W912QR21R0008_Specs_CT-0007.pdf

PDF 1 MB Posted

Attached to
Construction of the VA Medical Center (VAMC) Project in Louisville, KY
Solicitation number
W912QR21R0008
Issued by

About this file

This document provides details for an upcoming federal construction contract opportunity with the U.S. Army Corps of Engineers Louisville District. The contract is for the design and construction of a new VA Medical Center campus in Louisville, KY to replace aging facilities at a cost of approximately $705 million. Key aspects of the procurement include a December 2020 solicitation release date seeking a single firm-fixed-price proposal for a 1,554 calendar day period of performance. The project scope encompasses a new 104 bed hospital, 2,600 space parking structure, utilities, central plant, laundry, roadways and site improvements. Evaluation factors for best value proposals include past performance, management, subcontractor experience, schedule and small business participation. The document outlines eight optional line items that may be exercised including a laundry, parking structures, landscaping and renewable energy. It specifies System for Award Management registration is required to be eligible for award. The point of contact is provided for any questions.

View the file

Other files

File Type Posted
W912QR21R0008_Plans_PhaseA-0008.pdf PDF
W912QR21R0008_Specs_PhaseB_Vol3_110601-0008.xlsx XLSX spreadsheet
W912QR21R0008_Plans_PhaseB-0008.pdf PDF
W912QR21R0008_Specs_PhaseA-0008.pdf PDF
W912QR21R0008_CT-0008.pdf PDF
W912QR21R0008_Specs_PhaseB_Vol3_110601-0008.pdf PDF
W912QR21R0008_Specs_PhaseB_Vol3_110000_Part2-0008.pdf PDF
W912QR21R0008_Specs_PhaseB_Vol3_110000_Part1-0008.pdf PDF
W912QR21R0008_Specs_PhaseB-0008.pdf PDF
W912QR21R0008_Specs_PhaseB_Vol3_110601-0007..xlsx XLSX spreadsheet
W912QR21R0008_Specs_PhaseA-0007.pdf PDF
W912QR21R0008_Specs_PhaseB_Vol3_110601-0007.pdf PDF
W912QR21R0008_Plans_PhaseB_Part2-0007.pdf PDF
W912QR21R0008_Plans_PhaseA-0007.pdf PDF
W912QR21R0008_Plans_PhaseB_Part1-0007.pdf PDF
W912QR21R0008_Specs_PhaseB-0007.pdf PDF
W912QR21R0008_Specs_PhaseB_Vol3_110000_Part1-0007.pdf PDF
W912QR21R0008-0006.pdf PDF
W912QR21R0008_Plans-0005.pdf PDF
W912QR21R0008_Specs-0005.pdf PDF
W912QR21R0008_Specs_PhaseB_Vol3_110601-0005.xlsx XLSX spreadsheet
W912QR21R0008_Specs_PhaseB_Vol3_110000_Part2-0004.pdf PDF
W912QR21R0008_Plans-0004.pdf PDF
W912QR21R0008_Specs-0004.pdf PDF
W912QR21R0008_Specs_PhaseB_Vol3_110000_Part1-0004.pdf PDF
W912QR21R0008_Specs_PhaseB_Vol3_110601-0003.xlsx XLSX spreadsheet
W912QR21R0008_Specs-0003.pdf PDF
W912QR21R0008_Plans-0003.pdf PDF
W912QR21R0008Plans-0002.pdf PDF
W912QR21R0008Specs-0002.pdf PDF
W912QR21R0008_Specs_CT-0001.pdf PDF
W912QR21R0008_Specs_CT-0000.pdf PDF
W912QR21R0008_Specs_PhaseB_Vol2-0000.pdf PDF
W912QR21R0008_Plans_PhaseB_Vol36-0000.pdf PDF
W912QR21R0008_Plans_PhaseA_Vol10-0000.pdf PDF
W912QR21R0008_Plans_PhaseB_Vol32-0000.pdf PDF
W912QR21R0008_Plans_PhaseB_Vol70-0000.pdf PDF
W912QR21R0008_Plans_PhaseB_Vol33-0000.pdf PDF
W912QR21R0008_Plans_PhaseB_Vol31_Part1-0000.pdf PDF
W912QR21R0008_Specs_PhaseB_Vol1_00800004a06-0000.xlsx XLSX spreadsheet
W912QR21R0008_Plans_PhaseA_Vol60-0000.pdf PDF
W912QR21R0008_Plans_PhaseB_Vol31_Part2-0000.pdf PDF
W912QR21R0008_Plans_PhaseB_Vol34-0000.pdf PDF
W912QR21R0008_Plans_PhaseB_Vol60-0000.pdf PDF
W912QR21R0008_Specs_PhaseB_Vol6-0000.pdf PDF
W912QR21R0008_Plans_PhaseB_Vol50-0000.pdf PDF
W912QR21R0008_Specs_PhaseB_Vol5-0000.pdf PDF
W912QR21R0008_Specs_PhaseB_Vol1-0000.pdf PDF
W912QR21R0008_Specs_PhaseB_Vol7-0000.pdf PDF
W912QR21R0008_Plans_PhaseB_Vol30-0000.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILITARY/RESERVE BRANCH

ATTN: MICHAEL HUTCHENS

600 DR M L KING JR PL, RM 821

LOUISVILLE KY 40202-2236

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation number W912QR21R0008 for the Construction of the Veterans Affairs (VA) Medical Center (VAMC) in Louisville, KY is hereby amended as follow s:

SEE THE ATTACHED SUMMARY OF CHANGES

1. CONTRACT ID CODE PAGE OF PAGES

1 24

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Feb-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR21R0008

X 9B. DATED (SEE ITEM 11)

03-Dec-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Feb-2021

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE 964859

FACILITY CODECODE

EMAIL:TEL:

W912QR21R0008_Specs_CT-0007

W912QR21R0008

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMDT 0007 - SUMMARY OF CHANGES

AMENDMENT 0007 – SUMMARY OF CHANGES

1. The following specification sections are replaced in their entirety:

Volume No. Section No. Section Title CT 00 10 00 Price Breakout Schedule

PHASE A (Single Volume) Phase A 00 01 01 Table of Contents Phase A 03 30 01 Cast-in-Place Concrete for Garage

Structures Phase A 03 30 02 Cast-in-Place Concrete for Site

Structures Phase A 03 41 33 Precast Structural Pretensioned Concrete Phase A 03 45 00 Precast Architectural Concrete Phase A 05 12 00 Structural Steel Framing Phase A 05 31 00 Steel Decking Phase A 05 40 00 Cold-Formed Metal Framing Phase A 05 50 00 Metal Fabrications Phase A 05 52 20 Barrier Cable Systems Phase A 07 42 13.16 Metal Plate Wall Panels Phase A 07 42 53 Glass Exterior Rain and Wind Screen

Systems Phase A 09 91 00 Painting Phase A 10 14 00 Signage Phase A 10 22 13.01 Exterior Wire Mesh Partitions Phase A 22 07 11 Plumbing Insulation Phase A 31 20 00 Earthwork Phase A 31 63 26 Drilled Pier Phase A 31 68 13 Soil and Rock Anchors Phase A 33 30 00 Sanitary Sewer Utilities Phase A 33 30 01 Sanitary Pump Station – Pumps

PHASE B

1-7* 00 01 10 Table of Contents *Only issued once via this Amendment, but is to be replaced in indicated Volumes.

1 00 80 00.00 06 Special Provisions 1 00 80 00.05 06 Submittal Register A 1 00 80 00.06 06 Submittal Register B 1 00 80 00.08 06 Delegated Design List B 1 01 45 04.10 06 Contractor Quality Control 1 01 78 24.00 10 Facility Maintenance (FM) Data

Requirements 1 01 81 11 Exterior Shell Air-Blast Performance

Requirements

1 03 30 00 Cast-in-Place Concrete 1 03 30 01 Cast-in-Place Concrete for Garage

Structures 1 03 30 02 Cast-in-Place Concrete for Site

Structures 1 03 41 33 Precast Structural Pretensioned Concrete 1 03 45 00 Precast Architectural Concrete 1 03 45 00.02 Precast Architectural Concrete (Parking

Structure) 1 04 05 16 Masonry Grouting 1 04 20 00 Unit Masonry 1 05 12 00 Structural Steel Framing 1 05 31 00 Steel Decking 1 05 36 00 Composite Metal Decking 1 05 40 00 Cold-Formed Metal Framing 1 05 43 13 Medical Equipment Support Systems 1 05 50 00 Metal Fabrications 1 05 50 00.02 Metal Fabrications (Parking Structure) 1 05 52 20 Barrier Cable Systems

2 07 13 54 Thermoplastic Sheet Waterproofing 2 07 16 19 Metal Oxide Waterproofing 2 07 27 27 Fluid-Applied Membrane Air Barriers Vapor

Retarding 2 07 42 00 Metal Wall Panels 2 07 42 13.16.02 Metal Plate Wall Panels (Parking

Structure) 2 07 42 53 Glass Exterior Rain and Wind Screen

Systems 2 07 42 53.02 Glass Exterior Rain and Wind Screen

Systems (Parking Structure) 2 07 54 19 Polyvinyl-Chloride (PVC) Roofing 2 07 95 13 Expansion Joint Cover Assemblies 2 08 35 13.23 Accordion Folding Fire Doors 2 08 51 13 Aluminum Windows 2 08 71 00 Door Hardware 2 08 71 13 Automatic Door Operators 2 08 71 13.11 Low Energy Power Assist Door Operators 2 09 65 16 Resilient Sheet Flooring 2 09 65 19 Resilient Tile Flooring 2 09 91 00 Painting

3 10 14 00 Signage 3 10 22 13.02 Exterior Wire Mesh Partitions (Parking

Structure) 3 10 22 39.01 Automatic Operable Vertically Retractable

Acoustic Wall 3 10 26 41 Bullet Resistant Panels 3 11 06 00 Medical Equipment Schedule 3 11 06 01** Project Room Contents Report 3 11 41 21 Walk-in Coolers and Freezers 3 11 53 13 Laboratory Fume Hoods 3 11 53 53 Biological Safety Cabinets and Laminar

Airflow Workstations

3 11 71 00 Healthcare Equipment 3 11 71 02 Laboratory Washing and Sterilizing

Equipment 3 11 73 00 Ceiling Mounted Patient Lift System 3 11 74 00 Dental Equipment 3 12 31 00 Manufactured Metal Casework 3 13 01 00 Radio Frequency Shielding System 3 13 01 01 DC MRI Magnetic Shielding System 3 13 05 41 Seismic Restraint Requirements for Non-

Structural Components 3 13 49 00 Radiation Protection 3 13 49 25 Main Computer Room Shielding 3 14 21 00 Electric Traction Elevators 3 14 24 00 Hydraulic Elevators 3 14 91 33 Laundry and Linen Chutes 3 14 91 82 Trash Chutes 3 14 92 00 Pneumatic Tube System **Issued as standalone file with this Amendment as was done with the Initial Issue.

4 21 12 00 Manual Dry Standpipe Systems 4 21 13 13 Wet-Pipe Sprinkler Systems 4 21 13 16 Dry-Pipe Sprinkler Systems 4 21 22 00 Clean Agent Fire Suppression Systems 4 21 30 13 Electric-Driven Fire Pumps 4 22 07 11 Plumbing Insulation 4 22 11 00 Facility Water Distribution 4 22 61 13.74 Dental Compressed Air Piping 4 22 61 19.74 Dental Compressed Air Equipment 4 22 62 00 Vacuum Systems for Laboratory and

Healthcare Facilities 4 22 62 19.74 Dental Vacuum and Evacuation Equipment 4 22 63 00 Gas Systems for Laboratory and Healthcare

Facilities

5 23 07 11 HVAC And Boiler Plant Insulation 5 23 09 23 Direct Digital Control System for HVAC 5 23 31 00 HVAC Ducts and Casings 5 23 65 00 Cooling Towers 5 23 73 00 Indoor Central Station Air Handling Units 5 25 10 10 Advanced Utility Metering System

6 26 05 11 Requirements for Electrical Installations 6 27 05 11 Requirements for Communications

Installations 6 28 26 00 Electronic Personal Protection System 6 28 31 00 Fire Detection and Alarm

7 31 20 00 Earthwork 7 31 63 26 Drilled Pier 7 31 68 14 Soil and Rock Anchors for VA Medical

Center (Building B) Structure

7 32 14 13 Precast Concrete Unit Paving 7 32 33 13 Exterior Site Furnishings 7 32 97 00 Vegetated Roof Assemblies 7 33 10 00 Water Utilities 7 33 16 19 Elevated Water Storage Tank Structure 7 33 16 23 Ground Water Storage Tank Structure 7 33 30 00 Sanitary Sewer Utilities 7 33 40 00 Storm Sewer Utilities 7 33 40 13 Stormwater Pump Station 7 33 51 00 Natural-Gas Distribution

2. The following specification sections are replaced as described:

Volume No. Section No. Section Title

PHASE B

3 11 00 00*** Equipment Cut Sheets (Medical, Food

Service, VCS) (For Reference Only) ***Only the Medical Equipment Cut Sheets are replaced. These were initially issued via Amendment 0004 as Part 1 of the Specification Section file.

6 26 08 00b**** Division 26 FPT ****Only the Generator Functional Performance Test is replaced, and not the entire Specification Section Attachment.

3. The following specification sections are added in their entirety.

PHASE A (Single Volume) Phase A 03 35 43 Stained Concrete Finishing Phase A 22 05 29 Hangers and Supports for Plumbing Piping and Equipment

PHASE B

1 00 80 00.09 06 Physical Security Design Manual for VA

Facilities – Mission Critical Facilities

– July 2007

1 00 80 00.10 06 Physical Security Design Manual for VA Facilities – Life-Safety Protected

1 01 57 19.06 06 Louisville MSD Sanitary Lateral Extension Application

1 03 35 43 Stained Concrete Finishing

4. The following specification section is deleted in its entirety.

3 11 53 61 Custom Fabricated Laboratory Equipment

5. The following specification file is replaced in its entirety.

3 11 06 01 Project Room Contents Report - Excel file

6. The following drawings are replaced in their entirety:

Volume No. Drawing No. Drawing Title

PHASE A

10 CS505 Concrete Retaining Walls 10 CU234 Underground Storage - Tank 4 10 CU235 Outlet Control Structure Details 10 CU237D Sanitary tank Elevation View

60 SF003F South Parking Structural General Notes 60 SF401F South Parking Enlarged Plans 60 SF600F South Parking Schedules 60 A002 Architectural Symbols 60 AE311F South Parking Stair Sections N-W Core 60 AE313F South Parking Elevator Sections 60 AE401F South Parking Ground Level Enlarged Floor Plans and RCP 60 AE402F South Parking Level 1 Enlarged Floor Plans and RCP 60 AE403F South Parking Levels 2-5 Typ Enlarged Floor

Plans and RCP 60 AE404F South Parking Enlarged Floor Plans Level 6 60 AE700F South Parking Ground Level Reflected Ceiling

Plan 60 AE701F South Parking Level 1 Reflected Ceiling Plan 60 AE702F South Parking Level 2 Reflected Ceiling Plan 60 AE703F South Parking Level 3 Reflected Ceiling Plan 60 AE704F South Parking Level 4 Reflected Ceiling Plan 60 AE705F South Parking Level 5 Reflected Ceiling Plan 60 AE706F South Parking Level 6 Reflected Ceiling Plan 60 EE601F South Parking Electrical Schedules 60 EE701F South Parking One Line Diagrams

*****Drawings listed as being included in more than one Volume are only issued once via this Amendment, but are to be replaced in all indicated Volumes.

00 AE00002***** Architectural Symbols 00 AE60001B Exterior Material Finish, Louver Legends and

Paver-Landscape Layout 00 PL001***** Plumbing General Info

10 CS134 Layout and Materials Plan Area 4 10 CS400 Rooftop Courtyard Plan Enlargements 10 CS405 VAMC Outdoor Dining Terrace 10 CS406 Journey Corridor Segment 3 10 CS500 Pavement and Curb Ramp Details 10 CS504 Concrete Retaining Wall and Steps

10 CS516 Decorative Fence Details 1 10 CS517 Decorative Fence Details 2 10 CS527 Seat Wall Elevations 40-44, Roof Garden Light

Mounting 10 CS530 Bollard Details 3 10 CU104b Water Site Utility Plan Area 4 10 L107 Rooftop Garden and Courtyard Planting Plans 10 L501 Planting Details, Plant List 10 I107 Rooftop Garden and Courtyard Irrigation Plans 10 ES2002 VAMC Site Electrical and Telecom Plan Area 1 10 ES2006 VAMC Site Electrical and Telecom Plan Area 5 10 AS10051 South Covered Walkway 01 10 AS10052 South Covered Walkway 02 10 AS10061 North Covered Walkway 01 10 AS10301 Covered Walkway Details 10 AS10302 Covered Walkway Details

30 SF002B VAMC Structural General Notes 30 SF100B2 VAMC Ground Level Foundation Plan Area 2 30 SF100B3 VAMC Ground Level Foundation Plan Area 3 30 SF100B5 VAMC Ground Level Foundation Plan Area 5 30 SF100B6 VAMC Ground Level Foundation Plan Area 6 30 SF502B VAMC Typical Sections and Details 30 SF631B VAMC Schedules - Foundations & Framing

31 AE00002***** Architectural Symbols 31 AI100B5 VAMC Ground Level Floor Plan Area 5 31 AI101B3 VAMC Level 1 Floor Plan Area 3 31 AI101B4 VAMC Level 1 Floor Plan Area 4 31 AI102B2 VAMC Level 2 Floor Plan Area 2 31 AI102B4 VAMC Level 2 Floor Plan Area 4 31 AI102B5 VAMC Level 2 Floor Plan Area 5 31 AI102B6 VAMC Level 2 Floor Plan Area 6 31 AI103B1 VAMC Level 3 Floor Plan Area 1 31 AI103B5 VAMC Level 3 Floor Plan Area 5 31 AI103B6 VAMC Level 3 Floor Plan Area 6 31 AI105B5 VAMC Level 5 Floor Plan Area 5 31 AI1C0B6 VAMC Ground Level Reflected Ceiling Plan Area 6 31 AI1C1B1 VAMC Level 1 Reflected Ceiling Plan Area 1 31 AI1C1B6 VAMC Level 1 Reflected Ceiling Plan Area 6 31 AI2302B VAMC Level 3 Interior Elevations 31 AI4106B VAMC Nurse Stations 31 AI4107B VAMC Nurse Stations 31 AI4108B VAMC Nurse Stations 31 AI4111B VAMC Locker Rooms 31 AI4112B VAMC Locker Rooms 31 AI4114B VAMC Locker Rooms 31 AI4115B VAMC Toilet/Shower Area 31 AI4116B VAMC Toilet/Shower Area 31 AI4117B VAMC Bathrooms 31 AI4118B VAMC Bathrooms 31 AI4124B VAMC Toilet Rooms 31 AI4125B VAMC Toilet Rooms 31 AI4127B Public Toilet Rooms

31 AI4128B Public Toilet Rooms 31 AI4132B VAMC Dining Area 31 AI4142B VAMC Office Spaces 31 AI4153B VAMC Level 1 1B6101 Waiting 31 AI53011B VAMC Ceiling Details 31 AI6103B Level 1 Door Schedule Areas 1-2 31 AI6104B Level 1 Door Schedule Areas 3-4 31 AI6105B Level 1 Door Schedule Areas 5-6 31 AI6107B Level 2 Door Schedule Area 4 31 AI6108B Level 2 Door Schedule Area 5 31 AI6109B Level 2 Door Schedule Area 6 31 AI6110B Level 3 Door Schedule Areas 1-2 31 AI6111B Level 3 Door Schedule Areas 3-4 31 AI6112B Level 3 Door Schedule Area 5 31 AI6113B Level 3 Door Schedule Area 6 31 AI6114B Level 4 Door Schedule Areas 1-2 31 AI6115B Level 5 Door Schedule Areas 3-4 31 AI6116B Level 4 Door Schedule Area 5 31 AI6117B Level 4 Door Schedule Area 6 31 AI6119B Level 5 Door Schedule Area 5 31 AI6120B Level 5 Door Schedule Area 6 31 AI6121B Levels 6,7,& 8 Door Schedule 31 AI7600B VAMC Stair Details 31 AI7601B VAMC Stair Details 31 AI7602B VAMC Stair Details 31 AF100B4 VAMC Ground Level Finish Plan Area 4 31 AF100B5 VAMC Ground Level Finish Plan Area 5 31 AF100B6 VAMC Ground Level Finish Plan Area 6 31 AF101B1 VAMC Level 1 Finish Plan Area 1 31 AF101B2 VAMC Level 1 Finish Plan Area 2 31 AF101B3 VAMC Level 1 Finish Plan Area 3 31 AF101B5 VAMC Level 1 Finish Plan Area 5 31 AF102B1 VAMC Level 2 Finish Plan Area 1 31 AF102B2 VAMC Level 2 Finish Plan Area 2 31 AF102B3 VAMC Level 2 Finish Plan Area 3 31 AF103B1 VAMC Level 3 Finish Plan Area 1 31 AF103B2 VAMC Level 3 Finish Plan Area 2 31 AF103B3 VAMC Level 3 Finish Plan Area 3 31 AF103B4 VAMC Level 3 Finish Plan Area 4 31 AF104B1 VAMC Level 4 Finish Plan Area 1 31 AF104B2 VAMC Level 4 Finish Plan Area 2 31 AF104B3 VAMC Level 4 Finish Plan Area 3 31 AF105B1 VAMC Level 5 Finish Plan Area 1 31 AF105B2 VAMC Level 5 Finish Plan Area 2 31 AF105B3 VAMC Level 5 Finish Plan Area 3 31 AF105B5 VAMC Level 5 Finish Plan Area 5 31 AF600B1 VAMC Ground Level Room Finish Schedule Areas 1-

31 AF600B2 VAMC Ground Level Room Finish Schedule Area 6 31 AF601B1 VAMC Level 1 Room Finish Schedule Areas 1-2 31 AF601B2 VAMC Level 1 Room Finish Schedule Areas 2-4 31 AF601B3 VAMC Level 1 Room Finish Schedule Areas 4-5 31 AF601B4 VAMC Level 1 Room Finish Schedule Area 5-6 31 AF603B3 VAMC Level 3 Room Finish Schedule Areas 4-5 31 AF605B1 VAMC Level 5 Room Finish Schedule Areas 1-4 31 AF60000 VAMC Interior Finish Material Schedule

32 AE00002***** Architectural Symbols 32 AE105B1 VAMC Level 5 Penthouse Floor Plan Area 1 32 AE105B2 VAMC Level 5 Penthouse Floor Plan Area 2 32 AE106B2 VAMC Level 6 Penthouse Roof Plan Area 2 32 AE107B5 VAMC Level 7 Penthouse Roof Plan Area 5 32 AE108B6 VAMC Level 8 Roof Plan Area 6 32 AE2010B VAMC Partial Exterior Elevation South Area 3 32 AE2011B VAMC Partial Exterior Elevation South Area 6 32 AE2012B VAMC Partial Exterior Elevation North Area 1 32 AE2013B VAMC Partial Exterior Elevation North Area 4 32 AE2014B VAMC Partial Exterior Elevation Concourse Area

32 AE2015B VAMC Partial Exterior Elevation Concourse Area

32 AE2017B VAMC Partial Exterior Elevation Concourse Area

32 AE2018B VAMC Partial Exterior Elevation Concourse Area

32 AE2019B VAMC Partial Exterior Elevation Concourse Area

32 AE2032B VAMC Exterior Elevation West Bar SARRTP

Courtyard 32 AE2033B VAMC Exterior Elevation West Bar IPMH Courtyard 32 AE2035B VAMC Exterior Elevation East Bar Air Intakes 32 AE2036B VAMC Exterior Elevation West Bar Air Intakes 32 AE2037B VAMC Exterior Elevation West Bar Air Intakes 32 AE2038B VAMC Exterior Elevation Concourse Roof Plazas 32 AE2039B VAMC Exterior Elevation Concourse Roof Plazas 32 AE2042B (East Bar) N. East Enlarged Partial

Elevation/Sections Plans 32 AE2043B (East Bar Terrace) Enlarged Elevation/Sections 32 AE2044B (East Bar) S. East Enlarged Partial

Elevation/Sections/Plans 32 AE2046B (East Bar) S. West Concourse Enlarged West

Elevation/Section/Plans 32 AE3005B VAMC Concourse East Enlarged Elevation (Middle) 32 AE3019B VAMC Concourse Sections 32 AE3201B VAMC Wall Sections East Bar 32 AE3204B VAMC Wall Sections West Bar 32 AE3208B VAMC Wall Sections 32 AE4105B VAMC Enlarged Plan Concourse Plaza Roof 32 AE4106B VAMC Enlarged Plan Courtyard Plans 32 AE5104B VAMC Plan Details-East Bar 32 AE5302B ROOF Assembly Details 32 AE5303B ROOF Assembly Details 32 AE5411B VAMC Section Details East Bar Terrace 32 AE5501B VAMC Section Plan Details Concourse Typ.

Curtain Wall Details 32 AE5541B VAMC Section Details Concourse 32 AE5542B VAMC Section Details Concourse 32 AE5631B VAMC Section Details West Bar 32 AE5632B VAMC Section Details West Bar 32 AE6002B Performance Criteria 32 AE7004B VAMC Section Details South Canopy

32 AE7006B VAMC Section Details South Canopy 32 AE7010B VAMC Main Entrance (East) Canopy 01 32 AE7011B VAMC Main Entrance (East) Canopy 02 32 AE7012B VAMC Main Entrance (East) Canopy 03 32 AE7013B VAMC Main Entrance (East) Canopy 04 32 AE7014B VAMC Main Entrance (East) Canopy 04 32 AE7015B Ambulance Entrance Canopy 01 32 AE7018B ED Entrance Canopy 32 AE7020B Canopy Details 32 AE8001B Exterior Mockup Wall

33 AE00002***** Architectural Symbols 33 AQ100B4C VAMC Ground Level Equipment Floor Plan Area 4C 33 AQ100B4D VAMC Ground Level Equipment Floor Plan Area 4D 33 AQ100B5C VAMC Ground Level Equipment Floor Plan Area 5C 33 AQ100B6A VAMC Ground Level Equipment Floor Plan Area 6A 33 AQ100B6B VAMC Ground Level Equipment Floor Plan Area 6B 33 AQ100B6D VAMC Ground Level Equipment Floor Plan Area 6D 33 AQ101B5D VAMC Level 1 Equipment Floor Plan Area 5D 33 AQ101B6A VAMC Level 1 Equipment Floor Plan Area 6A 33 AQ102B1D VAMC Level 2 Equipment Floor Plan Area 1D 33 AQ102B4A VAMC Level 2 Equipment Floor Plan Area 4A 33 AQ102B4B VAMC Level 2 Equipment Floor Plan Area 4B 33 AQ102B4C VAMC Level 2 Equipment Floor Plan Area 4C 33 AQ102B4D VAMC Level 2 Equipment Floor Plan Area 4D 33 AQ103B1A VAMC Level 3 Equipment Floor Plan Area 1A 33 AQ103B1B VAMC Level 3 Equipment Floor Plan Area 1B 33 AQ103B1C VAMC Level 3 Equipment Floor Plan Area 1C 33 AQ103B1D VAMC Level 3 Equipment Floor Plan Area 1D 33 AQ103B2A VAMC Level 3 Equipment Floor Plan Area 2A 33 AQ103B2C VAMC Level 3 Equipment Floor Plan Area 2C 33 AQ103B4A VAMC Level 3 Equipment Floor Plan Area 4A 33 AQ103B4B VAMC Level 3 Equipment Floor Plan Area 4B 33 AQ103B5B VAMC Level 3 Equipment Floor Plan Area 5B 33 AQ104B2D VAMC Level 4 Equipment Floor Plan Area 2D 33 AQ104B3A VAMC Level 4 Equipment Floor Plan Area 3A 33 AQ104B3C VAMC Level 4 Equipment Floor Plan Area 3C 33 AQ104B4A VAMC Level 4 Equipment Floor Plan Area 4A 33 AQ104B4B VAMC Level 4 Equipment Floor Plan Area 4B 33 AQ104B4C VAMC Level 4 Equipment Floor Plan Area 4C 33 AQ104B4D VAMC Level 4 Equipment Floor Plan Area 4D 33 AQ104B5A VAMC Level 4 Equipment Floor Plan Area 5A 33 AQ104B5C VAMC Level 4 Equipment Floor Plan Area 5C 33 AQ104B5D VAMC Level 4 Equipment Floor Plan Area 5D 33 AQ104B6A VAMC Level 4 Equipment Floor Plan Area 6A 33 AQ104B6B VAMC Level 4 Equipment Floor Plan Area 6B 33 AQ104B6C VAMC Level 4 Equipment Floor Plan Area 6C 33 AQ104B6D VAMC Level 4 Equipment Floor Plan Area 6D 33 AQ105B4C VAMC Level 5 Equipment Floor Plan Area 4C 33 AQ105B5A VAMC Level 5 Equipment Floor Plan Area 5A 33 AQ105B5C VAMC Level 5 Equipment Floor Plan Area 5C 33 AQ105B5D VAMC Level 5 Equipment Floor Plan Area 5D 33 AQ105B6A VAMC Level 5 Equipment Floor Plan Area 6A 33 AQ105B6C VAMC Level 5 Equipment Floor Plan Area 6C 33 AQ20101 VAMC AFGE Equipment Elevations

33 AQ20702 VAMC Cardiovascular Equipment Elevations 33 AQ20703 VAMC Cardiovascular Equipment Elevations 33 AQ20704 VAMC Cardiovascular Equipment Elevations 33 AQ20705 VAMC Cardiovascular Equipment Elevations 33 AQ20706 VAMC Cardiovascular Equipment Elevations 33 AQ21202 VAMC Dental Equipment Elevations 33 AQ21205 VAMC Dental Equipment Elevations 33 AQ21206 VAMC Dental Equipment Elevations 33 AQ21301 VAMC Digestive Diseases Equipment Elevations 33 AQ21501 VAMC Electroencephalography (EGG) Laboratory

Elevations 33 AQ21601 VAMC EMS Support & Admin Equipment Elevations 33 AQ21802 VAMC EMS Lockers, Lounges, Toilets & Showers

Equipment Elevations 33 AQ22907 VAMC Medical/Surgical Inpatient Units Equipment

Elevations 33 AQ23305 VAMC Mental Health Clinic Equipment Elevations 33 AQ23401 VAMC NUC Med Equipment Elevations 33 AQ23402 VAMC NUC Med Equipment Elevations 33 AQ23403 VAMC NUC Med Equipment Elevations 33 AQ23901 VAMC PACT Primary Care Clinic Equipment Elevations 33 AQ23903 VAMC PACT Primary Care Clinic Equipment Elevations 33 AQ23904 VAMC PACT Primary Care Clinic Equipment Elevations 33 AQ23919 VAMC PACT Primary Care Clinic Equipment Elevations 33 AQ24006 VAMC Pathology Equipment 33 AQ24007 VAMC Pathology Equipment Elevations 33 AQ24011 VAMC Pathology Equipment Elevations 33 AQ24012 VAMC Pathology Equipment Elevations 33 AQ24013 VAMC Pathology Equipment Elevations 33 AQ24104 VAMC Pharmacy Service Equipment Elevations 33 AQ24502 VAMC Prosthetic & Sensory Aids Service EQ

Elevations 33 AQ24601 VAMC Pulmonary Medicine (Sleep Study) Equipment

Elevations 33 AQ24606 VAMC Pulmonary Medicine (Cardiac Rehab)

Equipment Elevations 33 AQ24909 VAMC Radiology Equipment Elevations 33 AQ25001 VAMC Research & Development Equipment

Elevations 33 AQ25002 VAMC Research & Development Equipment

Elevations 33 AQ25005 VAMC Research & Development Equipment

Elevations 33 AQ25101 VAMC SARRTP Equipment Elevations 33 AQ25102 VAMC SARRTP Equipment Elevations 33 AQ25103 VAMC SARRTP Equipment Elevations 33 AQ25401 VAMC Supply Processing Distribution Equipment

Elevations 33 AQ25504 VAMC Surgical Service Equipment Elevations 33 AQ25505 VAMC Surgical Service Equipment Elevations 33 AQ25507 VAMC Surgical Service Equipment Elevations 33 AQ25509 VAMC Surgical Service Equipment Elevations

34 PL001***** Plumbing General Info 34 PL100B4 VAMC Ground Level Plumbing Plan – Area B4

34 PL100B6 VAMC Ground Level Plumbing Plan – Area B6 34 PL101B4 VAMC Level 1 Plumbing Plan – Area B4 34 PL102B4 VAMC Level 2 Plumbing Plan – Area B4 34 PL103B4 VAMC Level 3 Plumbing Plan – Area B4 34 PL103B6 VAMC Level 3 Plumbing Plan – Area B6 34 PL104B4 VAMC Level 4 Plumbing Plan – Area B4 34 PL104B6 VAMC Level 4 Plumbing Plan – Area B6 34 PL202B1 VAMC Level 2 Lab/Med Gas Plan Area B1 34 PL202B2 VAMC Level 2 Lab/Med Gas Plan Area B2 34 PL202B3 VAMC Level 2 Lab/Med Gas Plan Area B3 34 PL203B1 VAMC Level 3 Lab/Med Gas Plan Area B1 34 PL203B2 VAMC Level 3 Lab/Med Gas Plan Area B2 34 PL203B3 VAMC Level 3 Lab/Med Gas Plan Area B3 34 PL204B1 VAMC Level 4 Lab/Med Gas Plan Area B1 34 PL204B2 VAMC Level 4 Lab/Med Gas Plan Area B2 34 PL204B3 VAMC Level 4 Lab/Med Gas Plan Area B3 34 PL506B VAMC Details - Plumbing

35 MH401B3 VAMC East Bar Penthouse Mechanical Enlarged Plan –

Area 3 35 MH405B4 VAMC West Bar Penthouse Mechanical Enlarged Plan -

Area 4 35 MH405B5 VAMC West Bar Penthouse Mechanical Enlarged Plan –

Area 5 35 MH405B6 VAMC West Bar Penthouse Mechanical Enlarged Plan -

Area 6

36 EE100B4 VAMC Ground Level Lighting Plan Area 4 36 EE100B5 VAMC Ground Level Lighting Plan Area 5 36 EE100B6 VAMC Ground Level Lighting Plan Area 6 36 EE101B5 VAMC Level 1 Lighting Plan Area 6 36 EE101B6 VAMC Level 1 Lighting Plan Area 6 36 EE102B4 VAMC Level 2 Lighting Plan Area 4 36 EE102B5 VAMC Level 2 Lighting Plan Area 5 36 EE102B6 VAMC Level 2 Lighting Plan Area 6 36 EE103B4 VAMC Level 3 Lighting Plan Area 4 36 EE103B5 VAMC Level 3 Lighting Plan Area 5 36 EE103B6 VAMC Level 3 Lighting Plan Area 6 36 EE104B4 VAMC Level 4 Lighting Plan Area 4 36 EE104B6 VAMC Level 4 Lighting Plan Area 6 36 EE105B4 VAMC Level 5 Lighting Plan Area 4 36 EE105B5 VAMC Level 5 Lighting Plan Area 5 36 EE204B5 VAMC Level 4 Lighting Plan Area 5 36 EE205B5 VAMC Level 5 Lighting Plan Area 5 36 EE600B8 VAMC Level 0 Panel Schedule ELP 36 EE600B-1 VAMC Level 0 Panel Schedule LP 36 EE601B16 VAMC Level 1 Panel Schedule LP 36 EE601B-1 VAMC Level 1 Panel Schedule LLP 36 EE601B-2 VAMC Level 1 Panel Schedule CLP 36 EE601B-3 VAMC Level 1 Panel Schedule LP 36 EE602B-1 VAMC Level 2 Panel Schedule CLP 36 EE602B-2 VAMC Level 2 Panel Schedule LP 36 EE603B-1 VAMC Level 3 Panel Schedule CLP 36 EE603B-2 VAMC Level 3 Panel Schedule LP

36 EE604B20 VAMC Level 4 Panel Schedule ELP 36 EE604B-1 VAMC Level 4 Panel Schedule CLP 36 EE604B-2 VAMC Level 4 Panel Schedule LLP 36 EE604B-3 VAMC Level 4 Panel Schedule LP 36 EE605B11 VAMC Level 5 Panel Schedule ELP 36 EE605B-1 VAMC Level 5 Panel Schedule CLP 36 EE605B-2 VAMC Level 5 Panel Schedule LP 36 EE606B7 VAMC Level 6 Panel Schedule ELP 36 EE606B-1 VAMC Level 6 Panel Schedule LP 36 EE720B VAMC Normal Power One Line Diagram East Bar 36 EE721B VAMC Emergency Power One Line Diagram East Bar 36 EE722B VAMC N1 Busway Normal Power Line Diagram East

Bar 36 EE723B VAMC N2 Busway Normal Power Line Diagram East

Bar 36 EE724B VAMC N3 Busway Normal Power Line Diagram East

Bar 36 EE725B VAMC Life Safety One Line Diagram East Bar 36 EE726B VAMC CR1, CR2, CR3 Critical One Line East Bar 36 EE727B VAMC EQ1 Emergency One Line Diagram East Bar 36 EE728B VAMC EQ2, EQ3 Busway Emergency One Line East

Bar 36 EE729B VAMC Emergency Power One Line Diagram East Bar 36 EE742B VAMC Emergency Power One Line Diagram West Bar 36 EE743B VAMC Emergency Power One Line Diagram West Bar 36 EE744B VAMC N4 Busway Normal Power One Line West Bar 36 EE746B VAMC N6 Busway Normal Power One Line West Bar 36 EE747B VAMC N7 Busway Normal Power One Line West Bar 36 EE748B VAMC Emergency Power One Line Diagram West Bar 36 EE749B VAMC Life Safety One Line Diagram West Bar 36 EE750B VAMC CR4 Busway Emergency One Line West Bar 36 EE751B VAMC CR5 Busway Emergency One Line West Bar 36 EE752B VAMC CR6 Busway Emergency One Line West Bar 36 EE753B VAMC CR7 Busway Emergency One Line West Bar 36 EE754B VAMC Emergency Power One Line West Bar 36 EE755B VAMC EQ4 Busway Emergency One Line West Bar 36 EE756B VAMC EQ5 Busway Emergency One Line West Bar 36 EE757B VAMC EQ6 Busway Emergency One Line West Bar 36 EE758B VAMC EQ7 Busway Emergency One Line West Bar 36 EE759B VAMC Emergency Power One Line Diagram West Bar 36 EE760B VAMC Emergency Power One Line Diagram West Bar

40 AE00002***** Architectural Symbols 40 SF003CD Central Utility Plant and Laundry Structural

General Notes 40 SF103D2 Central Utility Plant PH Roof Framing Plan –

Area D2 40 AF601D Central Utility Plant Door & Room Finish

Schedule 40 PL001***** Plumbing General Info 40 PL400C2A Laundry Ground Level Enlarged Plumbing Plan –

Area C2A 40 PL400C2B Laundry Ground Level Enlarged Plumbing Plan –

Area C2B

40 PL400C2C Laundry Ground Level Enlarged Plumbing Plan – Area C2C

40 PL400C2D Laundry Ground Level Enlarged Plumbing Plan – Area C2D

40 PL503D Central Utility Plant Details – Fuel Oil 40 PL602D Central Utility Plant Schedules – Plumbing 40 PL701D Central Utility Plant Diagrams 40 MH812D Misc – Electrical Sequence of Operations 40 EE700 Medium Voltage One Line Diagram Service and

Site 40 EE701 Medium Voltage Emergency One Line Diagram

50 AE00002***** Architectural Symbols 50 SF003E North Parking Structural General Notes 50 SF401E North Parking Enlarged Plans 50 SF503E North Parking Structural Typical Details 50 SF600E North Parking Schedules 50 AE402E North Parking Level 2 Enlarged Floor Plans and RCP 50 AE403E North Parking Typical and Level 6 Enlarged

Floor Plans and RCP 50 AE523E North Parking Enlarged Details Southeast Core 50 AE531E North Parking Roof Details 50 PL001***** Plumbing General Info 50 EE201E North Parking Level 1 Power Plan 50 EE204E North Parking Level 4 Power Plan 50 EE601E North Parking Panel Schedules and Relay Panels 50 EE602E North Parking Panel Schedules 50 EE701E North Parking Electrical One Line Diagrams 50 TC101E North Parking Level 1 Technology Plan 50 TC104E North Parking Level 4 Technology Plan

60 AE00002***** Architectural Symbols 60 EE200Fb South Parking Ground Level Power Plan 60 EE201Fb South Parking Level 1 Power Plan 60 EE601Fb South Parking Electrical Panel Schedules 60 EE602Fb South Parking Electrical Panel Schedules 60 EE701Fb South Parking Electrical One Line Diagrams 60 TC100F South Parking Ground Level Technology Plan 60 TC101F South Parking Level 1 Technology Plan

70 AE00002***** Architectural Symbols 70 PL001***** Plumbing General Info 70 EE600MISC Electrical Panel Schedules 70 AE101J1 Guard House Floor Plans 70 AE3201J1 Guard House Exterior Wall Sections 70 AE5301J1 Guard House Plan Details 70 EE700J Guard Houses - Single Line Diagram 70 PL700K Water Tower and Water Tank Process Flow Diagram 70 PL101P1 Pump House Plumbing Plan, Diagram, And Schedule 70 EE200P1 Pump House Power Floor Plan 70 EE700P1 Pump House Single Line Diagram

7. The proposal due date has been extended. Proposals are now due no later than 1:00 PM (Eastern) on 1 March 2021

- - - END OF SUMMARY OF CHANGES - - -

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 23-Feb-2021 01:00 PM to 01-Mar-2021 01:00 PM.

The following have been modified:

PRICE BREAKOUT SCHEDULE

SECTION 00 10 00

PRICE BREAKOUT SCHEDULE

Amendment 0007

PROJECT: Replacement VA Medical Center

LOCATION: Louisville, KY

PROJECT NUMBER: P2 453413 / VA PN 603-320

OFFEROR:

Item No.

Description Quantity Unit Unit

Price Amount

BASE PROPOSAL

Amendment 0003************************************************************************************************ 0001 Sitework 1 Job NA $ All costs associated with work beyond a line five feet outside of the exterior walls of the project structures to include, but not limited to, grading, site utilities, site improvements, etc., as indicated in Phase A Volume 10 and Phase B Volume 10 of the plans, unless otherwise not necessary due to combining of the Phases into one project. This Item also is exclusive of all costs associated with the indicated portion of Option D (Salt and Mulch Storage), the indicated portion of Option E (Fencing and Gates), all of Option F (Landscaping), and the indicated portion of Option H (piping and paving). This Item also is exclusive of all costs associated with Items 0002 through 0006 related to drilled piers and rock removal. This Item also includes all costs to grade and permanently seed stabilize areas in lieu of the structures and features associated with all of Option A (Laundry), all of Option B (South Parking Structure), the indicated portion of Option E (Guard Houses), all of Option F (Landscaping), and all of Option H (Water Tower, Water Tank, and Pump House). This Item also includes all costs to grade and place vehicular concrete in lieu of the structures associated with Option D (Maintenance Building, Salt and Mulch Storage, and Fuel Island). This Item also includes all costs to extend and merge the concrete curb and gutter along the Boulevard and the concrete integral curb along the West Service Drive, in lieu of the entrances to Option B (South Parking Structure).

************************************************************************************************Amendment 0003

0002 Drilled Piers in Unclassified

Excavations 1 Job NA $

All costs associated with the installation of the drilled pier foundations in unclassified excavations for the project structures included in the Base Proposal, to include the South Covered Walkway as indicated in Phase B Volume 10. This Item includes, but is not limited to, associated mobilization, labor, equipment, casings, concrete, reinforcing, and disposal of any associated spoils. For purposes of this Item, unclassified excavations are as defined in SECTION 31 63 26 DRILLED PIER for Phase B. The drilled pier unit prices and subtotals shall be provided below for the estimated quantities listed for each specified diameter, which shall sum to the total amount for this Item.

a 24” Diameter 480 VLF $ $ b 30” Diameter 1,050 VLF $ $ c 36” Diameter 1,810 VLF $ $ d 42” Diameter 700 VLF $ $ e 48” Diameter 1,130 VLF $ $ f 54” Diameter 820 VLF $ $ g 60” Diameter 540 VLF $ $ h 72” Diameter 40 VLF $ $

Item No.

Description Quantity Unit Unit

0003 Drilled Piers in Rock 1 Job NA $ All costs associated with the installation of the drilled pier foundations in rock for the project structures included in the Base Proposal, to include the South Covered Walkway as indicated in Phase B Volume 10. This Item includes, but is not limited to, associated mobilization, labor, equipment, casings, concrete, reinforcing, rock sockets, and disposal of any associated spoils. This Item is exclusive of all costs associated with any required test probe holes, which are covered under Item 0004. For purposes of this Item, rock is as defined in SECTION 31 63 26 DRILLED PIER for Phase B. The unit prices and subtotals shall be provided below for the estimated quantities listed for each specified diameter, which shall sum to the total amount for this Item.

a 24” Diameter 100 VLF $ $ b 30” Diameter 270 VLF $ $ c 36” Diameter 1,130 VLF $ $ d 42” Diameter 350 VLF $ $ e 48” Diameter 470 VLF $ $ f 54” Diameter 610 VLF $ $ g 60” Diameter 120 VLF $ $ h 72” Diameter 10 VLF $ $

0004 Drilled Pier Test Probe Holes 786 EA $ $ All costs associated with the installation of the estimated quantity of test probe holes in drilled piers for the project structures included in the Base Proposal, to include the South Covered Walkway as indicated in Phase B Volume 10. This Item includes, but is not limited to, associated mobilization, labor, equipment, and disposal of any associated spoils, as required per SECTION 31 63 26 DRILLED PIER for Phase B.

0005 Open Excavation Rock Removal 19,670 CY $ $ All costs associated with removal and off-site disposal of the estimated quantity of rock encountered during earthwork associated with open excavations. For purposes of this Item, open excavation rock removal is as defined in and quantity is as calculated per SECTION 31 20 00 EARTHWORK for Phases A and B, as appropriate. The definitions in the specification do not preclude rock removal via blasting so long as all contract requirements are met.

0006 Trench and Pit Rock Removal 3,190 CY $ $ All costs associated with the removal and off-site disposal of the estimated quantity of rock encountered during earthwork associated with trenches and pits. For purposes of this Item, trench and pit rock removal is as defined in and quantity is as calculated per SECTION 31 20 00 EARTHWORK for Phases A and B, as appropriate. The definitions in the specification do not preclude rock removal via blasting so long as all contract requirements are met.

0007 Hospital Building 1 Job NA $ All costs associated with work within a line five feet outside of the exterior wall of the structure as indicated in Phase B Volumes 30 through 37 and, as appropriate, Phase B Volume 00 of the plans. This Item is exclusive of all costs associated with Items 0002 through 0006 related to drilled piers and rock removal.

Amendment 0003************************************************************************************************ 0008 Dock / Central Utility Plant (CUP) 1 Job NA $ All costs associated with work within a line five feet outside of the exterior wall of the structures as indicated in Phase B Volume 40 and, as appropriate, Phase B Volume 00 of the plans. This Item is exclusive of all costs associated with Items 0002 through 0006 related to drilled piers and rock removal. This Item also is exclusive of all costs associated with Option A (Laundry), with the exception of the Connector area with the CUP. This Item is inclusive of the insulated wall construction with four-inch wythe of ground faced CMU above the roof of the laundry on the CUP indicated on Phase B Volume 40 Sheet AE312D Wall Section F6 extending down to the foundation of the north wall

Description Quantity Unit Unit of the CUP. This item is exclusive of the eight-inch wythe of CMU on the Laundry side of the north wall of the CUP indicated on Phase B Volume 40 Sheet AE312D Wall Section F6.

0009 North Parking Structure 1 Job NA $ All costs associated with work within a line five feet outside of the exterior wall of the structure as indicated in Phase B Volume 50 and, as appropriate, Phase B Volume 00 of the plans. This Item is inclusive of all structural steel shown on Phase B Volume 50 Sheet SF107E. This Item is exclusive of all costs associated with Items 0002 through 0006 related to drilled piers and rock removal. This Item also is exclusive of all costs associated with Option G (Photovoltaic (PV) Panel at North Parking Structure), to include the PV panels and support framing, with the exception of any associated utility conduits to connect to the overall structure utilities.

0010 Outbuildings and Miscellaneous

Structures 1 Job NA $

All costs associated with work within a line five feet outside of the exterior wall of the structures as indicated in Phase B Volume 70 of the plans. This Item is exclusive of all costs associated with the indicated portions of Option D (Maintenance Building and Fuel Island), the indicated portions of Option E (Guard Houses), and the indicated portions of Option H (Water Tower, Water Tank, and Pump House).

************************************************************************************************Amendment 0003

0011 Government Field Office 1 Job NA $ All costs associated with providing a Government Field Office, to include facility and all associated furniture and equipment, as specified in Section 01 50 00, Paragraph 3.6 (including associated subparagraphs).

Amendment 0003************************************************************************************************ 0012 Utility Provider Fees 1 Job NA $ 1,080,000 All fees associated with permanent utilities to be paid directly to the indicated utility providers. The fees are totaled under this Item and are itemized below by utility provider for reference. Only the Item total is to be included in the Total Base Proposal (i.e., do not include the itemized totals also).

a Louisville/Jefferson County

Metropolitan Sewer District (MSD) Connection fee, capacity charge, and inflow and infiltration (I/I) surcharge for connection to the sanitary sewer system.

1 Job NA $ 850,000 b Louisville Water Company (LWC)

System development charge, service installation fee, and tapping fee for four eight inch connections: two fire and two domestic.

1 Job NA $ 130,000 c Louisville Gas and Electric Company

(LG&E)

Connection fee for natural gas and electric.

1 Job NA $ 100,000

TOTAL BASE PROPOSAL $

Description Quantity Unit Unit

OPTIONS

0013 Option A1 – Laundry 1 Job NA $ This Item includes all work required in lieu of or in addition to that work included in the

Base Proposal. All additional costs associated with work within a line five feet outside of the exterior wall of the structure as indicated in Phase B Volume 40 and, as appropriate, Phase B Volume 00 of the plans. All costs associated with utilities beyond a line five feet outside of the exterior walls of the structure are to be included in the Base Proposal Item 0001 (Sitework), to include cutting and capping in place. This Item is inclusive of all additional costs to construct the north wall of the CUP in accordance with Phase B Volume 40 Sheet AE312D Wall Section F6 in lieu of or in addition to the wall construction included in the Base Proposal Item 0008 – Dock / Central Utility Plant (CUP). This Item is exclusive of all costs associated with “Option A2 – Laundry – Drilled Piers in Unclassified Excavations”, “Option A3 – Laundry – Drilled Piers in Rock”, and “Option A4 – Drilled Pier Test Probe Holes”.

***This Option must be exercised in conjunction with “Option A2 – Laundry – Drilled Piers in Unclassified Excavations”, “Option A3 – Laundry – Drilled Piers in Rock”, and “Option A4 – Laundry – Drilled Pier Test Probe Holes”.

***This Option may be exercised within 400 calendar days after Notice to Proceed.

0014 Option A2 – Laundry – Drilled Piers in Unclassified Excavations 1 Job NA $

All costs associated with the installation of the drilled pier foundations in unclassified excavations associated with “Option A1 – Laundry”, to include, but not limited to, associated mobilization, labor, equipment, casings, concrete, reinforcing, and disposal of any associated spoils. For purposes of this Item, unclassified excavations are as defined in SECTION 31 63 26 DRILLED PIER for Phase B. The drilled pier unit prices and subtotals shall be provided below for the estimated quantities listed for each specified a 24” Diameter 90 VLF $ $ b 30” Diameter 80 VLF $ $

***This Option must be exercised in conjunction with “Option A1 – Laundry”, “Option A3 –

Laundry – Drilled Piers in Rock”, “Option A4 – Laundry – Drilled Pier Test Probe Holes”.

0015 Option A3 – Laundry – Drilled Piers in Rock 1 Job NA $

All costs associated with the installation of the drilled pier foundations in rock associated with “Option A1 – Laundry”, to include, but not limited to, associated mobilization, labor, equipment, casings, concrete, reinforcing, rock sockets, and disposal of any associated spoils. This Item is exclusive of all costs associated with any required test probe holes, which are covered under Item 0016. For purposes of this Item, rock is as defined in SECTION 31 63 26 DRILLED PIER for Phase B. The drilled pier unit prices and subtotals shall be provided below for the estimated quantities listed for each specified diameter, which shall sum to the total amount for this Item.

a 24” Diameter 30 VLF $ $ b 30” Diameter 70 VLF $ $

***This Option must be exercised in conjunction with “Option A1 – Laundry”, “Option A2 –

Laundry – Unclassified Excavations”, and “Option A4 – Drilled Pier Test Probe Holes”.

Description Quantity Unit Unit

0016 Option A4 – Laundry – Drilled Pier

Test Probe Holes

22 EA $ $

All costs associated with the installation of the estimated quantity of test probe holes in drilled piers associated with “Option A1 – Laundry”, to include, but not limited to, associated mobilization, labor, equipment, and disposal of any associated spoils, as required per SECTION 31 63 26 DRILLED PIER for Phase B.

***This Option must be exercised in conjunction with “Option A1 – Laundry”, “Option A2 –

Laundry – Unclassified Excavations”, and “Option A3 – Laundry – Drilled Piers in Rock”.

Amendment 0001************************************************************************************************ 0017 Option B1 – South Parking

Structure 1 Job NA $

This Item includes all work required in lieu of or in addition to that work included in the Base Proposal. All additional costs associated with work within a line five feet outside of the exterior wall of the structure as indicated in Phase A Volume 60, Phase B Volume 60, and, as appropriate, Phase B Volume 00 of the plans, unless otherwise not necessary due to combining of the Phases into one project. All costs associated with utilities beyond a line five feet outside of the exterior walls of the structure are to be included in the Base Proposal Item 0001 (Sitework), to include cutting and capping in place. This Item is inclusive of all structural steel shown on Phase A Volume 60 Sheet SF107F. This Item is exclusive of all costs associated with “Option B2 – South Parking Structure – Drilled Piers in Unclassified Excavations”, “Option B3 – South Parking Structure – Drilled Piers in Rock”, “Option B4 – South Parking Structure – Drilled Pier Test Probe Holes”, and “Option B5 – South Parking Structure – Trench and Pit Rock Removal”. This Item also is exclusive of all costs associated with “Option J – Photovoltaic (PV) Panel at South Parking Structure”. All costs associated with any associated utility conduits to connect to the overall structure utilities to “Option J – Photovoltaic (PV) Panel at South Parking Structure” are to be included in the Base Proposal.

NOTE: This Option will not be exercised if “Option C – South Parking Lot” is exercised.

***This Option must be exercised in conjunction with “Option B2 – South Parking Structure

– Drilled Piers in Unclassified Excavations”, “Option B3 – South Parking Structure – Drilled Piers in Rock”, “Option B4 – South Parking Structure – Drilled Pier Test Probe Holes”, and “Option B5 – South Parking Structure – Trench and Pit Rock Removal”.

************************************************************************************************Amendment 0001

0018 Option B2 – South Parking

Structure – Drilled Piers in Unclassified Excavations

1 Job NA $

All costs associated with the installation of the drilled pier foundations in unclassified excavations associated with “Option B1 – South Parking Structure”, to include, but not limited to, associated mobilization, labor, equipment, casings, concrete, reinforcing, and disposal of any associated spoils. For purposes of this Item, unclassified excavations are as defined in SECTION 31 63 26 DRILLED PIER for Phase A. The drilled pier unit prices and subtotals shall be provided below for the estimated quantities listed for each specified a 30” Diameter 60 VLF $ $ b 36” Diameter 70 VLF $ $ c 42” Diameter 20 VLF $ $ d 48” Diameter 350 VLF $ $ e 54” Diameter 60 VLF $ $

Description Quantity Unit Unit

***This Option must be exercised in conjunction with “Option B1 – South Parking

Structure”, “Option B3 – South Parking Structure – Drilled Piers in Rock”, “Option B4 – South Parking Structure – Drilled Pier Test Probe Holes”, and “Option B5 – South Parking Structure – Trench and Pit Rock Removal”.

0019 Option B3 – South Parking

Structure – Drilled Piers in Rock 1 Job NA $

All costs associated with the installation of the drilled pier foundations in rock associated with “Option B1 – South Parking Structure”, to include, but not limited to, associated mobilization, labor, equipment, casings, concrete, reinforcing, rock sockets, and disposal of any associated spoils. This Item is exclusive of all costs associated with any required test probe holes, which are covered under Item 0020. For purposes of this Item, rock is as defined in SECTION 31 63 26 DRILLED PIER for Phase A. The drilled pier unit prices and subtotals shall be provided below for the estimated quantities listed for each specified a 30” Diameter 30 VLF $ $ b 36” Diameter 80 VLF $ $ c 42” Diameter 10 VLF $ $ d 48” Diameter 440 VLF $ $ e 54” Diameter 60 VLF $ $

Structure”, “Option B2 – South Parking Structure – Drilled Piers in Unclassified Excavations”, “Option B4 – South Parking Structure – Drilled Pier Test Probe Holes”, and “Option B5 – South Parking Structure – Trench and Pit Rock Removal”.

0020 Option B4 – South Parking

Structure – Drilled Pier Test Probe Holes

138 EA $ $

All costs associated with the installation of the estimated quantity of test probe holes in drilled piers associated with “Option B1 – South Parking Structure”, to include, but not limited to, associated mobilization, labor, equipment, and disposal of any associated spoils, as required per SECTION 31 63 26 DRILLED PIER for Phase A.

Structure”, “Option B2 – South Parking Structure – Drilled Piers in Unclassified Excavations”, “Option B3 – South Parking Structure – Drilled Piers in Rock”, and “Option B5 – South Parking Structure – Trench and Pit Rock Removal”.

0021 Option B5 – South Parking

Structure – Trench and Pit Rock Removal

140 CY $ $

All costs associated with the removal and off-site disposal of the estimated quantity of rock encountered during earthwork associated with trenches and pits. For purposes of this

Description Quantity Unit Unit

Item, trench and pit rock removal is as defined in and quantity is as calculated per SECTION 31 20 00 EARTHWORK for Phase A. The definitions in the specification do not preclude rock removal via blasting so long as all contract requirements are met.

Structure”, “Option B2 – South Parking Structure – Drilled Piers in Unclassified Excavations”, and “Option B3 – South Parking Structure – Drilled Piers in Rock”, and “Option B4 – South Parking Structure – Drilled Pier Test Probe Holes”.

Amendment 0004************************************************************************************************ 0022 Option C – South Parking Lot 1 Job NA $ This Item includes all work required in lieu of or in addition to that work included in the

Base…

This is the start of the file's text. The full file is on GovTribe.