W912QR21R0013_Specs_Vol1-0003.pdf
PDF 1 MB Posted
- Attached to
- Family Housing Renovation at WPAFB, OH
- Solicitation number
- W912QR21R0013
About this file
This federal contract opportunity announcement describes a solicitation for the construction and renovation of family housing at Wright-Patterson Air Force Base in Ohio. The U.S. Army Corps of Engineers Louisville District is seeking a firm-fixed-price contract for approximately $25 million to $100 million to modernize and repair 29 government-owned housing units. The scope of work includes interior and exterior renovations along with systems upgrades. It will be conducted in phases over multiple years. Interested parties can access the full solicitation on SAM.gov when it is posted. The selection will use a best value tradeoff process to evaluate technical, past performance, and price factors. Discussions may be held at the government's discretion. The point of contact for inquiries is provided.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W912QR21R0013 Construction and Renovation of Family Housing located at WPAFB, OH is hereby modified as follow s:
SEE SUMAMRY OF CHANGES
1. CONTRACT ID CODE PAGE OF PAGES
1 15
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR21R0013
X 9B. DATED (SEE ITEM 11)
18-Feb-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3.EFFECTIVE DATE
22-Mar-2021
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912QR21R0013_Specs_Vol1-0003
W912QR21R0013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMDT 0003 SUMMARY OF CHANGES
Solicitation W912QR21R0013 to renovate Family Housing located at WPAFB, OH is hereby modified as follows:
a. The following Specification Sections have been revised and replaced in their entirety:
a. Table of Contents
b. 00 10 00 Price Breakout Schedule
c. 07 60 00 Flashing and Sheet Metal
d. 10 28 13 Toliet Accessories
b. The following Specification Sections have been added in their entirety:
a. 11 31 13 Electrical Kitchen Equipment
c. The following Plan Sheets have been revised and replaced in their entirety:
Drawings Volume 2 – Type A
i. AD101 Basement Demolition Plan
ii. AD102 1st Floor Demolition Plan
iii. AD103 Additional Scope @ 447 Johnson
iv. AD104 2nd Floor Demolition Plan
v. AD105 Roof Demolition Plan
vi. A-101 Basement Plan
vii. A-102 1st Floor Plan
viii. A-103 2nd Floor Plan
ix. A-104 Attic Plan
x. A-105 Roof Plan
xi. A-201 Building Elevations
xii. A-202 Building Elevations
xiii. A-301 Building Sections
xiv. A-302 Building Sections
xv. A-303 Enlarged Wall Sections
xvi. A-304 Enlarged Wall Sections
xvii. A-305 Enlarged Wall Sections
xviii. A-501 Details
xix. A-502 Details
xx. A-506 Details
Drawings Volume 3 – Type B
i. AD101 Basement Demolition Plan
ii. AD102 1st Floor Demolition Plan
iii. AD103 2nd Floor Demolition Plan
iv. AD104 3rd Floor Demolition Plan
v. AD105 Roof Demolition Plan
vi. A-101 Basement Plan
vii. A-102 1st Floor Plan
viii. A-103 2nd Floor Plan
ix. A-104 3rd Floor Plan
x. A-105 Roof Plan
xi. A-201 Building Elevations
xii. A-202 Building Elevations
xiii. A-301 Building Sections
xiv. A-302 Building Sections
xv. A-303 Enlarged Wall Sections
xvi. A-304 Enlarged Wall Sections
xvii. A-501 Details
xviii. A-502 Details
xix. A-506 Details
Drawings Volume 4 – Type C
i. AD101 Basement Demolition Plan
ii. AD102 1st Floor Demolition Plan
iii. AD103 2nd Floor Demolition Plan
iv. AD104 3rd Floor Demolition Plan
v. AD105 Roof Demolition Plan
vi. A-101 Basement Plan
vii. A-102 1st Floor Plan
viii. A-103 2nd Floor Plan
ix. A-104 3rd Floor Plan
x. A-105 Roof Plan
xi. A-201 Building Elevations
xii. A-202 Building Elevations
xiii. A-301 Building Sections
xiv. A-302 Building Sections
xv. A-303 Enlarged Wall Sections
xvi. A-501 Details
xvii. A-502 Details
Drawings Volume 5 – Type D
i. AD101 Basement Demolition Plan
ii. AD102 1st Floor Demolition Plan
iii. AD103 2nd Floor Demolition Plan
iv. AD104 3rd Floor Demolition Plan
v. AD105 Roof Demolition Plan
vi. A-101 Basement Plan
vii. A-102 1st Floor Plan
viii. A-103 2nd Floor Plan
ix. A-104 3rd Floor Plan
x. A-105 Roof Plan
xi. A-201 Building Elevations
xii. A-202 Building Elevations
xiii. A-301 Building Sections
xiv. A-302 Building Sections
xv. A-303 Enlarged Wall Sections
xvi. A-501 Details
xvii. A-502 Details
Drawings Volume 6 – Type E
i. AD101 Basement Demolition Plan
ii. AD102 1st Floor Demolition Plan
iii. AD103 2nd Floor Demolition Plan
iv. AD104 3rd Floor Demolition Plan
v. AD105 Roof Demolition Plan
vi. A-101 Basement Plan
vii. A-102 1st Floor Plan
viii. A-103 2nd Floor Plan
ix. A-104 3rd Floor Plan
x. A-105 Roof Plan
xi. A-201 Building Elevations
xii. A-202 Building Elevations
xiii. A-301 Building Sections
xiv. A-302 Building Sections
xv. A-501 Details
xvi. A-502 Details
xvii. A-506 Details
Drawings Volume 7 – Type F
i. AD101 Basement Demolition Plan
ii. AD102 1st Floor Demolition Plan
iii. AD103 2nd Floor Demolition Plan
iv. AD104 3rd Floor Demolition Plan
v. AD105 Roof Demolition Plan
vi. A-101 Basement Plan
vii. A-102 1st Floor Plan
viii. A-103 2nd Floor Plan
ix. A-104 3rd Floor Plan
x. A-105 Roof Plan
xi. A-201 Building Elevations
xii. A-202 Building Elevations
xiii. A-301 Building Sections
xiv. A-302 Building Sections
xv. A-501 Details
xvi. A-502 Details
xvii. A-506 Details
Drawings Volume 8 – Type G
i. AD101 Basement Demolition Plan
ii. AD102 1st Floor Demolition Plan
iii. AD103 2nd Floor Demolition Plan
iv. AD104 Roof Demolition Plan
v. A-101 Basement Plan
vi. A-102 1st Floor Plan
vii. A-103 2nd Floor Plan
viii. A-104 Roof Plan
ix. A-201 Building Elevations
x. A-202 Building Elevations
xi. A-301 Building Sections
xii. A-302 Building Sections
xiii. A-303 Enlarged Wall Sections
xiv. A-501 Details
xv. A-502 Details
xvi. A-506 Details
d. The following Plan Sheets have been added in their entirety:
a. CD109 Civil Demolition Plan
b. C-109 Civil Site Plan
c. CS109 Location Plan
d. CU109 Civil Utility Plan
e. CG109 Grading and Erosion Control Plan
e. The following Plan Sheets have been deleted in their entirety:
Drawings Volume 1 – Site
i. CD109A Civil Demolition Plan – Bid Option
ii. C-109A Civil Site Plan – Bid Option
iii. CS109A Location Plan – Bid Option
iv. CU109A Civil Utility Plan – Bid Option
v. CG109A Grading and Erosion Control Plan – Bid Option
f. The proposal due date is hereby changed from 1:00pm ET on 23 March 2021 to 1:00pm ET on 06 April 2021.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 23-Mar-2021 01:00 PM to 06-Apr-2021 01:00 PM.
The number of offeror copies required has decreased by 1 from 7 to 6.
The following have been modified:
PRICE BREAKOUT SCHEDULE
CONTRACT LINE ITEM SCHEDULE
Line Item No. Description Unit Unit Amount Amount
BASE PROPOSAL
Phase 1 - Base 0001A Construction: All work, materials, and labor required to complete the whole house renovations for all homes, construction of new garages and renovations to existing garages in this phase within 5’ of the exterior walls, except for work included in CLINs 0001B-0001I. JOB $__________________
0001B Construction: Asbestos for Phase 1. All work, labor, materials and equipment Required to provide asbestos abatement as indicated in section 01 01 20 GENERAL
ENVIRONMENTAL PROTECTION REQUIREMENTS
(WPAFB) for floor tile, mastic, leveler and ceramic floor tile with mortar and grout. Estimated quantity 5,490 SF.
See Note no. 8. $/SF $_____________ $__________________
0001C Construction: Asbestos for Phase 1. All work, labor, materials and equipment Required to provide asbestos abatement as indicated in section 01 01 20 GENERAL
ENVIRONMENTAL PROTECTION REQUIREMENTS
(WPAFB) for ceramic wall tile with mortar and grout.
Estimated quantity 4,255 SF. See Note no. 8. $/SF $_____________ $__________________
0001D Construction: Asbestos for Phase 1. All work, labor, materials and equipment Required to provide asbestos abatement as indicated in section 01 01 20 GENERAL
ENVIRONMENTAL PROTECTION REQUIREMENTS
(WPAFB) for vibration dampers. Estimated quantity 39 SF. See Note no. 8. $/SF $_____________ $__________________
0001E Construction: Asbestos for Phase 1. All work, labor, materials and equipment Required to provide asbestos abatement as indicated in section 01 01 20 GENERAL
ENVIRONMENTAL PROTECTION REQUIREMENTS
(WPAFB) for linoleum and sheet flooring. Estimated Quantity 640 SF. See Note no. 8. $/SF $_____________ $__________________
0001F Construction: Asbestos for Phase 1. All work, labor, materials and equipment Required to provide asbestos abatement as indicated in section 01 01 20 GENERAL
ENVIRONMENTAL PROTECTION REQUIREMENTS
(WPAFB) for sink undercoating. Estimated quantity
10 SF. See Note no. 8. $/SF $_____________ $__________________
0001G Construction: Asbestos for Phase 1. All work, labor, materials and equipment Required to provide asbestos abatement as indicated in section 01 01 20 GENERAL
ENVIRONMENTAL PROTECTION REQUIREMENTS
(WPAFB) for joint compound/drywall. Estimated quantity 4,765 SF. See Note no. 8. $/SF $_____________ $__________________
******************************** AMDT 0003 ******************************************* 0001H Construction: Phase 1. Masonry repointing as indicated on the Architectural drawings (see A-201 and A-202 for each House type) (see Note No 8). Estimated quantity
15,481 SF. $/SF $_____________ $__________________
******************************** AMDT 0003 *******************************************
0001I Site Work: Phase 1. All work, materials, and labor required beyond 5’ from structures and not identified elsewhere. See Note no. 9. JOB $ __________________
Total Base Proposal (Phase 1) $__________________ Phase 1A - Base
0002A Construction: All work, materials, and labor required to complete the whole house renovation of 531 Lahm within 5’ of the exterior walls, except for work included in CLINs 0002B-0002G. JOB $__________________
0002B Construction: Asbestos for Phase 1A. All work, labor, materials and equipment Required to provide asbestos abatement as indicated in section 01 01 20 GENERAL
ENVIRONMENTAL PROTECTION REQUIREMENTS
(WPAFB) for floor tile, mastic, leveler and ceramic floor tile with mortar and grout. Estimated quantity 180 SF.
See Note No. 8. $/SF $_____________ $__________________
0002C Construction: Asbestos for Phase 1A. All work, labor, materials and equipment Required to provide asbestos abatement as indicated in section 01 01 20 GENERAL
ENVIRONMENTAL PROTECTION REQUIREMENTS
(WPAFB) for ceramic wall tile with mortar and grout.
Estimated quantity 530 SF. See Note No. 8. $/SF $_____________ $__________________
0002D Construction: Asbestos for Phase 1A. All work, labor, materials and equipment Required to provide asbestos abatement as indicated in section 01 01 20 GENERAL
ENVIRONMENTAL PROTECTION REQUIREMENTS
(WPAFB) for cardboard insulation. Estimated quantity 425 SF. See Note No. 8. $/SF $_____________ $__________________
0002E Construction: Asbestos for Phase 1A. All work, labor, materials and equipment Required to provide asbestos abatement as indicated in section 01 01 20 GENERAL
ENVIRONMENTAL PROTECTION REQUIREMENTS
(WPAFB) for pipe insulation. Estimated quantity 55 LF.
See Note No. 8. $/LF $_____________ $__________________
0002F Construction: Phase 1A. Masonry repointing as indicated on the Architectural drawings (see A-201 and A-202 for each House type) (see Note No 8). Estimated quantity 1,062 SF. $/SF $_____________ $__________________
0002G Site Work: Phase 1A. All work, materials, and labor required beyond 5’ from structures and not identified elsewhere. See Note no. 9. JOB $ _________________
Total Base Proposal (Phase 1A) $__________________ Phase 2 - Base 0003A Construction: All work, materials, and labor required to complete the whole house renovations for all homes, construction of new garages and renovations to existing garages in this phase within 5’ of the exterior walls, except for work included in CLINs 003B-0003F. JOB $__________________
0003B Construction: Asbestos for Phase 2. All work, labor, materials and equipment Required to provide asbestos abatement as indicated in section 01 01 20 GENERAL
ENVIRONMENTAL PROTECTION REQUIREMENTS
(WPAFB) for floor tile, mastic, leveler and ceramic floor tile with mortar and grout. Estimated quantity 4,955 SF.
See Note no. 8. $/SF $_____________ $__________________
0003C Construction: Asbestos for Phase 2. All work, labor, materials and equipment Required to provide asbestos abatement as indicated in section 01 01 20 GENERAL
ENVIRONMENTAL PROTECTION REQUIREMENTS
(WPAFB) for ceramic wall tile with mortar and grout.
Estimate quantity 1,935 SF. See Note no. 8. $/SF $_____________ $__________________
0003D Construction: Asbestos for Phase 2. All work, labor, materials and equipment Required to provide asbestos abatement as indicated in section 01 01 20 GENERAL
ENVIRONMENTAL PROTECTION REQUIREMENTS
(WPAFB) for vibration dampers. Estimated quantity 18 SF. See Note no. 8. $/SF $_____________ $__________________ ******************************** AMDT 0003 ******************************************* 0003E Construction: Phase 2. Masonry repointing as indicated on the Architectural drawings (see A-201 and A-202 for each House type) (see Note No 8). Estimate quantity
7,010 SF. $/SF $_____________ $__________________
******************************** AMDT 0003 *******************************************
0003F Site Work: Phase 2. All work, materials, and labor required beyond 5’ from structures and not identified elsewhere. See Note no. 9. JOB $ _________________
Total Base Proposal (Phase 2) $__________________ Option(s) ******************************** AMDT 0003 ******************************************* 0004A Option 0001: Landscaping for Phase 1. Costs associated with providing all Landscape plantings for this phase within 5’ each home. See Note no. 9. JOB $ ___________________
0004B Option 0002: Landscaping for Phase 1A. Costs associated with providing all Landscape plantings for this phase within 5’ each home. See Note no. 9. JOB $ ___________________
0004C Option 0003: Landscaping for Phase 2. Costs associated with providing all Landscape plantings for this phase within 5’ each home. See Note no. 9. JOB $ ___________________ ******************************** AMDT 0003 *******************************************
0005A Option 0004: Roof upgrade for Phase 1, 1A and 2.
All work, materials and labor required to upgrade the terracotta roof tile to Provincial style as indicated in specification section 07 32 14, CLAY
TILE ROOFING REPLACEMENT OR REPAIR. JOB $ ___________________
0005B Option 0005: Roof color upgrade for Phase 1, 1A and 2.
All work, materials and labor required to upgrade the terracotta roof tile in CLIN 0005A with custom color mix as indicated in specification section 07 32 14, CLAY
TILE ROOFING REPLACEMENT OR REPAIR.
This option is in addition to CLIN 0005A. JOB $ ___________________
Option 6 - 448 Metzger Dr.
(CLIN 0006A to 0006F will be awarded and exercised together.)
0006A Option 0006: Construction 448 Metzger Dr.:
All work, materials, and labor required to complete the whole house renovations, construction of new garage(s) within 5’ of the exterior walls, except for work included in CLINs 0006B-0006E. See Note no. 7. JOB $ ___________________
0006B Option 0006: Asbestos abatement. All work, labor, materials and equipment Required to provide asbestos abatement as indicated in section 01 01 20 GENERAL
ENVIRONMENTAL PROTECTION REQUIREMENTS
(WPAFB) for floor tile, mastic, leveler and ceramic floor tile with mortar and grout. Estimated quantity 485 SF.
See Note no. 8. $/SF $_____________ $__________________
0006C Option 0006: Asbestos abatement. All work, labor, materials and equipment Required to provide asbestos abatement as indicated in section 01 01 20 GENERAL
ENVIRONMENTAL PROTECTION REQUIREMENTS
(WPAFB) for ceramic wall tile with mortar and grout.
Estimate quantity 385 SF. See Note no. 8. $/SF $_____________ $__________________
0006D Option 0006: Asbestos abatement. All work, labor, materials and equipment Required to provide asbestos abatement as indicated in section 01 01 20 GENERAL
ENVIRONMENTAL PROTECTION REQUIREMENTS
(WPAFB) for vibration dampers. Estimated quantity 3 SF. See Note no. 8. $/SF $_____________ $__________________
0006E Option 0006: Site Work. All work, materials, and labor required beyond 5’ from structures and not identified elsewhere. See Note no. 9. JOB $ ___________________ ******************************** AMDT 0003 ******************************************* 0006F Option 0006: Construction: Masonry repointing as indicated on the Architectural drawings (See A-201 and A-202) See Note
no. 8. Estimated quantity 978 SF.
$/SF $_____________ $__________________
Total Proposal (Option 6, CLIN 0006A to 0006F) $____________________
0006G Option 0006: Landscaping for Option 6. Costs associated with providing all Landscape plantings for this phase within 5’ of each home. See Note no. 9. This CLIN is in addition to CLIN 0006A to 0006F. JOB $ ___________________ ******************************** AMDT 0003 *******************************************
0006H Option 0006: Roof upgrade for Option 6.
All work, materials and labor required to upgrade the terracotta roof tile to Provincial style as indicated in specification section 07 32 14, CLAY
TILE ROOFING REPLACEMENT OR REPAIR.
This CLIN is in addition to CLIN 0006A to 0006F, but exclusive of CLIN 0006G. JOB $ ___________________
0006I Option 0006: Roof color upgrade for Option 6.
All work, materials and labor required to upgrade the terracotta roof tile in CLIN 0006G with custom color mix as indicated in specification section 07 32 14, CLAY
TILE ROOFING REPLACEMENT OR REPAIR.
This option is in addition to CLIN 0006H. JOB $ ___________________
Option 7 - 419 Johnson Dr.
(CLIN 0007A to 0007E will be awarded and exercised together.)
0007A Option 0007: Construction 419 Johnson Dr.:
All work, materials, and labor required to complete the whole house renovations, construction of new garage(s) within 5’ of the exterior walls, except for work included in CLINs 0007B-0007D. See Note no. 7. JOB $ ___________________
0007B Option 0007: Asbestos abatement. All work, labor, materials and equipment Required to provide asbestos abatement as indicated in section 01 01 20 GENERAL
ENVIRONMENTAL PROTECTION REQUIREMENTS
(WPAFB) for floor tile, mastic, leveler and ceramic floor tile with mortar and grout. Estimated quantity 190 SF.
See Note no. 8. $/SF $_____________ $__________________
0007C Option 0007: Asbestos abatement. All work, labor, materials and equipment Required to provide asbestos abatement as indicated in section 01 01 20 GENERAL
ENVIRONMENTAL PROTECTION REQUIREMENTS
(WPAFB) for ceramic wall tile with mortar and grout.
Estimate quantity 550 SF. See Note no. 8. $/SF $_____________ $__________________
0007D Option 0007: Site Work. All work, materials, and labor required beyond 5’ from structures and not identified elsewhere. See Note no. 9. JOB $ ___________________
******************************** AMDT 0003 ******************************************* 0007E Option 0007: Construction: Masonry repointing as indicated on the Architectural drawings (see A-201 and A-202) (see Note No. 8) Estimated quantity 921 SF.
$/SF $_____________ $__________________
Total Proposal (Option 7, CLIN 0007A to 0007E) $____________________
0007F Option 0007: Landscaping for Option 7. Costs associated with providing all Landscape plantings for this phase within 5’ of each house.
See Note no. 9. This CLIN is in addition to CLIN 0007A to 0007E. JOB $ ___________________
******************************** AMDT 0003 *******************************************
0007G Option 0007: Roof upgrade for Option 7.
All work, materials and labor required to upgrade the terracotta roof tile to Provincial style as indicated in specification section 07 32 14, CLAY
TILE ROOFING REPLACEMENT OR REPAIR.
This CLIN is in addition to CLIN 0007A to 0007E, but exclusive of CLIN 0007F. JOB $ ___________________
0007H Option 0007: Roof color upgrade for Option 7.
All work, materials and labor required to upgrade the terracotta roof tile in CLIN 0007F with custom color mix as indicated in specification section 07 32 14, CLAY
TILE ROOFING REPLACEMENT OR REPAIR.
This option is in addition to CLIN 0007G. JOB $ ___________________
Option 8 - 437/439 Johnson Dr.
(CLIN 0008A to 0008F will be awarded and exercised together.)
0008A Option 0008: Construction 437/439 Johnson Dr.:
All work, materials, and labor required to complete the whole house renovations, construction of new garage(s) within 5’ of the exterior walls, except for work included in CLINs 0008B-0008E. See Note no. 7. JOB $ ___________________
0008B Option 0008: Asbestos abatement. All work, labor, materials and equipment Required to provide asbestos abatement as indicated in section 01 01 20 GENERAL
ENVIRONMENTAL PROTECTION REQUIREMENTS
(WPAFB) for floor tile, mastic, leveler and ceramic floor tile with mortar and grout. Estimated quantity 1,065 SF.
See Note no. 8. $/SF $_____________ $__________________
0008C Option 0008: Asbestos abatement. All work, labor, materials and equipment Required to provide asbestos abatement as indicated in section 01 01 20 GENERAL
ENVIRONMENTAL PROTECTION REQUIREMENTS
(WPAFB) for ceramic wall tile with mortar and grout.
Estimate quantity 1,025 SF. See Note no. 8. $/SF $_____________ $__________________
0008D Option 0008: Asbestos abatement. All work, labor, materials and equipment Required to provide asbestos abatement as indicated in section 01 01 20 GENERAL
ENVIRONMENTAL PROTECTION REQUIREMENTS
(WPAFB) for vibration dampers. Estimated quantity 6 SF. See Note no. 8. $/SF $_____________ $__________________
0008E Option 0008: Site Work. All work, materials, and labor required beyond 5’ from structures and not identified elsewhere. See Note no. 9. JOB $ ___________________ ******************************** AMDT 0003 ******************************************* 0008F Option 0008: Construction: Masonry repointing as indicated on the Architectural drawings (see A-201 and A-202) (see Note No. 8) Estimated quantity 2,011 SF.
$/SF $_____________ $__________________
Total Proposal (Option 8, CLIN 0008A to 0008F) $____________________
0008G Option 0008: Landscaping for Option 8. Costs associated with providing all Landscape plantings for this phase within 5’ of each home.
See Note no. 9. This CLIN is in addition to CLIN 0008A to 0008F. JOB $ ____________________ ******************************** AMDT 0003 *******************************************
0008H Option 0008: Roof upgrade for Option 8.
All work, materials and labor required to upgrade the terracotta roof tile to Provincial style as indicated in specification section 07 32 14, CLAY
TILE ROOFING REPLACEMENT OR REPAIR.
This CLIN is in addition to CLIN 0008A to 0008F, but exclusive of CLIN 0008G. JOB $ ___________________
0008I Option 0008: Roof color upgrade for Option 8.
All work, materials and labor required to upgrade the terracotta roof tile in CLIN 0008G with custom color mix as indicated in specification section 07 32 14, CLAY
TILE ROOFING REPLACEMENT OR REPAIR.
This option is in addition to CLIN 0008H. JOB $ ___________________
Option 9 – 816/818 Pearson Dr.
(CLIN 0009A to 0009G will be awarded and exercised together.)
0009A Option 0009: Construction 816/818 Pearson Dr.:
All work, materials, and labor required to complete the whole house renovations, construction of new garage(s) within 5’ of the exterior walls, except for work included in CLINs 0009B-0009F. See Note no. 7. JOB $ ___________________
0009B Option 0009: Asbestos abatement. All work, labor, materials and equipment Required to provide asbestos abatement as indicated in section 01 01 20 GENERAL
ENVIRONMENTAL PROTECTION REQUIREMENTS
(WPAFB) for floor tile, mastic, leveler and ceramic floor tile with mortar and grout. Estimated quantity 1,065 SF.
See Note no. 8. $/SF $_____________ $__________________
0009C Option 0009: Asbestos abatement. All work, labor, materials and equipment Required to provide asbestos abatement as indicated in section 01 01 20 GENERAL
ENVIRONMENTAL PROTECTION REQUIREMENTS
(WPAFB) for ceramic wall tile with mortar and grout.
Estimate quantity 1,025 SF. See Note no. 8. $/SF $_____________ $__________________
0009D Option 0009: Asbestos abatement. All work, labor, materials and equipment Required to provide asbestos abatement as indicated in section 01 01 20 GENERAL
ENVIRONMENTAL PROTECTION REQUIREMENTS
(WPAFB) for vibration dampers. Estimated quantity 6 SF. See Note no. 8. $/SF $_____________ $__________________
0009E Option 0009: Asbestos abatement. All work, labor, materials and equipment Required to provide asbestos abatement as indicated in section 01 01 20 GENERAL
ENVIRONMENTAL PROTECTION REQUIREMENTS
(WPAFB) for sink undercoating. Estimated quantity 10 SF. See Note no. 8. $/SF $_____________ $__________________
0009F Option 0009: Site Work. All work, materials, and labor required beyond 5’ from structures and not identified elsewhere. See Note no. 9. JOB $ ___________________ ******************************** AMDT 0003 ******************************************* 0009G Option 0009: Construction: Masonry repointing as indicated on the Architectural drawings (see A-201 and A-202) (see Note No. 8) Estimated quantity 2,149 SF.
$/SF $_____________ $__________________
Total Proposal (Option 9, CLIN 0009A to 0009G) $____________________
0009H Option 0009: Landscaping for Option 9. Costs associated with providing all Landscape plantings for this phase within 5’ of each home.
See Note no. 9. This CLIN is in addition to CLIN 0009A to 0009G. JOB $ ___________________ ******************************** AMDT 0003 *******************************************
0009I Option 0009: Roof upgrade for Option 9.
All work, materials and labor required to upgrade the terracotta roof tile to Provincial style as indicated in specification section 07 32 14, CLAY
TILE ROOFING REPLACEMENT OR REPAIR.
This CLIN is in addition to CLIN 0009A to 0009G, but exclusive of CLIN 0009H. JOB $ ___________________
0009J Option 0009: Roof color upgrade for Option 9.
All work, materials and labor required to upgrade the terracotta roof tile in CLIN 0009H with custom color mix as indicated in specification section 07 32 14, CLAY
TILE ROOFING REPLACEMENT OR REPAIR.
This option is in addition to CLIN 0009I. JOB $ ___________________
Total Options $ ___________________
Total Base + ALL Options $ ___________________
NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE
NOTE NO. 1
To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
NOTE NO. 2
Offerors must insert a price on all numbered items of the CLIN Schedule. Failure to do so may result in the offer being unacceptable. Any Option may be exercised within 500 calendar days of Notice to Proceed (NTP).
NOTE NO. 3
In accordance with 52.217-5, Evaluation of Options, the Government will evaluate offers for award purposes by add ing the total price for all options to the total price for the base requirement. Government will evaluate price based on total proposal (Base plus all options).
NOTE NO. 4
Each option may be executed exclusively of other options unless noted otherwise. Each option listed may be executed only once unless noted otherwise.
NOTE NO. 5
Offeror’s shall rely upon the contract documents for project requirements associated with each CLIN. Descriptions a nd titles given for overall project coordination and convenience
NOTE NO. 6
The target ceiling for award is $32,000,000.00. The government cannot guarantee that funds exceeding this target ceiling can be made available for award. Offerors are under no obligation to approach this ceiling.
NOTE NO. 7
See Specification Sections 01 11 00 and 01 14 00 for Phasing requirements and durations. If exercised, Options 0006 through 0009 (CLINs 0006 through 0009) will be included in Phase 2. Each option exercised shall add 25 calendar days to the total duration of Phase 2 and Period of Performance.
The specific home addresses and building numbers included in each phase are below. See Specification Section 01 11 00 for information related to garages and other requirements.
Phase 1 420 Metzger Dr. (Building #10424) 523 Johnson Dr. (Building #10704) 524 Metzger Dr. (Building #10804) 733 Pearson Rd. (Building #10716) 807 Pearson Rd. (Building #10817) 513/515 Johnson Dr. (Building #10702) 514/516 Metzger Dr. (Building #10802) 715/717 Pearson Rd. (Building #10712) 730/732 Pearson Rd. (Building #10516) 706/708 Pearson Rd. (Building #10616)
Phase 1A (Phase 1A may become available anytime during Phase 1 but no later than August 2022. Contractor shall make this phase a priority once available and shall be completed in 210 calendar days from the start date.)
531 Lahm Circle (Building #10700)
Phase 2 447 Johnson Dr. (Building #10518) 427/429 Johnson Dr. (Building #10522) 428/430 Metzger Dr. (Building #10422) 438/440 Metzger Dr. (Building #10420)
NOTE NO 8
CLIN Items as noted are estimates and are subject to the requirements of FAR 51.211-18 Variation in Estimated Quantity. Variations in the actual quantities encountered will be the subject of a contract modification as provided in Clause 52.211-18 Variation in Estimated Quantities.
******************************** AMDT 0003 *******************************************
NOTE NO 9
For CLIN 0004A, 0004B, 0004C, 0006G, 0007F, 0008G, 0009H this work includes plants, shrubs and flowers (generally adjacent to homes). Grading, seeding and trees planted as part of WPAFB’s replacement program are included in CLINs 0001I, 0002G, 0003F, 0006E, 0007D, 0008E, 0009F (see Specification Section 31 11 00, paragraph 3.2.1).
******************************** AMDT 0003 *******************************************
--END OF CLIN SCHEDULE—
(End of Summary of Changes)
W912QR21R0013-0003
P2# 476088 - Improve Family Housing
Wright-Patterson AFB, OH
PROJECT TABLE OF CONTENTS Page 1
Certified Final Submission
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 00.00 06 SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 01 50 PROJECT GENERAL REQUIREMENTS (WPAFB)
01 02 20 GENERAL ENVIRONMENTAL PROTECTION REQUIREMENTS (WPAFB)
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 32 01.00 06 PROJECT SCHEDULE
01 33 00.00 06 SUBMITTAL PROCEDURES
01 33 29.00 06 SUSTAINABILITY REPORTING
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 46 00.00 06 TOTAL BUILDING COMMISSIONING
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19.00 06 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00
DEMOLITION AND DECONSTRUCTION
02 42 91 REMOVAL AND SALVAGE OF HISTORIC CONSTRUCTION MATERIALS
DIVISION 03 - CONCRETE
03 30 00
CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 03 00
CONSERVATION TREATMENT FOR PERIOD MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00
STRUCTURAL STEEL
05 40 00 COLD-FORMED METAL FRAMING
05 52 00 METAL RAILINGS AND MISCELLANEOUS METAL ASSEMBLIES
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00
ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 16 20
CEMENTITIOUS CRYSTALLINE WATERPROOFING
07 19 00 WATER REPELLENTS
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
Wright-Patterson AFB, OH
PROJECT TABLE OF CONTENTS Page 2
07 32 14 CLAY TILE ROOFING REPLACEMENT OR REPAIR
07 41 13 METAL ROOF PANELS
07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING
07 60 00 FLASHING AND SHEET METAL
07 62 13 COPPER SHEET METAL FLASHING AND TRIM
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS, PANELS AND STAIRS
08 36 13 SECTIONAL OVERHEAD DOORS
08 52 00 ALUMINUM CLAD WOOD WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL AND DOOR LOUVERS
DIVISION 09 - FINISHES
09 01 90.50 PREPARATION OF HISTORIC WOOD AND METAL SURFACES FOR
PAINTINGAND RESTORATION
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 23 00 GYPSUM PLASTERING
09 24 23 CEMENT STUCCO
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 64 29 WOOD STRIP AND PLANK FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 28 13 TOILET ACCESSORIES
10 31 00 MANUFACTURED GAS FIREPLACE INSERTS
AMDT 0002
10 56 19 METAL WIRE SHELVING
AMDT 0002
AMDT 0003
DIVISION 11 - EQUIPMENT
11 31 13 ELECTRICAL KITCHEN EQUIPMENT
AMDT 0003
DIVISION 12 - FURNISHINGS
12 35 30.23 20 BATHROOM CASEWORK
12 36 00 COUNTERTOPS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
Wright-Patterson AFB, OH
PROJECT TABLE OF CONTENTS Page 3
22 00 00 PLUMBING, GENERAL PURPOSE
22 00 01 BACKFLOW PREVENTION DEVICES (WPAFB)
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 01 30.41 HVAC SYSTEM CLEANING
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93.00 06 TESTING, ADJUSTING, AND BALANCING (TAB) OF HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 11 25 FACILITY GAS PIPING
23 23 00 REFRIGERANT PIPING
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
Wright-Patterson AFB, OH
PROJECT TABLE OF CONTENTS Page 4
DIVISION 26 - ELECTRICAL
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 51 00 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 49 SMOKE AND CARBON MONOXIDE ALARMS
DIVISION 31 - EARTHWORK
31 00 00.00 06 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 21 13 RADON MITIGATION
31 31 16.13 CHEMICAL TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23.23 BASE COURSE DRAINAGE LAYERS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 13 73.00 06 COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
32 92 23 SODDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERAGE
33 40 00 STORM DRAINAGE UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
Wright-Patterson AFB, OH
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS Page 4
SECTION 07 60 00
FLASHING AND SHEET METAL
05/17
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM A653/A653M (2018) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM B32 (2008; R 2014) Standard Specification for Solder Metal
ASTM B69 (2013) Standard Specification for Rolled Zinc
ASTM B209 (2014) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate
ASTM B221 (2014) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes
ASTM D41/D41M (2011; R 2016) Standard Specification for Asphalt Primer Used in Roofing, Dampproofing, and Waterproofing
ASTM D226/D226M (2017) Standard Specification for Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing
ASTM D4586/D4586M (2007; E 2012; R 2012) Asphalt Roof Cement, Asbestos-Free
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
SMACNA 1793 (2012) Architectural Sheet Metal Manual, 7th Edition
1.2 GENERAL REQUIREMENTS
Finished sheet metal assemblies must form a weathertight enclosure without waves, warps, buckles, fastening stresses or distortion, while allowing for expansion and contraction without damage to the system. The sheet metal installer is responsible for cutting, fitting, drilling, and other operations in connection with sheet metal modifications required to accommodate the work of other trades. Coordinate installation of sheet
SECTION 07 60 00 Page 1 metal items used in conjunction with roofing with roofing work to permit continuous, uninterrupted roofing operations.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29.00 06 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00.00 06
SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Exposed Sheet Metal Coverings
Expansion Joints
Copings
AMDT 0003
Gutters
Downspouts
AMDT
SD-04 Samples
Finish Samples ; G
SD-08 Manufacturer's Instructions
Instructions for Installation
Quality Control Plan ; G
SD-10 Operation and Maintenance Data
Cleaning and Maintenance ; G
1.4 MISCELLANEOUS REQUIREMENTS
1.4.1 Product Data
Indicate thicknesses, dimensions, fastenings, anchoring methods, expansion joints, and other provisions necessary for thermal expansion and contraction. Scaled manufacturer's catalog data may be submitted for factory fabricated items.
1.4.2 Finish Samples
Submit two color charts and two finish sample chips from manufacturer's standard color and finish options for each type of finish indicated.
SECTION 07 60 00 Page 2
1.4.3 Operation and Maintenance Data
Submit detailed instructions for installation and quality control during installation, cleaning and maintenance , for each type of assembly indicated.
1.5 DELIVERY, HANDLING, AND STORAGE
Package and protect materials during shipment. Uncrate and inspect materials for damage, dampness, and wet-storage stains upon delivery to the job site. Remove from the site and replace damaged materials that cannot be restored to like-new condition. Handle sheet metal items to avoid damage to surfaces, edges, and ends. Store materials in dry, weather-tight, ventilated areas until installation.
PART 2 PRODUCTS
2.1 MATERIALS
Do not use lead, lead-coated metal, or galvanized steel. Use any metal listed by SMACNA 1793 for a particular item, unless otherwise indicated.
Provide materials, thicknesses, and configurations in accordance with SMACNA 1793 for each material. Different items need not be of the same metal, except that if copper is selected for any exposed item, all exposed items must be copper, and that contact between dissimilar metals must be avoided.
Furnish sheet metal items in 8 to 10 foot lengths. Single pieces less than 8 feet long may be used to connect to factory-fabricated inside and outside corners, and at ends of runs. Factory fabricate corner pieces with minimum 12 inch legs. Provide accessories and other items essential to complete the sheet metal installation. Provide accessories made of the same or compatible materials as the items to which they are applied.
Fabricate sheet metal items of the materials specified below and to the gage, thickness, or weight shown in Table I at the end of this section.
Provide sheet metal items with mill finish unless specified otherwise.
Where more than one material is listed for a particular item in Table I, each is acceptable and may be used, except as follows:
AMDT 0003
2.1.1 Exposed Sheet Metal Items
Must be of the same material. Consider the following as exposed sheet metal: gutters, downspous, cap, steeped, base, and eave flashings and related accessories.
In addition to the metals listed in Table I, lead-coated copper may be used for such items.
AMDT
2.1.2 Steel Sheet, Zinc-Coated (Galvanized)
Provide in accordance with ASTM A653/A653M .
SECTION 07 60 00 Page 3
2.1.3 Zinc Sheet and Strip
Provide in accordance with ASTM B69, Type I, a minimum of 0.024 inch thick.
2.1.4 Aluminum Alloy Sheet and Plate
Provide in accordance with ASTM B209 anodized clear form alloy, and temper appropriate for use. Provide material not less than 0.032-in in thickness.
2.1.5 Finishes
Provide exposed exterior sheet metal and aluminum with a baked on, factory applied color coating of polyvinylidene fluoride (PVF2) or approved equal fluorocarbon coating. Dry film thickness of coatings must be 0.8 to 1.3 mils . Color to be selected from manufacturer's full range of "cool roof" color choices. Field applications of color coatings are prohibited and will be rejected.
2.1.6 Aluminum Alloy, Extruded Bars, Rods, Shapes, and Tubes
ASTM B221.
2.1.7 Solder
Provide in accordance with ASTM B32, 95-5 tin-antimony.
2.1.8 Copings
Unless otherwise indicated, provide copings in copper sheets, 8 or 10 feet long, joined by a 3/4 inch locked and soldered seam.
2.1.9 Bituminous Plastic Cement
Provide in accordance with ASTM D4586/D4586M , Type I.
2.1.10 Roofing Felt
Provide in accordance with ASTM D226/D226M .
2.1.11 Asphalt Primer
Provide in accordance with ASTM D41/D41M.
2.1.12 Fasteners
Use the same metal as, or a metal compatible with the item fastened. Use stainless steel fasteners to fasten. Confirm compatibility of fasteners and items to be fastened to avoid galvanic corrosion due to dissimilar materials.
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Workmanship
Make lines and angles sharp and true. Free exposed surfaces from visible wave, warp, buckle, and tool marks. Fold back exposed edges neatly to form a 1/2 inch hem on the concealed side. Make sheet metal exposed to
SECTION 07 60 00 Page 4 the weather watertight with provisions for expansion and contraction.
Make surfaces to receive sheet metal plumb and true, clean, even, smooth, dry, and free of defects and projections. For installation of items not shown in detail or not covered by specifications conform to the applicable requirements of SMACNA 1793, Architectural Sheet Metal Manual. Provide sheet metal flashing in the angles formed where roof decks abut walls, curbs, ventilators, pipes, or other vertical surfaces and wherever indicated and necessary to make the work watertight. Join sheet metal items together as shown in Table II.
3.1.2 Nailing
Confine nailing of sheet metal generally to sheet metal having a maximum width of 18 inches . Confine nailing of flashing to one edge only. Space nails evenly not over 3 inch on center and approximately 1/2 inch from edge unless otherwise specified or indicated. Face nailing will not be permitted. Where sheet metal is applied to other than wood surfaces, include in shop drawings, the locations for sleepers and nailing strips required to secure the work. Secure flashing at one-half the normal interval to ensure a wind-resistant installation.
3.1.3 Cleats
Provide cleats for sheet metal 18 inches and over in width. Space cleats evenly not over 12 inches on center unless otherwise specified or indicated. Unless otherwise specified, provide cleats of 2 inches wide by 3 inches long and of the same material and thickness as the sheet metal being installed. Secure one end of the cleat with two nails and the cleat folded back over the nailheads. Lock the other end into the seam. Where the fastening is to be made to concrete or masonry, use screws and drive in expansion shields set in concrete or masonry. Pre-tin cleats for soldered seams.
3.1.4 Bolts, Rivets, and Screws
Install bolts, rivets, and screws where indicated or required. Provide compatible washers where required to protect surface of sheet metal and to provide a watertight connection. Provide mechanically formed joints in aluminum sheets 0.040 inches or less in thickness.
3.1.5 Seams
Straight and uniform in width and height with no solder showing on the face.
3.1.5.1 Flat-lock Seams
Finish not less than 3/4 inch wide.
3.1.5.2 Lap Seams
Finish soldered seams not less than one inch wide. Overlap seams not soldered, not less than 3 inches .
3.1.5.3 Loose-Lock Expansion Seams
Not less than 3 inches wide; provide minimum one inch movement within the joint. Completely fill the joints with the specified sealant, applied at
SECTION 07 60 00 Page 5 not less than 1/8 inch thick bed.
3.1.5.4 Standing Seams
Not less than one inch high, double locked without solder.
3.1.5.5 Flat Seams
Make seams in the direction of the flow.
3.1.6 Soldering
Where soldering is specified, apply to copper, terne-coated stainless steel, zinc-coated steel, and stainless steel items. Pre-tin edges of sheet metal before soldering is begun. Seal the joints in aluminum sheets of 0.040 inch or less in thickness with specified sealants. Do not solder aluminum.
3.1.6.1 Edges
Scrape or wire-brush the edges of lead-coated material to be soldered to produce a bright surface. Flux brush the seams in before soldering.
Treat with soldering acid flux the edges of stainless steel to be pre-tinned. Seal the joints in aluminum sheets of 0.040 inch or less in thickness with specified sealants. Do not solder aluminum.
3.1.7 Welding and Mechanical Fastening
Use welding for aluminum of thickness greater than 0.040 inch . Aluminum
0.040 inch or less in thickness must be butted and the space backed with formed flashing plate; or lock joined, mechanically fastened, and filled with sealant as recommended by the aluminum manufacturer.
3.1.7.1 Mechanical Fastening of Aluminum
Use No. 12, aluminum alloy, sheet metal screws or other suitable aluminum alloy or stainless steel fasteners. Drive fasteners in holes made with a No. 26 drill in securing side laps, end laps, and flashings. Space fasteners 12 inches maximum on center. Where end lap fasteners are required to improve closure, locate the end lap fasteners not more than 2 inches from the end of the overlapping sheet.
3.1.8 Protection from Contact with Dissimilar Materials
3.1.8.1 Copper or Copper-bearing Alloys
Paint with heavy-bodied bituminous paint surfaces in contact with dissimilar metal, or separate the surfaces by means of moistureproof building felts.
3.1.8.2 Aluminum
Do not allow aluminum surfaces in direct contact with other metals except stainless steel, zinc, or zinc coating. Where aluminum contacts another metal, paint the dissimilar metal with a primer followed by two coats of aluminum paint. Where drainage from a dissimilar metal passes over aluminum, paint the dissimilar metal with a non-lead pigmented paint.
SECTION 07 60 00 Page 6
3.1.8.3 Metal Surfaces
Paint surfaces in contact with mortar, concrete, or other masonry materials with alkali-resistant coatings such as heavy-bodied bituminous paint.
3.1.8.4 Wood or Other Absorptive Materials
Paint surfaces that may become repeatedly wet and in contact with metal with two coats of aluminum paint or a coat of heavy-bodied bituminous paint.
3.1.9 Expansion and Contraction
Provide expansion and contraction joints at not more than 32 foot intervals for aluminum and at not more than 40 foot intervals for other metals. Provide an additional joint where the distance between the last expansion joint and the end of the continuous run is more than half the required interval. Space joints evenly. Join extruded aluminum gravel stops and fascia by expansion and contraction joints spaced not more than 12 feet apart.
3.1.10 Eave Flashing
One piece in width, applied in 8 to 10 foot lengths with expansion joints spaced as specified in paragraph EXPANSION AND CONTRACTION. Provide a 3/4 inch continuous fold in the upper edge of the sheet to engage cleats spaced not more than 10 inches on center. Locate the upper edge of flashing not less than 18 inches from the outside face of the building, measured along the roof slope. Fold lower edge of the flashing over and loose-lock into a continuous edge strip on the fascia. Where eave flashing intersects metal valley flashing, secure with one inch flat locked joints with cleats that are 10 inches on center.
3.1.11 Sheet Metal Covering on Flat, Sloped, or Curved Surfaces
Except as specified or indicated otherwise, cover and flash all minor flat, sloped, or curved surfaces such as crickets, bulkheads, dormers and small decks with metal sheets of the material used for flashing; maximum size of sheets, 16 by 18 inches .
This is the start of the file's text. The full file is on GovTribe.