Commissioning_Specifications.pdf

PDF 266 KB Posted

Attached to
Construct Security Forces & Communications Training Facility Federal contract opportunity
Solicitation number
W912PQ19R9000
Issued by
Department of the Army New York Army National Guard

About this file

Commissioning Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Construct Security Forces & Communications Training Facility, newest first.
File Type Posted
W912PQ19R9000_0006.pdf PDF
Aluminum_Standing_Seam_Roofing_Specification.pdf PDF
W912PQ19R9000_0005.pdf PDF
Electric_Traction_Passenger_Elevators_Specifications.pdf PDF
W912PQ19R9000_0004.pdf PDF
Revised_Specs_Vol_2.pdf PDF
Geotechnical_Engineering_Report.pdf PDF
W912PQ19R9000_0003.pdf PDF
LoadBank_Connection_Switch_Cabinet_Specification.pdf PDF
Sheet_C-504_dated_05_29_2019.pdf PDF
Revised_Specs_Vol_1.pdf PDF
W912PQ19R9000_0002.pdf PDF
Attendance_Sheet.pdf PDF
Pre-Proposal_Slides_SF_&_Comm_Bldg.pdf PDF
W912PQ19R9000_0001.pdf PDF
W912PQ19R9000.pdf PDF
Combined_Drawing_Set_-_Issue_For_Construction.pdf PDF
EXHIBIT_D.pdf PDF
EXHIBIT_B.pdf PDF
EXHIBIT_C.pdf PDF
1170188_Volume_2_Specs.pdf PDF
1170188_Volume_1_Rev_1.pdf PDF
EXHIBIT_A.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repl ace Secur i t y For ces and Communi cat i ons Tr ai ni ng Faci l i t y WKVB109058

SECTI ON 01 91 13

COMMISSIONING

06/19

PART 1 GENERAL

1. 1 GENERAL PROVI SI ONS

At t ent i on i s di r ect ed t o t he CONTRACT AND GENERAL CONDI TI ONS and al l Sect i ons wi t hi n DI VI SI ON 01 - GENERAL REQUI REMENTS, whi ch ar e her eby made a par t of t hi s Sect i on of t he Speci f i cat i ons.

1. 2 DESCRI PTI ON OF WORK

a. Commi ssi oni ng: Commi ssi oni ng i s a pl anned, col l abor at i ve pr ocess of wi t nessi ng and t est i ng t hat conf i r ms t hat a new bui l di ng and i t s syst ems meet t he Owner ' s Pr oj ect Requi r ement s ( OPR) and t he pr oj ect ' s Basi s of Desi gn ( BOD) . The OPR i s a wr i t t en document t hat det ai l s t he i deas, concept s and cr i t er i a t hat ar e def i ned by t he owner t o be i mpor t ant t o t he success of t he pr oj ect . The BOD i ncl udes desi gn i nf or mat i on necessar y t o accompl i sh t he OPR, i ncl udi ng syst em descr i pt i ons, i ndoor envi r onment al qual i t y cr i t er i a, desi gn assumpt i ons, and r ef er ences t o appl i cabl e codes, s t andar ds, r egul at i ons and gui del i nes. Achi evement of t hese goal s begi ns i n t he Pr e- Desi gn phase, cont i nues t hr ough t he Desi gn, Const r uct i on and Accept ance Phases and concl udes i n t he Post - Accept ance Phase wi t h act ual ver i f i cat i on of per f or mance. Commi ssi oni ng shal l encompass and coor di nat e t he t r adi t i onal l y separ at e f unct i ons of syst em document at i on, equi pment st ar t up, cont r ol syst em cal i br at i on, t est i ng and bal anci ng, and per f or mance t est i ng. The commi ssi oni ng pr ocess wi l l be di r ect ed by an i ndependent , t hi r d- par t y Commi ssi oni ng Aut hor i t y ( CA) whose ser vi ces wi l l be pr ovi ded by Pond and Company.

1. I n t he Desi gn Phase t he Commi ssi oni ng Aut hor i t y shal l compl et e t he f ol l owi ng t asks:

a. Wr i t e commi ssi oni ng speci f i cat i ons t hat def i ne cont r act or r esponsi bi l i t i es and pr ovi de sampl es of r equi r ed commi ssi oni ng document at i on ( based on t he most r ecent i ndust r y- accept ed f or mat ) t o t he Desi gner f or i nt egr at i on i nt o t he pr oj ect speci f i cat i ons.

b. Devel op t he Commi ssi oni ng Pl an, det ai l i ng commi ssi oni ng t eam or gani zat i on, schedul e, and document at i on r equi r ement s.

I ncl ude al l r el at ed t est i ng, ver i f i cat i on and qual i t y cont r ol procedures.

c. Revi ew t he desi gn cal cul at i ons and per f or mance cr i t er i a f or t he pr oj ect , i dent i f y i ng oper at i on and mai nt enance pr obl ems.

Pr ovi de wr i t t en comment s and a checkl i st of r equi r ed act i ons t o be compl et ed by t he Desi gner pr i or t o phase appr oval and r ecommend al t er nat i ves wher e appr opr i at e.

d. Check and conf i r m t hat t he BOD i ncl udes al l of t he el ement s def i ned i n t he OPR at t he end of t he Desi gn Phase.

2. I n t he Const r uct i on Phase t he Commi ssi oni ng Aut hor i t y shal l compl et e t he f ol l owi ng t asks:

SECTI ON 01 91 13 Page 1

a. Updat e t he Commi ssi oni ng Pl an t o r ef l ect any changes i n t he

BOD.

b. Est abl i sh t he schedul e f or al l commi ssi oni ng act i v i t i es.

Ensur e t hat commi ssi oni ng act i v i t i es do not i nt er f er e wi t h any phase of t he pr oj ect .

c . Coor di nat e t he commi ssi oni ng pr ocess wi t h t he Pr oj ect Team t hr ough pr oj ect pl anni ng and ei ght ( 8) schedul ed commi ssi oni ng meetings.

d. Revi ew t he dr af t pr ef unct i onal ( syst ems r eadi ness) checkl i st s f r om t he cont r act or s ut i l i z i ng f i nal const r uct i on document at i on and appr oved submi t t al s.

e. Obser ve and document syst em ver i f i cat i on checks.

f . Devel op f unct i onal per f or mance t est s f or al l i n- scope equi pment . One submi ssi on wi l l be gi ven f or each commi ssi oned system.

g. Obser ve sel ect equi pment and syst em st ar t - ups. Revi ew sel ect equi pment and syst em st ar t - up r epor t s.

h. Revi ew cont r act or - compl et ed pr ef unct i onal ( syst ems r eadi ness) checkl i st s.

i . Revi ew TAB r epor t pr epar ed by TAB vendor f ol l owi ng syst em ai r and wat er bal anci ng.

j . Moni t or , di r ect , and document f unct i onal per f or mance t est s on al l bui l di ng syst ems i n col l abor at i on wi t h t he Pr oj ect Team.

k . Compi l e a compr ehensi ve commi ssi oni ng r epor t t hat i ncl udes al l commi ssi oni ng act i v i t i es and document at i on.

3. I n t he Post - Occupancy Phase t he Commi ssi oni ng Aut hor i t y shal l compl et e t he f ol l owi ng t asks:

a. Coor di nat e wi t h t he Pr oj ect Team t o ensur e t hat any r equi r ed " of f - season" t est s ar e compl et ed.

b. Ensur e t hat any r equi r ed changes ar e pr ovi ded as wr i t t en updat es i n t he pr oj ect document at i on.

4. The commi ssi oni ng pr ocess does not el i mi nat e or r educe t he r esponsi bi l i t y of t he syst em desi gner s and i nst al l i ng cont r act or s t o pr ovi de a f i ni shed and f ul l y f unct i oni ng pr oduct .

b. Commi ssi oni ng Aut hor i t y: The Commi ssi oni ng Aut hor i t y di r ect s and appr oves t he commi ssi oni ng wor k.

c. Responsi bi l i t y of Di sci pl i nes: The par t i es l i s t ed bel ow ar e par t of t he commi ssi oni ng t eam and wi l l be r equi r ed t o par t i c i pat e i n t he commi ssi oni ng pr ocess. The r esponsi bi l i t i es r el at i ve t o commi ssi oni ng f or each of t hese par t i es i s def i ned i n t hi s sect i on.

1. Desi gner

SECTI ON 01 91 13 Page 2

2. Engi neer

3. Owner

4. Commi ssi oni ng Aut hor i t y

5. Const r uct i on Manager

6. Mechani cal / El ect r i cal Coor di nat or

7. Test Techni c i an

8. Mechani cal Cont r act or

9. Pl umbi ng Cont r act or

10. Fi r e Pr ot ect i on Cont r act or

11. El ect r i cal Cont r act or

12. Cont r ol s Cont r act or

13. Test i ng, Adj ust i ng and Bal anci ng Cont r act or

14. Al l Tr ade and Non Tr ade Cont r act or s and equi pment suppl i er s/ manuf act ur er s t hat ar e associ at ed wi t h t he above disciplines.

d. Abbr evi at i ons:

1. The f ol l owi ng ar e common abbr evi at i ons used i n t he Speci f i cat i ons and i n t he commi ssi oni ng pr ocess. Def i ni t i ons ar e f ound i n Sect i on 1. 11.

A/ E- Desi gner and Desi gn Engi neer s EC- El ect r i cal Cont r act or CA- Commi ssi oni ng Aut hor i t y FM- Faci l i t y Manager CC- Cont r ol s Cont r act or FT- Funct i onal Per f or mance Test MC- Mechani cal Cont r act or CM- Const r uct i on Manager ( pr i me) PC- Pr ef unct i onal Checkl i st Subs- Tr ade/ Non- Tr ade Cont r act or s Cx- Commi ssi oni ng TAB- Test and Bal ance Cont r act or MEC Mechani cal / El ect r i cal Coor di nat or TT Test Techni c i an

1. 3 COORDINATION

a. Commi ssi oni ng Team. The member s of t he commi ssi oni ng t eam consi st of t he Commi ssi oni ng Aut hor i t y ( CA) , Faci l i t y Manager ( FM) , t he desi gnat ed r epr esent at i ve of t he Const r uct i on Manager ( CM) , t he Desi gner and desi gn engi neer s ( A/ E) , t he Mechani cal Cont r act or ( MC) , t he El ect r i cal Cont r act or ( EC) , t he TAB r epr esent at i ve, t he Cont r ol s Cont r act or ( CC) , Mechani cal / El ect r i cal Coor di nat or ( MEC) , Test Techni c i an ( TT) and any ot her i nst al l i ng Tr ade and Non Tr ade Cont r act or s or suppl i er s of equi pment . The Owner ' s bui l di ng or pl ant oper at or / engi neer i s al so a member of t he commi ssi oni ng t eam.

b. Management : The CA i s hi r ed by Pond and Company, di r ect s and coor di nat es al l commi ssi oni ng act i v i t i es and r epor t s t o t he Owner . Al l Pr oj ect Team member s wor k t oget her t o f ul f i l l t hei r cont r act ed r esponsi bi l i t i es and meet t he obj ect i ves of t he Cont r act Document s.

SECTI ON 01 91 13 Page 3

c. Schedul i ng: The CA wi l l wor k wi t h t he CM accor di ng t o est abl i shed pr ot ocol s t o schedul e commi ssi oni ng act i v i t i es. The CA wi l l pr ovi de suf f i c i ent not i ce t o t he CM and/ or MEC f or schedul i ng commi ssi oni ng act i v i t i es. The CM wi l l i nt egr at e al l commi ssi oni ng act i v i t i es i nt o t he mast er schedul e. Al l par t i es wi l l addr ess schedul i ng pr obl ems and make necessar y not i f i cat i ons i n a t i mel y manner i n or der t o expedi t e t he commi ssi oni ng pr ocess.

1. The CA wi l l pr ovi de t he i ni t i al schedul e of pr i mar y commi ssi oni ng event s at t he commi ssi oni ng scopi ng meet i ng. As const r uct i on pr ogr esses mor e det ai l ed schedul es ar e devel oped by t he CA and ar e i ncor por at ed i nt o t he pr oj ect schedul e by t he CM.

1. 4 COMMISSIONING PROCESS

Commi ssi oni ng Pr ocess. The f ol l owi ng nar r at i ve pr ovi des a br i ef over vi ew of t he t ypi cal commi ssi oni ng t asks dur i ng const r uct i on and t he gener al or der i n whi ch t hey occur .

1. Commi ssi oni ng dur i ng const r uct i on begi ns wi t h a scopi ng meet i ng conduct ed by t he CA wher ei n t he commi ssi oni ng pr ocess i s r evi ewed wi t h t he commi ssi oni ng t eam member s.

2. Addi t i onal meet i ngs schedul ed by t he CA wi l l be r equi r ed t hr oughout const r uct i on, t o pl an, scope, coor di nat e, and schedul e f ut ur e act i v i t i es and r esol ve pr obl ems.

3. Equi pment document at i on i s submi t t ed t o t he Engi neer dur i ng nor mal submi t t al s, i ncl udi ng det ai l ed st ar t - up pr ocedur es. The CA wi l l r evi ew and comment on appl i cabl e i t ems.

4. The Tr ade and Non Tr ade Cont r act or s devel op st ar t up pl ans and st ar t up document at i on f or mat s and pr ovi de t o t he CA. The CA uses t hi s i nf or mat i on t o suppl ement pr ef unct i onal checkl i st s t o be compl et ed, dur i ng t he st ar t up pr ocess.

5. The Tr ade and Non Tr ade Cont r act or s execut e and document t he pr ef unct i onal checkl i st s and per f or m st ar t up and i ni t i al checkout . The CA document s t hat t he checkl i st s and st ar t up wer e compl et ed accor di ng t o t he appr oved pl ans. Thi s may i ncl ude t he CA wi t nessi ng st ar t - up and pr ef unct i onal t est s of sel ect ed equipment.

6. The CA devel ops speci f i c equi pment and syst em Funct i onal Per f or mance Test pr ocedur es. The Tr ade and Non Tr ade Cont r act or s r evi ew t he pr ocedur es.

7. The pr ocedur es ar e execut ed by t he Tr ade and Non Tr ade Cont r act or s, and wi t nessed and document ed by t he CA. The Owner ' s FM i s al so i nvi t ed t o wi t ness t est i ng.

8. I t ems of non- compl i ance i n mat er i al , i nst al l at i on, or set up ar e cor r ect ed at t he Sub' s expense and t he syst em i n quest i on i s retested.

9. Def er r ed t est i ng i s conduct ed, as speci f i ed or r equi r ed.

SECTI ON 01 91 13 Page 4

1. 5 RELATED WORK

Al l of t he f ol l owi ng sect i ons appl y t o t he Wor k of t hi s sect i on. Thi s l i s t does not l i mi t t he wor k t hat may be r equi r ed by t he CM under addi t i onal speci f i cat i on sect i on f or t he compl et i on of t he Commi ssi oni ng pr ocess.

1. Di v i s i on 01 - GENERAL REQUI REMENTS

2. Di v i s i on 22 - PLUMBI NG

3. Di v i s i on 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG

4. Di v i s i on 25 - I NTEGRATED AUTOMATI ON

5. Di v i s i on 26 - ELECTRI CAL

1. 6 COMMI SSI ONI NG COMPLETI ON

a. Pr er equi s i t es t o f unct i onal compl et i on

1. Al l TAB wor k and commi ssi oni ng act i v i t i es must be compl et e pr i or t o Funct i onal Compl et i on, unl ess appr oved i n wr i t i ng by t he CA. Except i ons t o t hi s ar e t he pl anned cont r ol syst em t r ai ni ng per f or med af t er occupancy and any r equi r ed seasonal or appr oved def er r ed t est i ng. Thi s r equi r ement cover s al l syst ems, but i s not l i mi t ed t o:

a. Compl et ed and si gned st ar t - up and pr ef unct i onal checkl i st documentation

b. Request ed t r end l og dat a

c. Submi ssi on of f i nal appr oved TAB r epor t

d. Compl et i on of al l f unct i onal t est i ng

e. Al l i dent i f i ed def i c i enci es have been cor r ect ed or ar e appr oved by t he Pond and Company Pr oj ect Manager t o be except ed f r om t hi s mi l est one.

b. The CM wi l l det er mi ne t he dat e of Funct i onal Compl et i on af t er r evi ewi ng t he Commi ssi oni ng Agent ' s r ecommendat i on f or Funct i onal Completion.

c. Commi ssi oni ng act i v i t i es ar e non- compensabl e and cannot be a cause f or del ay c l ai ms.

1. 7 SYSTEMS TO BE COMMI SSI ONED

The f ol l owi ng syst ems wi l l be commi ssi oned i n t hi s pr oj ect . Test i ng r equi r ement s ar e par t of t hi s sect i on. Each member of t he commi ssi oni ng t eam shal l r evi ew al l t est pr ocedur es i n t hi s sect i on t o det er mi ne i f hi s/ her pr esence i s r equi r ed f or each t est ( f or exampl e, cer t ai n t est s of mechani cal equi pment may r equi r e t he suppor t of el ect r i cal per sonnel and vi ce ver sa) .

HVAC

o DDC Syst em

SECTI ON 01 91 13 Page 5 o Heat i ng Hot Wat er Syst em o Ai r Handl er Uni t s and Associ at ed Condenser Uni t s and Ret ur n Fans o Ter mi nal Uni t s o Mi scel l aneous Exhaust Fans o Spl i t Syst em DX Uni t s Plumbing o Domest i c Hot Wat er Syst em o Sump Pumps Electrical o Li ght i ng / Li ght i ng Cont r ol Syst em

1. 8 RESPONSIBILITIES

a. The r esponsi bi l i t i es of al l par t i es i n t he commi ssi oni ng pr ocess ar e pr ovi ded i n t hi s sect i on.

b. Al l Par t i es:

1. At t end commi ssi oni ng scopi ng meet i ng and addi t i onal meet i ngs, as necessar y.

c. Desi gner ( of A/ E) :

1. Const r uct i on Phase

a. At t end t he commi ssi oni ng scopi ng meet i ng and sel ect ed commi ssi oni ng t eam meet i ngs.

b. Per f or m nor mal submi t t al r evi ew, const r uct i on obser vat i on, as- bui l t dr awi ng pr epar at i on, et c. , as cont r act ed.

c. Pr ovi de any desi gn nar r at i ve document at i on r equest ed by t he CA.

d. Coor di nat e r esol ut i on of syst em def i c i enci es i dent i f i ed dur i ng commi ssi oni ng, accor di ng t o t he cont r act document s.

2. Post Const r uct i on Phase

a. Coor di nat e r esol ut i on of desi gn non- conf or mance and desi gn def i c i enci es i dent i f i ed dur i ng war r ant y- per i od commi ssi oni ng.

d. Desi gn Engi neer :

1. Const r uct i on Phase

a. Per f or m nor mal submi t t al r evi ew, const r uct i on obser vat i on, as- bui l t dr awi ng pr epar at i on, et c. , as cont r act ed. One si t e obser vat i on shoul d be compl et ed j ust pr i or t o syst em st ar t up.

b. Pr ovi de any desi gn nar r at i ve and sequences document at i on r equest ed by t he CA. The desi gner s shal l assi st ( al ong wi t h t he cont r act or s) i n c l ar i f y i ng t he oper at i on and cont r ol of commi ssi oned equi pment i n ar eas wher e t he speci f i cat i ons, cont r ol dr awi ngs or equi pment document at i on ar e not suf f i c i ent f or wr i t i ng det ai l ed t est i ng pr ocedur es.

c. Par t i c i pat e i n t he r esol ut i on of syst em def i c i enci es i dent i f i ed dur i ng commi ssi oni ng, accor di ng t o t he cont r act

SECTI ON 01 91 13 Page 6 documents.

e. Commi ssi oni ng Aut hor i t y ( CA) : The CA i s not r esponsi bl e f or desi gn concept , desi gn cr i t er i a, compl i ance wi t h codes, desi gn or gener al const r uct i on schedul i ng, cost est i mat i ng, or const r uct i on management .

The CA may assi st wi t h pr obl em- sol v i ng, non- conf or mance or t he r esol ut i on of def i c i enci es, but t he ul t i mat e r esponsi bi l i t y r esi des wi t h t he Const r uct i on Manager and t he A/ E. The pr i mar y r ol e of t he CA i s t o obser ve and document per f or mance and conf i r m t hat syst ems ar e f unct i oni ng i n accor dance wi t h t he Owner ' s Pr oj ect Requi r ement s ( OPR) , document ed desi gn i nt ent ( BOD) and t he Cont r act Document s. Cont r act or s wi l l pr ovi de al l t ool s and equi pment t o st ar t and f unct i onal l y t est bui l di ng equi pment and syst ems.

1. Const r uct i on Phase

a. Coor di nat e and di r ect t he commi ssi oni ng act i v i t i es i n a l ogi cal , sequent i al and ef f i c i ent manner usi ng consi st ent pr ot ocol s and f or ms, cent r al i zed document at i on, c l ear and r egul ar communi cat i ons and consul t at i ons wi t h al l necessar y par t i es, f r equent l y updat ed t i mel i nes and schedul es and t echni cal exper t i se.

b. Submi t commi ssi oni ng schedul e t o CM, MEC, TT, and A/ E t o ensur e t hat commi ssi oni ng act i v i t i es ar e bei ng schedul ed i nt o t he mast er schedul e.

c . Pl an and conduct a commi ssi oni ng scopi ng meet i ng and ot her commi ssi oni ng meet i ngs.

d. Request and r evi ew addi t i onal i nf or mat i on r equi r ed t o per f or m commi ssi oni ng t asks, i ncl udi ng cont r act or st ar t - up and checkout pr ocedur es.

e. Bef or e st ar t up r evi ew t he cur r ent cont r ol sequences and i nt er l ocks and wor k wi t h cont r act or s and desi gn engi neer s unt i l suf f i c i ent c l ar i t y has been obt ai ned, i n wr i t i ng, t o be abl e t o wr i t e det ai l ed t est i ng pr ocedur es.

f . Revi ew syst ems bei ng commi ssi oned f or compl i ance wi t h commi ssi oni ng needs, concur r ent wi t h t he A/ E r evi ews.

g. Per f or m si t e v i s i t s, as necessar y, t o obser ve component and syst em i nst al l at i ons. At t end sel ect ed pl anni ng and j ob- si t e meet i ngs t o obt ai n i nf or mat i on on const r uct i on pr ogr ess.

h. Ver i f y syst ems st ar t up by r evi ewi ng st ar t - up r epor t s and by sel ect ed s i t e obser vat i on.

i . Revi ew TAB execut i on pl an.

j . Ver i f y ai r and wat er syst ems bal anci ng by spot t est i ng, by r evi ewi ng compl et ed r epor t s and by sel ect ed s i t e obser vat i on.

k. Wi t h necessar y assi st ance and r evi ew f r om i nst al l i ng cont r act or s, wr i t e t he f unct i onal per f or mance t est pr ocedur es f or equi pment and syst ems. Thi s may i ncl ude ener gy management cont r ol syst em t r endi ng, st and- al one dat a l ogger moni t or i ng or manual f unct i onal t est i ng.

SECTI ON 01 91 13 Page 7 l . Anal yze any f unct i onal per f or mance t r end l ogs and moni t or i ng dat a t o ver i f y per f or mance.

m. Coor di nat e, wi t ness, and appr ove manual f unct i onal per f or mance t est s per f or med by i nst al l i ng cont r act or s. Coor di nat e r et est i ng as necessar y unt i l sat i sf act or y per f or mance i s achi eved.

n. Mai nt ai n a mast er def i c i ency and r esol ut i on l og and a separ at e t est i ng r ecor d. Pr ovi de t he CM, MEC, TT, and A/ E wi t h wr i t t en pr ogr ess r epor t s and t est r esul t s wi t h r ecommended act i ons.

o. Wi t ness per f or mance t est i ng of al l ot her owner cont r act ed t est s or t est s by manuf act ur er ' s per sonnel over whi ch t he CA may not have di r ect cont r ol ( a smoke cont r ol syst em, f or exampl e) .

Document t hese t est s.

p. Compi l e and mai nt ai n a commi ssi oni ng r ecor d.

q. Pr ovi de a f i nal commi ssi oni ng r epor t ( as descr i bed i n t hi s section).

r . Pr epar e a st andar d t r end l oggi ng package of pr i mar y par amet er s t hat wi l l pr ovi de t he oper at i ons st af f c l ear i ndi cat i ons of syst em f unct i on i n or der t o i dent i f y pr oper syst em oper at i on and t r oubl e shoot pr obl ems. The CA shal l al so pr ovi de any needed i nf or mat i on on i nt er pr et i ng t he t r ends.

2. Post Const r uct i on Phase

a. Coor di nat e and super vi se r equi r ed seasonal or def er r ed t est i ng and def i c i ency cor r ect i ons.

b. Ret ur n t o t he s i t e dur i ng t he opposi t e season f r om when f unct i onal t est i ng was per f or med ( appr oxi mat el y 6 mont hs i nt o t he Post Const r uct i on Phase) and r evi ew wi t h f aci l i t y st af f t he cur r ent bui l di ng oper at i on and t he condi t i on of out st andi ng i ssues r el at ed t o t he or i gi nal and seasonal commi ssi oni ng.

f . Const r uct i on Manager ( CM) , Mechani cal / El ect r i cal Coor di nat or ( MEC) , and or Test Techni c i an ( TT) :

1. Const r uct i on Phase

a. Faci l i t at e t he coor di nat i on of t he commi ssi oni ng wor k by t he CA. The CM, TT, and MEC wi l l ensur e t hat commi ssi oni ng act i v i t i es ar e bei ng ent er ed i nt o t he mast er schedul e.

b. At t end a commi ssi oni ng scopi ng meet i ng and ot her commi ssi oni ng t eam meet i ngs.

c. Per f or m t he nor mal r evi ew of Cont r act or submi t t al s and compl et ed commi ssi oni ng t est r esul t s.

d. When necessar y, obser ve and wi t ness pr ef unct i onal checkl i st s, st ar t up, and f unct i onal t est i ng of sel ect ed equi pment .

e. Revi ew commi ssi oni ng pr ogr ess and def i c i ency r epor t s.

f . Coor di nat e t he r esol ut i on of non- compl i ance and desi gn

SECTI ON 01 91 13 Page 8 def i c i enci es i dent i f i ed i n al l phases of commi ssi oni ng.

g. Ar r ange f or f aci l i t y oper at i ng and mai nt enance per sonnel t o at t end var i ous f i el d commi ssi oni ng act i v i t i es and f i el d training.

h. Pr epar e and submi t As- bui l t document at i on.

i . Pr ovi de wr i t t en not i ce f or t he compl et i on of t he commi ssi oni ng t est i ng.

2. Post Const r uct i on Phase

a. Assi st t he CA and User Agency as necessar y i n t he seasonal or def er r ed t est i ng and def i c i ency cor r ect i ons r equi r ed by t he specifications.

b. Ensur e t hat any seasonal or def er r ed t est i ng and any def i c i ency i ssues ar e addr essed.

g. Mechani cal , Cont r ol s, and TAB Cont r act or s: The commi ssi oni ng r esponsi bi l i t i es appl i cabl e t o each of t he mechani cal , cont r ol s, and TAB cont r act or s under 1. 05 RELATED WORK A. above i s as f ol l ows ( al l r ef er ences appl y t o commi ssi oned equi pment onl y) :

1. Const r uct i on Phases

a. At t end a commi ssi oni ng scopi ng meet i ng and ot her meet i ngs necessar y t o f ac i l i t at e t he Commi ssi oni ng pr ocess.

b. Tr ade and Non Tr ade Cont r act or s shal l pr ovi de t he CA wi t h nor mal cut sheet s and shop dr awi ng submi t t al s of commi ssi oned equipment.

c . Pr ovi de addi t i onal r equest ed document at i on t o t he CA f or devel opment of s t ar t - up and f unct i onal t est i ng pr ocedur es.

1) Typi cal l y t hi s document at i on wi l l c l ear l y i dent i f y det ai l ed manuf act ur er i nst al l at i on and st ar t - up, oper at i ng, t r oubl eshoot i ng and mai nt enance pr ocedur es. I t wi l l al so i ncl ude f ul l det ai l s of any owner - cont r act ed t est s, f an and pump cur ves, f ul l f act or y t est i ng r epor t s, i f any, and f ul l war r ant y i nf or mat i on, i ncl udi ng al l r esponsi bi l i t i es of t he Owner t o keep t he war r ant y i n f or ce.

I n addi t i on, t he i nst al l at i on, st ar t - up, and checkout mat er i al s t hat ar e shi pped wi t h t he equi pment and t he f i el d checkout sheet f or ms t o be used by t he f act or y or f i el d t echni c i ans shal l be submi t t ed t o t he Commi ssi oni ng Agent .

2) The Commi ssi oni ng Agent may r equest f ur t her document at i on necessar y f or t he commi ssi oni ng pr ocess.

3) Thi s dat a r equest may be made pr i or t o nor mal submi t t al s.

d. Pr ovi de a copy of t he submi t t al s of commi ssi oned equi pment , t hr ough nor mal channel s, t o t he CA and A/ E f or r evi ew and appr oval .

e. Tr ade and Non Tr ade Cont r act or s shal l assi st ( al ong wi t h t he desi gn engi neer s) i n c l ar i f y i ng t he oper at i on and cont r ol of

SECTI ON 01 91 13 Page 9 commi ssi oned equi pment i n ar eas wher e t he speci f i cat i ons, cont r ol dr awi ngs or equi pment document at i on i s not suf f i c i ent f or wr i t i ng det ai l ed t est i ng pr ocedur es.

f . Pr ovi de assi st ance t o t he CA i n pr epar i ng t he speci f i c f unct i onal per f or mance t est pr ocedur es. Subs shal l r evi ew t est pr ocedur es t o ensur e f easi bi l i t y , saf et y, and equi pment pr ot ect i on and pr ovi de necessar y wr i t t en al ar m l i mi t s t o be used dur i ng t he tests.

g. Devel op a f ul l s t ar t - up and i ni t i al checkout pl an usi ng manuf act ur er ' s st ar t - up pr ocedur es and t he pr ef unct i onal checkl i st s f r om t he CA f or al l commi ssi oned equi pment . Submi t t o CA and A/ E f or r evi ew and appr oval pr i or t o st ar t up.

h. Dur i ng t he st ar t up and i ni t i al checkout pr ocess, execut e t he mechani cal - r el at ed por t i ons of t he pr ef unct i onal checkl i st s f or al l commi ssi oned equi pment .

i . Per f or m and cl ear l y document al l compl et ed st ar t up and syst em oper at i onal checkout pr ocedur es, pr ovi di ng a copy t o t he CA and A/ E.

j . Addr ess cur r ent A/ E punch l i s t i t ems bef or e f unct i onal t est i ng. Ai r and wat er TAB shal l be compl et ed wi t h di scr epanci es and pr obl ems r emedi ed bef or e f unct i onal t est i ng of t he r espect i ve ai r - or wat er - r el at ed syst ems.

k. Pr ovi de ski l l ed t echni c i ans t o execut e st ar t i ng of equi pment and t o execut e t he f unct i onal per f or mance t est s. Ensur e t hat t hey ar e avai l abl e and pr esent dur i ng t he agr eed upon schedul es and f or suf f i c i ent dur at i on t o compl et e t he necessar y t est s, adj ust ment s and pr obl em sol v i ng.

l . Pr ovi de ski l l ed t echni c i ans t o per f or m f unct i onal per f or mance t est i ng under t he di r ect i on of t he CA f or speci f i ed equi pment . Assi st t he CA i n i nt er pr et i ng t he moni t or i ng dat a, as necessary.

m. Cor r ect def i c i enci es ( di f f er ences bet ween speci f i ed and obser ved per f or mance) as i nt er pr et ed by t he CA and A/ E and r et est t he equi pment .

n. Dur i ng const r uct i on, mai nt ai n as- bui l t dr awi ngs.

o. Pr ovi de t r ai ni ng of t he Owner ' s oper at i ng st af f usi ng exper t qual i f i ed per sonnel , as speci f i ed. Mai nt ai n s i gn- i n sheet s and pr ovi de copi es t o CA.

p. Coor di nat e wi t h equi pment manuf act ur er s t o det er mi ne speci f i c r equi r ement s t o mai nt ai n t he val i di t y of t he war r ant y.

2. Post Const r uct i on Phase

a. Execut e seasonal or def er r ed f unct i onal per f or mance t est i ng, wi t nessed by t he CA, accor di ng t o t he speci f i cat i ons.

b. Cor r ect def i c i enci es and make necessar y adj ust ment s t o as- bui l t dr awi ngs f or appl i cabl e i ssues i dent i f i ed i n any seasonal

SECTI ON 01 91 13 Page 10 testing.

h. Mechani cal Cont r act or : The r esponsi bi l i t i es of t he HVAC mechani cal cont r act or , dur i ng Const r uct i on Phases i n addi t i on t o t hose l i s t ed i n ( A) ar e:

1. Pr ovi de st ar t up f or al l HVAC equi pment , except f or t he bui l di ng aut omat i on cont r ol syst em.

2. Assi st and cooper at e wi t h t he TAB cont r act or and CA by:

a. Put t i ng al l HVAC equi pment and syst ems i nt o oper at i on and cont i nui ng t he oper at i on dur i ng each wor ki ng day of TAB and commi ssi oni ng, as r equi r ed.

b. I ncl udi ng cost of sheaves and bel t s t hat may be r equi r ed by TAB.

c. Pr ovi di ng t est hol es i n duct s and pl enums wher e di r ect ed by TAB t o al l ow ai r measur ement s and ai r bal anci ng. Pr ovi di ng an appr oved pl ug.

d. Pr ovi di ng t emper at ur e and pr essur e t aps accor di ng t o t he Const r uct i on Document s f or TAB and commi ssi oni ng t est i ng.

3. I nst al l a P/ T pl ug at each wat er sensor , whi ch i s an i nput poi nt t o t he cont r ol syst em.

4. Li st and c l ear l y i dent i f y on t he as- bui l t dr awi ngs t he l ocat i ons of al l ai r f l ow st at i ons.

5. Pr epar e a pr el i mi nar y schedul e f or Di v i s i on 15501 pi pe and duct syst em t est i ng, f l ushi ng, and cl eani ng, equi pment st ar t - up and TAB st ar t and compl et i on f or use by t he CA. Updat e t he schedul e as appropriate.

6. Not i f y t he CA 48 hour s pr i or t o pi pe and duct syst em t est i ng, f l ushi ng, c l eani ng, st ar t up of each pi ece of equi pment and TAB wi l l occur . Be r esponsi bl e t o not i f y t he CM and CA ahead of t i me, when commi ssi oni ng act i v i t i es not yet per f or med or not yet schedul ed wi l l del ay const r uct i on. Be pr oact i ve i n seei ng t hat commi ssi oni ng pr ocesses ar e execut ed and t hat t he CA has t he schedul i ng i nf or mat i on needed t o ef f i c i ent l y execut e t he commi ssi oni ng pr ocess.

i . Cont r ol s Cont r act or : The commi ssi oni ng r esponsi bi l i t i es of t he cont r ol s cont r act or , dur i ng Const r uct i on Phases i n addi t i on t o t hose l i s t ed i n ( A) ar e:

1. Sequences of Oper at i on Submi t t al s:

a. The Cont r ol s Cont r act or ' s submi t t al s of cont r ol dr awi ngs shal l i ncl ude compl et e det ai l ed sequences of oper at i on f or each pi ece of equi pment , r egar dl ess of t he compl et eness and cl ar i t y of t he sequences i n t he speci f i cat i ons. They shal l i ncl ude:

1) An over vi ew nar r at i ve of t he syst em ( 1 or 2 par agr aphs) gener al l y descr i bi ng i t s pur pose, component s, and f unct i on.

2) Al l i nt er act i ons and i nt er l ocks wi t h ot her syst ems.

SECTI ON 01 91 13 Page 11

3) Det ai l ed del i neat i on of cont r ol bet ween any packaged cont r ol s and t he bui l di ng aut omat i on syst em, l i s t i ng what poi nt s t he BAS moni t or s onl y and what BAS poi nt s ar e cont r ol poi nt s and ar e adj ust abl e.

4) Wr i t t en sequences of cont r ol f or packaged cont r ol l ed equi pment . ( Equi pment manuf act ur er s ' st ock sequences may be i ncl uded, but wi l l gener al l y r equi r e addi t i onal nar r at i ve) .

5) St ar t - up sequences.

6) War m- up mode sequences.

7) Nor mal oper at i ng mode sequences.

8) Unoccupi ed mode sequences.

9) Shut down sequences.

10) Capaci t y cont r ol sequences and equi pment st agi ng.

11) Temper at ur e and pr essur e cont r ol : set backs, set ups, r eset s, et c.

12) Det ai l ed sequences f or al l cont r ol st r at egi es, e. g. , economi zer cont r ol , opt i mum st ar t / st op, st agi ng, opt i mi zat i on, demand l i mi t i ng, et c.

13) Ef f ect s of power or equi pment f ai l ur e wi t h al l s t andby component f unct i ons.

14) Sequences f or al l al ar ms and emer gency shut downs.

15) Seasonal oper at i onal di f f er ences and r ecommendat i ons.

16) I ni t i al and r ecommended val ues f or al l adj ust abl e set t i ngs, set poi nt s and par amet er s t hat ar e t ypi cal l y set or adj ust ed by oper at i ng st af f ; and any ot her cont r ol set t i ngs or f i xed val ues, del ays, et c. t hat wi l l be usef ul dur i ng t est i ng and oper at i ng t he equi pment .

17) Schedul es, i f known.

18) To f aci l i t at e r ef er enci ng i n t est i ng pr ocedur es, al l sequences shal l be wr i t t en i n smal l st at ement s, each wi t h a number f or r ef er ence. For a gi ven syst em, number s wi l l not r epeat f or di f f er ent sequence sect i ons, unl ess t he sect i ons ar e number ed.

2. Cont r ol Dr awi ngs Submi t t al :

a. The cont r ol dr awi ngs shal l have a key t o al l abbr evi at i ons.

b. The cont r ol dr awi ngs shal l cont ai n gr aphi c schemat i c depi ct i ons of t he syst ems and each component .

c . The schemat i cs wi l l i nc l ude t he syst em and component l ayout of any equi pment t hat t he cont r ol syst em moni t or s, enabl es, or cont r ol s, even i f t he equi pment i s pr i mar i l y cont r ol l ed by

SECTI ON 01 91 13 Page 12 packaged or i nt egr al cont r ol s.

d. Pr ovi de a f ul l poi nt s l i s t wi t h at l east t he f ol l owi ng i ncl uded f or each poi nt :

1) Cont r ol l ed syst em

2) Poi nt abbr evi at i on

3) Poi nt descr i pt i on

4) Di spl ay uni t

5) Cont r ol poi nt or set poi nt ( Yes / No)

6) Moni t or i ng poi nt ( Yes / No)

7) I nt er medi at e poi nt ( Yes / No)

8) Cal cul at ed poi nt ( Yes / No)

e. Key:

f . Poi nt Descr i pt i on: DB t emp, ai r f l ow, et c.

g. Cont r ol or Set poi nt : Poi nt t hat cont r ol s equi pment and can have i t s set poi nt changed ( OSA, SAT, et c. )

h. I nt er medi at e Poi nt : Poi nt whose val ue i s used t o make a cal cul at i on whi ch t hen cont r ol s equi pment ( space t emper at ur es t hat ar e aver aged t o a v i r t ual poi nt t o cont r ol r eset ) .

i . Moni t or i ng Poi nt : Poi nt t hat does not cont r ol or cont r i but e t o t he cont r ol of equi pment , but i s used f or oper at i on, mai nt enance, or per f or mance ver i f i cat i on.

j . Cal cul at ed Poi nt : " Vi r t ual " poi nt gener at ed f r om cal cul at i ons of ot her poi nt val ues.

3. The Cont r ol s Cont r act or shal l keep t he CA and A/ E i nf or med of al l changes t o t hi s l i s t dur i ng pr ogr ammi ng and set up.

4. Assi st and cooper at e wi t h t he TAB cont r act or i n t he f ol l owi ng manner:

a. Meet wi t h t he TAB cont r act or pr i or t o begi nni ng TAB and r evi ew t he TAB pl an t o det er mi ne t he capabi l i t i es of t he cont r ol syst em t owar d compl et i ng TAB. Pr ovi de t he TAB any needed uni que i nst r ument s f or set t i ng t er mi nal uni t boxes and i nst r uct TAB i n t hei r use ( handhel d cont r ol syst em i nt er f ace f or use ar ound t he bui l di ng dur i ng TAB, et c. ) .

b. For a gi ven ar ea, have al l r equi r ed pr ef unct i onal checkl i st s, cal i br at i ons, st ar t up and sel ect ed f unct i onal t est s of t he syst em compl et ed and appr oved by t he CA pr i or t o TAB.

c. Pr ovi de a qual i f i ed t echni c i an t o oper at e t he cont r ol s t o assi st t he TAB cont r act or i n per f or mi ng TAB, or pr ovi de suf f i c i ent t r ai ni ng f or TAB t o oper at e t he syst em wi t hout assi st ance.

SECTI ON 01 91 13 Page 13

5. Assi st and cooper at e wi t h t he CA i n t he f ol l owi ng manner :

a. Usi ng a ski l l ed t echni c i an who i s f ami l i ar wi t h t hi s bui l di ng, execut e t he f unct i onal t est i ng of t he cont r ol s syst em as speci f i ed f or t he cont r ol s cont r act or . Assi st i n t he f unct i onal t est i ng of al l equi pment speci f i ed. Pr ovi de t wo- way r adi os dur i ng t he t est i ng.

b. Execut e al l cont r ol syst em t r end l ogs speci f i ed.

6. The cont r ol s cont r act or shal l pr epar e a wr i t t en pl an i ndi cat i ng i n a st ep- by- st ep manner , t he pr ocedur es t hat wi l l be f ol l owed t o t est , checkout and adj ust t he cont r ol syst em pr i or t o f unct i onal per f or mance t est i ng. At mi ni mum, t he pl an shal l i ncl ude f or each t ype of equi pment cont r ol l ed by t he aut omat i c controls:

a. Syst em name.

b. Li st of devi ces.

c. St ep- by- st ep pr ocedur es f or t est i ng each cont r ol l er af t er i nst al l at i on, i ncl udi ng:

1) Pr ocess of ver i f y i ng pr oper har dwar e and wi r i ng installation.

2) Pr ocess of downl oadi ng pr ogr ams t o l ocal cont r ol l er s and ver i f y i ng t hat t hey ar e addr essed cor r ect l y.

3) Pr ocess of per f or mi ng oper at i onal checks of each cont r ol l ed component .

4) Pl an and pr ocess f or cal i br at i ng val ve and damper act uat or s and al l sensor s.

5) A descr i pt i on of t he expect ed f i el d adj ust ment s f or t r ansmi t t er s, cont r ol l er s and cont r ol act uat or s shoul d cont r ol r esponses f al l out s i de of expect ed val ues.

d. A copy of t he l og and f i el d checkout sheet s t hat wi l l document t he pr ocess. Thi s l og must i ncl ude a pl ace f or i ni t i al and f i nal r ead val ues dur i ng cal i br at i on of each poi nt and cl ear l y i ndi cat e when a sensor or cont r ol l er has " passed" and i s oper at i ng wi t hi n t he cont r act par amet er s.

e. A descr i pt i on of t he i nst r ument at i on r equi r ed f or t est i ng.

f . I ndi cat e what t est s on what syst ems shoul d be compl et ed pr i or t o TAB usi ng t he cont r ol syst em f or TAB wor k. Coor di nat e wi t h t he CA and TAB cont r act or f or t hi s det er mi nat i on.

7. Pr ovi de a s i gned and dat ed cer t i f i cat i on t o t he CA and A/ E upon compl et i on of t he checkout of each cont r ol l ed devi ce, equi pment and syst em pr i or t o f unct i onal t est i ng f or each pi ece of equi pment or syst em, t hat al l syst em pr ogr ammi ng i s compl et e as t o al l r espect s of t he Cont r act Document s, except f unct i onal t est i ng requirements.

SECTI ON 01 91 13 Page 14

8. Beyond t he cont r ol poi nt s necessar y t o execut e al l document ed cont r ol sequences, pr ovi de moni t or i ng, cont r ol and v i r t ual poi nt s as r equest ed by t he CA t o demonst r at e syst em oper at i on.

9. Li st and c l ear l y i dent i f y on t he as- bui l t duct and pi pi ng dr awi ngs t he l ocat i ons of al l s t at i c and di f f er ent i al pr essur e sensor s ( ai r , wat er and bui l di ng pr essur e) .

J. TAB Cont r act or : The dut i es of t he TAB cont r act or , i n addi t i on t o t hose l i s t ed:

1. Si x weeks pr i or t o st ar t i ng TAB, submi t t o t he CA and A/ E t he qual i f i cat i ons of t he s i t e t echni c i an f or t he pr oj ect , i ncl udi ng t he name of t he cont r act or s and f aci l i t y manager s of r ecent pr oj ect s t he t echni c i an on whi ch was l ead.

2. Submi t t he out l i ne of t he TAB pl an and appr oach f or each syst em and component t o t he CA, A/ E, and t he cont r ol s cont r act or s i x weeks pr i or t o st ar t i ng t he TAB. Thi s pl an wi l l be devel oped af t er t he TAB has some f ami l i ar i t y wi t h t he cont r ol syst em.

3. The submi t t ed pl an wi l l i nc l ude:

a. Cer t i f i cat i on t hat t he TAB cont r act or has r evi ewed t he const r uct i on document s and t he syst ems wi t h t he desi gn engi neer s and cont r act or s t o suf f i c i ent l y under st and t he desi gn i nt ent f or each syst em.

b. An expl anat i on of t he i nt ended use of t he bui l di ng cont r ol syst em. The cont r ol s cont r act or wi l l comment on f easi bi l i t y of t he pl an.

c. Al l f i el d checkout sheet s and l ogs t o be used t hat l i s t each pi ece of equi pment t o be t est ed, adj ust ed and bal anced wi t h t he dat a cel l s t o be gat her ed f or each.

d. Di scussi on of what not at i ons and mar ki ngs wi l l be made on t he duct and pi pi ng dr awi ngs dur i ng t he pr ocess.

e. Fi nal t est r epor t f or ms t o be used.

f . Det ai l ed st ep- by- st ep pr ocedur es f or TAB wor k f or each syst em and i ssue: t er mi nal f l ow cal i br at i on ( f or each t er mi nal t ype) , di f f user pr opor t i oni ng, br anch / submai n pr opor t i oni ng, t ot al f l ow cal cul at i ons, r echecki ng, di ver si t y i ssues, expect ed pr obl ems and sol ut i ons, et c. Cr i t er i a f or usi ng ai r f l ow st r ai ght ener s or r el ocat i ng f l ow st at i ons and sensor s wi l l be di scussed. Pr ovi de t he anal ogous expl anat i ons f or t he wat er si de.

g. Li st of al l ai r f l ow, wat er f l ow, sound l evel , syst em capaci t y and ef f i c i ency measur ement s t o be per f or med and a descr i pt i on of speci f i c t est pr ocedur es, par amet er s, f or mul as t o be used.

h. Det ai l s of how t ot al f l ow wi l l be det er mi ned ( Ai r : sum of t er mi nal f l ows v i a BAS cal i br at ed r eadi ngs or v i a hood r eadi ngs of al l t er mi nal s, suppl y ( SA) and r et ur n ai r ( RA) pi t ot t r aver se, SA or RA f l ow st at i ons. Wat er : pump cur ves, c i r cui t set t er , f l ow st at i on, ul t r asoni c, et c. ) .

SECTI ON 01 91 13 Page 15 i . The i dent i f i cat i on and t ypes of measur ement i nst r ument s t o be used and t hei r most r ecent cal i br at i on dat e.

j . Speci f i c pr ocedur es t hat wi l l ensur e t hat bot h ai r and wat er s i de ar e oper at i ng at t he l owest possi bl e pr essur es and pr ovi de met hods t o ver i f y t hi s.

k . Conf i r mat i on t hat TAB under st ands t he out s i de ai r vent i l at i on cr i t er i a under al l condi t i ons.

l . Det ai l s of whet her and how mi ni mum out si de ai r cf m wi l l be ver i f i ed and set , and f or what l evel ( t ot al bui l di ng, zone, et c. ) .

m. Det ai l s of how bui l di ng st at i c and exhaust f an / r el i ef damper capaci t y wi l l be checked.

n. Pr oposed sel ect i on poi nt s f or sound measur ement s and sound measur ement met hods.

o. Det ai l s of met hods f or maki ng any speci f i ed coi l or ot her syst em pl ant capaci t y measur ement s.

p. Det ai l s of any TAB wor k t o be done i n phases ( by f l oor , et c. ) , or of ar eas t o be bui l t out l at er .

q. Det ai l s r egar di ng speci f i ed def er r ed or seasonal TAB wor k.

r . Det ai l s of any speci f i ed f al se l oadi ng of syst ems t o compl et e TAB wor k.

s . Det ai l s of al l exhaust f an bal anci ng and capaci t y ver i f i cat i ons, i ncl udi ng any r equi r ed r oom pr essur e di f f er ent i al s.

t . Det ai l s of any r equi r ed i nt er st i t i al cavi t y di f f er ent i al pr essur e measur ement s and cal cul at i ons.

u. Pl an f or hand- wr i t t en f i el d t echni c i an l ogs of di scr epanci es, def i c i ent or uncompl et ed wor k by ot her s, cont r act i nt er pr et at i on r equest s and l i s t s of compl et ed t est s ( scope and frequency).

v . Pl an f or f or mal pr ogr ess r epor t s ( scope and f r equency) .

w. Pl an f or f or mal def i c i ency r epor t s ( scope, f r equency and distribution).

4. A r unni ng l og of event s and i ssues shal l be kept by t he TAB f i el d t echni c i ans. Submi t hand- wr i t t en r epor t s of di scr epanci es, def i c i ent or uncompl et ed wor k by ot her s, cont r act i nt er pr et at i on r equest s and l i s t s of compl et ed t est s t o t he CA and CM at l east t wi ce a week.

5. Communi cat e i n wr i t i ng t o t he cont r ol s cont r act or al l set poi nt and par amet er changes made or pr obl ems and di scr epanci es i dent i f i ed dur i ng TAB whi ch af f ect t he cont r ol syst em set up and operation.

6. Pr ovi de a dr af t TAB r epor t wi t hi n t wo weeks of compl et i on. A

SECTI ON 01 91 13 Page 16 copy wi l l be pr ovi ded t o t he CA and A/ E. The r epor t wi l l cont ai n a f ul l expl anat i on of t he met hodol ogy, assumpt i ons and t he r esul t s i n a c l ear f or mat wi t h desi gnat i ons of al l uncommon abbr evi at i ons and col umn headi ngs. The r epor t shoul d f ol l ow t he l at est and most r i gor ous r epor t i ng r ecommendat i ons by AABC, NEBB or ASHRAE St andar d 111.

7. Pr ovi de t he CA and A/ E wi t h any r equest ed dat a, gat her ed, but not shown on t he dr af t r epor t s.

8. Pr ovi de a f i nal TAB r epor t f or t he CA and A/ E wi t h det ai l s , as i n t he dr af t .

9. Conduct f unct i onal per f or mance t est s and checks on t he or i gi nal TAB as speci f i ed.

K. El ect r i cal Cont r act or s: The commi ssi oni ng r esponsi bi l i t i es appl i cabl e t o t he el ect r i cal cont r act or ar e as f ol l ows ( al l r ef er ences appl y t o commi ssi oned equi pment onl y) :

1. Const r uct i on Phases

a. I ncl ude t he cost of commi ssi oni ng i n t he cont r act pr i ce, i f not yet l et .

b. I n each pur chase or der or subcont r act wr i t t en, i ncl ude r equi r ement s f or submi t t al dat a, and t r ai ni ng.

c. At t end a commi ssi oni ng scopi ng meet i ng and ot her necessar y meet i ngs schedul ed by t he CA t o f aci l i t at e t he Commi ssi oni ng process.

d. Cont r act or s shal l pr ovi de nor mal cut sheet s and shop dr awi ng submi t t al s t o t he CA of commi ssi oned equi pment .

e. Pr ovi de addi t i onal r equest ed document at i on t o t he CA f or devel opment of s t ar t - up and f unct i onal t est i ng pr ocedur es.

1) Typi cal l y t hi s wi l l i nc l ude det ai l ed manuf act ur er i nst al l at i on and st ar t - up, oper at i ng, t r oubl eshoot i ng and mai nt enance pr ocedur es, f ul l det ai l s of any owner - cont r act ed t est s, f an and pump cur ves, f ul l f act or y t est i ng r epor t s, i f any, and f ul l war r ant y i nf or mat i on, i ncl udi ng al l r esponsi bi l i t i es of t he Owner t o keep t he war r ant y i n f or ce c l ear l y i dent i f i ed. I n addi t i on, t he i nst al l at i on and checkout mat er i al s t hat ar e act ual l y shi pped i nsi de t he equi pment and t he act ual f i el d checkout sheet f or ms t o be used by t he f act or y or f i el d t echni c i ans shal l be submi t t ed t o t he Commi ssi oni ng Agent .

2) The Commi ssi oni ng Agent may r equest f ur t her document at i on necessar y f or t he commi ssi oni ng pr ocess.

3) Thi s dat a r equest may be made pr i or t o nor mal submi t t al s.

f . Tr ade and Non Tr ade Cont r act or s shal l assi st ( al ong wi t h t he desi gn engi neer s) i n c l ar i f y i ng t he oper at i on and cont r ol of commi ssi oned equi pment i n ar eas wher e t he speci f i cat i ons, cont r ol dr awi ngs or equi pment document at i on i s not suf f i c i ent f or wr i t i ng det ai l ed t est i ng pr ocedur es.

SECTI ON 01 91 13 Page 17

g. Pr ovi de assi st ance t o t he CA i n pr epar at i on of t he speci f i c f unct i onal per f or mance t est pr ocedur es. Subs shal l r evi ew t est pr ocedur es t o ensur e f easi bi l i t y , saf et y and equi pment pr ot ect i on and pr ovi de necessar y wr i t t en al ar m l i mi t s t o be used dur i ng t he t est s.

h. Devel op a f ul l s t ar t - up and i ni t i al checkout pl an usi ng manuf act ur er ' s st ar t - up pr ocedur es and t he pr ef unct i onal checkl i st s f r om t he CA. Submi t manuf act ur er ' s det ai l ed st ar t - up pr ocedur es and t he f ul l s t ar t - up pl an and pr ocedur es and ot her r equest ed equi pment document at i on t o CA f or r evi ew.

i . Dur i ng t he st ar t up and i ni t i al checkout pr ocess, execut e and document t he el ect r i cal - r el at ed por t i ons of t he pr ef unct i onal checkl i st s pr ovi ded by t he CA f or al l commi ssi oned equi pment .

j . Per f or m and cl ear l y document al l compl et ed st ar t up and syst em oper at i onal checkout pr ocedur es, pr ovi di ng a copy t o t he CA and A/ E.

k. Addr ess cur r ent A/ E punch l i s t i t ems bef or e f unct i onal t est i ng. Ai r and wat er TAB shal l be compl et ed wi t h di scr epanci es and pr obl ems r emedi ed bef or e f unct i onal t est i ng of t he r espect i ve ai r - or wat er - r el at ed syst ems.

l . Pr ovi de ski l l ed t echni c i ans t o execut e st ar t i ng of equi pment and t o execut e t he f unct i onal per f or mance t est s. Ensur e t hat t hey ar e avai l abl e and pr esent dur i ng t he agr eed upon schedul es and f or suf f i c i ent dur at i on t o compl et e t he necessar y t est s, adj ust ment s and pr obl em- sol v i ng.

m. Per f or m f unct i onal per f or mance t est i ng under t he di r ect i on of t he CA f or speci f i ed equi pment . Assi st t he CA i n i nt er pr et i ng t he moni t or i ng dat a, as necessar y.

n. Cor r ect def i c i enci es ( di f f er ences bet ween speci f i ed and obser ved per f or mance) as i nt er pr et ed by t he CA, and A/ E and r et est t he equi pment .

o. Dur i ng const r uct i on, mai nt ai n as- bui l t dr awi ngs and pr epar e f i nal as- bui l t dr awi ngs at pr oj ect compl et i on.

p. Pr ovi de t r ai ni ng of t he Owner ' s oper at i ng per sonnel as specified.

q. Coor di nat e wi t h equi pment manuf act ur er s t o det er mi ne speci f i c r equi r ement s t o mai nt ai n t he val i di t y of t he war r ant y.

2. Post Const r uct i on Phase

a. Execut e seasonal or def er r ed f unct i onal per f or mance t est i ng, wi t nessed by t he CA, accor di ng t o t he speci f i cat i ons.

b. Cor r ect def i c i enci es and make necessar y adj ust ment s t o as- bui l t dr awi ngs f or appl i cabl e i ssues i dent i f i ed i n any seasonal testing.

SECTI ON 01 91 13 Page 18

1. 9 TESTI NG REQUI REMENTS

Speci f i c f unct i onal t est i ng r equi r ement s ar e l i s t ed f or each syst em i n Par t 3 of t hi s sect i on. Fr om t hese r equi r ement s, t he Commi ssi oni ng Aut hor i t y ( CA) shal l devel op st ep- by- st ep pr ocedur es t o be execut ed by t he Subs as di r ect ed by t he Commi ssi oni ng Aut hor i t y. The t est r equi r ement s f or each pi ece of equi pment or syst em cont ai n t he f ol l owi ng:

1. The cont r act or s r esponsi bl e t o execut e t he t est s, under t he di r ect i on of t he CA.

2. A l i s t of t he i nt egr al component s bei ng t est ed.

3. Pr ef unct i onal checkl i st s associ at ed wi t h t he component s.

4. Funct i ons and modes t o be t est ed.

5. Requi r ed condi t i ons of t he t est f or each mode.

6. Speci al pr ocedur es.

7. Requi r ed met hods of t est i ng.

8. Requi r ed moni t or i ng.

9. Accept ance cr i t er i a.

10. Sampl i ng st r at egi es al l owed.

1. 10 TESTI NG PREREQUI SI TES

The f ol l owi ng appl i cabl e gener i c pr er equi s i t e checkl i st i t ems ar e r equi r ed t o be l i s t ed on each wr i t t en f unct i onal t est f or m and be compl et ed and checked of f by CA pr i or t o f unct i onal t est i ng.

1. Al l r el at ed equi pment has been st ar t ed up and st ar t - up r epor t s and pr ef unct i onal checkl i st s submi t t ed and appr oved r eady f or f unct i onal testing:

2. Al l cont r ol syst em f unct i ons f or t hi s and al l i nt er l ocki ng syst ems ar e pr ogr ammed and oper abl e per cont r act document s, i ncl udi ng f i nal set poi nt s and schedul es wi t h debuggi ng, l oop t uni ng and sensor cal i br at i ons compl et ed. Cont r ol s cont r act or t o s i gn and dat e when ready.

3. Test and bal ance ( TAB) compl et e and appr oved f or t he HVAC ai r and wat er syst ems.

4. Al l A/ E punch l i s t i t ems f or t hi s equi pment cor r ect ed.

5. These f unct i onal t est pr ocedur es r evi ewed and appr oved by i nst al l i ng cont r act or .

6. Saf et i es and oper at i ng r anges r evi ewed by t he CA.

7. Test r equi r ement s and sequences of oper at i on at t ached.

8. Schedul es and set…