About this file

Technical Exhibit (TE) 18 - Sample NCIR

View the file

Other files

File Type Posted
W91QVN-19-R-0120-P0004.pdf PDF
W91QVN-19-R-0120-P0003pdf.pdf PDF
Exhibit_31_Elevator_Checklist.docx DOCX document
Exhibit_32_Maintenance-Control-Program-MCP.PDF PDF
A2___Exhibit_10_Historical_Vacate_Quarters_data_.pdf PDF
A2__Exhibit_27____Macarthur_Circle_Map(GFOQ)_(1).pptx PPTX presentation
A2__Exhibit_28____GFOQ_Duplex_Floor_Plan_(Single_floor_Type_&_duplex).pdf PDF
A2__Exhibit_29_Housing_Floorplans.pdf PDF
A2__Exhibit_30_AFH_Room_Information_(2).xlsx XLSX spreadsheet
W91QVN-19-R-0120-P0002.pdf PDF
B1__W91QVN-19-R-0120-P0001(v2).pdf PDF
W91QVN-19-R-0120-P0001.pdf PDF
A2__Exhibit_26____Duplex_floor_plan_in_Red_Cloud_Circle(O6_housing).pdf PDF
A2__Exhibit_22____Plans_for_Area_Site__5101,5102,5103,5171,5172,5173.pdf PDF
A2__Exhibit_20____AFH_bldg_510_Floor_Plans.pptx PPTX presentation
A2__Exhibit_17____Contract_Discepancy_Report_CDR.doc DOC document
A2__Exhibit_13____Customer_Complaint.doc DOC document
A2__Exhibit_21____511_&_512_Unit_floor_plan.pdf PDF
A2__Exhibit_25____Red_Cloud_Circle_Map(_O6_Housing).pptx PPTX presentation
A2__Exhibit_6____Quality_and_Standards_of_Work.docx DOCX document
A2__Exhibit_8____Change_of_Occupany_Painting_Check_List.docx DOCX document
A2__Exhibit_14____GFOQ_Monthly_Report.doc DOC document
A2__Exhibit_10___Historical_Vacate_Quarters_data.doc DOC document
A2__Exhibit_16____Heavy_Equipment_Check_Lists.docx DOCX document
A2__Exhibit_4___Monthly_Service_Order_Report.doc DOC document
A2__Exhibit_5___Change_of_Occupancy_Montly_Report.docx DOCX document
A2__Exhibit_9____Change_of_Occupany_Maintenance_Checklist.docx DOCX document
A2__Exhibit_19____AFH_bldg_513_Garage_plan.pdf PDF
A2__Exhibit_11___Estimated_Service_Frequency.doc DOC document
A2__Exhibit_2___Deliverables(Data_Requirements).docx DOCX document
A2__Exhibit_27____Macarthur_Circle_Map(GFOQ)_(1).pptx PPTX presentation
W91QVN-19-R-0120.pdf PDF
A2__Exhibit_28____GFOQ_Duplex_Floor_Plan_(Single_floor_Type_&_duplex).pdf PDF
A2__Exhibit_24____Parking_Lot_floor_Plan_5101,5102,5103,5171,5172,5173_Area.pdf PDF
A2__Exhibit_3___Scheduled_Services.doc DOC document
A2__Exhibit_7____Change_of_Occupany_Cleaning_Check_List.xlsx XLSX spreadsheet
A2__Exhibit_23____Building_5101,5102,5103,5171,5172,5173_Flr_Plans.pdf PDF
A2__Exhibit_12____Daily_Contract_Inspection_Report.doc DOC document
A2__Exhibit_15____COM_Monthly_Report.xlsx XLSX spreadsheet
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NONCONFORMANCE INSPECTION REPORT (SEE INSTRUCTIONS ON REVERSE)

PAGE____1____OF___1__PAGES

1. REPORT NUMBER

00001

2. CONTRACT NUMBER
3. DELIVERY ORDER NUMBER
4. BUILDING/FACILITY NUMBER
5. CONTRACT NAME
6. CONTRACTOR
W91QVN-00-P-0000
P00001
512

Apt 705

Change of Occupancy Cleaning and Painting of (AFH), USAG Humphreys
Korean Construction Co. Ltd
7. SPECIFICATION NUMBER
8. SERVICE ORDER NUMBER
9. LOCATION
COP/COC
N/A
USAG Humphreys

DPW, Housing Div

10. DESCRIPTION OF NONCONFORMANCE CONDITION(S) OR ITEM(S)

(Reference the specifications, page, para, drawing number, as applicable)

14. CONTRACTOR CORRECTIVE ACTION

(Identify date/time of completion; initial each item)

This nonconformance report is issued to you on ________13 Sep 12_________. Contractor to repair

Non-conformance items identified in “10”. Return this form to Family Housing, Facilities Management

15. CONTRACTOR REPRESENTATIVE (QC) SIGN AND DATE

Branch, DPW Housing, Building 309.

18/19. INSPECTOR’S SIGNATURE
DATE
by ____14 Sep 12_____________per contract specifications, page no.__234____, para no.____2b(1)_____.
Follow up Inspection

20. COR COMMENTS

12. INSPECTED BY

DATE/TIME
13. TYPE OF INSPECTION

17. REVIEWED BY

DATE
16. DATE/TIME RETURNED
21. COR’S SIGNATURE
DATE

INSTRUCTIONS FOR COMPLETING NONCONFORMANCE INSPECTION REPORT

INSPECTOR’S INSTRUCTIONS (when issuing Nonconformance Report to contractor).

BLOCK 1-9

Fill out all information in these blocks. Mark N/A in blocks which do not apply.

BLOCK 10

Identify and list all nonconformance conditions of inspection. If additional sheets are needed use another Nonconformance Inspection Report and identify as next page. Reference the paragraph (para), page, and drawing number to the nonconformance condition, if applicable. Record any additional remarks pertinent to your inspection.

BLOCK 11

Fill in the date and time you issued the Nonconformance Report to the contractor. Indicate the date and time the contractor has to repair the nonconformance conditions and to return the report to the Housing, Facilities Management Branch. Reference the contact specifications page and paragraph number as it applies to time limit for repairing and/or re-performing service.

BLOCK 12

Sign and date the report.

BLOCK 13

Identify the type of inspection (i.e., Final, Re-Inspection, Change of Occupancy Cleaning (COC), Flooring, Change of Occupancy Painting (COP) etc.

CONTRACTOR’S INSTRUCTIONS (when correcting nonconformance items).

BLOCK 14

Correct nonconformance items. Indicate the date and time that each item/condition listed in Block 10 was corrected. Remark on any condition related to the repair such as extenuating circumstances which may prevent you from performing the corrective action.

BLOCK 15

Contractor Q.C. representative sign and date after the repairs are made. Return the completed report to the Housing, Facilities Management Branch, within the time frame identified in the referenced contract specifications. The Housing, Facilities Management Branch is located at USAG Humphreys, Building 309, telephone (DSN) 753-5798.

INSPECTOR’S INSTRUCTIONS (when receiving Nonconformance Report from contractor).

BLOCK 16

Identify the date and time the contractor returned the form or when the form was received at DPW Housing, Facilities Management Branch.

BLOCK 17

This block is for supervisory review after the form is returned from contractor.

INSPECTOR’S INSTRUCTIONS

BLOCK 18

Perform follow up inspection on rejected items. Indicate date and time of re-inspection (if applicable). Comment on any circumstances. If no follow up inspection is made, indicate not re-inspected.

BLOCK 19

Sign and date. Forward to the COR.

COR’S INSTRUCTIONS

BLOCK 20

Review this report. Add or attach comments. Coordinate input with Contracting Office if required.

BLOCK 21

Sign and date the report. Forward this copy to 411th, CSB, Humphrey’s office, Contract Administrator if required.

Retain this copy in the COR, Facilities Management Branch files.