AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide the follow ing:
1. Revised portions of the solicitation
2. Changes to Specif ications section
3. Responses to RFI's
4. Revised Draw ings
5. Extend proposal response date
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 19
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Jul-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912WJ-16-R-0007
X 9B. DATED (SEE ITEM 11)
05-Feb-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Jul-2016
CODE
US ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA ROAD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ-16-R-0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 15-Jul-2016 04:30 PM to 27-Jul-2016 04:30 PM.
The Issued By organization has changed from
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
to
US ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA ROAD
CONCORD MA 01742-2751
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been added by reference:
52.211-6 Brand Name or Equal AUG 1999
The following have been added by full text:
AMENDMENT 11
Solicitation Revisions
Revised Sections and Paragraphs of the Solicitation are as follows:
1. The section of the solicitation entitled “D. Factors to Be Evaluated, Factor 2 – Management Plan”, is amended in accordance with the specified changes included with this amendment under the same heading.
2. Revised and Reissued Contract Drawings are provided as an attachment (see attached drawings).
3. Changes to the Specification section are included with this amendment.
RFI’s
1. Bid Option No. 4, "covered walkway" is indicated on A-922, detail 2. There is an a general note where this is located on the drawing, but the extents of the bridge are not clearly defined. Please provide further carination. Please also provide quantity of deep foundations/footings (dimensions, depths, etc), slab requirements, along w/ Architectural requirements for the roof structure (details, specifications, etc).
Response: See revised Sheet A-922 included as part of this amendment. Extent of covered walkway is shown as a dashed line. Refer to Specification 10 73 00 Protective Walkway Cover for related information.
2. There is 3" Spray Foam Insulation required at the Skylights on drawing A-407; however, there is not a division 07 specification section. Please provide specifications for the spray foam insulation.
Response: See revised Sheet A-407 in attached amendment. Spray foam insulation replaced with polyisocyanurate insulation boards.
3. Will a RFP for Construction Testing and Inspection services will be issued?
Response: The P&Ss call for Contractor to perform the Quality Control testing and inspection. The Government may, at a future date, be issuing an RFP for Quality Assurance Testing.
4. Per drawing A-201, the legend calls out only two (2) different colors for FRCP panels; on drawing A- 501, the exterior schedule calls out four (4) different colors for FRCP panels; and on drawing A-541 the legend calls out three (3) different colors for FRCP panels. Please verify how many different color types there are for FRCP panels.
Response: There are three (3) FRCP colors: Color 1 Beige N891 (primary wall color), Color 2 Beige N892 (secondary wall color), Color 3 Green N592 (used at roof monitors). See revised Sheets A-201, A-202, A-203, A-204, A-301, A-302, A-501, A-541, A-542, A-543, A-544, A-545, and A-546.
5. Per drawings A-545 and A-546, the hatch patterns do not match up to the legend for the FRCP Panels. Please clarify which colors go where.
Response: See revised Sheets A-541, A-542, A-543, A-544, A-545, and A-546. Contractor shall match FRCP colors of adjacent middle school.
6. Confirm whether projects that are substantially complete meet the "complete" requirement set forth in the RFP for Factor 1- Technical Experience.
Response: See Amendment 8.
7. Confirm whether PPQs submitted for previous USACE projects may be used in lieu of requesting new PPQs.
Response: Submit PPQs as outlined in the Solicitation.
8. There appears to be duplicate Drawings issued for Drawings E-001 through T-601. Please clarify which set of E-001 through T-601 are to be used for bidding purposes.
Response: Yes, duplicate sets of Electrical drawings (E-001, ES-101, ES-102, EP-111, EP-121 EP-131, EL-111, EL-121, E-401, E-501 E-502, E-601, E-602, E-603, E-604, E-605, E-701, E-702, E-801, E-802) and Telecom drawings (T-111, T-121, T-501, T-502, T-601) were included in the drawings posted on Fed Biz Opps. Both sets are identical so either set may be used for bidding purposes except where any of the above drawings was revised an amendment.
9. The RFP requires that bidders identify a project manager, site superintendent, SSHO, CQC, and commissioning specialist. Per Div 01, para. 1.9, the superintendent may fill the CQC and SSHO roles.
Please confirm whether the designated superintendent may fill all three roles contingent upon meeting the requirements for each position.
Response: See Amendment No. 4.
10. Note #1 on CI-104 calls for 5' chain link fence while detail 5/L-502 calls for 4' chain link fence.
Please advise which height is correct?
Response: Fence should be 4’ high. See attached amendment revising Note 1 on Sheet CI-104.
11. Specification Section 11 68 14, 2.2E call for hand hold attachment points, density of 4 per square foot. 3 per square foot is more than enough even for a climbing gym. Would that be acceptable?
Response: 3 per square foot is acceptable. See amendment revising Section 11 68 14.
12. Room 1C09a show carpet C2 but finish schedule show C1, please clarify
Response: Music Storage Room 1C09a is to have Carpet floor finish (C2) as shown on the detailed floor pattern sheet I-210. Floor finish noted on Room Finish Schedule and Finish Location Plan is incorrect. See attached amendment for changes to Room Finish Schedule and Finish Location Plan.
13. Room 1C14 show RF1 but finish schedule show RF5, please clarify.
Response: Workroom 1C14 is to have Resilient floor finish (RF3) as shown on the detailed floor pattern sheet I-210. Floor finish noted on Room Finish Schedule and Finish Location Plan is incorrect.
See attached amendment for changes to Room Finish Schedule and Finish Location Plan.
14. The specs state that we’re to expand on the existing security system. However, it does not state the manufacturer of the system. Can you supply who the existing security manufacturer is? Also, if possible supply the main contact responsible for the current system?
Response: The security system in the Middle School is a Lenel OnGuard system.
15. Drawing EL-121 indicates an A13 Light to be installed in the Kiln room 2H02b. However, The Fixture schedule provided on Drawing E-601 does not appear to have an A13 Lighting type listed.
Please clarify what Lighting type is to be provided in Room 2H02b.
Response: Provide fixture type A7 at this location, see revised Sheet EL-121.
16. Per specification section 10 22 39 2.9.C under Bid Option #11, two alternates are described for Operable Partition Type 2. One option is for “clear glass with an applied translucent film” and the second option is for “cut-out with glazed insert in each door panel”. On the Alternates Bid Form only one line is provided for Bid Option #11. Please provide a second line for Bid Option #11 so both Operable Partition glazing pricing can be accounted for.
Response: Section 10 22 39 revised to include only one type of glazed operable partition.
17. Per specification 10 14 02 2.2.2 software is to be provided to create changeable message strips.
Please specify the quantity of software to be provided.
Response: Section 10 14 02 revised as part of amendment to delete requirement to submit software for creating message strip signs.
18. Per specification section 10 28 13 2.2.10 hand sanitizer dispensers (HSD) are to be provided.
However no hand sanitizer dispensers can be found on A-701 or listed in the Toilet Accessory Schedule on A-702. Please provide locations of hand sanitizer dispensers on drawings.
Response: Hand sanitizers will be Government furnished (see amendment for revisions to Section 10 28 13 Toilet Accessories. Hand sanitizers to be Contractor installed at HUB’s 2G00, 2J00, 2I00, 1E00, 1D00, PreK- 1D03, 05, 07, 09, 11, 13, Kinder- 1E01, 03, 05, 07 , 09 and Treat/Exam 1C26.
19. Bid option #4 – covered walkway – Drawing A922 and spec 10 73 00. It appears the spec is requesting the design and construction of the walkway. Please confirm. Also, notes state this is to extend from the temporary modular school to the middle school. Is this correct or should it just be over the bridge above the river? Is there any further details or writing’s that can further clarify the desired intent of this walkway?
Response: Yes, provide a temporary pre- engineered /fabricated walkway covering. Extent of covered walkway is shown as a dashed line (see revised Sheet A-922 in attached amendment). Refer to Specification 10 73 00 Protective Walkway Cover for related information.
20. Specification Section 27 60 01 states the existing Middle School Home Page for the Energy Efficiency Educational Dashboard shall be maintained & the existing Campus Page shall be updated to include the Primary School. Please provide the manufacturer, make & model of the existing Energy Efficiency Educational Dashboard system for the Middle School.
Response: The software is by QA Graphics. The touch screen display is NEC Display Solutions of America, Model V422-TM.
21. Specification Section 28 31 76, Paragraph 1.6.2.2 states to furnish equipment that is compatible with the existing Middle School. Please provide the manufacturer, Model and make of the existing Middle School Fire Alarm and Mass Notification system.
Response: Fire alarm is an Edwards United Technologies, Model EST-3.
22. Is there a “Buy America” clause in the General Conditions for this project?? I haven’t found anything in the bid documents, but we’ve heard that from a few of the Canadian suppliers. Please confirm or correct.
Response: See FAR clause 52.225-11.
23. Drawing Note 4 on Drawing FA-111 tell us that we are re-using the existing Primary School Fire Alarm Master Box; however, Note 6 on Drawing FA-601 tells us to provide a new master box. Please clarify if the fire alarm master box is new or existing to be re-used, and if new, please confirm type.
Response: Provide new (Sheet FA-111 and FA-601 are revised as part of this amendment). See Section 28 31 76.
24. Specifications do not require conduit for security system wiring; however they prohibit security wiring form entering cable trays with telecommunications wiring. Please confirm that security system cabling does not require conduit and may/should be run on J-Hooks separate from telecommunications cable tray.
Response: Conduit is not required for security system wiring. The system wiring must be supported separately.
25. Drawing P-141 shows a 4” domestic water line exiting the building however we find no notation in the civil drawings showing where this line extends/contacts to. Please advise
Response: Per Sheet CU-101B, the new water line will tie into an existing 8” water main at Sta. 6+75
(EP).
26. Per the attached Solicitation, we are “required to complete (in entirety) the Excel Spreadsheet titled “Price Proposal Breakdown”, which is attached to the Solicitation.” We have not found this document in the Solicitation or any of the (3) Amendments issued to date. We find only the bid form entitled “Bidding Schedule”, which lists only the Base Bid amount and the Optional Bid Items. Please advise.
Response: See Amendment No. 2, page 13 note.
27. Specification 10 14 02, page 4, 2.2.1 a states End Caps shall be 1/8" wide, aluminum with square style corners. Sign drawings on I-500 do not show any end caps. Please advise.
Response: Endcaps are not required on Interior Signage.
28. Is there an adequate structure over the river now that will sustain a covered walkway?
Response: Refer to drawing A922 BID OPTION #4. Notes 1 thru 4.
29. Should we include the cost to remove this walkway at the end of the project?
Response: Yes, the covered walk way is temporary.
30. Please ask the Architect to provide details for the “wood fascia trim” at edge of wood slat ceiling that borders Commons #1C01.
Response: Refer to Detail 5/A-663. Reference to Detail 33/A704 is changed to Detail 5/A-663 on Sheet A-831, Detail 7 as part of this amendment.
31. Finish schedule on I-002 show TW1-TW5. Room finish schedule on I-003 has TW6. Please provide product information.
Response: There is no TW6, any reference to TW6 in the Kinder Toilet Rooms should be TW5 (see revised Sheet I-003).
32. Per drawing A-111, a payphone is to be installed in the Main Office (Room 1A01). However the pay phone is not listed in specifications or FF & E drawings. Please confirm if contractor is to furnish and install pay phone, and if so provide specifications.
Response: No pay phone is required, just a phone jack at that location (Sheets A-111 and T-111 revised accordingly).
33. On sheet L – 201 it calls to “Provide 6 X 6 Pressure Treated Garden Boxes, Typical of 4” but the drawing shows 6. How many should be provided?
Response: Six, see Amendment 8.
34. Ref. A943, Bid Option #12 Classroom Millwork
a. Who is responsible to supply and install the SST intake & exhaust grilles shown in Detail 8/A943? Is this by the Casework Supplier or the HVAC Subcontractor?
b. Where is this material specified?
Response: The Contractor’s millworker should provide these components as part of the fabrication and installation of these pieces. Basis of Design is Krueger, SST grilles or approved equal.
35. Drawing A-632 in Open to Below above Commons Area, there are elevation 1-4/W-649 that is not on the documents. Please provide.
Response: Reference to Elevations 1-4/W-649 is deleted, see revised Sheet A-632 in this amendment.
36. Drawing A-922, bid option #4, indicates that the contractor provide a covered walk structure that allows unobstructed access between the temporary Primary School trailer compound and the Middle School. However, the path of this walkway is not shown. This is necessary for pricing.
Please provide the door-to-door path desired.
Response: See revised Drawing A-922 provided as part of this amendment for extent of covered walkway.
37a. For the covered walkway, are there any lighting requirements?
Response: None integral to the walkway covering. See pole mounted luminaires along walkway as shown on Sheet ES-102.
37b. Will the covered walkway remain in place, be removed and reinstalled in a permanent location, or removed and disposed? Is the walkway and footings temporary or permanent? Please provide clarification.
Response: The covered walkway assembly shall be removed at the end of the project.
38. RFI – Appliances
Is the owner providing the countertop microwaves?
The drawings request under counter refrigerators with and without locks. The specs request locks for all the UC refrigerators.
Could you please confirm if this project needs both refrigerators with and without locks?
Do you have a preferred brand and/or model for the refrigerators without locks?
Response:
Owner will provide microwaves (AE-01). Refer to drawings I-400, I-410 and I-420 for location reference.
For all under-counter refrigerators, provide with locks unless directed otherwise by Contracting Officer. AE-02 (dishwasher) & AE-03 (UC refrigerator) are integral with the millwork & Elec/Plmbg coordination and are covered in spec section 11 31 13 and are to be Contractor furnished and Contractor installed. The refrigerator for the Nurses Suite is to be freestanding, on casters and lockable as noted in the spec.
Provide refrigerator that meets requirements specified in Section 11 31 13.
39. Miscellaneous Metals-
The R2 & R5 railings could not find in the specification. Can you please provide manufacture and finishes? Can you clarify where the mechanical stair (A716) with the 1” grating is located?
Response: See Detail 18/A-713, Sheet A-714 and Detail 10/A-716. Sheet I-120 references HR1 and Finish Schedule (I-002) indicates finish. There isn’t a mechanical stair, Sheet A-716 is revised to delete Detail 5.
40. Miscellaneous Metals- Do the contract documents require moisture mitigation and/or any other means of protecting concrete vapor emissions from affecting flooring adhesives from failure in order to maintain the manufacturer’s warranty? Should a moisture mitigation add mixture be used when pouring the slab on grade and the slabs on deck?
Response: Refer to specifications 09 65 00-3.3 Moisture, Alkalinity and Bond Test, 09 65 66 3.2 Moisture Test.
41. Please provide more information on the mech stair such as location, number and length of grating treads.
Response: There isn’t a mechanical stair, Sheet A-716 is revised to delete Detail 5.
42. On drawing P131 there are numerous instances where "DD-A & OD-B (Bid Option #2)" is called out. However comparing to page A131, some of those instances occur where the roof area are labeled Option #14. Please confirm which option those drains are to coincide with.
Response: See revised Sheet P-131 as part of this amendment.
43. Drawing M702, Chilled Water System Sequence of Operation 3(a) states that the contractor shall hire the Hanscom Middle School BAS contractor to integrate the elementary school temperature controls into the middle school BAS. Please provide the name of said contractor as well as any J&A documents for sole sourcing.
Response: Requirement to hire Hanscom Middle School BAS contractor eliminated (see revised Sheet M-702).
44. Note 4 on M-002 reads "Provide Temporary heating (Min. 68 degrees F), Cooling (Max 72 degrees F)". Spec section 13 42 00 - 1.4 reads "HVAC system shall maintain and indoor temperature throughout all portions of the indoor facilities of 70 degrees F to 75 degrees F regardless of outdoor conditions". Please confirm what temperature the temporary heating and cooling system should maintain.
Response: The temporary conditions indicated on Note 4 on M-002 shall be maintained in all current work phases within the existing building. The requirements specified in Section 13 42 00 “Swingspace Trailer Facility Modulars” have been eliminated (see Amendment 8).
45. Drawing M602 specifies a basis of design for the radiant tubing to be Watts pex - also shown on M303. Specification 23 52 00 section 2.9.C.3 reads that it should be Watts Onix. There is a substantial price difference between the pex and the onix. Please clarify which tubing is to be used for the Radiant Heat System.
Response: Section 23 52 00 revised to require that radiant tubes shall be Watts RadiantPEX-AL or approved equal. The radiant tubes shall be multi-layered composite tubing consisting of an aluminum layer sandwiched between either crosslinked polyethylene (PEX) or crosslinked ethylene propylene diene monomer (EPDM) layers. PEX manufactured in accordance with ASTM F876 and ASTM F877 and tested in accordance with PPI TR-3. EPDM conforming to ASTM D2000. Oxygen penetration of less than 0.10 grams per cubic meter per day at 104 °F. Lastly, tubing shall have a nominal 5/8 inch inner diameter.
46. On page M602, Note 1 under Radiant Floor Heating Schedule reads "Packaged panel manifold and pump. Package to include mounting box, manifold, piping, valves, controls, and pump". Drawing M303 shows these pumps outside the manifold, and the Pump Schedule on M602 also specifies them as a separate product (P-17A - P23A). Please clarify the intent for the radiant pumps.
Response: The radiant floor heating system (Zone 1 thru Zone 7) shall be packaged panel manifold with pump. The pumps shall be located within the manifold enclosures. The P-17A thru P23A listed on the Pump Schedule on DWG M-602 are pump performance information for each zone.
47. Drawing I-110 Keynote 4 calls for elevator cab finishes to be from manufacturer "Forms and Surfaces" and are specific in detail. Please consider allowing comparable cab and entrance finishes from another company. Alternatively, please provide J&A for sole sourcing "Forms and Surfaces" products.
Response: Equal products may be provided in accordance with FAR Clause 52.211-6.
48. Drawing T-111 note 8. Is the Electrical Contractor considered the AV Contractor or is this being provided outside the contract by owner's contractor? Are they only supplying boxes & pipe? Nothing is listed in the Specs for any equipment on this either. Please advise.
Response: Contractor is responsible for conduit and boxes only.
49. Please verify the monthly rates we must assume to take over the present temporary classrooms for the duration of the primary school project. The only contractor aware of the costs associated with existing temporary classrooms is the contractor utilizing them for the middle school project. All contractors will be at a competitive disadvantage to J&J if this information remains confidential.
Response: As stated in Amendment 8, there are no rental or leasing costs. Sole ownership of the trailers will be turned over to the Contractor as stated in Section 13 42 00. The Contractor will be responsible for all operation, maintenance, and repairs costs. Approximate costs for operating, maintaining, and repairing the 31 trailers that comprised the temporary Middle School are provided in the revised Section 13 42 00 (revisions included as part of this amendment) along with a listing of those maintenance tasks that Lincoln Public Schools will perform.
50. Need some clarification in regards to the above referenced project. I see there is cable tray on drawings T-111, and T-121, however it does not specify what type of cable tray will be needed. The Spec calls for ladder style tray, and Basket style tray. As soon as I get clarification on the cable tray needed I can provided you an accurate quote.
Response: Basket style tray shall be utilized.
51. I’m looking at the walls shown in your plans, and they don’t make a lot of sense. The landscape plans clearly show the location and dimensions of the walls, but there is no grading shown. In the civil drawings, there is grading, but no walls. The grading shows a height difference of about 1’ sloping throughout that entire location of where the walls are shown on the landscape plans. Can you clarify each of the wall heights and the grade behind and in front of them?
Response: See sheet CI-101 for SWM Wall alignment info. In particular refer to the following:
sheet grid B-5 for location of alignment.
Note 3 regarding alignment location Note 4 refers to sheet CU303 for wall profile and section.
SWM Wall alignment table is located on sheet grid E-1.
52. Erosion control clarification, on sheet C-104 on the bottom portion of the limit of disturbance line, how far does the super silt fence extend?
Response: See sheet C103 for silt fence continuation.
53. Please clarify the location of mechanical stair as shown in 5/A-716.
Response: Detail 5 deleted from Sheet A-716. See revised Sheet A-716.
54. Does the perforated W,X,Y,Z rail panels in drawing A-714, have specifications? What is the finish?
Response: Refer to I-002 Finish schedule for HR-1 finish and Specification 09 90 00.
55. What is the correct surface around the six planter boxes?
Response: See Sheet L-201
56. RFI - ‘R6’ railings called out on the drawings, which take place at the (2) gym stairs, the ramp, the cafeteria stairs, and the circulation stair (all called out on A715). The rails say ‘SST rails’ which I believe to be stainless steel. On A716 detail 13 – it calls out the ‘R6’ railings to be 1 ½” SCH 40 pipe rail. What should be carried for R6 railing?
Response: Provide SST railings as indicated on A-715. Provide Sch 40 pipe rail at exit stairs.
57. Please reference detail 2/A-504 and other similar details. The metal coping shown in this detail.
Is this the .125” thick aluminum plate specified in section 074300 par. 2.2? Or is it a different material included under spec section 07600? If so, what material and thickness?
Response: Provide .125” thick aluminum plate for metal copings with Factory Color and Finish.
58. Please reference detail 2/A-509. The metal fascia shown in this detail. Is this the .125” thick aluminum plate specified in section 074300 par. 2.2? Or is it a different material included under spec section 07600? If so, what material and thickness.
Response: Provide .063 thick aluminum for Gravel Stop/Metal Fascia per 2/A-509 with Factory Color and Finish.
59. The Projector Screen Type 2 called for above the platform is not available dual sided at that size, with the specified viewing surfaces, per Draper, Inc. Please advise if two screens would be acceptable at that location? Please clarify which section specifies the Metal Canopy Signage shown in Detail 3/A-408?
Response: Dual sided Type 2 projector screen is available in the size specified. Metal canopy signage is a steel plate cut per sign elevation “HANSCOM PRIMARY SCHOOL” on 3/A-408.
60. Please advise on the extent of SF2 along the typical presentation walls in the following rooms (1D05, 1D07, 1E03, 1E05, 2G02, 2G04, 2I03, 2I05, 2J01, 2J03) as neither detail #14 on A-637 or detail #8 on A-639 show any SF2:
Response: Typical detail for finish (SF2) is on 7/A653 and extents are shown on elevations 1/A634 and 9/A639. As noted on the Finish Schedule and reflected on the finish plans, finish (SF2) – Acoustical Stretched Fabric System, is only installed in the Main Office Reception Area and in the Typical Learning Studios with Operable Partitions, those Studios with no operable partitions did not require the additional acoustical material.
61. Please advise if the tackable panels show in Details 3 & 4 on Sheet A-652 are being provided under Section 097200?
Response: The tack panels shown on the enlarged elevations referred to are not tackable wallcovering and would not be covered under spec section 097200. The material integral to the built-in reception desk in the Main Office is a 1/2”thick fabric wrapped tack panel (homosote or similar) as per the detail on 2&3/A654. Basis of design for the fabric is MFR: Maharam, Pattern: Tek-Wall, Subject 399535, Color: 004 Spade, 56”W.
62. I cannot locate a detail showing the XW1 panels. Please advise on the extent of these panels in rooms 1C01, 1C02, 1C03, 1C05, 2H00.
Response: Finish (XW1) is the gypsum perforated Acoustical panels and is same material as finish(XC1) and should be installed per the manufacturers instruction to conform to the wall partition assembly identified and to the standards set forth in spec section 09 29 00 Gypsum Board. This material does not occur in rooms/areas: 1C02, 1C05 and 2H00 (see revised Sheet I-003) but does occur in areas 1C01 and 1C03 of the Commons and to the extent shown on elevations 11/A634 and 4/A635 where “acoustical absorptive drywall” is noted. Also same material (XC1) is to be installed on all vertical and horizontal surfaces of Monitors per keynote no. 6 on sheet I-110.
63. Please advise what material should be used for the 4”x4” post shown in Detail 2 on Sheet A-922.
Response: As stated in Note 4 on Sheet A-922, the walkway cover is a delegated design. Provide walkway cover to withstand loads as indicated in drawing S-001. Walkway structural framing spacing per calculations.
64. Please advise on the depth of the footing shown in Detail 2 on Sheet A-922.
Response: As stated in Note 4 on Sheet A-922, the walkway cover is a delegated design. Provide walkway cover to withstand loads as indicated in drawing S-001. Walkway structural framing spacing per calculations.
65. Please provide an elevation corresponding with Detail 2 on Sheet A-922.
Response: There is no elevation corresponding with Detail 2 on Sheet A-922.
66. Please advise from which door at the temporary trailers that the protective walkway cover is to begin.
Response: See revised Sheet A-922 included as part of this amendment.
67. Please advise at which door at the Middle School the protective walkway cover should terminate.
Response: See revised Sheet A-922 included as part of this amendment.
68. Will a Building Permit be required for this project? If so, what entity has local jurisdiction for issuing the permit and what is the fee structure?
Response: No since this project is on federal property.
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
AMENDMENT 0010 OF SOLICITATION
1.1 CHANGES TO SPECIFICATIONS
1.1.1 Narrative Changes to the Specifications
1.2 CHANGES TO CONTRACT DRAWINGS
1.2.1 Revised and Reissued Contract Drawings
-- End of Section Table of Contents --
AMENDMENT 0008 OF SOLICITATION
1.1 CHANGES TO SPECIFICATIONS
1.1.1 Narrative Changes to the Specifications
1. Section 01 11 00 SUMMARY OF WORK, Subpart 1.8; add the following items to the table in this subpart:
TA-2 Paper towel dispenser As scheduled HSD Hand sanitizer dispenser As stated in response to RFI #83
2. Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS, Subpart 1.7.1.1;
insert the following sentence after the first sentence: “The SSHO is required to have five (5) years of construction industry safety experience or three (3) years if he possesses a Certified Safety Professional (CSP) or safety and health degree.”
3. Section 01 45 00 CONTRACTOR QUALITY CONTROL, Subpart 3.4.2; replace the second sentence with the following:
“The CQC System Manager must be a graduate engineer, graduate architect, or a graduate of construction management, with a minimum of 8 years construction experience on construction similar to this contract.”
4. Section 01 45 00 CONTRACTOR QUALITY CONTROL, Subpart 3.4.3; replace the
Experience Matrix table with the following:
Experience Matrix
Area Qualifications
Civil Graduate Civil Engineer, Construction Manager, or technician with 5 years of experience in civil quality control work
Mechanical Graduate Mechanical Engineer with 5 years of experience supervising mechanical features of work in the field with a construction company
Electrical Graduate Electrical Engineer with 5 years of experience supervising electrical features of work in the field with a construction company
Structural Graduate Civil Engineer (with Structural Track or Focus) or Construction Manager with 5 years of experience supervising structural features of work in the field with a construction company
Architectural Graduate Architect with 5 years of related experience
Environmental Graduate Environmental Engineer with 5 years of experience
Submittals Submittal Clerk with 5 years of experience processing submittals
Concrete, Pavements and Soils
Materials Technician with 5 years of experience for the appropriate area
Testing, Adjusting and Balancing (TAB) Personnel
Specialist must be a member of AABC or an experienced technician of the firm certified by the NEBB with 5 years experience in TAB related work
5. Section 10 14 02 INTERIOR SIGNAGE, Subpart 2.2.1; delete subparagraph a.
6. Section 10 14 02 INTERIOR SIGNAGE, Subpart 2.2.2; delete the third sentence.
7. Section 10 22 39 OPERABLE PARTITIONS (VERTICAL AND HORIZONTAL), Subpart 2.9, Subparagraph C; Replace subparagraph C with the following:
“C. Bid Option #11
Operable Partition Type 2
1. Basis of Design Modernfold Encore (STC 45)
2. Paired panel manual operation.
3. Panel width as indicated on drawings.
4. Panel height to be 10'-0" with supported GWB/metal stud to underside of deck
5. Provide cut-out with glazed insert in each door panel.
Glazing panels to be approximately 30 inchex by 74 inches
6. Track type 17
7. Automatic sure set floor seal.”
8. Section 10 28 13 TOILET ACCESSORIES, Subpart 2.2.4; Replace Subpart
2.2.4 with the following:
“2.2.4 Paper Towel Dispenser (TA-2)
Paper towel dispensers to be Government furnished.”
9. Section 10 28 13 TOILET ACCESSORIES, Subpart 2.2.8; Replace Subpart
2.2.8 with the following:
“2.2.8 Soap Dispenser (TA-13)
Soap dispensers to be Government furnished.”
10. Section 10 28 13 TOILET ACCESSORIES, Subpart 2.2.10; Replace Subpart
2.2.10 with the following:
“2.2.10 Hand Sanitizer Dispenser (HSD)
Hand sanitizer dispensers to be Government furnished.”
11. Section 10 28 13 TOILET ACCESSORIES, Subpart 2.2.13; Replace Subpart
2.2.13 with the following:
“2.2.13 Toilet Tissue Dispenser (TA-1)
Toilet tissue dispensers to be Government furnished.”
12. Section 11 68 14 INDOOR ATHLETIC EQUIPMENT, Subpart 2.2, Subparagraph E; in the second sentence replace “4 per square foot” with “3 per square foot”.
13. Section 13 42 00 SWINGSPACE TRAILER FACILITY MODULARS; Add the following subparts to the end of this section:
“1.5.1 Historical Operation, Maintenance, and Repair Costs for the Temporary Middle School Trailer Facility
For bidding purposes only, the following approximate monthly historical costs are provided for operation, maintenance, repair, insurance, and associated Contractor labor and overhead costs for the swingspace trailer facility during its use as a temporary Middle School:
• Monthly highest amount: $17,500
• Monthly lowest amount: $2,000
• Monthly average amount: $5,000
The temporary Middle School trailer facility was comprised of 31 trailers. The temporary Primary School trailer facility will be comprised of those same 31 trailers plus 6 additional trailers.
1.5.1.1 Operation and Maintenance Activities Performed by Lincoln Public Schools
Lincoln Public Schools is responsible for performing and paying all costs associated with the following tasks at the temporary trailer facility. The Contractor will be responsible for all other maintenance activities.
a. Snow removal, clearing of walks & parking areas, and shoveling of the roofs,
b. All janitorial/custodial services: cleaning, supplies, equipment, and installed dispensers,
c. Mowing and landscaping,
d. Trash and recyclables removal,
e. All utilities (electricity, water & sewerage),
f. Tenant maintenance to electrical (mostly replacing light bulbs),
g. All network/IT/server maintenance & operations,
h. All telephone system maintenance & operations,
i. All support of education programs, including copier supplies & maintenance,
j. Installation of lockers, cork boards & shelving,
k. Touch-up painting.”
14. Section 23 52 00 BOILERS AND HEATING EQUIPMENT, Subpart 2.9, Subparagraph C; In Item 3, replace “Watts ONIX” with “Watts RadiantPEX- AL or approved equal”.
1.2 CHANGES TO CONTRACT DRAWINGS
1.2.1 Revised and Reissued Contract Drawings
1. The following drawings are revised as indicated and reissued: C-103, CI-104, FL-001, D-102, A-111, A-201, A-202, A-203, A-204, A-301, A-302, A-407, A-501, A-541, A-542, A-543, A-544, A-545, A-546, A-632, A-716, A-831, A-922, I-002, I-003, I-110, M-702, P-131, ES-102, EL-121, T-111, T-121, T-502, FA-111, and FA-601.
END OF AMENDMENT
The following have been modified:
INSTRUCTIONS AND EVALUATION
A. FACTORS TO BE EVALUATED
The following evaluation factors will be used to evaluate each proposal. Award will be made to the offeror whose proposal is most advantageous to the Government based upon an integrated assessment of the evaluation factors described below.
FACTOR 1 – TECHNICAL EXPERIENCE
Technical experience shall include the Construction of new school buildings, demonstrating specialty spaces such as cafeteria, classrooms, gymnasium, science laboratories, and administrative space. Projects must demonstrate experience with all of the following activities.
Offerors that submit single projects that individually demonstrate all of the following activities may be more highly rated:
• Construction on Active School Campus – Show experience constructing a building on an active school campus, with students, bus traffic, and operating classrooms within close proximity to the construction area;
• Demolition of structures in constricted areas where the abatement of hazardous materials such as asbestos and lead was necessary prior to beginning structure demolition;
• Connecting to existing structure(s) and utilities;
• Participating in the construction of LEED-certified projects (silver or better) and in those that achieved LEED certification.
Evaluation Criteria for Factor 1:
Evaluation Criteria: Factor 1 will be evaluated and rated using an adjectival, combined technical/risk rating, in accordance with Table 1, in the Evaluation Approach Section below. The combined technical/risk rating includes consideration of risk in conjunction with the strengths, weaknesses, and deficiencies in determining technical ratings. Factor 1 will be evaluated first, on whether the Offeror’s past projects are relevant and recent to the work under the RFP. Relevancy will be determined by similarity of projects completed (physically or substantially completed) within the past ten (10) years that are similar to this solicitation in size, scope, price, and complexity.
Documentation that demonstrates completion (physically or substantially complete) of at least (2) projects similar in size, scope, price, and complexity to this Hanscom Primary School project and collectively address the four activities above will be considered to have met the minimum requirements of the RFP.