A2__Exhibit_8____Change_of_Occupany_Painting_Check_List.docx
DOCX document 11 KB Posted
- Attached to
- Total Preventative Maintenance, Repair and Cleaning Services for Army Family Housing (AFH) at USAG Humphreys
- Solicitation number
- W91QVN-19-R-0120
About this file
Technical Exhibit (TE) 8- Change of Occupancy Painting Checklist
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EHIBIT 8
Change of Occupancy Painting COP: Complete Interior Painting Checklists
Quarters No. Date In
Required Additional Time Work Yes No Date Out
Contractor's Signature
(Comment on Additional Work in the Remarks Section)
Checklist Item Item Description
1. Complete hiding is achieved.
| 2. | Surface | ||||
| a. Clean and non-chalking. | |||||
| b. No runs or paint edges. | |||||
| c. No peeling or non-adhesion. | |||||
| d. Uniform in texture, color and | reflectance. | ||||
| e. Dry to touch. | |||||
| f. Repairs and patches are finished. | |||||
| g. Overspray, previous paint, etc., | removed from appliances, rubber, | glass, electrical fixtures, | |||
| switch plates, receptacles, | covers, screens, hardware and | window runners. |
3. Clean interior window glass.
4. Doors and windows operate freely.
5. Natural, stained and revarnished finish are uniform in color and reflectance.
| 6. | All light bulbs installed and |
| working. |
7. Cleanup and restoration.
Remarks: