Sheet_C-504_dated_05_29_2019.pdf
PDF 2 MB Posted
- Attached to
- Construct Security Forces & Communications Training Facility Federal contract opportunity
- Solicitation number
- W912PQ19R9000
About this file
Sheet C-504 dated 05/29/2019
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912PQ19R9000_0006.pdf | ||
| Aluminum_Standing_Seam_Roofing_Specification.pdf | ||
| Electric_Traction_Passenger_Elevators_Specifications.pdf | ||
| W912PQ19R9000_0005.pdf | ||
| Commissioning_Specifications.pdf | ||
| W912PQ19R9000_0004.pdf | ||
| Geotechnical_Engineering_Report.pdf | ||
| Revised_Specs_Vol_2.pdf | ||
| W912PQ19R9000_0003.pdf | ||
| LoadBank_Connection_Switch_Cabinet_Specification.pdf | ||
| Revised_Specs_Vol_1.pdf | ||
| W912PQ19R9000_0002.pdf | ||
| Attendance_Sheet.pdf | ||
| Pre-Proposal_Slides_SF_&_Comm_Bldg.pdf | ||
| W912PQ19R9000_0001.pdf | ||
| EXHIBIT_D.pdf | ||
| EXHIBIT_B.pdf | ||
| W912PQ19R9000.pdf | ||
| Combined_Drawing_Set_-_Issue_For_Construction.pdf | ||
| EXHIBIT_C.pdf | ||
| 1170188_Volume_2_Specs.pdf | ||
| 1170188_Volume_1_Rev_1.pdf | ||
| EXHIBIT_A.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J A
S
G E
K
T L
N
T L
N
C O
N S
T R
U C
T I O
N
D
E T
A I L
S
C-504
C r e v d w g
1 2 3 4 5
A
B
C
D
SHEET ID
P a r k w a y
L a n e
S u i t e
P e a c h t r e e
C o r n e r s
G
A
P h o n e
F a x
S I Z
E
A N
S I
D
F I L E
N
M
E
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
C T
O
F I
U N
B E
R
D A
T E
D E
S C
R I P
T I O
N M
A R
K
ISSUE FOR CONSTRUCTION
R E
P L A
S
C
U R
I T
Y
F
O R
C E
S
A
N D
C O
M M
U N
I C
A T
I O
N
T
R A
I N
I N
G
F
A C
I L I T
Y
W E
S T
H A
M P
T O
N
B
E A
C H
N
W
Y
O R
K
N E
W
Y
O R
K
A
I R
T
I O
N A
L
G
U A
R D
F R
A N
C E
S
S
G
A B
R E
S K
I
A
I R
P O
R T
N E
W
Y
O R
K
J O
B
N
O
P
O N
D
P r o j e c t
N u m b e r
O
T
S O
L X
X X
X
X X
X
W L D
D
X X
X
X
X X
X
F I
P
T
H
M
N
A T
I O
N A
L
G
U A
R D
B
U R
E A
U P
R O
J E
C T
S
N
Y A
G
G
B
R E
S K
I
R
E P
L A
S
F
F C
A D
B
I M
C
A D
C
R
E V
P
O
T T
E D
B
Y
N
O R
M A
N
T
A N
Y A
6"
A2
POROUS CONCRETE PAVEMENT
NO SCALE
NOTES:
1. INSTALL ONE OBSERVATION WELL IN THE BIORETENTION BASIN
(SEE DETAIL C-507).
2. THE OBSERVATION WELL IS TO CONSIST OF 6-INCH DIAMETER PVC
SCHEDULE 40 PIPE (ASTM STD. D 1784) WITH A CAP SET 6 INCHES
ABOVE GROUND LEVEL AND IS TO BE LOCATED NEAR THE
LONGITUDINAL CENTER OF THE BIORETENTION BASIN. THE PIPE
SHALL HAVE A PLASTIC COLLAR WITH RIBS TO PREVENT ROTATION
WHEN REMOVING CAP. THE SCREW TOP LID SHALL BE
A “PANELLA” TYPE CLEANOUT WITH A LOCKING MECHANISM OR
SPECIAL BOLT TO DISCOURAGE VANDALISM. A PERFORATED (1/2
INCH DIAMETER HOLES) PVC SCHEDULE 40 PIPE SHALL BE
PROVIDED AND PLACED VERTICALLY WITHIN THE BIORETENTION
SOIL MEDIA PORTION OF THE BASIN AND A CAP PROVIDED AT THE
BOTTOM OF THE PIPE. THE BOTTOM OF THE CAP SHALL REST ON
THE BIORETENTION BASIN BOTTOM.
B4
OBSERVATION WELL
NO SCALE
6" SCH 40 SOLID
PVC RISER PIPE
6" SCH 40
PERFORATED
PVC PIPE
3" SHREDDED
HARDWOOD
MULCH LAYER
FINISHED GRADE
CLEAN STONE
LAYER
SCREW TOP LID
PIPE SEAL GASKET
A5
CLEANOUT
NO SCALE
SEWER LINE
45° BEND
FINISHED
GRADE
UNLESS CLEANOUT IS IN
18"X18"X6" DEEP CONC. PAD
CONC. PAVEMENT
PLUG IF LINE DOES
NOT CONTINUE
DIRECTION
OF FLOW
C1
INFILTRATION BASIN
NO SCALE
MAINTENANCE NOTES
1. PAVEMENT SURFACES SHOULD BE SWEPT AND VACUUMED TO REDUCE SEDIMENT ACCUMULATION AND
ENSURE CONTINUED SURFACE POROSITY. SWEEPING SHOULD BE PERFORMED AT LEAST TWICE
ANNUALLY WITH A COMMERCIAL CLEANING UNIT. WASHING SYSTEMS AND COMPRESSED AIR UNITS
SHOULD NOT BE USED TO PERFORM SURFACE CLEANING.
2. DRAINAGE PIPES, INLETS, STONE EDGE DRAINS, AND OTHER STRUCTURES WITHIN OR DRAINING TO THE
SUBBASE SHOULD BE CLEANED OUT AT REGULAR INTERVALS.
3. TRUCKS AND OTHER HEAVY VEHICLES CAN GRIND DIRT AND GRIT INTO THE POROUS SURFACES, LEADING TO CLOGGING AND PREMATURE FAILURE. THESE VEHICLES SHOULD BE PREVENTED FROM
TRACKING AND SPILLING MATERIAL ONTO THE PAVEMENT.
4. DEICERS SHOULD BE USED IN MODERATION. WHEN USED, DEICERS SHOULD BE NON-TOXIC AND
ORGANIC AND CAN BE APPLIED EITHER AS CALCIUM MAGNESIUM ACETATE OR AS PRETREATED SALT.
SNOW PLOWING SHOULD BE DONE CAREFULLY WITH BLADES SET ONE-INCH HIGHER THAN NORMAL.
PLOWED SNOW PILES AND SNOWMELT SHOULD NOT BE DIRECTED TO PERMEABLE PAVEMENT.
5. TYPICAL MAINTENANCE ACTIVITIES FOR PERMEABLE PAVING ARE SUMMARIZED BELOW (TABLE 5.17).
CONSTRUCTION NOTES
1. INSTALLATION PROCEDURES ARE VITAL TO THE SUCCESS OF PERVIOUS
PAVEMENT PROJECTS, PARTICULARLY PERVIOUS ASPHALT AND
CONCRETE PAVEMENT MIXES. THE SUBGRADE CANNOT BE OVERLY
COMPACTED WITH THE INCLUSION OF FINE PARTICULATES OR THE VOID
RATIO CRITICAL TO PROVIDING STORAGE FOR LARGE STORM EVENTS
WILL BE LOST. WEATHER CONDITIONS AT THE TIME OF INSTALLATION CAN
AFFECT THE FINAL PRODUCT. EXTREMELY HIGH OR LOW TEMPERATURES
SHOULD BE AVOIDED DURING CONSTRUCTION OF PERVIOUS ASPHALT
AND CONCRETE PAVEMENTS.
2. AREAS FOR POROUS PAVEMENT SYSTEMS SHALL BE CLEARLY MARKED
BEFORE ANY SITE WORK BEGINS TO AVOID SOIL DISTURBANCE AND
COMPACTION DURING CONSTRUCTION.
3. POROUS PAVEMENT AND OTHER INFILTRATION PRACTICES SHOULD BE
INSTALLED TOWARD THE END OF THE CONSTRUCTION PERIOD. UPSTREAM
CONSTRUCTION SHALL BE COMPLETED AND STABILIZED BEFORE
CONNECTION TO POROUS PAVEMENT SYSTEM. A DENSE AND VIGOROUS
VEGETATIVE COVER SHALL BE ESTABLISHED OVER ANY CONTRIBUTING
PERVIOUS DRAINAGE AREAS BEFORE RUNOFF CAN BE ACCEPTED INTO
THE FACILITY.
4. SUBSURFACE AREA SHOULD BE EXCAVATED TO PROPOSED DEPTH.
EXISTING SUBGRADE SHALL NOT BE COMPACTED OR SUBJECT TO
EXCESSIVE CONSTRUCTION EQUIPMENT PRIOR TO PLACEMENT OF
GEOTEXTILE AND STONE BED. WHERE EROSION OF SUBGRADE HAS
CAUSED ACCUMULATION OF FINE MATERIALS AND/OR SURFACE PONDING,
THIS MATERIAL SHALL BE REMOVED WITH LIGHT EQUIPMENT AND THE
UNDERLYING SOILS SCARIFIED TO A MINIMUM DEPTH OF 6 INCHES WITH A
YORK RAKE OR EQUIVALENT AND LIGHT TRACTOR.
5. THE BOTTOM OF THE INFILTRATION BED SHALL BE AT A LEVEL GRADE.
6. PLACE GEOTEXTILE AND RECHARGE BED AGGREGATE IMMEDIATELY
AFTER APPROVAL OF SUBGRADE PREPARATION TO PREVENT
ACCUMULATION OF DEBRIS OR SEDIMENT. PREVENT RUNOFF AND
SEDIMENT FROM ENTERING THE STORAGE BED DURING THE PLACEMENT
OF THE GEOTEXTILE AND AGGREGATE BED.
7. PLACE GEOTEXTILE IN ACCORDANCE WITH MANUFACTURER’S STANDARDS
AND RECOMMENDATIONS. ADJACENT STRIPS OF FILTER FABRIC SHALL
OVERLAP A MINIMUM OF 16 INCHES. FABRIC SHALL BE SECURED AT LEAST
4 FEET OUTSIDE OF BED. THIS EDGE STRIP SHOULD REMAIN IN PLACE
UNTIL ALL BARE SOILS CONTIGUOUS TO BEDS ARE STABILIZED AND
VEGETATED.
8. AS THE SITE IS FULLY STABILIZED, EXCESS GEOTEXTILE CAN BE CUT BACK
TO THE EDGE OF THE BED.
9. INSTALL AGGREGATE COURSE IN LIFTS OF 6-8 INCHES. KEEP EQUIPMENT
MOVEMENT OVER STORAGE BED SUBGRADES TO A MINIMUM. INSTALL
AGGREGATE TO GRADES INDICATED ON THE DRAWINGS. THE MATERIALS
OF CONSTRUCTION SHOULD BE IN ACCORDANCE WITH SPECIFICATION 32
11 20 BASE COURSE FOR RIGID PERVIOUS PAVING.
GENERAL SPECIFICATIONS
1. SUBBASE AGGREGATES SHALL BE CLEAN AND FREE OF FINES. ALL AGGREGATES WITHIN INFILTRATION
STORAGE BEDS SHALL MEET THE FOLLOWING CRITERIA:
· MAXIMUM WASH LOSS OF 0.5%
· MINIMUM DURABILITY INDEX OF 35
· MAXIMUM ABRASION OF 10% FOR 100 REVOLUTIONS AND MAXIMUM OF 50% FOR 500 REVOLUTIONS
INSPECTIONS DURING CONSTRUCTION
1. REGULAR INSPECTIONS SHALL BE MADE DURING THE FOLLOWING STAGES OF CONSTRUCTION:
· DURING EXCAVATION TO SUBGRADE.
· DURING PLACEMENT AND BACKFILL OF ANY DRAINAGE OR DISTRIBUTION SYSTEM(S).
· DURING PLACEMENT OF THE CRUSHED STONE SUBBASE MATERIAL.
· DURING PLACEMENT OF THE SURFACE MATERIAL.
· UPON COMPLETION OF FINAL GRADING AND ESTABLISHMENT OF PERMANENT STABILIZATION.
3:1 SIDE
SLOPES (TYP)
4" TOPSOIL - SEED & MULCH
(SEE NOTE 2)
INSPECTION RISER
(SEE DETAIL THIS SHEET)
EXISTING NATIVE SOIL
WITH INFILTRATION
RATE > 5" PER HOUR
3'-0' MINIMUM
BEDROCK/GROUNDWATER
NOTES
1. BOTTOM OF INFILTRATION BASIN SHALL HAVE A MINIMUM SURFACE AREA OF 167 SF.
2. TOPSOIL SHALL BE HAVE EQUIVALENT INFILTRATION RATE AS EXISTING SOIL
(GREATER THAN 5" PER HOUR).
INFILTRATION BASINS NOTES AND SPECIFICATIONS
1. THE SEQUENCE OF VARIOUS PHASES OF BASIN CONSTRUCTION SHALL BE
COORDINATED WITH THE OVERALL PROJECT CONSTRUCTION SCHEDULE. THE
PARTIALLY EXCAVATED BASIN, CANNOT SERVE AS A SEDIMENTATION BASIN.
2. INITIAL BASIN EXCAVATION SHOULD BE CARRIED TO WITHIN 2 FEET OF THE FINAL
ELEVATION OF THE BASIN FLOOR. FINAL EXCAVATION TO THE FINISHED GRADE
SHOULD BE DEFERRED UNTIL ALL DISTURBED AREAS ON THE WATERSHED HAVE
BEEN STABILIZED OR PROTECTED. THE FINAL PHASE EXCAVATION SHOULD
REMOVE ALL ACCUMULATED SEDIMENT. RELATIVELY LIGHT TRACKED
EQUIPMENT IS RECOMMENDED FOR THIS OPERATION TO AVOID COMPACTION OF
THE BASIN FLOOR. AFTER THE FINAL GRADING IS COMPLETED, THE BASIN
SHOULD RETAIN A HIGHLY POROUS SURFACE TEXTURE.
3. INFILTRATION BASINS MAY BE LINED WITH A 6- TO 12-INCH LAYER OF FILTER
MATERIAL SUCH AS COARSE SAND (AASHTO STD. M-43, SIZES 9 OR 10) TO HELP
PREVENT THE BUILDUP OF IMPERVIOUS DEPOSITS ON THE SOIL SURFACE. THE
FILTER LAYER CAN BE REPLACED OR CLEANED WHEN IT BECOMES CLOGGED.
WHEN A 6-INCH LAYER OF COARSE ORGANIC MATERIAL IS SPECIFIED FOR
DISCING (SUCH AS HULLS, LEAVES, STEMS, ETC.) OR SPADING INTO THE BASIN
FLOOR TO INCREASE THE PERMEABILITY OF THE SOILS, THE BASIN FLOOR
SHOULD BE SOAKED OR INUNDATED FOR A BRIEF PERIOD, THEN ALLOWED TO
DRY SUBSEQUENT TO THIS OPERATION. THIS INDUCES THE ORGANIC MATERIAL
TO DECAY RAPIDLY, LOOSENING THE UPPER SOIL LAYER.
4. EROSION PROTECTION OF INFLOW POINTS TO THE BASIN SHALL ALSO BE
PROVIDED.
5. THE BASIN SIDE SLOPES AND FLOOR SHALL BE STABILIZED WITH VEGETATION.
SELECTION OF SUITABLE VEGETATIVE MATERIALS AND APPLICATION OF
REQUIRED LIME, FERTILIZER, ETC. SHALL BE DONE IN ACCORDANCE WITH THE
THE PERMANENT SEEDING REQUIREMENTS PROVIDED ON SHEETC-752, DETAIL
C4.
6. MOWING SHALL BE CONDUCTED AT LEAST TWICE A YEAR, ONCE IN JUNE AND
AGAIN IN SEPTEMBER.
2'-6"
INFILTRATION
BASIN BOTTOM
6" SCH 40 SOLID
PVC RISER PIPE
6"
THREADED CLEANOUT CAP
INSPECTION RISER
FILTER LAYER
6"
POROUS CONCRETE
SURFACE COURSE
COMPACTED SUBGRADE
SAND LAYER (ONSITE SATISFACTORY
SAND MATERIAL MAY BE USED)
FILTER BLANKET (3/8" DIA. PEA GRAVEL)
3"
8"
RESERVOIR COURSE
(CRUSHED STONE AASHTO NO. 3)
4"
12"
GEOTEXTILE FILTER FABRIC ON
SIDES OF EXCAVATION
INFILTRATION BASIN BOTTOM
(SEE NOTE 1)
A M
E N
D
| Sheets and Views |
| C-504 |
File details come from the government source that posted it.