About this file

Technical Exhibit (TE) 3 - Scheduled Service

View the file

Other files

File Type Posted
W91QVN-19-R-0120-P0004.pdf PDF
W91QVN-19-R-0120-P0003pdf.pdf PDF
Exhibit_31_Elevator_Checklist.docx DOCX document
Exhibit_32_Maintenance-Control-Program-MCP.PDF PDF
A2___Exhibit_10_Historical_Vacate_Quarters_data_.pdf PDF
A2__Exhibit_27____Macarthur_Circle_Map(GFOQ)_(1).pptx PPTX presentation
A2__Exhibit_28____GFOQ_Duplex_Floor_Plan_(Single_floor_Type_&_duplex).pdf PDF
A2__Exhibit_29_Housing_Floorplans.pdf PDF
A2__Exhibit_30_AFH_Room_Information_(2).xlsx XLSX spreadsheet
W91QVN-19-R-0120-P0002.pdf PDF
B1__W91QVN-19-R-0120-P0001(v2).pdf PDF
W91QVN-19-R-0120-P0001.pdf PDF
A2__Exhibit_26____Duplex_floor_plan_in_Red_Cloud_Circle(O6_housing).pdf PDF
A2__Exhibit_22____Plans_for_Area_Site__5101,5102,5103,5171,5172,5173.pdf PDF
A2__Exhibit_20____AFH_bldg_510_Floor_Plans.pptx PPTX presentation
A2__Exhibit_17____Contract_Discepancy_Report_CDR.doc DOC document
A2__Exhibit_13____Customer_Complaint.doc DOC document
A2__Exhibit_21____511_&_512_Unit_floor_plan.pdf PDF
A2__Exhibit_25____Red_Cloud_Circle_Map(_O6_Housing).pptx PPTX presentation
A2__Exhibit_6____Quality_and_Standards_of_Work.docx DOCX document
A2__Exhibit_8____Change_of_Occupany_Painting_Check_List.docx DOCX document
A2__Exhibit_14____GFOQ_Monthly_Report.doc DOC document
A2__Exhibit_10___Historical_Vacate_Quarters_data.doc DOC document
A2__Exhibit_16____Heavy_Equipment_Check_Lists.docx DOCX document
A2__Exhibit_4___Monthly_Service_Order_Report.doc DOC document
A2__Exhibit_5___Change_of_Occupancy_Montly_Report.docx DOCX document
A2__Exhibit_18____Sample_NCIR.doc DOC document
A2__Exhibit_9____Change_of_Occupany_Maintenance_Checklist.docx DOCX document
A2__Exhibit_19____AFH_bldg_513_Garage_plan.pdf PDF
A2__Exhibit_11___Estimated_Service_Frequency.doc DOC document
A2__Exhibit_2___Deliverables(Data_Requirements).docx DOCX document
A2__Exhibit_27____Macarthur_Circle_Map(GFOQ)_(1).pptx PPTX presentation
W91QVN-19-R-0120.pdf PDF
A2__Exhibit_28____GFOQ_Duplex_Floor_Plan_(Single_floor_Type_&_duplex).pdf PDF
A2__Exhibit_24____Parking_Lot_floor_Plan_5101,5102,5103,5171,5172,5173_Area.pdf PDF
A2__Exhibit_7____Change_of_Occupany_Cleaning_Check_List.xlsx XLSX spreadsheet
A2__Exhibit_23____Building_5101,5102,5103,5171,5172,5173_Flr_Plans.pdf PDF
A2__Exhibit_12____Daily_Contract_Inspection_Report.doc DOC document
A2__Exhibit_15____COM_Monthly_Report.xlsx XLSX spreadsheet
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT 3PRIVATE

SCHEDULE OF SERVICES

Description

Response Time

Completion Time Service Orders:

Emergency

30 minutes during the

Continuous until safe

(Priority 1) contractor's normal and secure, and complete work hours, 45 minutes within two working days other than the contractor’s normal work hours, except gas leaks shall be 30 minutes at all times.

Urgent

24 hours

Two workdays

(Priority 2)

Routine

Two workdays

Four Workdays

(Priority 3)

Change of Occupancy Work :

Item Work Description

Work Completion Day

COP Interior painting to include repair, prepare, Prime, and paint walls, ceilings, cabinets, Doors, windows and trim, including

Replacement of wall coverings.

(a) DU less than 1,500 NSF (139.4 NSM)

2 days

(b) DU 1,500 to 3,000 NSF (139.4 to 278.7 NSM)

3 day

(c) DU greater than 3,000 NSF (278.7 NSM)

4 days Replace a sink, lavatory, faucet, flush valve, or water closet.

0.5 days

Replace kitchen countertop.

1 day

COM Miscellaneous repair and replacement work.

Replace resilient flooring (tile and sheet vinyl).

(a) DU less than 200 SF/18.6 SM to be retiled.

(b) DU more than 200 SF/18.6 SM to be retiled.

Replace carpet and pad or steam clean carpet.

Replace a bathtub or shower receptor including ceramic tile.

3 days

COC Complete DU cleaning.

(a) DU with less than 1,500 NSF/139.4 NSM

(b) DU 1,500 and 3,000 NSF/139.4 to 278.7 NSM

(c) DU greater than 3,000 NSF/ 278.7 NSM

3 days

Repair, prepare, and refinish wood floors, stair treads, risers, landings, banisters, and railings.

4 days

10.

Repair

Workday after receipt

7 days

Smoke and Fire or as ordered

Damaged Quarters

* Net Square Feet (NSF), Net Square Meter (NSM), Dwelling Unit (DU)

Note:

a. The amount of time shown for each item above is an average and may vary at any installation. Factors which may affect the average times are climatic (more humid areas may require more time for paint and floor finish to dry); higher than normal turnover of DUs which would overextend the contractor’s ability to meet the scheduled times (this shall not be reflected in contractor’s schedule of times but shall be negotiated separately if and when it occurs).

b. Items 1 through 4 will be done concurrently. The time allowed for the combination of items will be the longest time for that item which has the largest time.

c. Items 5 through 8 may be done concurrently with any one or combination of items 1 through 8 providing there are no physical conflicts in performing the work. (For example: items 2, 3, and 6 could be done concurrently. The time allowed for all three would be 1 day.) Where there is a conflict, times for items in conflict will be added together to give the total time allowed. (For example, the combination of items 1(b) and 6 will give a total time of 4 days.)

d. Item 9 shall not be done concurrently with other work items.