EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
30-105-04 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
J
PAGE OF PAGES
1 3
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
14-Jun-2019
4. REQUISITION/PURCHASE REQ. NO.
F9E7CE43134A002
5. PROJECT NO.(Ifapplicable)
6. ISSUED BY CODE W912PQ 7. ADMINISTERED BY (Ifother than item 6) CODE
106 NEW YORK AIR NATIONAL GUARD
106 MSG/MSC - WAWF W912PQ
150 RIVERHEAD ROAD
WESTHAMPTON BEACH NY 11978-1201
See Item 6
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.
W912PQ19R9000
X 9B. DATED (SEE ITEM 11)
30-Apr-2019
10A. MOD. OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt ofthis amendment prior to the hour and date specified in the solicitation or as amended by one ofthe following methods:
(a) By completing Items 8 and 15, and returning 1 copies ofthe amendment; (b) By acknowledging receipt ofthis amendment on each copy ofthe offer submitted;
or (c) By separate letter or telegramwhich includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. Ifby virtue ofthis amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegramor letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT S/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
A. This amendment is issued to correct the quantity of CLIN 0006, provide Request for Information 127 to 132, and adding Aluminum Standing Seam Roofing specifications.
B. All FAR provisions and clauses remain unchanged and in full force.
C. As in all of the amendments this amendment must be acknow ledged, see Block 11 above.
Except as provided herein, all terms and conditions ofthe document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
TEL: EMAIL:
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
14-Jun-2019
W912PQ19R9000
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
REQUEST FOR INFORMATION127-132
Q127-Please refer to Section 23 82 00.00 20 Terminal Units Page 17. Under Factory Coating 2.8.1 Equipment and Components 2.8.1.1 asks for weather resistant coating, (rust inhibitor) for coils on HVAC equipment. Please clarify the factory weather resistant coatings if possible.
A127 –This response assumes Section 23 82 00.00 20 Terminal Units was referenced in error and the question should have referenced Section 23 82 02.00 10 Unitary Heating and Cooling Equipment. Units located outside of the buildings shall be provided with the factory provided weather resistant finish. EAL
Q128- Per NFPA285 requirement for exterior fire rated wall construction, we cannot install rigid insulation behind the composite panels, since composite panels are not rated as brick veneer, please advise if we have to use mineral wool insulation (ROXUL Cavityrock) behind composite panels.
A128 – Mineral wool insulation is not required. Use rigid insulation as shown. For the exterior wall systems use 5/8” type x gypsum wall board on the interior side and 5/8” type x sheathing exterior grade.
Q129. The standing seam roof spec calls for 24 gauge Kynar steel for the roof panels, which is typically open to oxidation if within 2 miles or closer to sea water. Please advise if this acceptable or should we upgrade to 040 aluminum with same finish instead.
A129 – Provide roofing system for the high roof per specification section 07 61 15.00 20 Aluminum Standing Seam Roofing attached.
Q130- Answer to Q15 is not clear, please advise what’s the ANG seal material is.
A130 – ANG seal to be a chemically etched metal plaque, 60 inches in diameter made of 0.250 inch thick stainless steel alloy 316.
Q131- Amendment 0003 came with a complete revised specifications, and it’s hard to go thru the whole specification book to find all the changes for all divisions and the time of extension, please identify all changes made to the specification in this revision.
A131 – The Specifications in Rev2 volumes that were modified are:
10 11 00 09 64 23.13 10 26 00 33 71 02 11 81 29
Q132- Specs section 09 30 10 calls for Epoxy Resin Grout, however, plans call for the grout to be cement based (LATICRETE PERMACOLOR), please advise what’s the intended use of the epoxy grout.
A132 – Use epoxy grout as specified. The one shown on the drawings is for color selection only.
W912PQ19R9000
SECTION 00010 - SOLICITATION CONTRACT FORM
CLIN 0006
The pricing detail quantity has increased by 1.00 from 0.00 to 1.00.
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for CLIN 0006 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 11-SEP-2019 TO
11-JAN-2021
N/A FA6325 - 106 CES
SMSGT JAMES NIZZA (631) 723-7330
150 RIVERHEAD ROAD
BLDG. 250, BASE SUPPLY RECEIVING
FRANCIS S. GABRESKI AIRPORT (ANG)
WESTHAMPTON BEACH NY 11978-1201
631-723-7440 FOB: Destination
FA6325
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 11-SEP-2019 TO
11-JAN-2021
N/A FA6325 - 106 CES
SMSGT JAMES NIZZA (631) 723-7330
150 RIVERHEAD ROAD
BLDG. 250, BASE SUPPLY RECEIVING
FRANCIS S. GABRESKI AIRPORT (ANG)
WESTHAMPTON BEACH NY 11978-1201
631-723-7440 FOB: Destination
FA6325
(End of Summary of Changes)