.

OPTION Estimated Cost for War Hazard Loss

3001 12 Months OPTION Custodial Services

FFP

Custodial Services for Army Family Housing. All services shall be performed in accordance with para 7.2 of the PWS. (Firm Fixed Portion)

3002 12 Months OPTION Police Call Services

FFP

Police Call Services shall be performed in accordance with para 7.3 of the PWS.

(Firm Fixed Portion)

3003 12 Months OPTION Service Calls

FFP

Police Call Services shall be performed in accordance with para 7.4 of the PWS.

(Firm Fixed Portion)

3004 12 Months OPTION Change of Occupancy Maintenance

FFP

Preventative Maintenance (PM) including Minor Repair Services for Buildings, 510,511, 512, 513, 514, 523, 5101, 5102, 5103, 5171, 8172, 8173 and underground parking facilities, AFH 050, 060 070 duplexes. All services shall be performed in accordance with para 7.5 of the PWS. (Firm Fixed Price)

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Change of Occupancy Cleaning

FFP

Change of Occupancy Cleaning (COC). All work shall be performed in accordance

UNIT UNIT PRICE ESTIMATED AMOUNT

3005AA 8 Each OPTION COC, 2 Bedroom Type

FFP

All work shall be performed in accordance with section 7.6 of the PWS.

(Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3005AB 668 Each OPTION COC, 3 Bedroom Type

FFP

All work shall be performed in accordance with section 7.6 of the PWS.

(Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3005AC 244 Each OPTION COC, 4 Bedroom Type

FFP

COC, 4 Bedroom Type. All work shall be performed in accordance with section

7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3005AD 88 Each OPTION COC, 4 Bedroom Type Duplex

FFP

COC, 4 Bedroom Type (O6 Duplex Type).

All work shall be performed in accordance with section 7.6 of the PWS.

(Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3005AE 20 Each OPTION COC, 4 Bedroom Type GFOQ

FFP

COC, 4 Bedroom (FGOQ Duplex Type).

All work shall be performed in accordance with section 7.6 of the PWS.

(Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3005AF 2 Each OPTION COC, 4 Bedroom Type Single

FFP

COC, 4 Bedroom (GFOQ Single Type).

All work shall be performed in accordance with section 7.6 of the PWS.

(Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3005AG 8 Each OPTION COC, Super 4 Bedroom Type

FFP

COC, Super 4 Bedroom Type.

All work shall be performed in accordance with section 7.6 of the PWS.

(Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3005AH 72 Each OPTION COC, 5 Bedroom Type

FFP

COC, 5 Bedroom Type.

All work shall be performed in accordance with section 7.6 of the PWS.

(Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Change of Occupancy Maintenance

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

3006AA 1,000 Each OPTION Change of Occupancy Maintenance(APT)

FFP

Change of Occupancy Maintenance (COM), Apartment Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3006AB 110 Each OPTION Change of Occupancy Maintenance(Single)

FFP

Change of Occupancy Maintenance (Single House Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Change of Occupancy Painting(COP)

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

3007AA 8 Each OPTION COP, 2 Bedroom Type

FFP

COP, 2 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3007AB 668 Each OPTION COP, 3 Bedroom Type

FFP

COP, 3 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3007AC 244 Each OPTION COP, 4 Bedroom Type

FFP

COP, 4 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3007AD 88 Each OPTION COP, 4 Bedroom Type(O6 Duplex)

FFP

COP, 4 Bedroom (O6 Duplex Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3007AE 20 Each OPTION COP, 4 Bedroom Type(GFOQ Duplex)

FFP

COP, 4 Bedroom (GFOQ Duplex Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3007AF 2 Each OPTION COP, 4 Bedroom Type(GFOQ Single)

FFP

COP, 4 Bedroom (GFOQ Single Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3007AG 8 Each OPTION COP, Super 4 Bedroom Type

FFP

COP, Super 4 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3007AH 72 Each OPTION COP, 5 Bedroom Type

FFP

COP, 5 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Project Works

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

3008AA 50,000 Square

Dryer Air Duct Cleaning. All work shall be performed in accordance with section

7.7.5 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3008AB 50,000 Square

A/C Heating Duct Cleaning. All work shall be performed in accordance with section 7.7.5 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3008AC 100,000 Square

Interior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.7.2 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3008AD 100,000 Square

Exterior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.7.3 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3008AE 20,000 Square

Replace Vinyl Composition Floor 12"x12"x1/8". All work shall be performed in accordance with section 7.7.4 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3008AF 20,000 Square

Floor installing or replacement (Meratone) QMS-1367. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3008AG 20,000 Square

Floor installing or replacement (Meratone) QMS-3126. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3008AH 10,000 Square

Replace ceramic floor tile. All work shall be performed in accordance with section

7.7.4.2 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3008AJ 20 Each OPTION Replace Solid Core Single Door

FFP

Replace solid core wood single door flush type (600mm - 1475mm x 2100mm x 35mm thick). All work shall be performed in accordance with section 7.7.11 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3008AK 20 Each OPTION Replace Solid Core Single Door

FFP

Replace solid core wood single door flush type (600mm - 1300mm x 2100mm x 44.5mm thick). All work shall be performed in accordance with section 7.7.4.2 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3008AL 100 Each OPTION Replace Dishwasher

FFP

Replace dishwasher (using agency furnished) including water and drain connection. All work shall be performed in accordance with section 1.3.3.6.3 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3008AM 215 Each OPTION Replace Carbon Monoxide Sensor

FFP

Replace carbon monoxide sensor. All work shall be performed in accordance with section 7.7.6.2 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3008AN 280 Each OPTION Carbon Monoxide Sensor

FFP

Carbon Monoxide Sensor. All work shall be performed in accordance with section

7.7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

3008AP 20,000 Square

Replace wooden flooring 1/4" thick. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Major Repair

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

3009AA 1 Lot OPTION Repair Elevator

FFP

Elevator Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.8.1 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW80,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)

3009AB 1 Lot OPTION Repair CCTV

FFP

CCTV Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.7.1 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW 30,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)

3009AC 1 Lot OPTION Repair DDC

FFP

DDC Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.8.2 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW30,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)

3010 1 Job OPTION Contractor Manpower Reporting

FFP

Contractor Manpower Reporting Application (CMRA). Requirement must be reported by 31 October of each calendar year during the life of the contract. See para 12.0 of the PWS for CMRA requirement herein. (Firm Fixed Portion)

NOTE: Not to exceed 20 Man hours for data collection and report.

OPTION Estimated Cost for War Hazard Loss

4001 12 Months OPTION Custodial Services

FFP

Custodial Services for Army Family Housing. All services shall be performed in accordance with para 7.2 of the PWS. (Firm Fixed Portion)

4002 12 Months OPTION Police Call Services

FFP

Police Call Services shall be performed in accordance with para 7.3 of the PWS.

(Firm Fixed Portion)

4003 12 Months OPTION Service Calls

FFP

Police Call Services shall be performed in accordance with para 7.3 of the PWS.

(Firm Fixed Portion)

4004 12 Mole

(mol)

OPTION Change of Occupancy Maintenance

Preventative Maintenance (PM) including Minor Repair Services for Buildings, 510,511, 512, 513, 514, 523, 5101, 5102, 5103, 5171, 8172, 8173 and underground parking facilities, AFH 050, 060 070 duplexes. All services shall be performed in accordance with para 7.5 of the PWS. (Firm Fixed Price)

OPTION Change of Occupancy Cleaning

FFP

Change of Occupancy Cleaning (COC). All work shall be performed in accordance

UNIT UNIT PRICE ESTIMATED AMOUNT

4005AA 8 Each OPTION COC, 2 Bedroom Type

FFP

All work shall be performed in accordance with section 7.6 of the PWS.

(Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4005AB 668 Each OPTION COC, 3 Bedroom Type

FFP

All work shall be performed in accordance with section 7.6 of the PWS.

(Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4005AC 244 Each OPTION COC, 4 Bedroom Type

FFP

COC, 4 Bedroom Type. All work shall be performed in accordance with section

7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4005AD 88 Each OPTION COC, 4 Bedroom Type Duplex

FFP

COC, 4 Bedroom Type (O6 Duplex Type).

All work shall be performed in accordance with section 7.6 of the PWS.

(Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4005AE 20 Each OPTION COC, 4 Bedroom Type GFOQ

FFP

COC, 4 Bedroom (FGOQ Duplex Type).

All work shall be performed in accordance with section 7.6 of the PWS.

(Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4005AF 2 Each OPTION COC, 4 Bedroom Type Single

FFP

COC, 4 Bedroom (GFOQ Single Type).

All work shall be performed in accordance with section 7.6 of the PWS.

(Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4005AG 8 Each OPTION COC, Super 4 Bedroom Type

FFP

COC, Super 4 Bedroom Type.

All work shall be performed in accordance with section 7.6 of the PWS.

(Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4005AH 72 Each OPTION COC, 5 Bedroom Type

FFP

COC, 5 Bedroom Type.

All work shall be performed in accordance with section 7.6 of the PWS.

(Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

Change of Occupancy Maintenance

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

4006AA 1,000 Each OPTION Change of Occupancy Maintenance(APT)

FFP

Change of Occupancy Maintenance (COM), Apartment Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4006AB 110 Each OPTION Change of Occupancy Maintenance(Single)

FFP

Change of Occupancy Maintenance (Single House Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Change of Occupancy Painting(COP)

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

4007AA 8 Each OPTION COP, 2 Bedroom Type

FFP

COP, 2 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4007AB 668 Each OPTION COP, 3 Bedroom Type

FFP

COP, 3 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4007AC 244 Each OPTION COP, 4 Bedroom Type

FFP

COP, 4 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4007AD 88 Each OPTION COP, 4 Bedroom Type(O6 Duplex)

FFP

COP, 4 Bedroom (O6 Duplex Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4007AE 20 Each OPTION COP, 4 Bedroom Type(GFOQ Duplex)

FFP

COP, 4 Bedroom (GFOQ Duplex Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4007AF 2 Each OPTION COP, 4 Bedroom Type(GFOQ Single)

FFP

COP, 4 Bedroom (GFOQ Single Type). All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4007AG 8 Each OPTION COP, Super 4 Bedroom Type

FFP

COP, Super 4 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4007AH 72 Each OPTION COP, 5 Bedroom Type

FFP

COP, 5 Bedroom Type. All work shall be performed in accordance with section 7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Project Works

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

4008AA 50,000 Square

Dryer Air Duct Cleaning. All work shall be performed in accordance with section

7.7.5 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4008AB 50,000 Square

A/C Heating Duct Cleaning. All work shall be performed in accordance with section 7.7.5 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4008AC 100,000 Square

Interior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.7.2 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4008AD 100,000 Square

Exterior Painting, Latex-2 Coats. All work shall be performed in accordance with section 7.7.3 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4008AE 20,000 Square

Replace Vinyl Composition Floor 12"x12"x1/8". All work shall be performed in accordance with section 7.7.4 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4008AF 20,000 Square

Floor installing or replacement (Meratone) QMS-1367. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4008AG 20,000 Square

Floor installing or replacement (Meratone) QMS-3126. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4008AH 10,000 Square

Replace ceramic floor tile. All work shall be performed in accordance with section

7.7.4.2 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4008AJ 20 Each OPTION Replace Solid Core Single Door

FFP

Replace solid core wood single door flush type (600mm - 1475mm x 2100mm x 35mm thick). All work shall be performed in accordance with section 7.7.11 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4008AK 20 Each OPTION Replace Solid Core Single Door

FFP

Replace solid core wood single door flush type (600mm - 1300mm x 2100mm x 44.5mm thick). All work shall be performed in accordance with section 7.7.4.2 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4008AL 100 Each OPTION Replace Dishwasher

FFP

Replace dishwasher (using agency furnished) including water and drain connection. All work shall be performed in accordance with section 1.3.3.6.3 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4008AM 215 Each OPTION Replace Carbon Monoxide Sensor

FFP

Replace carbon monoxide sensor. All work shall be performed in accordance with section 7.7.6.2 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4008AN 280 Each OPTION Carbon Monoxide Sensor

FFP

Carbon Monoxide Sensor. All work shall be performed in accordance with section

7.7.6 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4008AP 20,000 Square

Replace wooden flooring 1/4" thick. All work shall be performed in accordance with section 7.7.4.1 of the PWS. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

OPTION Major Repair

FFP

UNIT UNIT PRICE ESTIMATED AMOUNT

4009AA 1 Lot OPTION Repair Elevator

FFP

Elevator Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.8.1 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW80,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4009AB 1 Lot OPTION Repair CCTV

FFP

CCTV Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.7.1 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW 30,000,000.00 Do not propose a price for this CLIN. (Requirement Portion)

UNIT UNIT PRICE ESTIMATED AMOUNT

4009AC 1 Lot OPTION Repair DDC

FFP

DDC Repair. All work shall be performed upon receipt of task orders on a as needed basis in accordance with section 7.7.8.2 of the PWS. This CLIN has a Not to Exceed (NTE) amount of KW30,000,000.00. Do not propose a price for this CLIN. (Requirement Portion)

4010 1 Job OPTION Contractor Manpower Reporting

FFP

Contractor Manpower Reporting Application (CMRA). Requirement must be reported by 31 October of each calendar year during the life of the contract. See para 12.0 of the PWS for CMRA requirement herein. (Firm Fixed Portion)

NOTE: Not to exceed 20 Man hours for data collection and report.

OPTION Estimated Cost for War Hazard Loss

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT FOR TOTAL PREVENTATIVE MAINTENANCE,

REPAIR AND CLEANING SERVICES FOR ARMY FAMILY HOUSING (AFH) AT USAG

HUMPHREYS

1.1. GENERAL: This is a non-personal service contract is to provide Total Preventive Maintenance (PM) including minor repair and cleaning Services for AFH at USAG Humphreys. The contractor shall provide all personnel, equipment, tools, materials, supervision, and services necessary to perform as defined in this Performance Work Statement (PWS), except Government-Furnished Property (GFP) and services as specified in this PWS.

1.2. SCOPE OF WORK: The contractor shall perform the contracted services to the standards identified in this contract. The main functions are:

• Custodial services including, policing and ground maintenance services in Common Areas and Facilities.

• Routine Preventive Maintenance and Minor Repair: Maintenance of Common Areas, Maintenance and Operations of Heating, Ventilation and Air Conditioning (HVAC) Equipment, Elevator and Playground Safety Inspections of all Army Family Housing (AFH) Facilities.

• Customer Service Call System

• Change of Occupancy Maintenance (COM)

• Change of Occupancy Cleaning (COC)

• Change of Occupancy Painting (COP)

• Project Works

• Major Replacement/Repair Service

1.2.1. CONTRACTOR AND KEY PERSONNEL QUALIFICATION.

1.2.2. Contractor’s Qualification: Certificate of Business Registrations and Permission: The contractor shall submit all valid and current a Certificate of Business Registrations and Permission: The offeror shall provide all three (3) below identified requirements. For the ii) & iii) requirement, subcontractor’s registration and permission is allowable. In case of subcontractor(s) use, the offeror shall submit copies of the subcontract agreement with official companies who possess the registration and permission.

Additionally, the offeror shall submit copies of the subcontractor’s specific registration and permission issued by Republic of Korea (ROK).

1) Prime Contractor’s a valid Construction Business Registration (건설업등록증) for the business item category of “Building/Facilities Maintenance” (시설물유지관리업) in accordance with the Article 9 of

ROK Law "Framework Act on Construction Industry" (건설산업기본법).

2) Electric Work Business registration (전기공사업등록증) in accordance with the “Electric Work

Business Act (전기시공업), Article 4, Para 1 of the ROK Law.

3) Public Sanitation Control Business Permission (위생관리용역업신고)

1.2.2.1. Prior Experience: The contractor shall have at least two (2) years of verifiable experience in preventive maintenance & repair, custodial and PWS related services of various facilities within the last seven (7) years from the release date of this solicitation.

1.3. Key Personnel.

1.3.1. Key Personnel Qualification. The contractor shall provide sufficient personnel as a Preventive Maintenance and Repair Team which consists of at least Contract Manager (CM), Plumber(s), Quality Control Inspector, HVAC Mechanic(s), Electrician(s), Facility Repair Craftsman(s), Elevator Mechanic(s) and Service Call Receptionist(s) to accomplish the PWS requirements. All key personals has to be at the site during operation hours.

1.3.1.2. Contract Manager (CM). The Contractor shall provide an on-site Contract Manager (CM). The CM shall be physically present during normal duty hours (During normal duty hours (08:00-17:00 hrs, Monday thru Friday) to handle any problems /complaints that may occur, shall conduct overall management, coordination, furnish liaison with the Government and shall be responsible for the performance and management of Maintenance and Repairs services required under this contract. The CM shall be able to read, write, speak and understand English and shall fully understand the requirements of this contract. The contractor shall notify the COR of any changes in CM personnel. The CM shall have full authority and responsibility to act for the contractor on all contract matters relating to daily operations under this contract.

1.3.1.3. Quality Control Inspector. The contractor should provide an on-site QC. The QCI shall physically present during normal duty hours. The QCI should the Quality Control Plan (QCP) and insure daily reporting for quality control inspection.

1.3.1.4. Plumber. The plumbers shall possess technician licenses issued by ROK Government in plumbing repair (배관 기능사 자격증).

1.3.1.5. Heating, Ventilating and Air Conditioning (HVAC) Mechanic.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.