W912QR21R0008_Plans_PhaseA-0008.pdf
PDF 5 MB Posted
- Solicitation number
- W912QR21R0008
About this file
This announcement provides information about an upcoming federal contract opportunity to design and construct a new medical center campus to replace aging facilities at the Robley Rex VA Medical Center in Louisville, KY. The U.S. Army Corps of Engineers intends to issue a request for proposal for a firm-fixed-price construction contract with a duration of 1,554 calendar days and a target ceiling of approximately $705 million. The project scope involves building a new 104-bed hospital, parking structure for 2,600 cars, campus infrastructure, and other site improvements. The solicitation is anticipated for release on 3 December 2020 and will be available electronically at Beta.SAM. Proposals will be evaluated using a best value tradeoff process considering past performance, management, schedule, small business participation, and price. Award is intended without discussions but the right to hold discussions is reserved if in the government's best interest.
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D
DETENTION BASIN WITH GCL LINER
SEE DETAIL BELOW
DETENTION BASIN
WITH GCL LINER
SEE DETAIL BELOW
MSD EF-05-02 STRAIGHT HEADWALL
INLET PROTECTION AT 18" CULVERT
DETENTION BASIN
WITH GCL LINER
SEE DETAIL BELOW
SILT FENCE
LIMITS OF WORK
UNDERGROUND STORMWATER
DETENTION BASIN
EROSION CONTROL BLANKET
MSD EPM-5:ECB/TRM
MSD CLASS II, TYPE B
EROSION CONTROL BLANKET
MSD EF-05-02 STRAIGHT HEADWALL
INLET PROTECTION
MSD EF-05-02 STRAIGHT HEADWALL
INLET PROTECTION
MSD EF-05-02 STRAIGHT HEADWALL
INLET PROTECTION
INSTALL INLET PROTECTION
AT ALL STORM SEWER INLETS
MSD EF-01-02, EF-03-02, EF-13-01 OR
EF-14-01 AS APPLICABLE
NOTE:
ENTIRE SITE, EXCEPT STONE HAUL
ROAD, TO RECEIVE TEMPORARY
SEEDING UPON COMPLETION OF MASS
GRADING OPERATIONS.
DETENTION BASIN B
SURFACE AREA AT ELEV 587.0 = 8,884 SQUARE FEET
SURFACE AREA AT ELEV 590.0 = 14,470 SQUARE FEET
MAX DEPTH = 3.5' VOLUME AT ELEV 589.99 = 34,615 CUBIC FEET
STORM SEWER INLETS AND PIPING
TYP
SOUTH PARKING ACCESS DURING
PHASE B CONSTRUCTION
PHASE A CONSTRUCTION
STAGING AND TRAILER AREA
SOUTH PARKING DECK
SILT FENCE
TEMPORARY CONSTRUCTION FENCE
TEMPORARY
CONSTRUCTION FENCE
FILTER FABRIC INLET
PROTECTION IN
NON-PAVED AREA
(MSD EF-01-02), TYP.
FILTER FABRIC INLET
PROTECTION IN PAVED
AREA (MSD EF-03-02), TYP.
FILTER FABRIC INLET
PROTECTION IN PAVED
AREA (MSD EF-03-02),
TYP.
FILTER FABRIC INLET
PROTECTION IN PAVED
AREA (MSD EF-03-02),
TYP.
FILTER FABRIC INLET
PROTECTION IN PAVED
AREA (MSD EF-03-02),
TYP.
FILTER FABRIC INLET
PROTECTION IN PAVED
AREA (MSD EF-03-02),
TYP.
FILTER FABRIC INLET
PROTECTION IN PAVED
AREA (MSD EF-03-02),
TYP.
FILTER FABRIC INLET
PROTECTION IN PAVED
AREA (MSD EF-03-02),
TYP.
FILTER FABRIC INLET
PROTECTION IN
NON- PAVED AREA
(MSD EF-01-02), TYP.
FILTER FABRIC INLET
PROTECTION IN NON-PAVED
AREA (MSD EF-01-02), TYP.
FILTER FABRIC INLET
PROTECTION IN
NON-PAVED AREA
(MSD EF-01-02), TYP.
FILTER FABRIC INLET
PROTECTION IN
NON-PAVED AREA,
(MSD EF-01-02) TYP.
OUTLET STABILIZATION
MSD EMP-8:OS
TYP
OUTLET STABILIZATION
STONE STABILIZED CONSTRUCTION
ENTRANCE AND CONSTRUCTION
WASHING STATION
UNDERGROUND STORMWATER
DETENTION BASIN
UNDERGROUND STORMWATER
DETENTION BASIN
STORMWATER
PUMP STATION
BACKFILL NORTH FACE OF PARKING
DECK TO ELEVATION 598.00
BACKFILL EAST FACE OF PARKING DECK
TO 12" BELOW FINISH FLOOR ELEVATION;
ALLOW FOR INSTALLATION OF HAUL
ROAD TO DECK ENTRY
MSD EPM-8:OS OUTLET STABILIZATION
KYTC CHANNEL LINING CLASS II
ON NON-WOVEN GEOTEXTILE.
CHANNEL LINING TO EXTENT 5' UPSTREAM, AND 20'
DOWNSTREAM OF OUTLET. LINING TO EXTEND TO
TOP OF EXISTING DITCH BANK ON I-264 SIDE
TYPICAL AT ALL OUTLETS INTO I-264 DITCH
DETENTION BASIN OUTLET
SEE DETAIL 1 ON SHEET CU120
TYP
SILT FENCE AT PERIMETER OF
BASIN OUTLET STONE
TYP
STONE HAUL ROAD
TYP
DETENTION BASIN C
SURFACE AREA AT ELEV 583.0 = 3,076 SQUARE FEET
SURFACE AREA AT ELEV 585.0 = 10,502 SQUARE FEET
MAX DEPTH = 2.4' VOLUME AT ELEV 584.78 = 12,304 CUBIC FEET
DETENTION BASIN A
SURFACE AREA AT ELEV 586.75 = 955 SQUARE FEET
SURFACE AREA AT ELEV 589.0 = 4,334 SQUARE FEET
MAX DEPTH = 2.25' VOLUME AT ELEV 588.57 = 2,878 CUBIC FEET
SILT FENCE
15' J HOOK @ 100'
INTERVALS ALONG
SILT FENCE
15' J HOOK @ 100'
INTERVALS ALONG
SILT FENCE
15' J HOOK @ 100'
INTERVALS ALONG
SILT FENCE
590 590
SOIL EROSION AND SEDIMENTATION CONTROL
POST PHASE A CONSTRUCTION LEGEND:
PROPERTY LINE
TEMPORARY CONSTRUCTION FENCE
LIMITS OF WORK
SILT FENCE (MSD EF-09-02)
STONE STABILIZED TEMPORARY CONSTRUCTION ENTRANCE (MSD ER-01-03)
EROSION CONTROL BLANKET (MSD EC-07-01)
STONE HAUL ROAD
DETENTION BASIN WITH GCL
FILTER FABRIC INLET PROTECTION, IN NON-PAVED AREA (MSD EF-01-02)
STONE BAG INLET PROTECTION, ADJACENT TO HAUL ROAD (MSD EF-03-02)
NOTES:
SEQUENCE WORK SO THAT STONE HAUL ROAD IS CONSTRUCTED PRIOR TO START OF
EXCAVATION OR CONSTRUCTION OF UTILITIES OR PARKING STRUCTURE. CONDUCT GRADING
OPERATIONS ONLY TO THE EXTENT NEEDED TO CONSTRUCT STONE HAUL ROAD AND INSTALL
ROAD PRIOR TO COMMENCEMENT OF OTHER WORK.
STONE HAUL ROAD TO SLOPE AS SHOWN ON GRADING PLAN.
SET TOP OF STONE 6" HIGHER THAN GRADES SHOWN ON GRADING PLAN IN HAUL ROAD AREAS
TO FACILITATE DRAINAGE.
MAINTAIN STONE HAUL ROAD DURING CONSTRUCTION SO THAT NO RUTS, WASH OUTS,
DEPRESSIONS OR OTHER DEFORMITIES IN THE DRIVING SURFACE EXIST LONGER THAT 24
HOURS. REPAIR ALL ABOVE-DESCRIBED ANOMALIES IN GRADE LINE OF STONE HAUL ROAD
WITHIN 24 HOURS OF THEIR FORMATION. THE STONE HAUL ROAD IS TO BE KEPT IN GOOD
REPAIR AS DESCRIBED HERE SO IT CAN BE EASILY UTILIZED BY EMERGENCY VEHICLES.
1'- 0"
TYPE III GEOTEXTILE
PREPARED AND
COMPACTED
SUBGRADE
SLOPE
5" KYTC No. 5 STONE
GRADE SHOWN ON PLANS
IN HAUL ROAD AREAS
TRIAXIAL GEOGRID
TENSAR TX160
7" KYTC No. 3 STONE
5"
GRADE SHOWN ON PLANS
1"
7" KYTC No. 3 STONE EDGE
PREPARED AND COMPACTED SUBGRADE
2'- 0"
1'-6" 1'-6"
PHASE B GRADES (NOT
IN CONTRACT)
COMPACTED
SOIL BACKFILL
4" THICK LAYER FINE AGGREGATE CUSHION
AASHTO M6, FINE AGGREGATE FOR PORTLAND
CEMENT CONCRETE, OR AS RECOMMENDED
BY LINER MANUFACTURER
GEOSYNTHETIC CLAY LINER (GCL) WITH
LAMINATED GEOMEMBRANE
GCL ANCHOR TRENCH PER LINER
MANUFACTURER'S RECOMMENDATIONS
STORMWATER
DETENTION BASIN
4' TOPSOIL AND SEED
1'-0"
EROSION CONTROL BLANKET, MSD CLASS II, TYPE B
EROSION PREVENTION AND
SEDIMENT CONTROL PLAN -
POST PHASE A
CS101
1. CS100 - EROSION PREVENTION AND SEDIMENT CONTROL PLAN - PHASE A DEPICTS
PRE-CONSTRUCTION CONDITIONS. CS101 - EROSION PREVENTION AND SEDIMENT
CONTROL PLAN - POST PHASE A DEPICTS REQUIRED CONDITIONS ONCE PHASE A
WORK IS COMPLETE.
2. REFER TO CS102 - EROSION PREVENTION AND SEDIMENT CONTROL NOTES FOR EPSC
NOTES, SEQUENCE OF CONSTRUCTION, AND MAINTENANCE SCHEDULE.
NOTES:
PMD JY
0' 120'60'30'
SCALE: 1" = 60'-0"
STONE HAUL ROAD1 SECTION NO SCALE
GEOSYNTHETIC CLAY LINER (GCL)2 SECTION NO SCALE
t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t
EM RA, JY, SH
URS | SMITHGROUP JOINT VENTURE
T 313.983.3600 F 313.983.3636
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Facilities
Management
B
A
C
D
E
F
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
Louisville, Kentucky
REPLACEMENT VA MEDICAL CENTER
VA Project No. 603-320
TRUE NORTH
PROJECT NORTH
97 8654321 o n e s i x t e e n t h i n c h o n e f o o t o n e t h i r t y s e c o n d t h i n c h o n e f o o t
PROJECT # 14576907/22200.000
OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT - CENTRAL REGION
3001 GREEN BAY ROAD
BUILDING 48
NORTH CHICAGO, IL 60064
T 224.610.3492
U.S. DEPARTMENT OF VETERANS AFFAIRS
500 WEST JEFFERSON ST.
Suite 1600
LOUISVILLE, KY 40202
www.urscorp.com | www.smithgroupjjr.com
CONSTRUCTION DOCUMENTS
20NOV2020
USACE P2 No. 453413
USACE LOUISVILLE DISTRICT
600 DR. MARTIN LUTHER KING PLACE
LOUISVILLE, KY 40202
PHONE: 502-315-6766
FAX: 502-315-6195
CONTRACTING DIVISION OrientationSeal
20NOV2020
PHA CERTIFIED FINAL 20NOV2020
Mark
TYPE I
TYPE II
TYPE III
TYPE IV
TYPE V
SLOPE PROTECTION AND CHANNEL LINING
UNDERDRAINS AND FOUNDATION DRAINS
SUBGRADE OR EMBANKMENT STABILIZATION
DRAINAGE BLANKETS AND PAVEMENT EDGE DRAINS
SUBGRADE UNDERCUTS
GEOTEXTILE MATERIALS AND APPLICATION
GEOTEXTILE MATERIALS TO BE PER KENTUCKY TRANSPORTATION
CABINET (KYTC) MATERIALS SPECIFICATION SECTION 843 FOR THE
TYPES INDICATED ABOVE.
GEOTEXTILE INSTALLATION TO BE PER KYTC SPECIFICATION
SECTION 214
GEOSYNTHETIC CLAY LINER
GEOSYNTHETIC CLAY LINER TO BE A REINFORCED CLAY LINER CONSISTING OF A LAYER OF SODIUM BENTONITE BETWEEN A POLYPROPYLENE WOVEN GEOTEXTILE AND A POLYPROPYLENE NONWOVEN GEOTEXTILE WHICH ARE
NEEDLE-PUNCHED TOGETHER AND LAMINATED TO A POLYETHYLENE GEOFILM.
AMENDMENT 0008 1 26FEB2021
CERTIFIED FINAL
PHYSICAL PROPERTIES
MATERIAL PROPERTY TEST METHOD TEST FREQUENCY REQUIRED VALUES
BENTONITE SWELL INDEX ASTM D5890 1 PER 50 TONNES 24 mL / 2g MIN.
BENTONITE FLUID LOSS ASTM D5891 1 PER 50 TONNES 18 mL max.
BENTONITE MASS / AREA ASTM D5993 40,000 SQUARE FEET 0.75 LB / FT
GCL GRAB STRENGTH ASTM D6768 200,000 SQUARE FEET 45 LBS / IN MARV
GCL PEEL STRENGTH ASTM D6496 40,000 SQUARE FEET 3.5 LBS / IN MIN.
GCL FLUID CONDUCTTIVITY ASTM D5887 PERIODIC 5 x 10 cm/s MAX.
GCL FLUX ASTM D5887 PERIODIC 1 x 10 m / m / s MAX.
GCL HYDRATED INTERNAL SHEAR STRENGTH ASTM D5321 PERIODIC 500 PSF TYPICAL
ASTM D6243
-10
-9 3 2
W
2Q R
R
_P la ns _P ha se
A-
2-YEAR ORIFICE ELEVATION
STRUCTURE OCS-301
RIM
INLET IE
OUTLET IE
2-YEAR
10-YEAR
100-YEAR
ORIFICE INFO.
588.50
585.50
SIZE (IN)
6.0
NUMBER
FLOW
FLOW
6.00'
DIAMETER
2.0 0'
SU
MP
FLOWFLOW
BAFFLE WALL
BAFFLE WALL
ORIFICE HOLES IN BAFFLE WALL
SEE CHART FOR NUMBER
SIZE AND ELEVATION
1.00'
12" C TO C HOLE
SPACING, TYP.
PLAN OF STRUCTURE
SECTION A-A SECTION B-B
NOTES:
MANHOLE AND OUTLET STRUCTURES TO BE PRECAST
CONCRETE STRUCTURES WITH INTEGRAL BOTTOM.
STRUCTURES TO BE PER ASTM C-478.
A A
B B
25-YEAR ORIFICE ELEVATION
PIPE INLET
100-YEAR STORM ELEVATION/OVERFLOW (TOP OF BAFFLE)
FRAME AND GRATE
(ABOVE)
FINISH GRADE
MANHOLE FRAME AND GRATE
ECCENTRIC CONE SECTION
MANHOLE STEPS
STRUCTURE
RIM
INLET IE
OUTLET IE
2-YEAR
10-YEAR
100-YEAR
ORIFICE INFO.
SIZE (IN)NUMBER
OCS-302
592.60
588.50 NA
T/BAFFLE NA
T/BAFFLE
100-YEAR ORIFICE ELEVATION
10-YEAR ORIFICE ELEVATION
25-YEAR - --
25-YEAR
STRUCTURE
RIM
INLET IE
OUTLET IE
2-YEAR
10-YEAR
100-YEAR
ORIFICE INFO.
SIZE (IN)NUMBER
OCS-303
585.75
T/BAFFLE NA
25-YEAR
STRUCTURE OCS-304
RIM
INLET IE
OUTLET IE
2-YEAR
10-YEAR
100-YEAR
ORIFICE INFO.
587.88
SIZE (IN)NUMBER
STRUCTURE
RIM
INLET IE
OUTLET IE
2-YEAR
10-YEAR
100-YEAR
ORIFICE INFO.
SIZE (IN)NUMBER
OCS-305
593.93
NA
T/BAFFLE NA
T/BAFFLE
25-YEAR
25-YEAR
STRUCTURE
RIM
INLET IE
OUTLET IE
2-YEAR
10-YEAR
100-YEAR
ORIFICE INFO.
SIZE (IN)NUMBER
OCS-307
586.27
T/BAFFLE NA
25-YEAR
587.00 588.57
5.5 6.0
589.99
589.26 6.05
582.3
2.0
584.80
582.65
582.50 584.97
3.0 4.0
582.65
587.62
586.20 5.04
574.91 577.99 579.43
3.6 6.0
581.89 NA
5.54
574.84 574.44
564.11
564.17 567.75
2.9 5.7
563.60
572.63
569.70 6.05
BASIN A
BASIN B
BASIN C
TANK 3
TANK 1
TANK 4
NOTES:
1. BASIS OF DESIGN LAG PUMPS TO BE FLYGT NP3202 LT3~616, 480V, 3-PHASE, 45 HP
PUMPS. PUMPS TO BE COMPLETE REMOVABLE PACKAGE INCLUDING LIFTING RAILS
AND ALL LEVEL CONTROLS, VALVES AND APPURTENANCES NECESSARY.
2. BASIS OF DESIGN LEAD (SUMP) PUMP TO BE BARNES 4SEV7544DS, 480V, 3 PHASE,
7.5 HP, 1750 RPM, PROVIDE PUMP CONTROLLER TO SET PUMP CYCLE FOR
EQUIVALENT DISCHARGE RATE OF 2,500 GALLONS PER HOUR (312 GPM) . PROVIDE
CHECK VALVES IN RISERS. CONNECT PUMP DISCHARGE PIPING TO ADJACENT LAG
PUMP 12" DISCHARGE PIPE. PUMP TO BE INSTALLED AS A REMOVABLE PACKAGE
INCLUDING LIFTING CHAINS. PROVIDE ALL LEVEL CONTROLS, VALVES AND
APPURTENANCES NECESSARY.
3. WET WELL TO BE 18'-10" x 13'-8" CONCRETE STRUCTURE. PROVIDE ROCK ANCHORS
AND 8" MINIMUM THICK CONCRETE LEVELING MAT ON TOP OF EXISTING ROCK
SURFACE. ROCK ANCHORS TO BE DESIGNED BY CONTRACTOR TO RESIST 100,000
LBS OF TOTAL UPLIFT.
4. APPLY TWO COATS OF MASTIC WATERPROOFING TO ENTIRE EXTERIOR SURFACE
OF WET WELL. PROVIDE CONCRETE TOP SECTION WITH CUSTOM PUMP ACCESS
HATCH FOR EACH PUMP CAPABLE OF AASHTO HS-20 LOADING. COORDINATE
ACCESS HATCH SIZE WITH PUMP MINIMUM CLEAR OPENING AND PUMP LIFTING
RAIL REQUIREMENTS. PROVIDE MANHOLE STEPS.
5. PROVIDE AND INSTALL ALL PIPING, APPURTENANCES AND SUPPORTS REQUIRED
TO CONNECT PUMPS TO 18" DISCHARGE PIPE. CHECK VALVES ARE REQUIRED IN
ALL PUMP DISCHARGE PIPING. PIPE MATERIALS TO MEET PUMP MANUFACTURER'S
RECOMMENDATIONS. PIPING SHOWN IS SCHEMATIC AND MAY BE MODIFIED TO
MEET PUMP MANUFACTURER'S REQUIREMENTS. INSTALL UNIONS OR OTHER
APPROVED QUICK DISCONNECT METHOD FOR EASY PUMP REMOVAL
6. PROVIDE AND INSTALL PUMP CONTROLLER AND ALL WIRING, BREAKERS,
DISCONNECTS, CONDUIT AND CONDUCTORS REQUIRED TO OPERATE THE PUMPS.
LOCATE PUMP CONTROLLER IN SOUTH PARKING DECK. COORDINATE WITH SHEET
ES2007. ELECTRICAL CONNECTIONS TO MEET ALL APPLICABLE CODES AND
ORDINANCES.
7. INSTALL COMMUNICATIONS LINES FROM WET WELL AND PUMP CONTROLLER TO
PUMP CONTROLLER LOCATION IN SOUTH PARKING DECK. COORDINATE CABLE
REQUIREMENTS WITH CONTRACTING OFFICER.
8. PROVIDE ADEQUATE AIR RELIEF IN DISCHARGE LINE AS REQUIRED TO PREVENT
AIR LOCK
9. ALL EXTERIOR FORCE MAIN PIPING TO BE RESTRAINED JOINT DUCTILE IRON PIPING
10. PROVIDE AND INSTALL AASHTO HS-20 RATED ACCESS HATCH FOR EACH PUMP.
COORDINATE ACCESS HATCH SIZE REQUIREMENTS WITH PUMP MANUFACTURERS
REQUIREMENTS.
BASIS OF DESIGN HATCHES
HATCH "A" BILCO MODEL J-2H20
HATCH "B" BILCO MODEL J-3H20
HATCH 'C' BILCO, CUSTOM MODEL SIMILAR TO JD-3H20, CLEAR OPENING =
42" x 52" OR AS REQUIRED BY PUMP MFR.
11. LADDER TO BE PRE-MANUFACTURED VAULT LADDER, FIXED TYPE, MOUNTED TO
SIDE OF WET WELL, STAINLESS STEEL OR ALUMINUM, 300 LB MINIMUM CAPACITY.
TOP STEP SHALL BE WITHIN 24" OF TOP OF HATCH. BOTTOM RUNG SHALL BE
WITHIN 16" OF BOTTOM OF WET WELL. RUNGS TO BE SLIP RESISTANT
CONSTRUCTION.
'-0
2'- 0"
'-01 8"
2'- 0"
18" DIP
18" x 16" REDUCER
16" X 12" REDUCING WYE
12" DIP12" x 45° BEND
12" DIP
12" DIP
16" x 12" REDUCER
12" x 12" WYE
12" x 45° BEND
12" x 45° BEND
16" X 12" REDUCING WYE
12" DIP
MODULAR ELASTOMER SEAL
AT ALL PIPE PENETRATIONS
12" DIP
2'-0" 3'-934" 3'-114"
1'-7" 8"
4'-6" 2'-0"
10'-6" 7'-2"
18" DIP
18" x 16" REDUCER
16" X 12" REDUCING WYE
16" x 12" REDUCER
12" x 12" WYE
16" X 12" REDUCING WYE
12" x 90° BEND
12" CHECK VALVE
PUMP, PUMP SEAT, MOUNTING,
AND LIFTING RAIL AND CHAIN SET
PER PUMP MANUFACTURER.
LIFTING RAIL
MODULAR ELASTOMER SEAL
AT ALL PIPE PENETRATIONS
PIPE SUPPORT
TYP
LEAD PUMP
LAG PUMP
TYPICAL 4
PLACES
BAFFLE WALL
36" RCP IN FROM
STMH-013
1'- 6"
1'- 11 2"
PUMP LEVELS:
LEAD OFF 558.89
LEAD ON 560.89
LAG 1 OFF 560.89
LAG 1 ON 564.00
LAG 2 OFF 564.00
LAG 2 ON 566.00
LAG 3 OFF 566.00
LAG 3 ON 568.88
LAG 4 OFF 568.88
LAG 4 ON 571.46
ALARM : 577.00
NOTE:
LEAD PUMP OFF WHEN
LAG PUMP(S) RUNNING
6'-9"
17'-8"
13'-8"
'-8
3 16
ROCK ANCHOR
TYP
ROCK ANCHOR
CONCRETE LEVELING MAT
2'- 2"
4'- 8"
4'- 8"
4'- 8"
4'- 21 4"
1'- 73 4"
ROCK ANCHOR
CONCRETE LEVELING MAT
#10's @ 12" VERT
LAG PUMP
TYP
6" HIGH CONCRETE
ANTI-VORTEX BAFFLE
TYP
OPENINGS
IN BAFFLE
WALL
#6's @ 12" HORIZ
#9's @ 12" TOP & BOT #6's @ 12"
#10's @ 12" EW BOT #8's @ 12" EW TOP
1'- 6"
CONNECT LEAD PUMP 4" DISCHARGE LINE TO
LAG PUMP 12" DISCHARGE LINE WITH
12" x 4" REDUCING WYE
SLOPE FLOOR TO
PUMPS
SLOPE FLOOR TO
PUMPS
BAFFLE
WALL
NOTE:
INSTALL #6, 48"x48" CORNER BARS
@ 12" O.C. HORIZ AT STRUCTURE
CORNERS
TOP OF BAFFLE WALL
9'- 71 2"
22'-0"
9'- 71 2" 6"
3'-0"
LEAD PUMP
OPNG
1134" 2'-812" 1'-1112" 2'-812" 1'-1112" 2'-812" 1'-1112" 2'-812" 93 4"
1'- 9"
OPENINGS IN BAFFLE WALL
TYP
#6 BARS @ 12" O.C. EW
PLACE BARS 2 12" CLEAR
FROM WALL FACE OPPOSITE
36" STORM SEWER
EXTEND BARS 10" INTO
STRUCTURE SIDE WALL
THREE #6 BARS x 48" LONG
EXTEND BARS 10" INTO
STRUCTURE FLOOR
TYP BETWEEN OPENINGS
ACCESS HATCH
SECTION ASECTION B
BAFFLE WALL ELEVATION
36" RCP
IN FROM
STMH-013
NOTE:
LEAD PUMP NOT SHOWN
W12x26, CENTERED BETWEEN PUMPS
COORDINATE MEMBER SIZE WITH MINIMUM
HATCH SIZE AND PUMP CLEARANCE
REQUIREMENTS
W12x26
W12x26
W12x26
W12x26
BEAM POCKET
FOR ROOF BEAMS
TYP
ROOF BEAM
TYP
LADDERHATCH B HATCH A
HATCH C
TWO #6 BARS x 48" LONG
EXTEND BARS 10" INTO
STRUCTURE FLOOR
W x2 t h r e e q u a r t e r s i n c h o n e f o o t o n e i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t
EM RA, JY, SH
URS | SMITHGROUP JOINT VENTURE
T 313.983.3600 F 313.983.3636
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Facilities
Management
B
A
C
D
E
F
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
Louisville, Kentucky
REPLACEMENT VA MEDICAL CENTER
VA Project No. 603-320
TRUE NORTH
PROJECT NORTH
97 8654321 o n e s i x t e e n t h i n c h o n e f o o t o n e t h i r t y s e c o n d t h i n c h o n e f o o t
PROJECT # 14576907/22200.000
OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT - CENTRAL REGION
3001 GREEN BAY ROAD
BUILDING 48
NORTH CHICAGO, IL 60064
T 224.610.3492
U.S. DEPARTMENT OF VETERANS AFFAIRS
500 WEST JEFFERSON ST.
Suite 1600
LOUISVILLE, KY 40202
www.urscorp.com | www.smithgroupjjr.com
CONSTRUCTION DOCUMENTS
20NOV2020
USACE P2 No. 453413
USACE LOUISVILLE DISTRICT
600 DR. MARTIN LUTHER KING PLACE
LOUISVILLE, KY 40202
PHONE: 502-315-6766
FAX: 502-315-6195
CONTRACTING DIVISION OrientationSeal
20NOV2020
PHA CERTIFIED FINAL 20NOV2020
Mark
CU235
OUTLET CONTROL
STRUCTURE DETAILS
OUTLET CONTROL STRUCTURES1 N.T.S.
SOUTH PUMP STATION - PS-6022 N.T.S.
MAXIMUM ALLOWABLE DISCHARGE RATES (CFS)
2-YEAR 10-YEAR 25-YEAR 100-YEAR
TANK-1 (OCS-305) 3.39 7.22 9.50 12.93
TANK-3 (OCS-304) 2.41 9.90 15.14 23.58
TANK-4 (OCS-307) 1.69 6.94 10.62 16.54
UNDERGROUND DETENTION SYSTEM BASIS OF DESIGN:
1. BASIS OF DESIGN MANUFACTURER FOR UNDERGROUND DETENTION SYSTEM IS STORMTRAP PRECAST
CONCRETE DETENTION UNITS.
2. CONTRACTOR MAY MAY ELECT TO USE SUBSTITUTE UNDERGROUND DETENTION SYSTEM MEETING THE
FOLLOWING REQUIREMENTS.
3. SUBSTITUTE UNDERGROUND DETENTION SYSTEM MUST BE DESIGNED BY A LICENSED PROFESSIONAL
ENGINEER REGISTERED IN THE STATE OF KENTUCKY
4. SUBSTITUTE SYSTEM MUST BE WATER TIGHT.
5. SUBSTITUTE SYSTEM MAY NOT USE AN OPEN BOTTOM / AGGREGATE BASE DESIGN.
6. UNDERGROUND PIPE SIZE OR VAULT HEIGHT SHALL NOT BE LESS THAN 36-INCHES.
7. UNDERGROUND DETENTION SYSTEM SHALL HAVE A MINIMUM OF TWO ACCESS-WAYS FOR MAINTENANCE
AND INSPECTION OF THE ENTIRE DETENTION SYSTEM.
8. UNDERGROUND DETENTION SYSTEMS SHALL DISCHARGE THROUGH A MULTI-STAGE CONTROLLED
OUTLET. DISCHARGE RATES MAY NOT EXCEED THE PRE-CONSTRUCTION DISCHARGE RATES FOR THEIR
TRIBUTARY AREAS. MAXIMUM DISCHARGE RATES ARE AS LISTED IN THE TABLE BELOW:
9. DESIGN, LAYOUT, SHOP DRAWINGS AND CALCULATIONS MUST BE PROVIDED TO THE CONTRACTING
OFFICER FOR RECORD KEEPING PURPOSES.
14. THE CONFIGURATION OF A SUBSTITUTE UNDERGROUND DETENTION SYSTEM MAY NOT INTERFERE WITH
OR IMPACT DESIGN AND INSTALLATION OF OTHER SITE SYSTEMS.
15. DESIGN OF SUBSTITUTE SYSTEM IS CONSIDERED PART OF THE CONTRACTOR'S BIDDING PROCESS.
DESIGN FEES ASSOCIATED WITH THE CONTRACTOR'S PREPARATION OF SUBSTITUTE SYSTEM WILL NOT
BE REIMBURSED.
PREFABRICATED WATER QUALITY UNITS BASIS OF DESIGN:
1. BASIS OF DESIGN MANUFACTURER FOR UNDERGROUND DETENTION SYSTEM IS STORMTRAP PRECAST
CONCRETE WATER QUALITY UNITS.
2. CONTRACTOR MAY MAY ELECT TO USE SUBSTITUTE MANUFACTURER FOR PREFABRICATED WATER
QUALITY UNITS.
3. PREFABRICATED UNITS MUST BE 'OFF-LINE' DESIGN
4. SUBSTITUTE UNITS MUST MEET THE CURRENT 80-PERCENT TOTAL SUSPENDED SOLIDS REMOVAL
CRITERIA CONTAINED IN CHAPTER 18 OF THE LATEST MSD DESIGN MANUAL. AND CURRENT CITY OF
LOUISVILLE / MSD GREEN INFRASTRUCTURE ORDINANCE AND DESIGN REQUIREMENTS.
5. CONTRACTOR MAY USE MANUFACTURER AND UNITS PRE-APPROVED BY MSD. CONTACT MSD FOR
CURRENT LIST OF MANUFACTURERS AND MODELS.
6. PREFABRICATED UNITS MUST BE CAPABLE OF TREATING THE FLOW RATES LISTED BELOW, RATES ARE CALCULATED USING THE RAINFALL INTENSITY OF 2.82 INCHES/HOUR RAINFALL INTENSITY PER CHAPTER
18 OF 2015 EDITION OF THE MSD DESIGN MANUAL.
7. DESIGN, LAYOUT, AND SHOP DRAWINGS MUST BE PROVIDED TO THE CONTRACTING OFFICER FOR
RECORD KEEPING PURPOSES.
8. THE CONFIGURATION OF A SUBSTITUTE UNDERGROUND DETENTION SYSTEM MAY NOT INTERFERE WITH
OR IMPACT DESIGN AND INSTALLATION OF OTHER SITE SYSTEMS.
9. ANY DESIGN ASSOCIATED WITH SUBSTITUTE PREFABRICATED WATER QUALITY UNITS IS CONSIDERED PART OF THE CONTRACTOR'S BIDDING PROCESS. DESIGN FEES ASSOCIATED WITH THE CONTRACTOR'S
PREPARATION OF SUBSTITUTE SYSTEM WILL NOT BE REIMBURSED.
WATER QUALITY TREATMENT RATES (CFS)
STRUCTURE UPSTREAM
STRUCTURE
DOWNSTREAM
STRUCTURE TREATMENT RATE
WQ-501-4 STMH-051 TANK 1 7.88
WQ-503-6 CB-213 TANK 3 23.47
WQ-503-7 CB-215 TANK 3 0.48
WQ-504-8 STMH-011 TANK 4 3.21
WQ-504-9 STMH-019 TANK 4 15.89
PUMP STATION BASIS OF DESIGN:
1. BASIS OF DESIGN MANUFACTURER FOR STORMWATER PUMPS ARE AS LISTED IN NOTES 1 AND 2 ABOVE DETAIL.
2. CONTRACTOR MAY ELECT TO USE SUBSTITUTE PUMP MODELS / MANUFACTURER MEETING THE FOLLOWING REQUIREMENTS.
3. LAG PUMPS MUST BE CAPABLE OF PUMPING THE COMBINED OUTFLOWS FROM SURFACE DETENTION BASIN C, AND UNDERGROUND DETENTION TANKS 3 AND 4 FOR THE 2, 10, 25 AND 100-YEAR RAINFALL
EVENTS.
4. LAG PUMPS MUST BE CAPABLE OF PUMPING A MINIMUM OF 4,000 GPM INDIVIDUALLY WITH A COMBINED MINIMUM PUMPING CAPACITY OF 15,000 GPM WITH A VERTICAL LIFT OF 27-FEET, WITH TOTAL
DYNAMIC HEAD OF 36.5-FEET.
5. LAG PUMPS SHALL NOT RUN AT WATER LEVELS IN THE WET WELL THAT ARE BELOW THOSE INDUCED BY RAIN EVENTS LESS THAN THE 2-YEAR EVENT.
6. LEAD PUMP SHALL BE CAPABLE OF PUMPING 350 GPM AT 27-FEET OF VERTICAL LIFT.
7. LEAD PUMP SHALL RUN AT WATER LEVELS IN THE WET WELL THAT ARE BELOW THOSE INDUCED BY THE 2-YEAR RAIN EVENT.
8. WET WELL DESIGN SHOWN ABOVE IS TAILORED TO SPECIFIC BASIS OF DESIGN PUMP MODELS MANUFACTURED BY FLYGT AND BARNES. CONTRACTOR SHALL PROVIDE WET WELL DESIGN TAILORED TO
SUBSTITUTE PUMP MODEL'S AND MANUFACTURER'S REQUIREMENTS .
9. CONTRACTOR'S SUBSTITUTE PUMP STATION MUST BE PROVIDED AS A COMPLETE, OPERABLE PACKAGE. ALL PUMPS, PUMP CONTROLS, LIFTING RAILS, LIFTING CHAINS, ACCESS HATCHES, PIPING, VALVES, FITTINGS AND APPURTENANCES MUST BE INCLUDED.
10. CONTRACTOR SHALL COORDINATE POWER REQUIREMENTS FOR SUBSTITUTE PUMP STATION WITH THOSE SHOWN IN THE CONTRACT DOCUMENTS. REVISIONS OR MODIFICATIONS TO THE POWER AND OR
CONTROLLER REQUIREMENTS WILL BE INCLUDED WITH THE CONTRACTOR'S PRICE FOR THE SUBSTITUTED PUMP STATION
11. CONTRACTOR SHALL DESIGN WET WELL ASSOCIATED WITH SUBSTITUTE PUMP STATION FOR AASHTO HS-20 LOADING.
12. CONTRACTOR SHALL DESIGN WET WELL ASSOCIATED WITH SUBSTITUTE PUMP STATION TO RESIST BUOYANCY INDUCED BY GROUND WATER LEVELS TO THE TOP OF THE WET WELL.
13. DESIGN, LAYOUT, AND SHOP DRAWINGS MUST BE PROVIDED TO THE CONTRACTING OFFICER FOR RECORD KEEPING PURPOSES.
14. SUBSTITUTE PUMP STATION MUST BE DESIGNED BY A LICENSED PROFESSIONAL ENGINEER REGISTERED IN THE STATE OF KENTUCKY.
15. THE CONFIGURATION OF A SUBSTITUTE PUMP STATION MAY NOT INTERFERE WITH OR IMPACT DESIGN AND INSTALLATION OF OTHER SITE SYSTEMS.
16. DESIGN OF SUBSTITUTE PUMP STATION IS CONSIDERED PART OF THE CONTRACTOR'S BIDDING PROCESS. DESIGN FEES ASSOCIATED WITH THE CONTRACTOR'S PREPARATION OF SUBSTITUTE PUMP
STATION WILL NOT BE REIMBURSED.
AMENDMENT 0007 1 10FEB2021
CERTIFIED FINAL
AMENDMENT 0008 2 26FEB2021
W
2Q R
R
_P la ns _P ha se
A-
M M
SD SD
SC SC
SB SB
SA SA
S1
S1
S3
S3
S4
S4
S5
S5
S6
S6
S7
S7
S8
S8
S9
S9
S10
S10
S12
S12
S2
S2 S11
S11
EE200F
EE200F
EE200F
STAIR
GF2501
ELEV.
GF1102
STAIR
GF1101
TELECOM
GF1104
S2.5
S11.3
S0.9
S12.1
(TYP)
(TYP)
(TYP)(TYP)
(TYP)
(TYP)
8 8 8 8
SA
S11
STAIR
GF2501
S11.3 S12.1
SD
S12
TELECOM
GF1104
S11.3
SITE STORM PUMP
STATION CONTROL
PANEL EDP1FB
DS-E-OFA
SEE ONE-LINES
S1 S2
ELEV.
GF1102
STAIR
GF1101
S2.5S0.9
1 1
3 4
TELECOM
GF1103
SUMP PUMP 1 SUMP PUMP 2
Pl ot
Da te:
th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
CONSTRUCTION DOCUMENTS -
URS | SMITHGROUP JOINT VENTURE
500 WEST JEFFERSON ST.
Suite 1600
LOUISVILLE, KY 40202
T 313.983.3600 F 313.983.3636 www.urscorp.com | www.smithgroupjjr.com
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management
B
A
C
D
E
F
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
TRUE NORTH
PROJECT NORTH
97 8654321 o n e si xt e e n th in c h o n e fo o t o n e th ir ty se c o n d th in c h o n e fo o t
PROJECT # 14576907/22200.000
OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT - CENTRAL REGION
3001 GREEN BAY ROAD
BUILDING 48
NORTH CHICAGO, IL 60064
T 224.610.3492
U.S. DEPARTMENT OF VETERANS AFFAIRS
B1 B2 B3
B4 B5 B6
C2 D2D1
KEY PLAN
C1
F
E
SHEET INDEX ID:
NON-SPRINKLERED
N1 N2
USACE LOUISVILLE DISTRICT
600 DR. MARTIN LUTHER KING PLACE
LOUISVILLE, KY 40202
PHONE: 502-315-6766
FAX: 502-315-6195
CONTRACTING DIVISION
OrientationSeal
CERTIFIED FINAL
Mark
2/2 3/2
1 7
:48 :29
A M
26FEB2021
EE200F
SOUTH PARKING GROUND LEVEL
POWER PLAN
BJW GKS
LOUISVILLE, KENTUCKY
REPLACEMENT VA MEDICAL CENTER
VA Project No. 603-320 USACE P2 No. 453413
601.15.2.E2-EE200F-Phase A-ELECTRICAL
SCALE: 1/16" = 1'-0"1 GROUND LEVEL POWER PLAN - PHASE A
SCALE: 1/4" = 1'-0"2 GROUND LEVEL POWER PLAN - ENLARGED SE - PHASE A
SCALE: 1/4" = 1'-0"3 GROUND LEVEL POWER PLAN - ENLARGED SW - PHASE A
SCALE: 1/4" = 1'-0"4 GROUND LEVEL POWER PLAN - ENLARGED NW - PHASE A
SHEET NOTES
KEYNOTES
1 PROVIDE ONE (1) 1" CONDUIT (RECEPTACLES) UNDERSLAB FROM
ELEVATOR PIT TO ELECTRICAL ROOM. FIELD VERIFY STUB UP
LOCATIONS.
2 PROVIDE TWO (2)-3" CONDUITS, FOR NORMAL POWER, WITH PULL
WIRE. ROUTE CONDUITS UNDER SLAB-CONCRETE ENCASED. RISE
CONDUITS TO LEVEL 1 ELECTRICAL ROOM CONCRETE ENCASED.
EXTEND CONDUITS 10' BEYOND FOUNDATION.
3 PROVIDE TWO (2)-4" CONDUITS, FOR TELECOM SERVICES, UNDER
SLAB AND RISE UP INTO GROUND LEVEL TELECOM ROOM. EXTEND
CONDUIT 10' BEYOND FOUNDATION.
4 PROVIDE THREE (3) 3" CONDUITS FOR LIFE SAFETY POWER, WITH
PULLWIRE. ROUTE CONDUITS UNDERSLAB CONCRETE ENCASED.
RISE CONDUITS TO LEVEL 1 ELECTRICAL ROOM. CONCRETE
ENCASED. EXTEND CONDUITS 10' BEYOND FOUNDATION.
5 PROVIDE THREE (3)-4" CONDUITS, FOR LEGALLY REQUIRED
STANDBY, WITH PULL WIRE. ROUTE CONDUITS UNDER
SLAB-CONCRETE ENCASED RISE CONDUITS TO LEVEL 1
ELECTRICAL ROOM, CONCRETE ENCASED. REFER TO STRUCTURAL
DRAWINGS. EXTEND CONDUITS 10' BEYOND FOUNDATION.
6 HORIZONTAL CONDUIT SLEEVE, TYPICAL FOR ALL PRECAST
BEAMS. REFER TO STRUCTURAL DRAWINGS FOR EXACT
LOCATION.
7 PROVIDE TWO (2) 4" CONDUITS FOR FUTURE PV FEEDER. ROUTE
UNDERSLAB AND THROUGH FOUNDATION, 5' BEYOND
FOUNDATION. PROVIDE PULLWIRE. RISE CONDUITS TO LEVELS 5
PV EQUIPMENT AREA. EXTEND CONDUITS 10' BEYOND
FOUNDATION.
8 PROVIDE ONE (1) 4" PVC CONDUIT, STUBBED UP TO GROUND
LEVEL, TO SERVE LIGHTNING PROTECTION SYSTEM DOWN
CONDUCTOR. LIGHTNING PROTECTION SYSTEM SHALL BE
INSTALLED IN PHASE B. EXTEND CONDUIT THROUGH FOUNDATION
AND 5' BEYOND FOUNDATION, PROVIDE PULL WIRE AND CAP
CONDUIT.
9 PROVIDE FEEDER TO SUMP PUMP CONTROL PANEL, REFER TO
ONE-LINE DIAGRAM.
10 PROVIDE ONE (1) 1.5" CONDUIT FOR LEVEL CONTROL AND PUMP
ALARM CABLE. CABLE FURNISHED BY SUMP PUMP
MANUFACTURER, CONTRACTOR SHALL INSTALL CABLE. FINAL
CONTROL CONNECTIONS BY SUMP PUMP MANUFACTURER. FIELD
VERIFY CONDUIT SIZE REQUIRED, WITH MANUFACTURER, PRIOR
TO ROUGH-IN.
11 CONTROL PANEL FURNISHED BY DIV. 33 PUMP MANUFACTURES,
INSTALLED BY CONTRACTOR.
1 A ALL AREAS OF THE NORTH PARKING STRUCTURE, INCLUDING
ALL ENCLOSED ROOMS, ARE TO BE CONSIDERED "WET OR
DAMP" LOCATIONS PER SPECIFICATION 260533, PARAGRAPH 3.7.
PROVIDE RACEWAY AND INSTALLATION PER 260533,
PARAGRAPH 3.7.
PHA CERTIFIED FINAL 20NOV2020
AMENDMENT 0008 1 26FEB2021
W
2Q R
R
_P la ns _P ha se
A-
JJ SD
SC
SB
SA
S1 S3 S4 S5 S6 S7 S8 S9 S10 S12S2
S11
EE201F
EE201F
EE201F
S2.5
S11.3
S0.9
S12.1
1 (TYP)
1 (TYP)
(TYP)
(TYP)
1 (TYP)
1 (TYP)
46 6 6 6
SA
S11 S11.3 S12.1
STAIR
1F2501
SD
S12
S11 S11.3
2 3
TELECOM
1F1105
S1 S3S2
DP1FA
LP1FA
ATS-L-1FA
LDP1FA
LLP1FA
DS-L-1FA
DS-EM-1FA
S2.5S0.9
EMER ELEC. ROOM
1F1104
ELEC.
1F1103
ELEV
1F1102
STAIR
1F1101
EDP1FA
ATS-E-1FA
Pl ot
Da te:
th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
CONSTRUCTION DOCUMENTS -
URS | SMITHGROUP JOINT VENTURE
500 WEST JEFFERSON ST.
Suite 1600
LOUISVILLE, KY 40202
T 313.983.3600 F 313.983.3636 www.urscorp.com | www.smithgroupjjr.com
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management
B
A
C
D
E
F
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
TRUE NORTH
PROJECT NORTH
97 8654321 o n e si xt e e n th in c h o n e fo o t o n e th ir ty se c o n d th in c h o n e fo o t
PROJECT # 14576907/22200.000
OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT - CENTRAL REGION
3001 GREEN BAY ROAD
BUILDING 48
NORTH CHICAGO, IL 60064
T 224.610.3492
U.S. DEPARTMENT OF VETERANS AFFAIRS
B1 B2 B3
B4 B5 B6
C2 D2D1
KEY PLAN
C1
F
E
SHEET INDEX ID:
NON-SPRINKLERED
N1 N2
USACE LOUISVILLE DISTRICT
600 DR. MARTIN LUTHER KING PLACE
LOUISVILLE, KY 40202
PHONE: 502-315-6766
FAX: 502-315-6195
CONTRACTING DIVISION
OrientationSeal
CERTIFIED FINAL
Mark
2/2 3/2
1 7
:48 :39
A M
26FEB2021
EE201F
SOUTH PARKING LEVEL 1 POWER
PLAN
BJW GKS
LOUISVILLE, KENTUCKY
REPLACEMENT VA MEDICAL CENTER
VA Project No. 603-320 USACE P2 No. 453413
601.15.2.E2-EE201F-Phase A-ELECTRICAL
SCALE: 1/16" = 1'-0"1 LEVEL 1 POWER PLAN - PHASE A
SCALE: 1/4" = 1'-0"2 LEVEL 1 POWER PLAN - ENLARGED SE - PHASE A
SCALE: 1/4" = 1'-0"3 LEVEL 1 POWER PLAN - ENLARGED SW - PHASE A
SCALE: 1/4" = 1'-0"4 LEVEL 1 POWER PLAN - ENLARGED NW - PHASE A
SHEET NOTES
KEYNOTES
1 HORIZONTAL CONDUIT SLEEVE, TYPICAL FOR ALL PRECAST BEAMS.
REFER TO STRUCTURAL DRAWINGS FOR EXACT LOCATION.
2 PROVIDE TWO (2) 4" CONDUIT SLEEVES FOR FUTURE TELECOM
CONDUITS TO FLOOR BELOW.
3 PROVIDE FOUR (4) 4" CONDUIT SLEEVES FOR FUTURE POWER
CONDUITS TO FLOOR BELOW.
4 PROVIDE TWO (2) 4" CONDUITS FOR FUTURE PV FEEDER. PROVIDE
PULLWIRE. RISE CONDUITS TO LEVELS 5 PV EQUIPMENT AREA.
5 SUMP PUMP CONTROL PANEL BY DIVISION 22.
6 LOCATION OF FUTURE (PHASE B) 4" CORE DRILL SLEEVE THRU
FLOOR FOR LIGHTNING PROTECTION SYSTEM DOWN CONDUCTOR.
LIGHTNING PROTECTION SYSTEM SHALL BE INSTALLED IN PHASE B.
A ALL AREAS OF THE NORTH PARKING STRUCTURE, INCLUDING
ALL ENCLOSED ROOMS, ARE TO BE CONSIDERED "WET OR
DAMP" LOCATIONS PER SPECIFICATION 260533, PARAGRAPH 3.7.
PROVIDE RACEWAY AND INSTALLATION PER 260533,
PARAGRAPH 3.7.
PHA CERTIFIED FINAL 20NOV2020
AMENDMENT 0008 1 26FEB2021
W
2Q R
R
_P la ns _P ha se
A-
SD
SB
SA
S1 S3
S4
S4
S5
S5
S6
S6
S7
S7
S8
S8
S9
S9
S10
S10 S12S2
S11
EE202F
EE202F
EE202F
S2.5
S11.3
S0.9
S12.1
1 (TYP)
1 (TYP)
1 (TYP)
1 (TYP)
1 (TYP)
1 (TYP)
44 4 4
SA
S11
STAIR
2F2501
S11.3 S12.1
SD
S12
ELEC.
2F1104
S11.3 S12.1
2 3
S1 S2
STAIR
2F1101
ELEV
LOBBY
2F1102
ELEC.
2F1103
S2.5S0.9
2 3
Pl ot
Da te:
th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
CONSTRUCTION DOCUMENTS -
URS | SMITHGROUP JOINT VENTURE
500 WEST JEFFERSON ST.
Suite 1600
LOUISVILLE, KY 40202
T 313.983.3600 F 313.983.3636 www.urscorp.com | www.smithgroupjjr.com
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management
B
A
C
D
E
F
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
TRUE NORTH
PROJECT NORTH
97 8654321 o n e si xt e e n th in c h o n e fo o t o n e th ir ty se c o n d th in c h o n e fo o t
PROJECT # 14576907/22200.000
OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT - CENTRAL REGION
3001 GREEN BAY ROAD
BUILDING 48
NORTH CHICAGO, IL 60064
T 224.610.3492
U.S. DEPARTMENT OF VETERANS AFFAIRS
B1 B2 B3
B4 B5 B6
C2 D2D1
KEY PLAN
C1
F
E
SHEET INDEX ID:
NON-SPRINKLERED
N1 N2
USACE LOUISVILLE DISTRICT
600 DR. MARTIN LUTHER KING PLACE
LOUISVILLE, KY 40202
PHONE: 502-315-6766
FAX: 502-315-6195
CONTRACTING DIVISION
OrientationSeal
CERTIFIED FINAL
Mark
2/2 3/2
1 7
:48 :44
A M
26FEB2021
EE202F
SOUTH PARKING LEVEL 2 POWER
PLAN
BJW GKS
LOUISVILLE, KENTUCKY
REPLACEMENT VA MEDICAL CENTER
VA Project No. 603-320 USACE P2 No. 453413
601.15.2.E2-EE202F-Phase A-ELECTRICAL
SCALE: 1/16" = 1'-0"1 LEVEL 2 POWER PLAN - PHASE A
SCALE: 1/4" = 1'-0"2 LEVEL 2 POWER PLAN - ENLARGED SE - PHASE A
SCALE: 1/4" = 1'-0"3 LEVEL 2 POWER PLAN - ENLARGED SW - PHASE A
SCALE: 1/4" = 1'-0"4 LEVEL 2 POWER PLAN - ENLARGED NW - PHASE A
SHEET NOTES
KEYNOTES
1 HORIZONTAL CONDUIT SLEEVE, TYPICAL FOR ALL PRECAST
BEAMS. REFER TO STRUCTURAL DRAWINGS FOR EXACT
LOCATION.
2 PROVIDE TWO (2) 4" CONDUIT SLEEVES FOR FUTURE TELECOM
CONDUITS TO FLOOR BELOW.
3 PROVIDE FOUR (4) 4" CONDUIT SLEEVES FOR FUTURE POWER
CONDUITS TO FLOOR BELOW.
4 LOCATION OF FUTURE (PHASE B) 4" CORE DRILL SLEEVE THRU
FLOOR FOR LIGHTNING PROTECTION SYSTEM DOWN CONDUCTOR.
LIGHTNING PROTECTION SYSTEM SHALL BE INSTALLED IN PHASE
B.
5 PROVIDE TWO (2) 4" CONDUITS FOR FUTURE PV FEEDER. PROVIDE
PULLWIRE. RISE CONDUITS TO LEVELS 5 PV EQUIPMENT AREA.
A ALL AREAS OF THE NORTH PARKING STRUCTURE, INCLUDING
ALL ENCLOSED ROOMS, ARE TO BE CONSIDERED "WET OR
DAMP" LOCATIONS PER SPECIFICATION 260533, PARAGRAPH 3.7.
PROVIDE RACEWAY AND INSTALLATION PER 260533,
PARAGRAPH 3.7.
PHA CERTIFIED FINAL 20NOV2020
AMENDMENT 0008 1 26FEB2021
W
2Q R
R
_P la ns _P ha se
A-
SD SD
SC SC
SB SB
SA
S1
S1
S3
S3
S4
S4
S5
S5
S6
S6
S7
S7
S8
S8
S9
S9
S10
S10
S12
S12
S2
S2 S11
S11
EE203F
EE203F
EE203F
S2.5
S11.3
S0.9
S12.1
1 (TYP)
1 (TYP)
1 (TYP)
1 (TYP)
1 (TYP)
1 (TYP)
5 5 5 5
SA
S11 S11.3 S12.1
STAIR
3F2501
SD
S12
S11.3 S12.1
2 3
ELEC.
3F2104
SD
S1 S2 S2.5S0.9
2 3
TELECOM
3F2103
ELEV
3F1102
STAIR
3F1101
Pl ot
Da te:
th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
CONSTRUCTION DOCUMENTS -
URS | SMITHGROUP JOINT VENTURE
500 WEST JEFFERSON ST.
Suite 1600
LOUISVILLE, KY 40202
T 313.983.3600 F 313.983.3636 www.urscorp.com | www.smithgroupjjr.com
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management
B
A
C
D
E
F
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
TRUE NORTH
PROJECT NORTH
97 8654321 o n e si xt e e n th in c h o n e fo o t o n e th ir ty se c o n d th in c h o n e fo o t
PROJECT # 14576907/22200.000
OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT - CENTRAL REGION
3001 GREEN BAY ROAD
BUILDING 48
NORTH CHICAGO, IL 60064
T 224.610.3492
U.S. DEPARTMENT OF VETERANS AFFAIRS
B1 B2 B3
B4 B5 B6
C2 D2D1
KEY PLAN
C1
F
E
SHEET INDEX ID:
NON-SPRINKLERED
N1 N2
USACE LOUISVILLE DISTRICT
600 DR. MARTIN LUTHER KING PLACE
LOUISVILLE, KY 40202
PHONE: 502-315-6766
FAX: 502-315-6195
CONTRACTING DIVISION
OrientationSeal
CERTIFIED FINAL
Mark
2/2 3/2
1 7
:48 :54
A M
26FEB2021
EE203F
SOUTH PARKING LEVEL 3 POWER
PLAN
BJW GKS
LOUISVILLE, KENTUCKY
REPLACEMENT VA MEDICAL CENTER
VA Project No. 603-320 USACE P2 No. 453413
601.15.2.E2-EE203F-Phase A-ELECTRICAL
SCALE: 1/16" = 1'-0"1 LEVEL 3 POWER PLAN - PHASE A
SCALE: 1/4" = 1'-0"2 LEVEL 3 POWER PLAN - ENLARGED SE - PHASE A
SCALE: 1/4" = 1'-0"3 LEVEL 3 POWER PLAN - ENLARGED SW - PHASE A
SCALE: 1/4" = 1'-0"4 LEVEL 3 POWER PLAN - ENLARGED NW - PHASE A
SHEET NOTES
KEYNOTES
1 HORIZONTAL CONDUIT SLEEVE, TYPICAL FOR ALL PRECAST
BEAMS. REFER TO STRUCTURAL DRAWINGS FOR EXACT
LOCATION.
2 PROVIDE TWO (2) 4" CONDUIT SLEEVES FOR FUTURE TELECOM
CONDUITS TO FLOOR BELOW.
3 PROVIDE FOUR (4) 4" CONDUIT SLEEVES FOR FUTURE POWER
CONDUITS TO FLOOR BELOW.
4 PROVIDE TWO (2) 4" CONDUITS FOR FUTURE PV FEEDER. PROVIDE
PULLWIRE. RISE CONDUITS TO LEVELS 5 PV EQUIPMENT AREA.
5 LOCATION OF FUTURE (PHASE B) 4" CORE DRILL SLEEVE THRU
FLOOR FOR LIGHTNING PROTECTION SYSTEM DOWN CONDUCTOR.
LIGHTNING PROTECTION SYSTEM SHALL BE INSTALLED IN PHASE
B.
PHA CERTIFIED FINAL 20NOV2020
AMENDMENT 0008 1 26FEB2021
A ALL AREAS OF THE NORTH PARKING STRUCTURE, INCLUDING
ALL ENCLOSED ROOMS, ARE TO BE CONSIDERED "WET OR
DAMP" LOCATIONS PER SPECIFICATION 260533, PARAGRAPH 3.7.
PROVIDE RACEWAY AND INSTALLATION PER 260533,
PARAGRAPH 3.7.
W
2Q R
R
_P la ns _P ha se
A-
SB
SA
S1 S3 S4 S5 S6 S7 S8 S9 S10 S12S2
S11
EE204F
EE204F
EE204F
ELEC.
4F1104
ELEC.
4F1103
ELEV
LOBBY
4F1102
STAIR
4F1101
S2.5
S11.3
S0.9
S12.1
1 (TYP)
1 (TYP)
1 (TYP)
1 (TYP)
1 (TYP)
1 (TYP)
5 5 5 5
SA
S11
STAIR
4F2501
S11.3 S12.1
SD
S12
ELEC.
4F1104
S11.3
2 3
SD
S1 S2
STAIR
4F1101
ELEV
LOBBY
4F1102
ELEC.
4F1103
LP4FA
LLP4FA
S2.5S0.9
2 3
Pl ot
Da te:
th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
CONSTRUCTION DOCUMENTS -
URS | SMITHGROUP JOINT VENTURE
500 WEST JEFFERSON ST.
Suite 1600
LOUISVILLE, KY 40202
T 313.983.3600 F 313.983.3636 www.urscorp.com | www.smithgroupjjr.com
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management
B
A
C
D
E
F
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
TRUE NORTH
PROJECT NORTH
97 8654321 o n e si xt e e n th in c h o n e fo o t o n e th ir ty se c o n d th in c h o n e fo o t
PROJECT # 14576907/22200.000
OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT - CENTRAL REGION
3001 GREEN BAY ROAD
BUILDING 48
NORTH CHICAGO, IL 60064
T 224.610.3492
U.S. DEPARTMENT OF VETERANS AFFAIRS
B1 B2 B3
B4 B5 B6
C2 D2D1
KEY PLAN
C1
F
E
SHEET INDEX ID:
NON-SPRINKLERED
N1 N2
USACE LOUISVILLE DISTRICT
600 DR. MARTIN LUTHER KING PLACE
LOUISVILLE, KY 40202
PHONE: 502-315-6766
FAX: 502-315-6195
CONTRACTING DIVISION
OrientationSeal
CERTIFIED FINAL
Mark
2/2 3/2
1 7
:49 :04
A M
26FEB2021
EE204F
SOUTH PARKING LEVEL 4 POWER
PLAN
BJW GKS
LOUISVILLE, KENTUCKY
REPLACEMENT VA MEDICAL CENTER
VA Project No. 603-320 USACE P2 No. 453413
601.15.2.E2-EE204F-Phase A-ELECTRICAL
SCALE: 1/16" = 1'-0"1 LEVEL 4 POWER PLAN - PHASE A
SCALE: 1/4" = 1'-0"2 LEVEL 4 POWER PLAN - ENLARGED SE - PHASE A
SCALE: 1/4" = 1'-0"3 LEVEL 4 POWER PLAN - ENLARGED SW - PHASE A
SCALE: 1/4" = 1'-0"4 LEVEL 4 POWER PLAN - ENLARGED NW - PHASE A
SHEET NOTES
KEYNOTES
1 HORIZONTAL CONDUIT SLEEVE, TYPICAL FOR ALL PRECAST
BEAMS. REFER TO STRUCTURAL DRAWINGS FOR EXACT
LOCATION.
2 PROVIDE TWO (2) 4" CONDUIT SLEEVES FOR FUTURE TELECOM
CONDUITS TO FLOOR BELOW.
3 PROVIDE FOUR (4) 4" CONDUIT SLEEVES FOR FUTURE POWER
CONDUITS TO FLOOR BELOW.
4 PROVIDE TWO (2) 4" CONDUITS FOR FUTURE PV FEEDER. PROVIDE
PULLWIRE. RISE CONDUITS TO LEVELS 5 PV EQUIPMENT AREA.
5 LOCATION OF FUTURE (PHASE B) 4" CORE DRILL SLEEVE THRU
FLOOR FOR LIGHTNING PROTECTION SYSTEM DOWN CONDUCTOR.
LIGHTNING PROTECTION SYSTEM SHALL BE INSTALLED IN PHASE
B.
PHA CERTIFIED FINAL 20NOV2020
AMENDMENT 0008 1 26FEB2021
A ALL AREAS OF THE NORTH PARKING STRUCTURE, INCLUDING
ALL ENCLOSED ROOMS, ARE TO BE CONSIDERED "WET OR
DAMP" LOCATIONS PER SPECIFICATION 260533, PARAGRAPH 3.7.
PROVIDE RACEWAY AND INSTALLATION PER 260533,
PARAGRAPH 3.7.
W
2Q R
R
_P la ns _P ha se
A-
SB
SA
S1 S3 S4 S5 S6 S7 S8 S9 S10 S12S2
S11
EE205F
EE205F
EE205F
EE205F
S2.5
S11.3
S0.9
S12.1
1 (TYP)
(TYP)
1 (TYP)
1 (TYP)
1 (TYP)
1 (TYP)
4 4 4 4
SA
S11
STAIR
5F2501
S11.3 S12.1
SD
S12
ELEC.
5F1104
S11.3
2 3
SD
S1 S2
STAIR
5F1101
ELEV
LOBBY
5F1102
ELEC.
5F1103
S2.5S0.9
SOLAR EQ. ROOM
5F1105
S0.9
Pl ot
Da te:
th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
CONSTRUCTION DOCUMENTS -
URS | SMITHGROUP JOINT VENTURE
500 WEST JEFFERSON ST.
Suite 1600
LOUISVILLE, KY 40202
T 313.983.3600 F 313.983.3636 www.urscorp.com | www.smithgroupjjr.com
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management
B
A
C
D
E
F
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
TRUE NORTH
PROJECT NORTH
97 8654321 o n e si xt e e n th in c h o n e fo o t o n e th ir ty se c o n d th in c h o n e fo o t
PROJECT # 14576907/22200.000
OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT - CENTRAL REGION
3001 GREEN BAY ROAD
BUILDING 48
NORTH CHICAGO, IL 60064
T 224.610.3492
U.S. DEPARTMENT OF VETERANS AFFAIRS
B1 B2 B3
B4 B5 B6
C2 D2D1
KEY PLAN
C1
F
E
SHEET INDEX ID:
NON-SPRINKLERED
N1 N2
USACE LOUISVILLE DISTRICT
600 DR. MARTIN LUTHER KING PLACE
LOUISVILLE, KY 40202
PHONE: 502-315-6766
FAX: 502-315-6195
CONTRACTING DIVISION
OrientationSeal
CERTIFIED FINAL
Mark
2/2 3/2
1 7
:49 :14
A M
26FEB2021
EE205F
SOUTH PARKING LEVEL 5 POWER
PLAN
BJW GKS
LOUISVILLE, KENTUCKY
REPLACEMENT VA MEDICAL CENTER
VA Project No. 603-320 USACE P2 No. 453413
601.15.2.E2-EE205F-Phase A-ELECTRICAL
SCALE: 1/16" = 1'-0"1 LEVEL 5 POWER PLAN - PHASE A
SCALE: 1/4" = 1'-0"2 LEVEL 5 POWER PLAN - ENLARGED SE - PHASE A
SCALE: 1/4" = 1'-0"3 LEVEL 5 POWER PLAN - ENLARGED SW - PHASE A
SCALE: 1/4" = 1'-0"5 LEVEL 5 POWER PLAN - ENLARGED NW - PHASE A
SCALE: 1/4" = 1'-0"4 LEVEL 5 POWER PLAN - ENLARGED NE - PHASE A
SHEET NOTES
KEYNOTES
1 HORIZONTAL CONDUIT SLEEVE, TYPICAL FOR ALL PRECAST
BEAMS. REFER TO STRUCTURAL DRAWINGS FOR EXACT
LOCATION.
2 PROVIDE TWO (2) 4" CONDUIT SLEEVES FOR FUTURE TELECOM
CONDUITS TO FLOOR BELOW.
3 PROVIDE FOUR (4) 4" CONDUIT SLEEVES FOR FUTURE POWER
CONDUITS TO FLOOR BELOW.
4 LOCATION OF FUTURE (PHASE B) 4" CORE DRILL SLEEVE THRU
FLOOR FOR LIGHTNING PROTECTION SYSTEM DOWN CONDUCTOR.
LIGHTNING PROTECTION SYSTEM SHALL BE INSTALLED IN PHASE
B.
5 PROVIDE TWO (2) 4" CONDUITS FOR FUTURE PV FEEDER. PROVIDE
PULLWIRE. RISE CONDUITS TO LEVELS 5 PV EQUIPMENT AREA.
PHA CERTIFIED FINAL 20NOV2020
AMENDMENT 0008 1 26FEB2021
A ALL AREAS OF THE NORTH PARKING STRUCTURE, INCLUDING
ALL ENCLOSED ROOMS, ARE TO BE CONSIDERED "WET OR
DAMP" LOCATIONS PER SPECIFICATION 260533, PARAGRAPH 3.7.
PROVIDE RACEWAY AND INSTALLATION PER 260533,
PARAGRAPH 3.7.
W
2Q R
R
_P la ns _P ha se
A-
SB
SA
S1 S3 S4 S5 S6 S7 S8 S9 S10 S12S2
S11
EE206F
EE401F
PHASE B
PV PANEL
(TYP.)
S2.5
S11.3
S0.9
S12.1
S1 S2
Space 3F1105
Space 3F1103
S2.5S0.9
Pl ot
Da te:
th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
CONSTRUCTION DOCUMENTS -
URS | SMITHGROUP JOINT VENTURE
500 WEST JEFFERSON ST.
Suite 1600
LOUISVILLE, KY 40202
T 313.983.3600 F 313.983.3636 www.urscorp.com | www.smithgroupjjr.com
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Drawing Number
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of Facilities
Management
B
A
C
D
E
F
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
TRUE NORTH
PROJECT NORTH
97 8654321 o n e si xt e e n th in c h o n e fo o t o n e th ir ty se c o n d th in c h o n e fo o t
PROJECT # 14576907/22200.000
OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT - CENTRAL REGION
3001 GREEN BAY ROAD
BUILDING 48
NORTH CHICAGO, IL 60064
T 224.610.3492
U.S. DEPARTMENT OF VETERANS AFFAIRS
B1 B2 B3
B4 B5 B6
C2 D2D1
KEY PLAN
C1
F
E
SHEET INDEX ID:
NON-SPRINKLERED
N1 N2
USACE LOUISVILLE DISTRICT
600 DR. MARTIN LUTHER KING PLACE
LOUISVILLE, KY 40202
PHONE: 502-315-6766
FAX: 502-315-6195
CONTRACTING DIVISION
OrientationSeal
CERTIFIED FINAL
Mark
2/2 3/2
1 7
:49 :23
A M
26FEB2021
EE206F
SOUTH PARKING LEVEL 6 POWER
PLAN
BJW GKS
LOUISVILLE, KENTUCKY
REPLACEMENT VA MEDICAL CENTER
VA Project No. 603-320 USACE P2 No. 453413
601.15.2.E2-EE206F-Phase A-ELECTRICAL
SCALE: 1/16" = 1'-0"1 LEVEL 6 POWER PLAN - PHASE A
SCALE: 1/4" = 1'-0"4 LEVEL 6 POWER PLAN - ENLARGED NW - PHASE A
SHEET NOTES
KEYNOTES
1 LOCATION OF FUTURE (PHASE B) 4" CORE DRILL SLEEVE THRU
FLOOR FOR LIGHTNING PROTECTION SYSTEM DOWN CONDUCTOR.
LIGHTNING PROTECTION SYSTEM SHALL BE INSTALLED IN PHASE
B.
PHA CERTIFIED FINAL 20NOV2020
AMENDMENT 0008 1 26FEB2021
A ALL AREAS OF THE NORTH PARKING STRUCTURE, INCLUDING
ALL ENCLOSED ROOMS, ARE TO BE CONSIDERED "WET OR
DAMP" LOCATIONS PER SPECIFICATION 260533, PARAGRAPH 3.7.
PROVIDE RACEWAY AND INSTALLATION PER 260533,
PARAGRAPH 3.7.
W
2Q R
R
_P la ns _P ha se
A-
| Amendment 0008 - Phase A Drawings |
| Phase A - Volume 10 |
| CS101 -EROSION PREVENTION AND SEDIMENT CONTROL PLAN -POST PHASE A |
| CU235 -OUTLET CONTROL STRUCTURE DETAILS |
| Phase A Volume 60 |
| EE200F -SOUTH PARKING GROUND LEVEL POWER PLAN |
| EE201F -SOUTH PARKING LEVEL 1 POWER PLAN |
| EE202F -SOUTH PARKING LEVEL 2 POWER PLAN |
| EE203F -SOUTH PARKING LEVEL 3 POWER PLAN |
| EE204F -SOUTH PARKING LEVEL 4 POWER PLAN |
| EE205F -SOUTH PARKING LEVEL 5 POWER PLAN |
| EE206F -SOUTH PARKING LEVEL 6 POWER PLAN |