W912QR21R0008_Specs_PhaseB_Vol4-0000.pdf
PDF 5 MB Posted
- Solicitation number
- W912QR21R0008
About this file
This notice announces an upcoming Request for Proposal for the construction of a new VA Medical Center campus in Louisville, KY. The project includes construction of a 104-bed hospital, parking structures for 2,600 cars, campus infrastructure, and site improvements across 34 acres. Optional line items include a laundry facility, parking areas, maintenance buildings, fencing and landscaping. The contract will be a firm-fixed-price for approximately $705 million, excluding the Government Field Office. The solicitation is anticipated for release on December 3, 2020 and will be available through SAM.gov. The selection process will use best value tradeoff with evaluation factors including past performance, management, key subcontractor experience, schedule, small business participation, and price. Discussions are not planned but may be held at the Government's discretion.
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Construction of the New VA Medical Center (VAMC) Project in Louisville, KY
P2: 453413
Design-Bid-Build RFP
Specifications Phase B Volume 4 Div. 22
Certified Final Design
03 December 2020
W912QR21R0008
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
W912QR21R0008_Specs_PhaseB_Vol4-0000
Replacement VA Medical Center Louisville, Kentucky
Project Managers
Cynthia K. Pozolo, FAIA URS/SmithGroup Joint Venture Project Manager SmithGroup 500 Griswold Street, Suite 1700 Detroit, Michigan 48226 t 313.983.3600
Randy L. Kirschner, AIA, NCARB URS/SmithGroup Joint Venture Project Manager
AECOM
277 Nationwide Blvd.
Columbus, Ohio 43215 t 614.464.4500
CERTIFIED FINAL
VA101CFM-P-0157/603-320
USACE P2 No. 453413
Phase B New Hospital Buildings Specifications 22-05-11 — 22-70-00 (Vol. 4)
03 December 2020
VA 603-320, P2 453413
Louisville VAMC Replacement Phase B
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
TABLE OF CONTENTS
Section 00 01 10
VOLUME 1
DIVISION 00 - SPECIAL SECTIONS
00 01 07 Seals Page 00 01 10 Table of Contents 00 31 32 Geotechnical Data 00 31 32a 9-12-14 Report of Geotechnical Exploration Rev 1
00 31 32b Supplemental Recommendations Summary Report of Geotechnical
Exploration (REV 1) 01 November 2018
00 31 32c Louisville VA Hospital Geophysical Report 2 29 16
00 80 00.00
Special Provisions
00 80 00.01
Construction Project Sign Details
00 80 00.02
Communication Systems Matrix
00 80 00.03
LOD Matrix
00 80 00.04
Initial Facility Maintenance Data (COBie) Workbooks (FMDW)
– Provided under separate cover as .XLS spreadsheets (a-e)
00 80 00.04a
Hospital Building Medical Center
– Provided under separate cover as .XLS spreadsheets (a-e)
00 80 00.04b
Central Utility Plan (CUP) – Laundry
– Provided under separate cover as .XLS spreadsheets (a-e)
00 80 00.04c
North Parking Structure (Garage)
– Provided under separate cover as .XLS spreadsheets (a-e)
00 80 00.04d
Miscellaneous
– Provided under separate cover as .XLS spreadsheets (a-e)
00 80 00.04e
South Parking Structure (Garage)
– Provided under separate cover as .XLS spreadsheets (a-e)
00 80 00.05
Project Submittal Register – Phase A
00 80 00.06
Project Submittal Register – Phase B
00 80 00.07
Delegated Design List – Phase A
00 80 00.08
Delegated Design List – Phase B
DIVISION 01 - GENERAL REQUIREMENTS
01 32 01.00
Project Schedule
01 33 00.00
Submittal Procedures
01 35 26.00
Government Safety Requirements
00 01 10-2
01 35 26.01
FORM 16-1 Certificate of Compliance for LHE and Rigging
01 35 26.02
CELRL FORM 1259 Activity Hazards Analysis
01 43 39 Exterior Wall Mockups 01 45 00.15
Resident Management System Contractor Mode (RMS CM)
01 45 04.10
Contractor Quality Control
01 45 29 Testing Laboratory Services 01 45 35 Special Inspections 01 50 00 Temporary Construction Facilities and Controls 01 50 00.01 Federal Airport Authority (FAA) and/or Kentucky Airport Zoning
Commission (KAZC) Determination and Permit – Antenna Tower and Building
01 50 00.02 Federal Airport Authority (FAA) and/or Kentucky Airport Zoning Commission (KAZC) Determination and Permit – Elevated Water Tank
01 50 00.03 Property Transfers with KYTC 01 57 19.00
Temporary Environmental Controls and Permits
01 57 19.01
Permit Matrix
01 74 19 Construction and Demolition Waste Management 01 78 23 Operations and Maintenance Manuals 01 78 24.00
Facility Maintenance (FM)Data Requirements
01 79 00 Operations and Maintenance Training 01 81 11 Exterior Shell Air-Blast Performance Requirements 01 81 13 Sustainable Construction Requirements 01 91 00 General Commissioning Requirements 01 91 00a Appendix A Commissioning Status Tracking 01 91 00b Appendix B Commissioning Schedule Activities 01 91 18 Commissioning of Building Envelope Systems
DIVISION 02 – EXISTING CONDITIONS
NOT USED
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete 03 30 01 Cast-in-Place Concrete for Garage Structures 03 30 02 Cast-in-Place Concrete for Site Structures 03 41 33 Precast Structural Pretension Concrete 03 45 00 Precast Architectural Concrete 03 45 00.02 Precast Architectural Concrete (Parking Structure)
DIVISION 04 – MASONRY
04 05 13 Masonry Mortaring 04 05 16 Masonry Grouting 04 20 00 Unit Masonry
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 05 12 13 Architecturally Exposed Structural Steel Framing 05 21 00 Steel Joist Framing
00 01 10-3
05 31 00 Steel Decking 05 36 00 Composite Metal Decking 05 40 00 Cold-Formed Metal Framing 05 43 13 Medical Equipment Support Systems 05 50 00 Metal Fabrications 05 50 00.02 Metal Fabrications (Parking Structure) 05 50 11 Metal Fabrications for Fall Protection Systems 05 51 00 Metal Stairs 05 52 20 Barrier Cable Systems 05 58 13 Column and Beam Covers 05 70 10 Decorative Metal Grilles 05 73 13 Glazed Decorative Railing Systems
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 06 16 63 Sheathing 06 20 00 Finish Carpentry 06 61 16 Solid Surface Fabrications
VOLUME 2
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 Pressure Testing an Air Barrier System for Air Tightness 07 05 23a Appendix A Air Leakage Test Form Example 07 05 23b Appendix B Air Leakage Test Results Form 07 05 23c Appendix C Test Agency Qualifications Sheet 07 11 13 Bituminous Damproofing O7 13 00 Sheet Waterproofing 07 13 26 Self-Adhering Sheet Waterproofing 07 13 54 Thermoplastic Sheet Waterproofing O7 14 13 Hot Fluid-Applied Rubberized Asphalt Waterproofing 07 16 19 Metal Oxide Waterproofing 07 18 00.02 Traffic Coatings (Parking Structure) 07 18 13 Pedestrian Traffic Coatings 07 21 13 Thermal Insulation 07 22 00 Roof and Deck Insulation 07 27 27 Fluid-Applied Membrane Air Barriers, Vapor Retarding 07 40 00.02 Roofing and Siding Panels (Parking Structure) 07 42 00 Metal Wall Panels 07 42 13 16.02
Metal Plate Wall Panels (Parking Structure)
07 42 29 Terra Cotta Panel Rain Screen Systems 07 42 53 Glass Exterior Rain and Wind Screen Systems 07 42 53.02 Glass Exterior Rain and Wind Screen Systems (Parking Structure) 07 54 19 Polyvinyl-Chloride (PVC) Roofing 07 54 19a Appendix A Example RRO Report 07 60 00 Flashing and Sheet Metal 07 72 00 Roof Accessories 07 76 16 Roof Decking Pavers 07 81 00 Applied Fireproofing 07 81 23 Intumescent Fireproofing 07 84 00 Firestopping 07 92 00 Joint Sealants 07 95 13 Expansion Joint Cover Assemblies
00 01 10-4
07 95 13 19.02
Parking Deck Expansion Joint Cover Assemblies (Parking Structure)
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 08 14 00 Interior Wood Doors 08 17 10 Integrated Door Assemblies 08 31 13 Access Doors and Frames 08 33 00 Coiling Doors and Grilles 08 33 00.02 Coiling Grilles (Parking Structure) 08 33 13 Coiling Counter Doors 08 34 53 Security Doors and Frames 08 34 59 Vault Doors and Day Gates 08 35 13.23 Accordion Folding Fire Doors 08 41 13 Aluminum-Framed Entrances and Storefronts 08 41 13.02 Aluminum-Framed Entrances and Storefronts (Parking Structure) 08 41 26.01 Custom All-Glass Wall and Door System 08 42 29.23 Sliding and Bi-Folding Automatic Entrances 08 42 33 Revolving Door Entrances 08 42 43 Intensive Care Unit (ICU) Entrances 08 44 13 Glazed Aluminum Curtain Walls 08 44 13.02 Glazed Aluminum Curtain Walls (Parking Structure) 08 51 13 Aluminum Windows 08 56 19 Pass Windows 08 56 53 Blast and Ballistic Resistant Windows 08 56 59 Service and Teller Window Units 08 56 66 Security Window Screens 08 62 00 Unit Skylights 08 63 00 Metal-Framed Skylights 08 71 00 Door Hardware 08 71 13 Automatic Door Operators 08 71 13.11 Low Energy Power Assist Door Operators 08 80 00 Glazing 08 88 16 Vision Control Glass 08 90 00 Louvers and Vents
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 09 22 16 Non-Structural Metal Framing 09 23 00 Gypsum Plastering 09 24 00 Portland Cement Plastering 09 26 00 Veneer Plastering 09 29 00 Gypsum Board 09 30 13 Ceramic / Porcelain Tiling 09 51 00 Acoustical Ceilings 09 54 26 Linear Wood Wall and Ceiling Systems 09 54 81 Custom Interior Aluminum Beams and Fins 09 65 13 Resilient Base and Accessories 09 65 16 Resilient Sheet Flooring 09 65 16.33 Rubber Sheet Flooring 09 65 19 Resilient Tile Flooring 09 65 66 Resilient Athletic Flooring 09 66 16 Terrazzo Floor Tile 09 67 23.20 Resinous (Epoxy Based) With Vinyl Chip Broadcast (RES-2)
00 01 10-5
09 67 23.30 Resinous (Epoxy Based) High Performance Mortar Flooring (RES-3) 09 67 23.40 Resinous Poured in Place Resilient Flooring (RES-4) 09 67 23.50 Resinous Terrazzo Flooring (RES-5) 09 67 23.60 Resinous Urethane and Epoxy Mortar Flooring (RES-6A and RES-6B) 09 67 23.70 Epoxy Floor Coating (EPY-01, EPY-02) 09 68 13 Tile Carpeting 09 69 00 Access Flooring 09 77 01 Interior Glass Wall Panel System 09 77 14 Wood Veneer Acoustic Wall Panels 09 84 33 Sound-Absorbing Wall Units 09 91 00 Painting 09 96 59 Resinous Specialty Glazed Coating Systems for Walls, Ceilings, Wallboard, and Block CMU (RES-W1, RES-W2) 09 96 59.10 High Build Glazed Specialty Coating (SC-01)
VOLUME 3
DIVISION 10 – SPECIALTIES
10 11 13 Chalkboards and Markerboards 10 11 23 Tackboards 10 13 00 Directories 10 14 00 Signage 10 21 13 Toilet Compartments 10 21 16 Shower and Dressing Compartments 10 21 23 Cubicle Curtain Tracks 10 22 13 Interior Wire Mesh Partitions 10 22 13.02 Exterior Wire Mesh Partitions (Parking Structure) 10 22 39 Folding Panel Partitions 10 22 39.01 Automatic Operable Vertically Retractable Acoustic Wall 10 25 13 Patient Bed Service Walls (PBSW) 10 26 00 Wall and Door Protections 10 26 41 Bullet Resistant Panels 10 28 00 Toilet Bath and Laundry Accessories 10 44 13 Fire Extinguisher Cabinets 10 44 13.02 Fire Extinguisher Cabinets (Parking Structure) 10 55 00.16 Private-Delivery Postal Specialties 10 56 26 Manual Mobile and Fixed Shelving 10 75 00 Flagpoles 10 82 19 Exterior Acoustical Barrier Screen Walls
DIVISION 11 – EQUIPMENT
11 05 12 General Motor Requirements for Equipment 11 06 00 Medical Equipment Schedule 11 06 01 Project Room Contents Report 11 08 00 Commissioning of Equipment 11 11 00 Laundry Equipment 11 12 00 Parking Control Equipment - Parking/Barrier Gate Operators 11 12 00.02 Parking Control Equipment (Parking Structure) 11 13 00 Loading Dock Equipment 11 17 36 Package Transfer Units 11 24 11 Horizontal Lifeline Fall Protection Systems 11 24 14 Suspended Façade Access Equipment 11 40 11 Custom Fabricated Foodservice Equipment 11 40 21 Foodservice Equipment - Utility Distribution System 11 41 00 Food Storage Equipment
00 01 10-6
11 41 21 Walk-In Coolers and Freezers 11 44 00 Food Cooking Equipment 11 45 00 Miscellaneous Food Service Equipment 11 48 00 Cleaning and Disposal Equipment 11 53 00 Laboratory Equipment 11 53 13 Laboratory Fume Hoods 11 53 53 Biological Safety Cabinets and Laminar Airflow Workstations 11 53 61 Custom Fabricated Laboratory Equipment 11 71 00 Healthcare Equipment 11 71 01 Medical Washing and Sterilizing Equipment 11 71 02 Laboratory Washing and Sterilizing Equipment 11 73 00 Ceiling Mounted Patient Lift System 11 73 11 Patient ICU Service Boom Systems 11 74 00 Dental Equipment 11 78 00 Mortuary Equipment 11 78 13 Mortuary Refrigerators 11 82 00 Waste Handling Equipment
DIVISION 12 – FURNISHINGS
12 24 00 Window Shades 12 24 00.01 Motorized Window Shades 12 31 00 Manufactured Metal Casework 12 32 00 Manufactured Wood Casework 12 35 53 Adaptable Laboratory Casework Systems 12 36 00 Laboratory Countertops and Accessories 12 36 61.16 Solid Surfacing Countertops 12 48 13 Entrance Floor Mats
DIVISION 13 - SPECIAL CONSTRUCTION
13 01 00 Radiofrequency (RF) MRI Shielding System 13 01 01 DC MRI Magnetic Shielding System 13 05 41 Seismic Restraint Requirements for Non-Structural Components 13 21 13.34 Automatic Clean Room Swinging Doors and Fixed Windows 13 21 13.38 Clean Room Pass-Through Chambers 13 21 29 Constant Temperature Rooms 13 49 00 Radiation Protection 13 49 00 A Radiation Shielding Plan Review Report (Level 1) 13 49 00 B Radiation Shielding Plan Review Report (Level 2) 13 49 00 C Radiation Shielding Plan Review Report (Level 3) 13 49 00 D Radiation Shielding Plan Review Report (Level 4) 13 49 23 AC ELF Magnetic Shielding Systems 13 49 25 Main Computer Room Shielding
DIVISION 14– CONVEYING EQUIPEMENT
14 08 00 Commissioning of Conveying Equipment 14 21 00 Electric Traction Elevators 14 24 00 Hydraulic Elevators 14 91 33 Laundry and Linen Chutes 14 91 82 Trash Chutes 14 92 00 Pneumatic Tube System
DIVISION 21- FIRE SUPPRESSION
21 08 00 Commissioning of Fire Suppression System
00 01 10-7
21 12 00 Manual Dry Standpipe Systems 21 13 13 Wet-Pipe Sprinkler Systems 21 13 16 Dry-Pipe Sprinkler Systems 21 22 00 Clean Agent Fire Suppression Systems 21 30 13 Electric-Driven, Fire Pumps
VOLUME 4
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 22 05 12 General Motor Requirements for Plumbing Equipment 22 05 19 Meters and Gages for Plumbing Piping 22 05 23 General-Duty Valves for Plumbing Piping 22 05 33 Heat Tracing for Plumbing Piping 22 07 11 Plumbing Insulation 22 08 00 Commissioning of Plumbing Systems 22 08 00a Division 22 Sample PFC 22 08 00b Division 22 Sample FPT 22 11 00 Facility Water Distribution 22 11 23 Domestic Water Pumps 22 13 00 Facility Sanitary and Vent Piping 22 13 23 Sanitary Waste Interceptors 22 13 29 Sanitary Sewerage Pumps 22 14 00 Facility Storm Drainage 22 14 29 Sump Pumps 22 15 00 General Service Compressed-Air Systems 22 20 00 Facility Natural-Gas Piping 22 31 11 Water Softeners 22 33 00 Electric Domestic Water Heaters 22 35 00 Domestic Water Heat Exchangers 22 40 00 Plumbing Fixtures 22 61 13.74 Dental Compressed-Air Piping 22 61 19.74 Dental Compressed-Air Equipment 22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 22 62 19.74 Dental Vacuum and Evacuation Equipment 22 63 00 Gas Systems for Laboratory and Healthcare Facilities 22 66 00 Chemical-Waste Systems for Laboratory and Healthcare Facilities 22 67 19.16 Reverse-Osmosis Water Equipment 22 70 00 Facility Fuel Oil Systems
VOLUME 5
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 10 Common Work Results for Boiler Plant and Steam Generation 23 05 11 Common Work Results for HVAC 23 05 12 General Motor Requirements for HVAC and Steam Generation
Equipment 23 05 14 Variable Frequency Drives 23 05 41 Noise and Vibration Control for HVAC Piping and Equipment 23 05 51 Noise and Vibration Control for Boiler Plant 23 05 93 Testing, Adjusting, and Balancing for HVAC 23 07 11 HVAC and Boiler Plant Insulation 23 08 00 Commissioning of HVAC Systems 23 08 00a Division 23 Sample PFC 23 08 00b Division 23 Sample FPT 23 08 11 Demonstrations and Tests for Boiler Plant
00 01 10-8
23 08 11a Attachment A VHA Boiler and Associated Plant Safety Device Testing Manual Fifth Edition
23 08 11b Attachment B Appendix B of VHA Directive 1810 23 09 11 Instrumentation and Control for Boiler Plant 23 09 23 Direct-Digital Control System for HVAC 23 21 11 Boiler Plant Piping Systems 23 21 13 Hydronic Piping 23 21 23 Hydronic Pumps 23 22 13 Steam and Condensate Heating Piping 23 22 23 Steam Condensate Pumps 23 23 00 Refrigerant Piping 23 25 00 HVAC Water Treatment 23 31 00 HVAC Ducts and Casings 23 34 00 HVAC Fans 23 35 03 Dryer Vent Exhaust System 23 36 00 Air Terminal Units 23 37 00 Air Outlets and Inlets 23 40 00 HVAC Air Cleaning Devices 23 50 11 Boiler Plant Mechanical Equipment 23 51 00 Breechings, Chimneys, and Stacks 23 52 39 Fire-Tube Boilers 23 64 00 Packaged Water Chillers 23 64 20 Heat Recovery Chillers 23 65 00 Cooling Towers 23 73 00 Indoor Central-Station Air-Handling Units 23 81 00 Decentralized Unitary HVAC Equipment 23 81 23 Computer-Room Air-Conditioners 23 81 43 Air-Source Unitary Heat Pumps 23 82 00 Convection Heating and Cooling Units 23 82 16 Air Coils
DIVISION 25 – INTEGRATED AUTOMATION
25 10 10 Advanced Utility Metering System 25 08 00 Commissioning of Advanced Utility Metering Systems
VOLUME 6
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 26 05 13 Medium-Voltage Cables 26 05 19 Low-Voltage Electrical Power Conductors and Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 33 Raceway and Boxes for Electrical Systems 26 05 36.26 Wireways for Radiology Equipment 26 05 41 Underground Electrical Construction 26 05 73 Overcurrent Protective Device Study 26 08 00 Commissioning of Electrical Systems 26 08 00a Division 26 Sample PFC 26 08 00b Division 26 FPT 26 09 23 Lighting Controls 26 11 16 Secondary Unit Substations 26 13 13 Medium-Voltage Circuit Breaker Switchgear 26 13 16 Medium-Voltage Fusible Interrupter Switches 26 20 11 Isolated Power Systems 26 22 00 Low-Voltage Transformers
00 01 10-9
26 23 00 Low-Voltage Switchgear 26 23 13 Generator Paralleling Controls 26 24 13 Distribution Switchboards 26 24 16 Panelboards 26 24 19 Motor Control Centers 26 25 11 Busways 26 26 10 Emergency Power Off System 26 27 26 Wiring Devices 26 29 11 Motor Controllers 26 29 21 Enclosed Switches and Circuit Breakers 26 32 13 Engine Generators 26 33 53 Static Uninterruptible Power Supply 26 36 23 Automatic Transfer Switches 26 41 00 Facility Lightning Protection 26 43 13 Surge Protective Devices 26 51 00 Interior Lighting 26 56 00 Exterior Lighting
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 27 05 26 Grounding and Bonding for Communications Systems 27 05 33 Raceways and Boxes for Communications Systems 27 08 00 Commissioning of Communications Systems 27 10 00 Control, Communication and Signal Wiring 27 11 00 Telecommunications Room Fittings 27 15 00 Communications Structured Cabling 27 41 31 Cable Television Distribution System 27 51 16 Public Address (Overhead Paging) System 27 51 23 Clinical Intercom 27 51 25 Limited Area Networked Sound Masking System 27 52 23 Nurse Call and Code Blue System 27 53 13 Clock Systems 27 53 19 Distributed Antenna System
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 28 05 13 Conductors and Cables for Electronic Safety and Security 28 05 26 Grounding and Bonding for Electronic Safety and Security 28 05 28.33 Conduits and Backboxes for Electronic Safety and Security 28 08 00 Commissioning of Electronic Safety and Security Systems 28 13 00 Physical Access Control and Security Management System 28 13 53 Security Access Detection 28 16 00 Intrusion Detection System 28 23 00 Video Surveillance 28 26 00 Electronic Personal Protection System 28 31 00 Fire Detection and Alarm 28 52 31 Emergency Communications Systems
VOLUME 7
DIVISION 31 – EARTHWORK
31 20 00 Earthwork 31 23 19 Dewatering 31 23 23.33 Flowable Fill
00 01 10-10
31 31 16 Termite Control 31 63 26 Drilled Pier 31 68 14 Soil and Rock Anchors for VA Medical Center (Building B)
Structure
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 32 12 16 Asphalt Paving 32 14 13 Precast Concrete Unit Paving 32 17 13 Parking Bumpers 32 17 23 Pavement Markings 32 17 26 Tactile Warning Surfacing 32 31 13.02 Chain Link Fences and Gates (Parking Structure) 32 31 53 Perimeter Security Fences and Gates 32 33 13 Exterior Site Furnishings 32 84 00 Planting Irrigation 32 90 00 Planting 32 97 00 Vegetated Roof Assemblies
DIVISION 33 – UTILITIES
33 08 00 Commissioning of Site Utility Systems 33 10 00 Water Utilities 33 16 19 Elevated Water Storage Tank Structure 33 16 23 Ground Water Storage Tank Structure 33 30 00 Sanitary Sewer Utilities 33 40 00 Storm Sewer Utilities 33 40 13 Stormwater Pump Station 33 46 13 Foundation Drainage 33 51 00 Natural-Gas Distribution
DIVISION 34 – TRANSPORTATION
34 08 00 Commissioning of Active Vehicle Barriers 34 71 13 Vehicle Barriers 34 75 13.13 Active Vehicle Barriers
DIVISION 48 – ELECTRICAL POWER GENERATION
48 08 00 Commissioning of Solar Energy Electrical Power Generation Systems 48 14 00 Solar Energy Electrical Power Generation Systems
22 05 11 - 1
SECTION 22 05 11
COMMON WORK RESULTS FOR PLUMBING
PART 1 - GENERAL
1.1 DESCRIPTION
A. The requirements of this Section shall apply to all sections of
Division 22.
B. Definitions:
1. Exposed: Piping and equipment exposed to view in finished rooms.
C. Abbreviations/Acronyms:
1. ABS: Acrylonitrile Butadiene Styrene
2. AC: Alternating Current
3. ACR: Air Conditioning and Refrigeration
4. AI: Analog Input
5. AISI: American Iron and Steel Institute
6. AO: Analog Output
7. AWG: American Wire Gauge
8. BACnet: Building Automation and Control Network
9. BAg: Silver-Copper-Zinc Brazing Alloy
10. BAS: Building Automation System
11. BCuP: Silver-Copper-Phosphorus Brazing Alloy
12. BSG: Borosilicate Glass Pipe
13. CDA: Copper Development Association
14. C: Celsius
15. CLR: Color
16. CO: Carbon Monoxide
17. COR: Contracting Officer’s Representative
18. CPVC: Chlorinated Polyvinyl Chloride
19. CR: Chloroprene
20. CRS: Corrosion Resistant Steel
21. CWP: Cold Working Pressure
22. CxA: Commissioning Agent
23. db(A): Decibels (A weighted)
24. DDC: Direct Digital Control
25. DI: Digital Input
26. DISS: Diameter Index Safety System
27. DO: Digital Output
28. DVD: Digital Video Disc
29. DN: Diameter Nominal
22 05 11 - 2
30. DWV: Drainage, Waste and Vent
31. ECC: Engineering Control Center
32. EPDM: Ethylene Propylene Diene Monomer
33. EPT: Ethylene Propylene Terpolymer
34. ETO: Ethylene Oxide
35. F: Fahrenheit
36. FAR: Federal Acquisition Regulations
37. FD: Floor Drain
38. FED: Federal
39. FG: Fiberglass
40. FNPT: Female National Pipe Thread
41. FPM: Fluoroelastomer Polymer
42. GPM: Gallons Per Minute
43. HDPE: High Density Polyethylene
44. Hg: Mercury
45. HOA: Hands-Off-Automatic
46. HP: Horsepower
47. HVE: High Volume Evacuation
48. ID: Inside Diameter
49. IPS: Iron Pipe Size
50. Kg: Kilogram
51. kPa: Kilopascal
52. lb: Pound
53. L/s: Liters Per Second
54. L/min: Liters Per Minute
55. MAWP: Maximum Allowable Working Pressure
56. MAX: Maximum
57. MED: Medical
58. m: Meter
59. MFG: Manufacturer
60. mg: Milligram
61. mg/L: Milligrams per Liter
62. ml: Milliliter
63. mm: Millimeter
64. MIN: Minimum
65. NF: Oil Free Dry (Nitrogen)
66. NPTF: National Pipe Thread Female
67. NPS: Nominal Pipe Size
22 05 11 - 3
68. NPT: Nominal Pipe Thread
69. OD: Outside Diameter
70. OSD: Open Sight Drain
71. OS&Y: Outside Stem and Yoke
72. OXY: Oxygen
73. PBPU: Prefabricated Bedside Patient Units
74. PH: Power of Hydrogen
75. PLC: Programmable Logic Controllers
76. PP: Polypropylene
77. PPM: Parts per Million
78. PSIG: Pounds per Square Inch
79. PTFE: Polytetrafluoroethylene
80. PVC: Polyvinyl Chloride
81. PVDF: Polyvinylidene Fluoride
82. RAD: Radians
83. RO: Reverse Osmosis
84. RPM: Revolutions Per Minute
85. RTRP: Reinforced Thermosetting Resin Pipe
86. SCFM: Standard Cubic Feet Per Minute
87. SDI: Silt Density Index
88. SPEC: Specification
89. SPS: Sterile Processing Services
90. STD: Standard
91. SUS: Saybolt Universal Second
92. SWP: Steam Working Pressure
93. TEFC: Totally Enclosed Fan-Cooled
94. TFE: Tetrafluoroethylene
95. THHN: Thermoplastic High-Heat Resistant Nylon Coated Wire
96. THWN: Thermoplastic Heat & Water Resistant Nylon Coated Wire
97. T/P: Temperature and Pressure
98. USDA: U.S. Department of Agriculture
99. V: Volt
100. VAC: Vacuum
101. VA: Veterans Administration
102. VAMC: Veterans Administration Medical Center
103. VAC: Voltage in Alternating Current
104. WAGD: Waste Anesthesia Gas Disposal
105. WOG: Water, Oil, Gas
22 05 11 - 4
1.2 RELATED WORK
A. Section 01 3300, SUBMITTAL PROCEDURES..
B. Section 01 74 19, CONSTRUCTION WASTE MANAGEMENT.
C. Section 01 79 00, OPERATIONS AND MAINTENANCE TRAINING.
D. Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS.
E. Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS.
F. Section 03 30 00, CAST-IN-PLACE CONCRETE: Concrete and Grout.
G. Section 05 31 00, STEEL DECKING: Building Components for Attachment of
Hangers.
H. Section 05 36 00, COMPOSITE METAL DECKING: Building Components for
Attachment of Hangers.
I. Section 05 50 00, METAL FABRICATIONS.
J. Section 07 60 00, FLASHING AND SHEET METAL: Flashing for Wall and Roof
Penetrations.
K. Section 07 84 00, FIRESTOPPING.
L. Section 07 92 00, JOINT SEALANTS.
M. Section 09 91 00, PAINTING.
N. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL
COMPONENTS.//
O. Section 22 05 12, GENERAL MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT.
P. Section 22 07 11, PLUMBING INSULATION.
Q. Section 22 08 00, COMMISSIONING OF PLUMBING SYSTEMS.
R. Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC.
S. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.
T. Section 26 05 19, LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES.
U. Section 26 29 11, MOTOR CONTROLLERS.
V. Section 31 20 00, EARTH MOVING: Excavation and Backfill.
1.3 APPLICABLE PUBLICATIONS
A. The publications listed below shall form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. American Society of Mechanical Engineers (ASME):
ASME Boiler and Pressure Vessel Code -
BPVC Section IX-2013....Welding, Brazing, and Fusing Qualifications
B31.1-2012..............Power Piping
C. American Society for Testing and Materials (ASTM):
A36/A36M-2012...........Standard Specification for Carbon Structural
Steel
22 05 11 - 5
A575-96(R2013)e1........Standard Specification for Steel Bars, Carbon, Merchant Quality, M-Grades
E84-2013a...............Standard Test Method for Surface Burning
Characteristics of Building Materials
E119-2012a..............Standard Test Methods for Fire Tests of
Building Construction and Materials
F1760-01(R2011).........Standard Specification for Coextruded
Poly(Vinyl Chloride) (PVC) Non-Pressure Plastic
Pipe Having Reprocessed-Recycled Content
D. International Code Council, (ICC):
IBC-2015................International Building Code
IPC-2015................International Plumbing Code
E. Manufacturers Standardization Society (MSS) of the Valve and Fittings
Industry, Inc:
SP-58-2009..............Pipe Hangers and Supports - Materials, Design, Manufacture, Selection, Application and
Installation
SP-69-2003..............Pipe Hangers and Supports - Selection and
Application
F. Military Specifications (MIL):
P-21035B................Paint High Zinc Dust Content, Galvanizing
Repair (Metric)
G. National Electrical Manufacturers Association (NEMA):
MG 1-2011...............Motors and Generators
H. National Fire Protection Association (NFPA):
51B-2014................Standard for Fire Prevention During Welding, Cutting and Other Hot Work
54-2012.................National Fuel Gas Code
70-2014.................National Electrical Code (NEC)
I. NSF International (NSF):
5-2012..................Water Heaters, Hot Water Supply Boilers, and
Heat Recovery Equipment
14-2012.................Plastic Piping System Components and Related
Materials
61-2012.................Drinking Water System Components – Health
Effects
372-2011................Drinking Water System Components – Lead Content
22 05 11 - 6
J. Department of Veterans Affairs (VA):
PG-18-10................Plumbing Design Manual
PG-18-13-2011...........Barrier Free Design Guide
1.4 SUBMITTALS
A. Submittals, including number of required copies, shall be submitted in accordance with Section 01 33 00, SUBMITTAL PROCEDURES.
B. Information and material submitted under this section shall be marked
"SUBMITTED UNDER SECTION 22 05 11, COMMON WORK RESULTS FOR PLUMBING",
with applicable paragraph identification.
C. Contractor shall make all necessary field measurements and investigations to assure that the equipment and assemblies will meet contract requirements and will fit the space available.
D. If equipment is submitted which differs in arrangement from that shown, provide drawings that show the rearrangement of all associated systems.
Approval will be given only if all features of the equipment and associated systems, including accessibility, are equivalent to that required by the contract.
E. Prior to submitting shop drawings for approval, contractor shall certify in writing that manufacturers of all major items of equipment have each reviewed drawings and specifications, and have jointly coordinated and properly integrated their equipment and controls to provide a complete and efficient installation.
F. Installing Contractor shall provide lists of previous installations for selected items of equipment. Contact persons who will serve as references, with telephone numbers and e-mail addresses shall be submitted with the references.
G. Manufacturer's Literature and Data: Manufacturer’s literature shall be submitted under the pertinent section rather than under this section.
1. Electric motor data and variable speed drive data shall be submitted with the driven equipment.
2. Equipment and materials identification.
3. Firestopping materials.
4. Hangers, inserts, supports and bracing. Provide load calculations for variable spring and constant support hangers.
5. Wall, floor, and ceiling plates.
H. Submittals and shop drawings for interdependent items, containing applicable descriptive information, shall be furnished together and complete in a group. Coordinate and properly integrate materials and
22 05 11 - 7 equipment in each group to provide a completely compatible and efficient installation. Final review and approvals will be made only by groups.
I. Coordination Drawings: Complete consolidated and coordinated layout drawings shall be submitted for all new systems, and for existing systems that are in the same areas. The drawings shall include plan views, elevations and sections of all systems and shall be on a scale of not less than 1:32 (3/8 inch equal to one foot). Clearly identify and dimension the proposed locations of the principal items of equipment. The drawings shall clearly show the proposed location and adequate clearance for all equipment, controls, piping, pumps, valves and other items. All valves, trap primer valves, water hammer arrestors, strainers, and equipment requiring service shall be provided with an access door sized for the complete removal of plumbing device, component, or equipment. Equipment foundations shall not be installed until equipment or piping layout drawings have been approved. Detailed layout drawings shall be provided for all piping systems. In addition, details of the following shall be provided.
1. Mechanical equipment rooms.
2. Interstitial space.
3. Hangers, inserts, supports, and bracing.
4. Pipe sleeves.
5. Equipment penetrations of floors, walls, ceilings, or roofs.
J. Maintenance Data and Operating Instructions:
1. Maintenance and operating manuals in accordance with Division 1, Article, INSTRUCTIONS, for systems and equipment. Include complete list indicating all components of the systems with diagrams of the internal wiring for each item of equipment.
2. Include listing of recommended replacement parts for keeping in stock supply, including sources of supply, for equipment shall be provided. The listing shall include belts for equipment: Belt manufacturer, model number, size and style, and distinguished whether of multiple belt sets.
K. Completed System Readiness Checklist provided by the Commissioning
Agent and completed by the contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 22 08 00 COMMISSIONING OF PLUMBING SYSTEMS.
22 05 11 - 8
L. Submit training plans, trainer qualifications and instructor qualifications in accordance with the requirements of Section 22 08 00
COMMISSIONING OF PLUMBING SYSTEMS.
1.5 QUALITY ASSURANCE
A. Products Criteria:
1. Standard Products: Material and equipment shall be the standard products of a manufacturer regularly engaged in the manufacture, supply and servicing of the specified products for at least 5 years.
However, digital electronics devices, software and systems such as controls, instruments, computer work station, shall be the current generation of technology and basic design that has a proven satisfactory service record of at least 5 years.
2. Equipment Service: There shall be permanent service organizations, authorized and trained by manufacturers of the equipment supplied, located within 100 miles of the project. These organizations shall come to the site and provide acceptable service to restore operations within four hours of receipt of notification by phone, e-mail or fax in event of an emergency, such as the shut-down of equipment; or within 24 hours in a non-emergency. Names, mail and e-mail addresses and phone numbers of service organizations providing service under these conditions for (as applicable to the project):
pumps, compressors, water heaters, critical instrumentation, computer workstation and programming shall be submitted for project record and inserted into the operations and maintenance manual.
3. All items furnished shall be free from defects that would adversely affect the performance, maintainability and appearance of individual components and overall assembly.
4. The products and execution of work specified in Division 22 shall conform to the referenced codes and standards as required by the specifications. Local codes and amendments enforced by the local code official shall be enforced, if required by local authorities such as the natural gas supplier. If the local codes are more stringent, then the local code shall apply. Any conflicts shall be brought to the attention of the Contracting Officer.
5. Multiple Units: When two or more units of materials or equipment of the same type or class are required, these units shall be products of one manufacturer.
22 05 11 - 9
6. Assembled Units: Manufacturers of equipment assemblies, which use components made by others, assume complete responsibility for the final assembled product.
7. Nameplates: Nameplate bearing manufacturer's name or identifiable trademark shall be securely affixed in a conspicuous place on equipment, or name or trademark cast integrally with equipment, stamped or otherwise permanently marked on each item of equipment.
8. Asbestos products or equipment or materials containing asbestos shall not be used.
9. Bio-Based Materials: For products designated by the USDA’s Bio-
Preferred Program, provide products that meet or exceed USDA recommendations for bio-based content, so long as products meet all performance requirements in this specifications section. For more information regarding the product categories covered by the Bio-
Preferred Program, visit http://www.biopreferred.gov .
B. Welding: Before any welding is performed, contractor shall submit a certificate certifying that welders comply with the following requirements:
1. Qualify welding processes and operators for piping according to ASME
"Boiler and Pressure Vessel Code", Section IX, "Welding and Brazing
Qualifications".
2. Comply with provisions of ASME B31 series "Code for Pressure
Piping".
3. Certify that each welder and welding operator has passed American
Welding Society (AWS) qualification tests for the welding processes involved, and that certification is current.
4. All welds shall be stamped according to the provisions of the
American Welding Society.
C. Manufacturer's Recommendations: Where installation procedures or any part thereof are required to be in accordance with the recommendations of the manufacturer of the material being installed, printed copies of these recommendations shall be furnished to the Contracting Officer prior to installation. Installation of the item will not be allowed to proceed until the recommendations are received. Failure to furnish these recommendations can be cause for rejection of the material.
D. Execution (Installation, Construction) Quality:
1. All items shall be applied and installed in accordance with manufacturer's written instructions. Conflicts between the
22 05 11 - 10 manufacturer's instructions and the contract documents shall be referred to the Contracting Officer for resolution. Printed copies or electronic files of manufacturer’s installation instructions shall be provided to the Contracting Officer at least 10 working days prior to commencing installation of any item.
2. All items that require access, such as for operating, cleaning, servicing, maintenance, and calibration, shall be easily and safely accessible by persons standing at floor level, or standing on permanent platforms, without the use of portable ladders. Examples of these items include, but are not limited to: all types of valves, filters and strainers, transmitters, and control devices. Prior to commencing installation work, refer conflicts between this requirement and contract documents to Contracting Officer for resolution.
3. Complete layout drawings shall be required by Paragraph, SUBMITTALS.
Construction work shall not start on any system until the layout drawings have been approved by VA.
4. Installer Qualifications: Installer shall be licensed and shall provide evidence of the successful completion of at least five projects of equal or greater size and complexity. Provide tradesmen skilled in the appropriate trade.
5. If an installation is unsatisfactory to the Contracting Officer, the
Contractor shall correct the installation at no additional cost or additional time to the Government.
E. Guaranty: Warranty of Construction, FAR clause 52.246-21.
F. Plumbing Systems: IPC, International Plumbing Code. Unless otherwise required herein, perform plumbing work in accordance with the latest version of the IPC. For IPC codes referenced in the contract documents, advisory provisions shall be considered mandatory, the word “should” shall be interpreted as “shall”. Reference to the “code official” or
“owner” shall be interpreted to mean the Contracting Officer.
G. Cleanliness of Piping and Equipment Systems:
1. Care shall be exercised in the storage and handling of equipment and piping material to be incorporated in the work. Debris arising from cutting, threading and welding of piping shall be removed.
2. Piping systems shall be flushed, blown or pigged as necessary to deliver clean systems.
22 05 11 - 11
3. The interior of all tanks shall be cleaned prior to delivery and beneficial use by the Government. All piping shall be tested in accordance with the specifications and the International Plumbing
Code (IPC). All filters, strainers, fixture faucets shall be flushed of debris prior to final acceptance.
4. Contractor shall be fully responsible for all costs, damage, and delay arising from failure to provide clean systems.
1.6 DELIVERY, STORAGE AND HANDLING
A. Protection of Equipment:
1. Equipment and material placed on the job site shall remain in the custody of the Contractor until phased acceptance, whether or not the Government has reimbursed the Contractor for the equipment and material. The Contractor is solely responsible for the protection of such equipment and material against any damage.
2. Damaged equipment shall be replaced with an identical unit as determined and directed by the Contracting Officer. Such replacement shall be at no additional cost or additional time to the Government.
3. Interiors of new equipment and piping systems shall be protected against entry of foreign matter. Both inside and outside shall be cleaned before painting or placing equipment in operation.
4. Existing equipment and piping being worked on by the Contractor shall be under the custody and responsibility of the Contractor and shall be protected as required for new work.
1.7 AS-BUILT DOCUMENTATION
A. Submit manufacturer’s literature and data updated to include submittal review comments and any equipment substitutions.
B. Submit operation and maintenance data updated to include submittal review comments, substitutions and construction revisions shall be inserted into a three ring binder. All aspects of system operation and maintenance procedures, including piping isometrics, wiring diagrams of all circuits, a written description of system design, control logic, and sequence of operation shall be included in the operation and maintenance manual. The operations and maintenance manual shall include troubleshooting techniques and procedures for emergency situations.
Notes on all special systems or devices such as damper and door closure interlocks shall be included. A List of recommended spare parts
(manufacturer, model number, and quantity) shall be furnished.
22 05 11 - 12
Information explaining any special knowledge or tools the owner will be required to employ shall be inserted into the As-Built documentation.
C. The installing contractor shall maintain as-built drawings of each completed phase for verification; and, shall provide the complete set at the time of final systems certification testing. As-built drawings are to be provided, and a copy of them on Auto-Cad version 2014 provided on compact disk or DVD. Should the installing contractor engage the testing company to provide as-built or any portion thereof, it shall not be deemed a conflict of interest or breach of the ‘third party testing company’ requirement.
D. Certification documentation shall be provided prior to submitting the request for final inspection. The documentation shall include all test results, the names of individuals performing work for the testing agency on this project, detailed procedures followed for all tests, and a certification that all results of tests were within limits specified.
PART 2 - PRODUCTS
2.1 MATERIALS FOR VARIOUS SERVICES
A. Steel pipe shall contain a minimum of 25 percent recycled content.
B. Plastic pipe, fittings and solvent cement shall meet NSF 14 and shall bear the NSF seal “NSF-PW”. Polypropylene pipe and fittings shall comply with NSF 14 and NSF 61. Solder or flux containing lead shall not be used with copper pipe.
C. Material or equipment containing a weighted average of greater than
0.25 percent lead shall not be used in any potable water system intended for human consumption, and shall be certified in accordance with NSF 61 or NSF 372.
D. In-line devices such as water meters, building valves, check valves, stops, valves, fittings, tanks and backflow preventers shall comply with NSF 61 and NSF 372.
E. End point devices such as drinking fountains, lavatory faucets, kitchen and bar faucets, ice makers supply stops, and end-point control valves used to dispense drinking water must meet requirements of NSF 61 and
NSF 372.
2.2 FACTORY-ASSEMBLED PRODUCTS
A. Standardization of components shall be maximized to reduce spare part requirements.
B. Manufacturers of equipment assemblies that include components made by others shall assume complete responsibility for final assembled unit.
22 05 11 - 13
1. All components of an assembled unit need not be products of same manufacturer.
2. Constituent parts that are alike shall be products of a single manufacturer.
3. Components shall be compatible with each other and with the total assembly for intended service.
4. Contractor shall guarantee performance of assemblies of components, and shall repair or replace elements of the assemblies as required to deliver specified performance of the complete assembly at no additional cost or time to the Government.
C. Components of equipment shall bear manufacturer's name and trademark, model number, serial number and performance data on a name plate securely affixed in a conspicuous place, or cast integral with, stamped or otherwise permanently marked upon the components of the equipment.
D. Major items of equipment, which serve the same function, shall be the same make and model.
2.3 COMPATIBILITY OF RELATED EQUIPMENT
A. Equipment and materials installed shall be compatible in all respects with other items being furnished and with existing items so that the result will be a complete and fully operational system that conforms to contract requirements.
2.4 SAFETY GUARDS
A. Pump shafts and couplings shall be fully guarded by a sheet steel guard, covering coupling and shaft but not bearings. Material shall be minimum 16-gage sheet steel; ends shall be braked and drilled and attached to pump base with minimum of four 1/4 inch bolts. Reinforce guard as necessary to prevent side play forcing guard onto couplings.
B. All Equipment shall have moving parts protected from personal injury.
2.5 LIFTING ATTACHMENTS
A. Equipment shall be provided with suitable lifting attachments to enable equipment to be lifted in its normal position. Lifting attachments shall withstand any handling conditions that might be encountered, without bending or distortion of shape, such as rapid lowering and braking of load.
2.6 ELECTRIC MOTORS, MOTOR CONTROL, CONTROL WIRING
A. All material and equipment furnished and installation methods used shall conform to the requirements of Section 22 05 12, GENERAL MOTOR
REQUIREMENTS FOR PLUMBING EQUIPMENT; Section 26 29 11, MOTOR
22 05 11 - 14
CONTROLLERS; and, Section 26 05 19, LOW-VOLTAGE ELECTRICAL POWER
CONDUCTORS AND CABLES. All electrical wiring, conduit, and devices necessary for the proper connection, protection and operation of the systems shall be provided. Premium efficient motors shall be provided.
Unless otherwise specified for a particular application, electric motors shall have the following requirements.
B. Special Requirements:
1. Where motor power requirements of equipment furnished deviate from power shown on plans, provide electrical service designed under the requirements of NFPA 70 without additional cost or time to the
Government.
2. Assemblies of motors, starters, and controls and interlocks on factory assembled and wired devices shall be in accordance with the requirements of this specification.
3. Wire and cable materials specified in the electrical division of the specifications shall be modified as follows:
a. Wiring material located where temperatures can exceed 160° F shall be stranded copper with Teflon FEP insulation with jacket.
This includes wiring on the boilers and water heaters.
b. Other wiring at boilers and water heaters, and to control panels, shall be NFPA 70 designation THWN.
c. Shielded conductors or wiring in separate conduits for all instrumentation and control systems shall be provided where recommended by manufacturer of equipment.
4. Motor sizes shall be selected so that the motors do not operate into the service factor at maximum required loads on the driven equipment. Motors on pumps shall be sized for non-overloading at all points on the pump performance curves.
5. Motors utilized with variable frequency drives shall be rated
“inverter-ready” per NEMA Standard, MG1.
C. Motor Efficiency and Power Factor: All motors, when specified as “high efficiency or Premium Efficiency” by the project specifications on driven equipment, shall conform to efficiency and power factor requirements in Section 22 05 12, GENERAL MOTOR REQUIREMENTS FOR
PLUMBING EQUIPMENT, with no consideration of annual service hours.
Motor manufacturers generally define these efficiency requirements as
“NEMA premium efficient” and the requirements generally exceed those of
22 05 11 - 15 the Energy Policy Act (EPACT), revised 2005. Motors not specified as
“high efficiency or premium efficient” shall comply with EPACT.
D. Single-phase Motors: Capacitor-start type for hard starting applications. Motors for centrifugal pumps may be split phase or permanent split capacitor (PSC).
E. Poly-phase Motors: NEMA Design B, Squirrel cage, induction type. Each two-speed motor shall have two separate windings. A time delay (20 seconds minimum) relay shall be provided for switching from high to low speed.
F. Rating: Rating shall be continuous duty at 100 percent capacity in an ambient temperature of 104° F; minimum horsepower as shown on drawings;
maximum horsepower in normal operation shall not exceed nameplate rating without service factor.
G. Insulation Resistance: Not less than one-half meg-ohm between stator conductors and frame shall be measured at the time of final inspection.
2.7 VARIABLE SPEED MOTOR CONTROLLERS
A. Refer to Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS and Section 26 29 11, MOTOR CONTROLLERS for specifications.
B. The combination of controller and motor shall be provided by the respective pump manufacturer, and shall be rated for 100 percent output performance. Multiple units of the same class of equipment, i.e. pumps, shall be product of a single manufacturer.
C. Motors shall be premium efficient type, “invertor duty”, and be approved by the motor controller manufacturer. The controller-motor combination shall be guaranteed to provide full motor nameplate horsepower in variable frequency operation. Both driving and driven motor sheaves shall be fixed pitch.
D. Controller shall not add any current or voltage transients to the input
AC power distribution system, DDC controls, sensitive medical equipment, etc., nor shall be affected from other devices on the AC power system.
2.8 EQUIPMENT AND MATERIALS IDENTIFICATION
A. Use symbols, nomenclature and equipment numbers specified, shown on the drawings, or shown in the maintenance manuals. Coordinate equipment and valve identification with local VAMC shops. In addition, provide bar code identification nameplate for all equipment which will allow the equipment identification code to be scanned into the system for
22 05 11 - 16 maintenance and inventory tracking. Identification for piping is specified in Section 09 91 00, PAINTING.
B. Interior (Indoor) Equipment: Engraved nameplates, with letters not less than 3/16 inch high of brass with black-filled letters, or rigid black plastic with white letters specified in Section 09 91 00, PAINTING shall be permanently fastened to the equipment. Unit components such as water heaters, tanks, coils, filters, etc. shall be identified.
C. Exterior (Outdoor) Equipment: Brass nameplates, with engraved black filled letters, not less than 3/16 inch high riveted or bolted to the equipment.
D. Control Items: All temperature, pressure, and controllers shall be labeled and the component’s function identified. Identify and label each item as they appear on the control diagrams.
E. Valve Tags and Lists:
1. Plumbing: All valves shall be provided with valve tags and listed on a valve list (Fixture stops not included).
2. Valve tags: Engraved black filled numbers and letters not less than
1/2 inch high for number designation, and not less than 1/4 inch for service designation on 19 gage, 1-1/2 inches round brass disc, attached with brass "S" hook or brass chain.
3. Valve lists: Valve lists shall be created using a word processing program and printed on plastic coated cards. The plastic coated valve list card(s), sized 8-1/2 inches by 11 inches shall show valve tag number, valve…
This is the start of the file's text. The full file is on GovTribe.