A2__Exhibit_12____Daily_Contract_Inspection_Report.doc

DOC document 37 KB Posted

Attached to
Total Preventative Maintenance, Repair and Cleaning Services for Army Family Housing (AFH) at USAG Humphreys
Solicitation number
W91QVN-19-R-0120
Issued by

About this file

Technical Exhibit (TE) 12 - Daily Contract Inspection Report

View the file

Other files

File Type Posted
W91QVN-19-R-0120-P0004.pdf PDF
W91QVN-19-R-0120-P0003pdf.pdf PDF
Exhibit_31_Elevator_Checklist.docx DOCX document
Exhibit_32_Maintenance-Control-Program-MCP.PDF PDF
A2___Exhibit_10_Historical_Vacate_Quarters_data_.pdf PDF
A2__Exhibit_27____Macarthur_Circle_Map(GFOQ)_(1).pptx PPTX presentation
A2__Exhibit_28____GFOQ_Duplex_Floor_Plan_(Single_floor_Type_&_duplex).pdf PDF
A2__Exhibit_29_Housing_Floorplans.pdf PDF
A2__Exhibit_30_AFH_Room_Information_(2).xlsx XLSX spreadsheet
W91QVN-19-R-0120-P0002.pdf PDF
B1__W91QVN-19-R-0120-P0001(v2).pdf PDF
W91QVN-19-R-0120-P0001.pdf PDF
A2__Exhibit_26____Duplex_floor_plan_in_Red_Cloud_Circle(O6_housing).pdf PDF
A2__Exhibit_22____Plans_for_Area_Site__5101,5102,5103,5171,5172,5173.pdf PDF
A2__Exhibit_20____AFH_bldg_510_Floor_Plans.pptx PPTX presentation
A2__Exhibit_17____Contract_Discepancy_Report_CDR.doc DOC document
A2__Exhibit_13____Customer_Complaint.doc DOC document
A2__Exhibit_21____511_&_512_Unit_floor_plan.pdf PDF
A2__Exhibit_25____Red_Cloud_Circle_Map(_O6_Housing).pptx PPTX presentation
A2__Exhibit_6____Quality_and_Standards_of_Work.docx DOCX document
A2__Exhibit_8____Change_of_Occupany_Painting_Check_List.docx DOCX document
A2__Exhibit_14____GFOQ_Monthly_Report.doc DOC document
A2__Exhibit_10___Historical_Vacate_Quarters_data.doc DOC document
A2__Exhibit_16____Heavy_Equipment_Check_Lists.docx DOCX document
A2__Exhibit_4___Monthly_Service_Order_Report.doc DOC document
A2__Exhibit_5___Change_of_Occupancy_Montly_Report.docx DOCX document
A2__Exhibit_18____Sample_NCIR.doc DOC document
A2__Exhibit_9____Change_of_Occupany_Maintenance_Checklist.docx DOCX document
A2__Exhibit_19____AFH_bldg_513_Garage_plan.pdf PDF
A2__Exhibit_11___Estimated_Service_Frequency.doc DOC document
A2__Exhibit_2___Deliverables(Data_Requirements).docx DOCX document
A2__Exhibit_27____Macarthur_Circle_Map(GFOQ)_(1).pptx PPTX presentation
W91QVN-19-R-0120.pdf PDF
A2__Exhibit_28____GFOQ_Duplex_Floor_Plan_(Single_floor_Type_&_duplex).pdf PDF
A2__Exhibit_24____Parking_Lot_floor_Plan_5101,5102,5103,5171,5172,5173_Area.pdf PDF
A2__Exhibit_3___Scheduled_Services.doc DOC document
A2__Exhibit_7____Change_of_Occupany_Cleaning_Check_List.xlsx XLSX spreadsheet
A2__Exhibit_23____Building_5101,5102,5103,5171,5172,5173_Flr_Plans.pdf PDF
A2__Exhibit_15____COM_Monthly_Report.xlsx XLSX spreadsheet
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DAILY CONTRACT INSPECTION REPORT

(INSTRUCTIONS ON REVERSE SIDE)

1. CONTRACT NUMBER

3. ABBREVIATED CONTRACT NAME
4. NAME OF CONTRACTOR (COMPANY NAME)

2. SPECIFICATION NUMBER

5. NOTICE TO PROCEED DATE
7. WEATHER AND TEMPERATURE
0800 HOURS
1200 HOURS
1500 HOURS

6. ACTUAL DATE STARTED

8a. CONTRACTOR DESCRIBE WORK BEING PERFORMED (INCLUDE LOCATION OF WORK)

8b. NUMBER OF WORKERS ON JOB

8c. NAME OF CONTRACTOR’S REPRESENTATIVE

9b. CONTRACTOR RECORD GOVERNMENT REPRESENTATIVE’S INSTRUCTIONS (IF ANY)

10. CONTRACTOR DESCRIBE DIFFICULTIES ENCOUNTERED (INCLUDE DELAYS, DESCRIBE WORK NOT PERFORMED IN ACCORDANCE WITH SPECIFICATIONS, CORRECTIVE ACTIONS, ETC.)

11. INSPECTOR EVALUATE CONTRACTOR’S INPUT TO ITEMS 8, 9, AND 10

WAS A SITE INSPECTION PERFORMED OF THE WORK IDENTIFIED IN BLOCKS? ____YES ____ NO ____ N/A ________________________

(DATE OF INSPECTION)

12. ESTIMATED COMPLETION

DATE

13. PERCENT COMPLETE
14. CONTRACTOR’S SIGNATURE AND DATE

15. INSPECTOR’S SIGNATURE AND DATE

16. ENGINEERING REVIEW (SIGNATURE AND DATE)

17. CONTRACTING ADMINISTRATOR’S SIGNATURE AND DATE

18. REPORT IS FOR DATE(S)
19. REPORT SERIAL NUMBER

INSTRUCTIONS FOR FILLING OUT DAILY CONTRACT INSPECTION REPORTS

A.

CONTRACTOR’S INSTRUCTIONS.

1.

Fill out a report when you are working, one each day, and not less than one each week when you are not working. Give the report to the inspector or deliver it to the Contrating Officers Representative, HFB. If you are not working for a long period, waiting on materials, or waiting on a modification, fill out the report once a week.

2.

Fill in Blocks 1 through 10, 14, and 19 daily or not less than once a week when no work is proceeding. Fill in Blocks 12 and 13 each Thursday and more often when appropriate. Government representatives will fill in the balance of the blanks.

3.

Block 1 Write in the Contract Number. The last two number groups are sufficient (i.e., 00-P-0000 for W91QVN-00-P-0000). The Inspector will show you this if you have any questions.

4.

Block 2 Write in the Contact Specifications (Spec) Number.

5.

Block 3 Write in the Contract Short Title from the front page of the Specifications.

6.

Block 4 Write in your company’s name.

7.

Block 5 Write in the date you were given the “Notice to Proceed” by the Contracting Officer.

8.

Block 6 Write in the date you started working on the contract.

9.

Block 7 If the weather affects your contract, record it here. If you are working indoors, leave it blank.

10.

Block 8a Write in what you’ve been doing, what you’ve been working on, location of the work, and facility/building number if it applies.

11.

Block 8b Write in the number of workers on the job consistent with the work described in Block 8a.

12.

Block 8c Write in the name of the contractor’s representative on the job at the time the work described in Block 8a was being performed.

13.

Block 9 Write in any instructions given to you by the Inspector, Contracting Officer’s Representative (COR) , or Project Manager.

14.

Block 10 Write in any problems you may have encountered. Read the instructions in this block.

15.

Block 12 Write in the estimated completion date of contract.

16.

Block 13 Fill in on Thursday’s report (see instruction 2); estimate percent of work completed.

17.

Block 14 The employee who makes the report, signs and dates here.

18.

Block 18 Write in the date(s) or period(s) covered by the report. This is NOT the day you turn it in.

19.

Block 19 This is a sequential report number (Example: If it’s the eleventh report you are turning in, write in “11”).

20.

If you have any questions about the Daily Contract Inspection Report, call the HFB 753-6605, 753-7663. He/She is usually at this number Monday through Friday at the following times: 8:00 a.m. - 11:30 a.m. - 12:30 p.m. - 4:30 p.m.

21.

If you want to hand-deliver the inspection reports, give them to the Inspector when he visits the job site or deliver them to Building 309.

B.

INSPECTOR’S INSTRUCTIONS.

1.

Block 11 Inspector evaluate the input given by the contractor. Read the instructions in this block. If you have performed an inspection of the work identified by the contractor in Block 8, indicate this by checking “YES”; record the date of inspection. If no, check “NO”. If the work involved does not require inspection, check “N/A”. Provide any input, comments, etc., which are or may be relevant to the evaluation of the contractor’s work. Coordinate input with the COR, Contract Administrator, and/or Contractor, if required.

2.

Block 15 Sign and date the report. This date must be consistent with the date of your signature; do not backdate.

3.

Forward the report to the COR for review and additional evaluation or instructions.

C.

COR INSTRUCTIONS.

1.

Engineering review report; add and/or attach comments. Coordinate input with Contracting Office, and/or Inspection, if required.

2.

Block 16 Sign and date report.

File details come from the government source that posted it.