Hanscom Primary School, Hanscom AFB, Bedford, MA
SECTION 13 42 00 Page 1 Revised June 2016
SECTION 13 42 00
SWINGSPACE TRAILER FACILITY MODULARS
PART 1 GENERAL
1.1 TEMPORARY TRAILER RETENTION, OPERATION, MAINTENANCE, AND REPAIRS
The existing Middle School trailer facility shall be retained on site for the duration of construction of the Primary School to serve as a temporary Primary School.
The Primary School Contractor is no longer required to refurbish the existing trailer facility for use as a Primary School facility. The existing trailers being used as a temporary Middle School will have been modified for use as a Primary School facility by the Middle School contractor. The Primary School Contractor is no longer required to provide six additional trailers as indicated on the drawings. This work also will have been provided by the Middle School contractor.
The Primary School Contractor shall accept the assignment of all right, title and interest in the existing swingspace trailers, including the six additional trailers, from the Middle School Contractor ‘‘as is’’, effective midnight on September 30 2016. The Government makes no warranties, express or implied, as to the condition of the trailers. The existing swingspace trailer facility will be assigned to the Primary School Contractor at no cost.
The Primary School contractor shall perform all operation and maintenance required on or within the temporary trailer facility from the date of assignment until the new Primary School is complete and the temporary Primary school is vacated by the Government. With the exception of work covered by the Middle School contractor’s Warranty of Construction on the trailers, the Primary School contractor shall also be responsible for all repairs of the swingspace trailer facility, including, but not limited to, equipment repair or replacement from the date of assignment until the trailer facility is vacated by the Government, including removal of all materials and equipment from the temporary trailer facility.
1.2 GENERAL
Contractors are not permitted to park their vehicles behind trailers. No dumpsters are allowed in the paved area behind temporary facilities. The paved area and the sidewalk shall be free of vehicles for fire truck access.
1.3 SEQUENCING AND SCHEDULING
See Section 01 00 00 GENERAL REQUIREMENTS.
1.4 REMOVAL AND DISPOSAL OF SWINGSPACE TRAILER FACILITY
Upon completion of the new Primary School and relocation by Lincoln Public Schools of all materials and equipment from the temporary trailer facility to the new Primary school, the Primary School Contractor shall remove and dispose of all trailers, or demolish these and associated playgrounds and equipment, and associated utilities and shall restore the site as shown on the contract drawings.
1.5 AVAILABLE INFORMATION
Provided at the end of this section is, for information only, the Manufacturer’s Certificates of Origin and as-built drawings for the 31 trailers that comprised the temporary Middle School and that will be
Hanscom Primary School, Hanscom AFB, Bedford, MA
SECTION 13 42 00 Page 2 Revised June 2016 transferred to the Primary School Contractor at no cost. Prior to turnover of these trailers to the Contractor, they will have been modified as required for use as the temporary Primary School. Additionally, Manufacturer’s Certificates of Origin for the 6 additional trailers that are being added to the trailer facility to form the new temporary Primary School are also attached at the end of this section. These trailers will be purchased by the Middle School Contractor and will also be transferred to the Primary School Contractor at no cost.
MANUFACTURER’S CERTIFICATES OF ORIGIN
PRIMARY SCHOOL TRAILER FACILITY
THIRTY ONE (31) ORIGINAL TRAILERS
AS-BUILT DRAWINGS
THIRTY ONE (31) ORIGINAL TRAILERS
MANUFACTURER’S CERTIFICATES OF ORIGIN
SIX (6) ADDITIONAL TRAILERS