A2__Exhibit_7____Change_of_Occupany_Cleaning_Check_List.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Total Preventative Maintenance, Repair and Cleaning Services for Army Family Housing (AFH) at USAG Humphreys
Solicitation number
W91QVN-19-R-0120
Issued by

About this file

Technical Exhibit (TE) 7 - Change of Occupancy Cleaning Checklist

View the file

Other files

File Type Posted
W91QVN-19-R-0120-P0004.pdf PDF
W91QVN-19-R-0120-P0003pdf.pdf PDF
Exhibit_31_Elevator_Checklist.docx DOCX document
Exhibit_32_Maintenance-Control-Program-MCP.PDF PDF
A2___Exhibit_10_Historical_Vacate_Quarters_data_.pdf PDF
A2__Exhibit_27____Macarthur_Circle_Map(GFOQ)_(1).pptx PPTX presentation
A2__Exhibit_28____GFOQ_Duplex_Floor_Plan_(Single_floor_Type_&_duplex).pdf PDF
A2__Exhibit_29_Housing_Floorplans.pdf PDF
A2__Exhibit_30_AFH_Room_Information_(2).xlsx XLSX spreadsheet
W91QVN-19-R-0120-P0002.pdf PDF
B1__W91QVN-19-R-0120-P0001(v2).pdf PDF
W91QVN-19-R-0120-P0001.pdf PDF
A2__Exhibit_26____Duplex_floor_plan_in_Red_Cloud_Circle(O6_housing).pdf PDF
A2__Exhibit_22____Plans_for_Area_Site__5101,5102,5103,5171,5172,5173.pdf PDF
A2__Exhibit_20____AFH_bldg_510_Floor_Plans.pptx PPTX presentation
A2__Exhibit_17____Contract_Discepancy_Report_CDR.doc DOC document
A2__Exhibit_13____Customer_Complaint.doc DOC document
A2__Exhibit_21____511_&_512_Unit_floor_plan.pdf PDF
A2__Exhibit_25____Red_Cloud_Circle_Map(_O6_Housing).pptx PPTX presentation
A2__Exhibit_6____Quality_and_Standards_of_Work.docx DOCX document
A2__Exhibit_8____Change_of_Occupany_Painting_Check_List.docx DOCX document
A2__Exhibit_14____GFOQ_Monthly_Report.doc DOC document
A2__Exhibit_10___Historical_Vacate_Quarters_data.doc DOC document
A2__Exhibit_16____Heavy_Equipment_Check_Lists.docx DOCX document
A2__Exhibit_4___Monthly_Service_Order_Report.doc DOC document
A2__Exhibit_5___Change_of_Occupancy_Montly_Report.docx DOCX document
A2__Exhibit_18____Sample_NCIR.doc DOC document
A2__Exhibit_9____Change_of_Occupany_Maintenance_Checklist.docx DOCX document
A2__Exhibit_19____AFH_bldg_513_Garage_plan.pdf PDF
A2__Exhibit_11___Estimated_Service_Frequency.doc DOC document
A2__Exhibit_2___Deliverables(Data_Requirements).docx DOCX document
A2__Exhibit_27____Macarthur_Circle_Map(GFOQ)_(1).pptx PPTX presentation
W91QVN-19-R-0120.pdf PDF
A2__Exhibit_28____GFOQ_Duplex_Floor_Plan_(Single_floor_Type_&_duplex).pdf PDF
A2__Exhibit_24____Parking_Lot_floor_Plan_5101,5102,5103,5171,5172,5173_Area.pdf PDF
A2__Exhibit_3___Scheduled_Services.doc DOC document
A2__Exhibit_23____Building_5101,5102,5103,5171,5172,5173_Flr_Plans.pdf PDF
A2__Exhibit_12____Daily_Contract_Inspection_Report.doc DOC document
A2__Exhibit_15____COM_Monthly_Report.xlsx XLSX spreadsheet
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

EXHIBIT 7
COC Check List
Item No.DescriptionStandardRemarks/ Recommendations
1Range (Gas/Electric)a) Completely Assembled
b) Clean of all dirt, grease, food and carbonized particals and cleaning residueProtect floor under the range to prevent damage to floor. Disassemble range to clean. Clean the floor under the range and remove wax and stains. Do not paint range or parts. Range burners may be cleaned using dry coarse steel wool. Ovens may be cleaned using a commercial cleaner, except abrasive type of oven cleaner shall not be used for self or continuous cleaning ovens. Disconnecting, connecting or removing gas ranges from gas lines by the contractor shall be done by only qualified journeymen.
c) Relight pilot lights.
d) Oven light works and light cover is clear and clean
e) Elements, oven racks, burners, burner rings, broiler pan, storage drawer(s), drip pans and control knobs are clean to 1b) standards.
f) Gas burner perforations free of ostuctions
g) The floor under the range is clean to 1b) standard to include free of wax and stains
2Refrigeratorsa) Defrosted with no ice in freezer compartment.
b) Refrigerator plugged in and set at the highest temperature witht the door closed.
Item No.DescriptionStandardRemarks/ Recommendations
Refrigerators (continued)c) Light bulb is working and clean.
d) Refrigerator coil and motor compartment are clean of all dust, dirt, cobwebs and grease.
e) Interior racks, tracks, crisper, trays, butter compartment, interior and exterior surfaces and door gaskets shall be clean of all dirt, dust, stains, food particals, grease, cleaning residue and mildew.
f) The refrigerator drip pan is clean and reinstalled after cleaning
g) The floor under the refigerator is clean and free of wax and stains. Do not use sharp objects to remove ice or frost. Do not use harsh detergents or chemicals such as oven cleaner to clean the refrigerator.
3Walls, Ceilings, Interior Doors and Woodworka) Textured ceilings shall be dusted and clean of dust and cob webs. Texture walls shall be cleaned to 3 b) standard.Ensure areas by protruding corners, light and fan switches, doors, door frames, above and behind refrigerator and range are thoroughly cleaned.
b) Walls and untextured ceilings shall be clean and free of all marks, stains, grease, food particles and other foreign materials. There shall be no laps or streak marks.
Item No.DescriptionStandardRemarks/ Recommendations
Walls, Ceilings, Interior Doors and Woodwork (Continued)c) Woodwork and interior doors shall be clean and free of all marks, stains, grease, food particles and smudges. No dirt in corners or groves of wood molding.
4Kitchen sinks, Dishwashers and Counter-topsa) Kitchen sinks and strainers shall be clean of dirt, grease, soap, scouring powder and residue. Faucets, down spout and plated metal shall be clean bright and untarnished.Run water and turn on for 3-5 seconds. Notify Contract Management Branch within 2 working hours after discovery, if dishwasher does not work. Run dishwasher through rinse cycle. The contractor shall repair or replace appliances as needed by using a separate task number on the cleaning service order.
b) Dishwashers shall work and shall be clean inside and out of all dirt, grease, soap, food particles, residue and foreign material. Metal shall be clean and bright.
c) Countertops shall be clean of all grease, dirt, scouring powder, stains and residue. Counter tops shall have a sheen when viewed across the top.
5Bathroom sinks, toilets, bathtubs, showers, showers stalls and accessoriesa) Bathroom sinks shall be freee of dirt, grease, soap, scouring powder, residue, stains and have a bright clean sheen. All exposed metal shall be bright and clean.Ceramic tile shall not be waxed. Tile grout lines shall be cleaned using a stiff bristle brush and cleanser.
b) Toilets shall be clean to the standard of 5 a) above. Toilet bowls shall be disinfected.
Item No.DescriptionStandardRemarks/ Recommendations
Bathroom sinks, toilets, bathtubs, showers, showers stalls and accessories (Continued)c) Showers, Shower Stalls and tubs shall be clean to the standard of 5 a) above
d) Ceramic tile (floors and and walls) shall be clean and bright with clean grout llines; shall be disinfected.
e) Accessories and fixtures such as mirrors, medicine cabinets, soap dishes, tooth brush holders, towel bars, shower curtians rods and glass doors shall be clean and bright.
f) Caulking shall be clean of stains, fungi and mildew.

6 Lights and fixtures (Interior and Exterior) Lights and fixtures shall be clean of dust, dirt and bugs. Missing and burned out bulbs shall be replaced (includes incandescent and fluorescent). Wattage of replacement bulbs shall not exceed fixture rating. All glass bowls and other translucent light covers of all light fixtures shall be removed, cleaned and washed inside and out and reinstalled.

7Exhaust Fans, Filters and Grillsa) Kitchen fan blades, support, housing, guard and hood shall be clean of all dirt, grease and food particlesFan motors shall be "damp wiped" only, not washed. Remove, clean and reinstall washable filters.
Caution: Ensure that the stove top fire suppression system in the 2600 area is disengaged prior to cleaning. Engage the system when cleaning is complete. Use recommended suppression manufacturer's procedures.
Item No.DescriptionStandardRemarks/ Recommendations
Exhaust Fans, Filters and Grills (Continued)b) Ceiling and bathroom fans and grills shall be clean of dirt, grease and residueInoperative fans shall be repaired or replaced using a separate task number on the cleaning service order.
c) Washable filters shall be cleaned and replaced
8Basement, Garages, Laundry Rooms, Furnace Rooms, Storage Areas, Balconies, Patio Decksa) Pipes, I-beams, electrical conduit, stairs, handrails and floors shall be clean of dust, cob webs, lint and dirt. There shall be no trash such as paper, boxes and bottles.Do not use liquid to clean mechanical and electrical components and systems. Remove all trash. Ensure flammable items are not stored near furnaces.
b) No flammable materials stored within ten (10') of furnaces.
c) Furnace vents shall be free of dust, dirt, lint and film.
d) Laundry sinks and fixtures shall be clean to the standard of 5 a) above.
e) Laundry dryer vents shall be cleaned to the exit of the building or to the main venting system.
f) Balconies shall be swept, mopped and clean of all cob webs, dust and debris
g) Abandon items in the storage area shall be disposed of by the contractor.
h) Storage areas shall be free of cob webs, floors shall be swept and mopped.
Item No.DescriptionStandardRemarks/ Recommendations
9Cabinets (wood or metal) and Closetsa) Interior of cabinets and closets shall be empty
b) Cabinets and closets shall be free of all marks, residue, grease, stains, food particles and dirt inside and out. All shelving paper shall removed.Do not use abrasives or scouring powder. Use care in removing shelving paper to avoid damage to paint and shelving.
c) Natural and wood cabinet doors shall have a sheen from a light coat of furniture polish.
10BlindsBlinds shall be free of dust, grease, film.
11Windows, Window Frames, Skylight and Window Screensa) Areas of glass, including skylights shall be free of all smudges, paint, overspray, streaks, dirt, residue and foreign material.NOTE: High Rise buildings shall only have those outside windows cleaned that are accesible to the contractor. Only screens accesible to the contractor shall removed and cleaned and reinstalled.
b) All interior and exterior surfaces of glass, window, frames and screens shall be cleaned to remove dust, dirt, greas, smudges, paint, overspray and residue.
c) Window screens shall be reinstalled on window framing. Damaged screens shall be repaired or replaced.

12 Stairways and Stair Landings Stairs shall be clean of dirt, grease, scuff marks, residue and built up wax.

Item No.DescriptionStandardRemarks/ Recommendations
13FloorsFloors shall be clean of all dirt, stains, soil and old wax. Floors shall have a uniform finish with not mop or brush marks, light or dark areas. Hard to reach places next to walls and corners shall be free of built up dirt and wax. Floors shall be dry.
14Vinyl and Ceramic FloorsFloors and base shall be clean of all dirt , soil marks, stains, grease and smudges. There shall be no built up wax. Floors shall be bright and clean with no light or dark areas. Refer to item 5 d) for ceramic floorsFloors, except "no-wax" type floors, shall be buffed to a sheen, except ceramic tile. New tile floors shall not be washed for four days after the tile is installed. Other methods of cleaning such as damp mopping is permitted.
15Exterior doors, carports, storage areas, porches, balconies, patios and decks, step,s walks, yards asphalt and concretea) Exterior doors shall be free of smudges, grease and oil.Carports, garages, storage spaces, porches, balconies, patios and decks, steps and walks shall be swept. Pickup and rake the yard(s). Clean snow and ice from walkway, stairs and landings. Any door mats, shovels, rakes, lawnmowers, sprinklers, hoses and hose nozzles in quarters or quarters area shall be moved to the storage area. Water shall not be used outside during freezing weather.
b) Carports, storage areas, porches, steps and walls shall be clean of debris, dirt, cob webs and dust.
c) Yards shall be clean of litter, debris, dead leaves and trash.
d) Concrete and asphalt shall be free of oil and gease stains.
Item No.DescriptionStandardRemarks/ Recommendations
Exterior doors, carports, storage areas, porches, balconies, patios and decks, step,s walks, yards asphalt and concrete (Continued)e) Walkways, patios, stairs and landings shall be free of mulch washout, overgrown grass, weeds, ice and snow.
16Garbage cansGarbage cans shall be sanitized, clean and free of trash garbage and residue.
17Gas FireplacesFree of black soot and swept. Walls shall be cleaned. Hearth and apron clean of soot and dirt. Glass enclosure doors clean as in 11 b) above.

Sheet2

Sheet3

File details come from the government source that posted it.